List of Spares

The document is a list of spares for a POL (Petroleum, Oil, Lubricant) depot. It includes spare parts required for pumps, meters, firewater pumps, diesel engines, valves, strainers, hydrants, cooling systems, instruments, control panels, and DG (diesel generator) sets. The list specifies the item description and recommended quantity of each spare part required expressed as a percentage of the installed equipment or fixed minimum quantities.

Uploaded by

Saraswatapalit
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

List of Spares

The document is a list of spares for a POL (Petroleum, Oil, Lubricant) depot. It includes spare parts required for pumps, meters, firewater pumps, diesel engines, valves, strainers, hydrants, cooling systems, instruments, control panels, and DG (diesel generator) sets. The list specifies the item description and recommended quantity of each spare part required expressed as a percentage of the installed equipment or fixed minimum quantities.

Uploaded by

Saraswatapalit
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT OWNER CONS LTANT

: POL Depot : IBP Co. Limited. : B!lme" L!#"ie $ Co. Ltd.

Volume - 2 DOC. NO. POL/SPARES Li%t o& Sp!"e%

List of Spares

Contents: PRODUCT PUMPS (HORIZONTAL AND SUBMERSIBLE) LO! METERS IRE !ATER PUMPS "OC#E$ PUMPS SUMP PUMP MOTORS OR IRE I%HTIN% S$STEM DIESEL EN%INE &AL&E (ALL SIZES AND T$PES UPTO '( NB) OR PROCESS ) P S$STEM STRAINERS OR PROCESS ) IRE PROTECTION S$STEM H$DRANT ACCESSORIES !ATER SPRA$* COOLIN% S$STEM ACCESSORIES INSTRUMENTS OR PROCESS ) P S$STEM CONTROL PANEL* IRE ALARM PANEL D% SET

P!'e No. ( o& )

PROJECT OWNER CONS LTANT

: POL Depot : IBP Co. Limited. : B!lme" L!#"ie $ Co. Ltd.

Volume - 2 DOC. NO. POL/SPARES Li%t o& Sp!"e%

1.0

PRODUCT PUMPS (HORIZONTAL AND SUBMERSIBLE) Item Descripti ! i) ii) iii) i$) $) $i) Gasket & O Ring Set Set of Wear Rings Shaft with Key %earing set (ra&ial & thr!st) '"peller n!t( key & lock washer as applica le )artri&ge type "echanical seal "t# i! terms $ % $ e&c' m (e) $ p*mp 100% 30% 100% (applica le for S! "ersi le #!"ps only) 30% 30% 30%

The EPC Contractor shall work out the total quantity of Spares required from the abobe table depending on the number of pumps (both horizontal & submersible +.0 ,LO- METERS Item Descripti ! a) a+1 a+, a+3 a+. a+1 a+3 a+4 ) +1 +, +3 c) c+1 c+, &) &+1 &+, *eter #acking glan& asse" ly *o!nting gasket )o$er O-Ring /&0!ster 2ace an& #inion gear set Gear #late %earing #late Set Strainer %asket (.0 "esh) 5op )o$er gasket %asket lock pin /ir 6li"inator Ree& an& 2loat /sse" ly Seals #reset 7al$e )!p & G!i&e asse" ly Gasket & seals "t# i! terms $ % $ t t&) ! . $ Meter U!its 30% 30% 100% 11% ,0% 11% 11% 11% 30% 30% 10% 30% ,0% 30%
P!'e No. 2 o& )

PROJECT OWNER CONS LTANT

: POL Depot : IBP Co. Limited. : B!lme" L!#"ie $ Co. Ltd.

Volume - 2 DOC. NO. POL/SPARES Li%t o& Sp!"e%

&+3 &+. &+1 &+3 ..0

8inkage /sse" ly #resent co!nter )o!nter Rate of flow in&icator

11% 10% 10% 10%

,IRE -ATER PUMPS Item Descripti ! a) ) c) &) e) f) g) h) ') 0) k) l) ") '"peller #!"p Shaft "*&!tit# i! terms $ % $ t t&) ! . $ P*mps

10% 10% )asing Ring (96 & :96) Sets 100% '"peller Ring (96 & :96) 100% )la"ping #late for split glan& 100% %!sh for glan& 100% 8antern Ring 100% Split Glan& 100% %all %earing (96 & :96) 10% Shaft Slee$e (96 & :96) 10% Gaskets of each type 10% ;O< ring for shaft slee$e 10% #in of each type ,00%

/.0

0O1E2 PUMPS Item Descripti ! a) ) c) &) e) f) g) h) ') 0) k) "t# i! terms $ % $ t t&) ! . $ p*mps

'"peller 10% #!"p Shaft 10%+ 8antern Ring 100% 8i=!i& 9eflector 100% Ra&ial %all %earing 100% Shaft Slee$e Set 10% Key for i"peller & n!t Sets 100% 8ock Washer for i"peller n!t 100% St!ffing %o> packing ,00% Oil Seal ,00% Gaskets of each type 100%

P!'e No. * o& )

PROJECT OWNER CONS LTANT

: POL Depot : IBP Co. Limited. : B!lme" L!#"ie $ Co. Ltd.

Volume - 2 DOC. NO. POL/SPARES Li%t o& Sp!"e%

3.0

SUMP PUMP Item Descripti ! a) ) c) &) e) f) g) "t# i! terms $ % $ t t&) ! . $ p*mps

'"peller 10% #!"p Shaft 10% %earing 100% Key for '"peller & :!t 100% 8ock Washer for i"peller n!t 100% #acking Sets 100% Gaskets of each type (Set) 100%

4.0

MOTORS ,OR ,IRE ,I5HTIN5 S2STEM Item Descripti ! a) %earing of each type T t&) "*&!tit# $ Sp&res i! terms $ % 10% for ?ockey #!"p *otors 10% for S!"p #!"p *otors 100% for Siren

6.0

DIESEL EN5INE (one set means total quantity required for replacement of one complete set Item Descripti ! (Sets) a) ) c) &) e) f) g) h) i) 0) k) l) ") n) o) p) =) "t# i! terms $ % $ t t&) ! . $ e!7i!es

Sprayers('n0ectors 100% #iston 10% #iston ring 100% 'nlet $al$e asse" ly 10% 6>ha!st $al$e asse" ly 10% Springs 100% #acking an& gaskets 100% 2!el filters@ ele"ents & seals ,00% 8! e Oil filters@ ele"ents & seals ,00% Scrapper ring 100% Solenoi& coil for f!el $al$e 100% *ain %earing 10% %ig en& & s"all en& earings of connecting ro& 10% Spee&o"eter 10% Spee&"eter wire 100% Aoses with en& connector of each type 10% )ranking starter asse" ly 10%

P!'e No. + o& )

PROJECT OWNER CONS LTANT

: POL Depot : IBP Co. Limited. : B!lme" L!#"ie $ Co. Ltd.

Volume - 2 DOC. NO. POL/SPARES Li%t o& Sp!"e%

8.0

9AL9E (ALL SIZES AND T2PES UPTO 30 NB) : ,OR PROCESS ; , P S2STEM a) )o"plete $al$e type(siBe 10% of the total $al$e installe& of each or , nos+ of each type(siBe whiche$er is higher+

<.0

STRAINERS : ,OR PROCESS ; ,IRE PROTECTION S2STEM a) ) )o"plete internals incl!&ing stiffener ;O< ring C C C 10% of strainers installe& of each siBe(type with "ini"!" of 1 no+ of each siBe(type+

10.0

H2DRANT ACCESSORIES a) ) c) &) e) f) g) 8!g asse" ly for C hy&rant C 8!g asse" ly for C )o!plings C 7al$e seats for C hy&rant $al$es C '+R+Ring for hy&rant C $al$es C '+R+Ring for co!pling C 8ocking asse" ly for C "onitor C ;0< ring for "onitor C ,1% of total =!antity installe& or 10 nos+ whiche$er is higher+

11.0

-ATER SPRA2=COOLIN5 S2STEM ACCESSORIES a) ) Spray :oBBles Re$ol$ing Aea& 10% of total =!antity of each siBe(type or 10 nos+ of each siBe(type whiche$er is higher+ One of each siBe(type

1+.0

INSTRUMENTS : ,OR PROCESS ; , P S2STEM a) ) c) &) e) f) g) h) #ress!re Ga!ges of each #ress!re Switches 8e$el 'n&icators 8e$el Switches 2low 'n&icators 2low Switches Solenoi& $al$e asse" ly *an!al )all #oint C C C C C C C C C C 10% of total =!antity of each type or 1 :o+ type whiche$er is higher+

P!'e No. , o& )

PROJECT OWNER CONS LTANT

: POL Depot : IBP Co. Limited. : B!lme" L!#"ie $ Co. Ltd.

Volume - 2 DOC. NO. POL/SPARES Li%t o& Sp!"e%

1..0

CONTROL PANEL=,IRE ALARM PANEL a) ) c) &) e) f) g) h) ') 2!ses 'n&ication la"ps C C 10% of total =!antity installe& ,0% of total =!antity installe&

#!sh %!ttons C Selector Switches C /!>ilary relays( C contactors C /nn!nciation win&owC la"ps C )ontrol car&s for C ann!nciation facia C )ontrol car&s for fire C alar" panel C #ower s!pply "o&!le C

10% of total =!antity installe& or , nos+ whiche$er is higher+

1/.0

D5 SET Item Descripti ! a) ) c) &) e) f) g) 6le"ent )orrosion Resistor 6le"ent 8! e Oil 2ilter 6le"ent 8+O+ %ypass 2ilter 6le"ent 2!el 2ilter #late )orrosion Resistor 6le"ent /ir )leaner (O!ter) 6le"ent /ir )leaner ('nner) T t&) "*&!tit# $ Sp&res $ r e&c' D5 Set 3 nos+ 3 nos+ 3 nos+ 3 nos+ 10 nos+ , nos+ , nos+

P!'e No. ) o& )