0% found this document useful (0 votes)
210 views3 pages

API MPM Chap Pter 3 3.1A

This standard describes procedures for manually gauging the liquid level of petroleum and petroleum products in tanks. It covers gauging equipment, procedures for innage and outage/ullage gauging, free water gauging, and precautions. The document provides guidance on gauging non-pressurized fixed-roof and floating-roof tanks, as well as marine tank vessels, and includes considerations for factors that can influence accuracy such as temperature, water, and foam. It aims to standardize manual gauging practices across the petroleum industry.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
210 views3 pages

API MPM Chap Pter 3 3.1A

This standard describes procedures for manually gauging the liquid level of petroleum and petroleum products in tanks. It covers gauging equipment, procedures for innage and outage/ullage gauging, free water gauging, and precautions. The document provides guidance on gauging non-pressurized fixed-roof and floating-roof tanks, as well as marine tank vessels, and includes considerations for factors that can influence accuracy such as temperature, water, and foam. It aims to standardize manual gauging practices across the petroleum industry.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

API MPM

MS Chap
C pter 3
3.1A
Stand
dard Pra
actice for
f the Manual
M
l Gaugiing of P
Petroleu
um and
d
Petrolleum Products
s
THIRD EDIT
TION | AUGUST
T 2013 | 31 PAG
GES | $100.00 | PRODUCT NO
O. H301A03

This standard describes the


t following:
a) the procedures for manually
m
gaugin
ng the liquid le
evel
of petro
oleum and pettroleum products in nonpresssure
fixed-ro
oof, floating-roo
of tanks and marine
m
tank
vesselss;
b) procedu
ures for manu
ually gauging th
he level of free
e
water th
hat may be fou
und with the petroleum
p
or
petroleum products;
c) method
ds used to veriify the length of
o gauge tapess
under field
f
conditionss and the influ
uence of bob
weightss and tempera
ature on the ga
auge tape lenggth;
and
d) influencces that may affect
a
the posiition of gaugin
ng
reference point (eithe
er the datum plate
p
or the
reference gauge poin
nt).
Throughout this standard the term petrroleum will be used
to denote petroleum, petrroleum produccts, or the liqu
uids
normally associated with the petroleum
m industry.
This standard is applicable for gauging quantities of
liquids having Reid vapor pressures lesss than 103 kP
Pa
(15 psia).
The method
d used to determine the volu
ume of tank
contents fro
om gauge read
dings is not co
overed in this
standard.
The determination of tem
mperature, den
nsity, API gravitty,
and suspen
nded sedimentt and water of the tank conttents
are not with
hin the scope of
o this standarrd; however,
methods ussed for these determinations
d
s may be foun
nd in
the API Man
nual of Petrole
eum Measurem
ment Standard
ds
(MPMS).

www.api.org

Forr ordering inforrmation:


Onlline: www.apii.org/pubs
Phoone: 1-800-854-7179
(Toll-freee in the U.S. and Canada)
(+1) 303
3-397-7056
(Local an
nd Internationa
al)
Faxx:

(+1) 303
3-397-2740

applicable.
APII members receeive a 30% disscount where a

Contents
Page

Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Normative References. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

4
4.1
4.2
4.3
4.4
4.5

Gauging Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Nonelectronic Gauge Tapes, Bobs, and Bars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Portable Electronic Gauging Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Gauging Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Water-finding Rules. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5
5.1
5.2
5.3
5.4
5.5

Gauging Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Method Outline. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Reading and Reporting Gauges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Innage Gauging Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Outage/Ullage Gauging Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Conversions Between Innage and Outage/Ullage Gauges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

6
6.1
6.2
6.3

Free Water Gauging Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


Water-indicating Paste Procedure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Thief Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Electronic Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7
7.1
7.2

Gauging Procedure for Marine Vessels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15


Outline and Selection of Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Reading and Recording Gauges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

8
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
8.10
8.11

Operational Precautions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
System Integrity and Line Fullness. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Checks Before Measuring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tank Mixers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Water Draw-off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Entrained Air and Foam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Gauge Hatch. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Roof Displacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tank Bottoms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Temperature Determination and Sampling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Solid Crust . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3
3
3
5
6
7

11
11
13
14

15
15
15
15
16
16
16
16
16
17
17
18

Annex A (normative) Tape Comparison Against a Traceable Reference Standard. . . . . . . . . . . . . . . . . . . . . . . 19


Annex B (informative) Gauging Uncertainties of Tank Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Annex C (informative) Tank Mixers and Tank Mixing for Custody Transfers . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Annex D (informative) Caverns. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Bibliography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
v

Contents
Page

Figures
1
Typical Gauge Tapes and Bobs and Typical Water Gauge Bar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2
Water Finding Rule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3
Gauging Diagram. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4
Free Water Gauging. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
5
Core Thief, Trap Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
6
Schematic Diagram Illustrating the Zone of Partial Displacement Common to All Floating Roofs . . . . 17
A.1 Calibration of Spring Balance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
A.2 Tape and Bob Comparison. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
B.1 Tank Without Deformation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
B.2 Situation 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
B.3 Situation 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

vi

You might also like