Nitrogen Clean-Outs: Total Well Hole Volume Total CT Annular
Nitrogen Clean-Outs: Total Well Hole Volume Total CT Annular
WELLBORE INPUTS
CASING
TUBING
OPEN HOLE
NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK
Required N2 Rate (scm/min) for full lift Required N2 Rate for Upward motion
In Casing 0 0
In Tubing 0 0
In Open Hole 0 0
In Casing #DIV/0!
In Tubing #DIV/0!
In Open Hole #DIV/0!
WELLBORE INPUTS
NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK
Method #1
Annular Velocity (m/min) Annular velocity must be minimum of 35 m/min to insure full lift
note: Annular capacity is the annular volume per meter between CT and Tubing / Casing (Quality Tubing Chart)
Bottoms Up Time
or
WELLBORE INPUTS
NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK
NOTES:
FOAM QUALITY IS A GIVEN VALUE
MUST CHOOSE A FOAM RATE WHICH WILL RESULT IN AN ANNULAR VELOCITY THAT IS TWICE THE PARTICLE SETTLING RATE
ANNULAR VELOCITIES
FOAM RATE
N2 RATE
N2 RATE:______________SCM/min
YES
IS ANNULAR VELOCITY A MINIMUM OF TWICE THE PARTICLE SETTLING RATE
*NOTE: settling rates in Field Data Handbook pg. 800.034*
HAS COILCADE STR AND DESIGN AIDS BEEN REVIEWED IF WELL IS DEVIATED OR HORIZONTAL
FOAM CLEAN-OUTS
FILL UP
FROM FRACTURING TABLES SECTION 800 IN (KG/M)
RATE OF PENETRATION
ROP:_________________________(m/min)
CALCULATION SHEET FLUID CLEAN-OUTS
WELLBORE INPUTS
NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK
ANNULAR VELOCITIES
YES
IS ANNULAR VELOCITY A MINIMUM OF TWICE THE PARTICLE SETTLING RATE
*NOTE: settling rates in Field Data Handbook pg. 800.034*
HAS COILCADE STR AND DESIGN AIDS BEEN REVIEWED IF WELL IS DEVIATED OR HORIZONTAL
FLUID CLEAN-OUTS
LOADING
FLUID LOAD WATER = 1ppg = 119.9 kg/m3
GEL = 3 ppg = 359.7 kg/m3
FILL UP
FROM FRACTURING TABLES SECTION 800 IN (KG/M)
RATE OF PENETRATION
ROP:_________________________(m/min)
CALCULATION SHEET ACID
WELLBORE INPUTS
NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK
WELLBORE INPUTS
NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK
FLUID VOLUME
LIQUID N2 VOLUME
SCM
STAGE TIME NOTE: NORMALLY CHOOSE A FLUID RATE AND MODIFY N2 RATE TO OBTAIN REQUIRED FOAM QUALITY
BHST BHP NVF FQ FLUID RATE STAGE TIME N2 RATE DH FOAM RATE