???? ???? : first liquefaction of methane by ??? : first liquefaction of methane by ???
1917 : Liquefaction of gas to extract helium (Texas) 1917 : Liquefaction of gas to extract helium (Texas)
1920/30s 1920/30s : LNG produced to store natural gas in USA : LNG produced to store natural gas in USA
1944 : major accident in Cleveland peak shaving 1944 : major accident in Cleveland peak shaving
1950s : start of new era of development 1950s : start of new era of development
1959/60 : trial runs of Methane Pioneer from USA to UK 1959/60 : trial runs of Methane Pioneer from USA to UK
1964 : Camel plant (Algeria) commissioned, first 1964 : Camel plant (Algeria) commissioned, first
commercial deliveries to UK and France commercial deliveries to UK and France
2001 : annual LNG trade of 107 2001 : annual LNG trade of 107 mt mt (+ 7.5% over last 20 years) (+ 7.5% over last 20 years)
0
500
1000
1500
2000
2500
70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 '00
B
i
l
l
i
o
n
c
m
/
y
NATURAL GAS AND LNG TRADE NATURAL GAS AND LNG TRADE
NATURAL GAS AND LNG TRADE
NG Consumption NG Consumption
NG International Trade NG International Trade
LNG Trade LNG Trade
LNG DEMAND VERSUS INSTALLED CAPACITY
LNG DEMAND VERSUS INSTALLED CAPACITY
0
20
40
60
80
100
120
140
160
180
200
70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 '00 '02 '04 '06 '08 '10
M
t
a
INSTALLED CAPACITY INSTALLED CAPACITY
DEMAND DEMAND
LOCATIONS OF LNG PLANTS
Existing
Under construction
EVOLUTION OF TRAIN CAPACITY
EVOLUTION OF TRAIN CAPACITY
0,00
1,00
2,00
3,00
4,00
5,00
6,00
1960 1970 1980 1990 2000 2010
M
i
l
l
i
o
n
t
o
n
n
e
s
p
e
r
y
e
a
r
FRACTIONATION FRACTIONATION
REFRIGERATION REFRIGERATION
SULPHUR SULPHUR
RECOVERY RECOVERY
TYPICAL BLOCK DIAGRAM
TYPICAL BLOCK DIAGRAM
ACID GAS ACID GAS
REMOVAL REMOVAL
DEHYDRATION DEHYDRATION
AND MERCURY AND MERCURY
REMOVAL REMOVAL
LIQUEFACTION LIQUEFACTION
NITROGEN NITROGEN
REMOVAL REMOVAL
LNG STORAGE LNG STORAGE
AND LOADING AND LOADING
C3 C3 C4 C4 Gasoline Gasoline
MAIN LIQUEFACTION TECHNOLOGIES
MAIN LIQUEFACTION TECHNOLOGIES
A.P.C.I. A.P.C.I. - - C3/MR : 57 trains in operation + 7 under construction C3/MR : 57 trains in operation + 7 under construction
PHILLIPS PHILLIPS - - Optimised Cascade : 3 trains in operation (Trinidad & Optimised Cascade : 3 trains in operation (Trinidad &
Tobago) + 1 under construction ( Tobago) + 1 under construction (Idku Idku Egypt) Egypt)
STATOIL/LINDE STATOIL/LINDE - - MFCP : 1 train under construction ( MFCP : 1 train under construction (Snohvit Snohvit - - Norway) Norway)
SHELL SHELL DMR : 2 trains in project (Sakhalin) DMR : 2 trains in project (Sakhalin)
TYPICAL PRICE BREAK
TYPICAL PRICE BREAK
2 TRAINS 2 TRAINS
Mini Maxi Mini Maxi Criteria Criteria
Common/inlet facilities Common/inlet facilities 1 % 10 % 1 % 10 % Project Definition Project Definition
Acid Gas removal Acid Gas removal 3 % 3 % 8 % 8 % Gas composition Gas composition
Dehydration Dehydration 2 % 2 % 3 % 3 %
Mercury removal Mercury removal 1 % 1 % 1 % 1 %
Refrigeration/Liquefaction 25 % 40 % Refrigeration/Liquefaction 25 % 40 % Cooling system Cooling system
Compressors configuration Compressors configuration
Fractionation Fractionation 1 % 1 % 3 % 3 %
Sulphur recovery/ Sulphur recovery/prilling prilling 0 % 0 % 3 % 3 %
_____ ______ _____ ______
TOTAL TOTAL 45 % to 65 % 45 % to 65 %
TYPICAL PRICE BREAK
TYPICAL PRICE BREAK
UTILITES UTILITES
Mini Maxi Mini Maxi Criteria Criteria
Power Generation : Power Generation : 3 % 7 % 3 % 7 % Gas or steam turbine Gas or steam turbine
Cooling water : Cooling water : 2 % 2 % 6 % 6 % Cooling system Cooling system
(air (air water water seawater) seawater)
Other Waters, Steam, Other Waters, Steam, Project definition,sparing Project definition,sparing
Fuel, Air, Nitrogen : Fuel, Air, Nitrogen : 3 % 3 % 6 % 6 % philosophy philosophy
_____ ______ _____ ______
TOTAL TOTAL 8 % to 15 % 8 % to 15 %
TYPICAL PRICE BREAK
TYPICAL PRICE BREAK
COMMON COMMON
Mini Maxi Mini Maxi
Site infrastructure, road & fences Site infrastructure, road & fences 2 % 4 % 2 % 4 %
Control room Control room - - Substations Substations 2 % 2 % 2 % 2 %
DCS, ESD,FG & Telecom DCS, ESD,FG & Telecom 2 % 2 % 3 % 3 %
Administration, maintenance buildings Administration, maintenance buildings 2 % 2 % 3 % 3 %
_____ ______ _____ ______
TOTAL TOTAL 7 % to 10 % 7 % to 10 %
TYPICAL PRICE BREAK
TYPICAL PRICE BREAK
OTHERS OTHERS
Mini Maxi Criteria
Gas pipeline Gas pipeline 1MM$ per Km 1MM$ per Km On project definitions On project definitions
Site Preparation Site Preparation 2 % 2 % 5 % 5 % Site conditions Site conditions
Material Off Loading Material Off Loading Airport 2 % Airport 2 % 6 % 6 % Remote area Remote area
Residential area Residential area 4 % 4 % 8 % 8 % Client requirement Client requirement
Spare parts Spare parts 2 % 5 % 2 % 5 % Client requirement Client requirement
Movables Movables 2 % 2 % 4 % 4 % Client requirement Client requirement
Training & Start Training & Start- -up up 1 % 1 % 2 % 2 % Take over definition Take over definition
_____ __ _____ _____ ___
TOTAL TOTAL 15 % to 30 % 15 % to 30 %
THE TRENDS
THE TRENDS
CONTINUOUS INCREASING OF THE UNIT CAPACITY : CONTINUOUS INCREASING OF THE UNIT CAPACITY :
8 Mty are now considered 8 Mty are now considered
New Process developments : APCI New Process developments : APCI APX, AXENS, Others APX, AXENS, Others
New Driving Machines New Driving Machines
Frame 9 Gas Turbine (3,000 rpm) Frame 9 Gas Turbine (3,000 rpm)
Electric Motors Electric Motors
New 3,000 rpm compressors New 3,000 rpm compressors
New Unit lay out New Unit lay out
TANKS CAPACITY UP TO 200,000 m3 ARE CONSIDERED TANKS CAPACITY UP TO 200,000 m3 ARE CONSIDERED
LNG FLOATING PLANT ON BARGE (FLNG) LNG FLOATING PLANT ON BARGE (FLNG)