IBS Score - Sample

The document is an IBS scoresheet that evaluates the use of industrialized building system (IBS) elements in a construction project. It assigns IBS factor scores to different building elements and areas based on their IBS content. The total IBS score for the project is 45.7 out of 100.

Uploaded by

Asraf Muidin
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
219 views

IBS Score - Sample

The document is an IBS scoresheet that evaluates the use of industrialized building system (IBS) elements in a construction project. It assigns IBS factor scores to different building elements and areas based on their IBS content. The total IBS score for the project is 45.7 out of 100.

Uploaded by

Asraf Muidin
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

IBS SCORESHEET

AREA (m2) or LENGTH (m)


2 1470 m

ELEMENTS

IBS FACTOR

COVERAGE

IBS SCORE

Part 1 : Structure Elements Precast beams + Precast columns + Hollow core slabs Ground Floor Area = Precast beams + Precast columns + Hollow core slabs 1st Floor Area = Precast beams + Precast columns + Hollow core slabs 2nd Floor Area = Precast beams + Precast columns + Hollow core slabs 3rd Floor Area Precast beams + Precast columns + Hollow core slabs 4th Floor Area = Roof truss using prefab metal roof truss Roof Area = (Including Services Floor) Precast beams + Precast columns + Insitu slab (all floors) Void Area (Including lift area + staircase) (all floors) Total Part 1 Part 2 : Wall System External wall and internal wall using precast blockworks External wall and internal wall using brickwall Total Part 2 Part 3 : Other Simplified Construction Solutions Percentage of beam sizes follow MS 1064 Percentage of column sizes follow MS 1064 Percentage of wall sizes follow MS 1064 Percentage of slab sizes follow MS 1064 Percentage of door sizes follow MS 1064 Percentage of window sizes follow MS 1064 Repetition of floor height Total Part 3 IBS CONTENTS SCORE OF PROJECT (Part 1+ Part 2 + Part 3) 100% 100% 100% 100% 100% 100% 100% 2 2 1 1 2 2 2 12 84.7
90 % 1.0 (
90 /

1.0

1470 /

4510

) =

0.326

0.326 x

1.00

x 50 =

16.30

m2 m2 m2
2 0m

1.0

0 /

4510

) =

0.000

0.000 x

1.00

x 50 =

0.00

1.0

0 /

4510

) =

0.000

0.000 x

1.00

x 50 =

0.00

1.0

0 /

4510

) =

0.000

0.000 x

1.00

x 50 =

0.00

1.0

0 /

4510

) =

0.000

0.000 x

1.00

x 50 =

0.00

2065
2 975 m

1.0

2065 /

4510

) =

0.458

0.458 x

1.00

x 50 =

22.89

0.6 0.6

( (

975 / 0 /

4510 4510

) = ) =

0.22 0.00

0.22 x 0.00 x

0.60 0.60

x 50 = x 50 =

6.49 0.00

m2 4,510 m2

1.0

45.7

100

) =

0.90

0.90 x 1.00 x 30 =

27.00

10 %

0.0

10 /

100 1.00

) =

0.10

0.10 x 0.00 x 30 = 27.0

0.00

100 %