The document provides a diagram of a power plant and its components. It includes raw water intake and treatment, a coal yard and crushing facilities, boilers that produce steam to drive a turbine generator, condenser cooling systems, ash handling processes, and electrical interconnections. The power plant has two 145 tonnes per hour boilers that generate steam to power a 67.5 megawatt generator.

Uploaded by

Harish Sharma
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
115 views

Powerplant

The document provides a diagram of a power plant and its components. It includes raw water intake and treatment, a coal yard and crushing facilities, boilers that produce steam to drive a turbine generator, condenser cooling systems, ash handling processes, and electrical interconnections. The power plant has two 145 tonnes per hour boilers that generate steam to power a 67.5 megawatt generator.

Uploaded by

Harish Sharma
Copyright
© © All Rights Reserved
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 1

HIRAKUD RESERVOIR

WATER BY GRAVITY
RAW WATER PIT
CLARIFLOCULATOR
CLARIFIED WATER
RESERVOIR
DEMINERALISATION WATER
PROCESS DM WATER PLANT
DM WATER STORAGE TANK
CONDENSER COOLING WATER OUTLET
CONDENSER COOLING WATER INLET
10.5 / 132 KV GENERATOR
TRANSFORMER
CCW PUMP
ASH MOUND
ASH SILO
BOILER FEED PUMP
COAL
YARD
COAL MINE
SECONDARY CRUSHER
FED COAL
CONVEYING
RAW WATER PUMP
MAIN STEAM
LIGHT DIESEL OIL
TANK
MAIN CONDENSATE
DEAERATOR
HOT
WELL
LOW PRESSURE
FEED HEATERS
CONDENSATE PUMP
CONDENSER
TURBINE
ST EAM
DRAM
FEED WAT ER T O ST EAM DRAM
STEAM TO CONV. ZONE
RISER PI PE
COMBERTI ON
CHAMBER
FEE DER
P IPE
OMAGA
SUP.
CYCL ONE E XPA NTI ON
B ELOW
D CC
L OOP SEAL
E XPA NTI ON
B ELOW
S UP. 3
S UP. 1
S UP. 2
EC O. C OI L
H AN GE R TUB E
CONV.
ZONE
MAI N STEAM L INE
GO TO T URBINE
S A F AN
P A F AN
ROOT BLOWER
AC
F AN
COMB .T OP
H EA DER
A SH
C OOLER
STA RT UP
B UR NER
S A AI R TOST UP B UR NER
P A AI R TONOZZI LES
C OMB. BOTTOM H EAD ER
FEE DER P IP E
P A AI R TOBE D NOZZI LES
AI R HEAT ER
SPR AY
V ALV E
S UP. 1 OUT LET H EAD ER
SU P. 3 IN LE TH EA DE R
CONV .ZONE B OTT OM H EA DER
IN TER
ME AD I.
H EA DER
E CO I N LET
H EA DER
P A AI R TONOZZI LES
A SH PI PE TO A SH S IOL
A SH VE SA L
A SH VE SA L
GOTO A SH SI LO
.
D rg , prp by k sur esh
I D F AN
E S P
TO ASH
SI LO
Drg, p rp b y ksure sh
D rg , prp by
k sur esh
132 KV SWITCHYARD
INDAL - SMELTER
STACK FLY & BOTTOM ASH
ELETRO STATIC
PRECIPITATOR
BOILERS 2X145
TPH
DRY ASH CONVEYING
SYSTEM
Drg by k suresh
DM WATER MAKE-UP
RESERVE FEED WATER TANK
V
BURLA POWER
HOUSE
LIGHT DIESEL OIL PUMP
Lub oil
tank
1x67.5 MW GENERATOR
PRIMARY CRUSHER
PROCESS SIMULATION
COOLING TOWER
R
W
P
R
W
P
COAL BUNKERS
ASH UTILISATION
RAW WATER PIT
RWP
78