0% found this document useful (0 votes)
151 views

Accumulator Function Test

The document provides instructions for testing the accumulator function, capacity of the accumulator pumps, and precharge on bottles or spherical accumulators. It involves opening and closing valves like the HCR valve and annular valve to isolate different components. Steps are provided to check the usable fluid stored, how long it takes the pumps to regain pressure, and ensuring the precharge pressure does not drop below minimum levels.

Uploaded by

amirakhavansafar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views

Accumulator Function Test

The document provides instructions for testing the accumulator function, capacity of the accumulator pumps, and precharge on bottles or spherical accumulators. It involves opening and closing valves like the HCR valve and annular valve to isolate different components. Steps are provided to check the usable fluid stored, how long it takes the pumps to regain pressure, and ensuring the precharge pressure does not drop below minimum levels.

Uploaded by

amirakhavansafar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Accumulator Function Test

TO CHECK THE USABLE FLUID STORED IN THE ACCUMULATOR BOTTLES ON THE ACCUMULATOR (O.O. #2 section III.A.2.c.i. or ii or iii) 1. 2. 3. 4. 5. 6. 7. Make sure all rams and annular are open and if applicable HCR is closed. Ensure accumulator is pumped up to working pressure! (Shut off all pumps) Open HCR Valve. (If applicable) Close annular. Close all pipe rams. Open one set of the pipe rams to simulate closing the blind ram. If you have a 3 ram stack open the annular to achieve the 50% safety factor for 5M and greater systems). 8. Accumulator pressure should be 200 psi over desired precharge pressure, ( Accumulator working pressure {1500 psi = 750 desired psi}{2000 and 3000 psi = 1000 desired psi}). Record the remaining pressure__________________________psi. If annular is closed, open it at this time and close HCR.

TO CHECK THE CAPACITY OF THE ACCUMULATOR PUMPS (O.O. #2 section III.A.2.f.) Shut the accumulator bottles or spherical, ( isolate them from the pumps & manifold) open the bleed off valve to the tank,( manifold psi should go to O psi) close bleed valve. NOTE: Make sure that the HCR is fully closed and the annular is fully open prior to going through the next steps: 1. Open the HCR valve handle, ( if applicable). 2. Close annular valve handle. 3. With pumps only, time how long it takes to regain manifold pressure to 200 psi over desired precharge pressure! ( Accumulator working pressure {1500 psi = 750 desired psi}{2000 and 3000 psi = 1000 desired psi}). Record elapsed time____________________. ( 2 minutes or less)

TO CHECK THE PRECHARGE ON BOTTLES OR SPHERICAL ( O.O. #2 section III.A.2.d.) 1. Open bottles back up to the manifold ( pressure should be above the desired precharge pressure, {1500 psi = 750 desired psi}{2000 and 3000 psi = 1000 desired psi}) may need to use pumps to pressure back up. 2. With power to pumps shut off open bleed line to the tank. 3. Watch and record where the pressure drops, ( accumulator psi ). Record the pressure drop ____________________________ psi. If pressure drops below MINIMUM precharge, (Accumulator working pressure {1500 psi = 700 min.}{2000 and 3000psi = 900 psi min.}) each bottle shall be independently checked with a gauge.