0% found this document useful (0 votes)
33 views

Batchdetermination Process Order

This document provides guidance on how to manually determine the batch number when creating a process order in SAP. It outlines the necessary master data and configuration settings required for batch determination. It then walks through the steps to create a process order and perform batch selection for a component by loading batch selection criteria and copying the selected batch into the process order.

Uploaded by

rtmathew12
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views

Batchdetermination Process Order

This document provides guidance on how to manually determine the batch number when creating a process order in SAP. It outlines the necessary master data and configuration settings required for batch determination. It then walks through the steps to create a process order and perform batch selection for a component by loading batch selection criteria and copying the selected batch into the process order.

Uploaded by

rtmathew12
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

Batch Determination during process order

creation
Definition:-
While creating a process order, for components, batch number can be determined
based on the batch search determination.
We have maintained the
Batch search strategy,
Batch management active for a component.
Batch creation indicator in work scheduling view for component
Classification to the material master.
With all the above master data setting and relevant configuration setting, when you
create a process order, batch determination should be carried out.
Objective
This document will guide to create process order and do batch determination manually
to the component.

Prerequisites:-
Material master.
Menu path
Logistics roduction rocess rocess !rder rocess !rder Create C!"#
$ With Material
%ouble click C!"# & with material
Maintain Material, roduction plant and order type as shown above.
Click
Maintain Total 'ty, (inish %ate as shown above
Click
Click to do batch determination manually.
)elect the material by clicking the grey bo* in the left.
Click at the bottom
+ote,$ )ince no selection criteria is maintained, you will get this message.
Click
-ad the batch selection criteria been maintained, it would automatically popup the
batch.
Click
Click
+ow, batch search will be done to the value range of (at content between #. & /. 0
Click
The selected batch will be displayed
Click to get copied into the process order.
Click
Click

You might also like