2014 Capital Projects Preparation and Construction Typical Project Preparation Item Schedule Days

The document outlines a typical project preparation schedule for capital projects including 21 steps from collecting initial project data to handing over completed works. It involves preparing drawings, traffic and geological studies, applying for permits, developing bills of quantities, tendering the project, evaluating bids, obtaining necessary approvals, signing contracts, paying advances, and handing sites over to contractors to commence 120 days of construction work.

Uploaded by

Ronald Kaaku
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

2014 Capital Projects Preparation and Construction Typical Project Preparation Item Schedule Days

The document outlines a typical project preparation schedule for capital projects including 21 steps from collecting initial project data to handing over completed works. It involves preparing drawings, traffic and geological studies, applying for permits, developing bills of quantities, tendering the project, evaluating bids, obtaining necessary approvals, signing contracts, paying advances, and handing sites over to contractors to commence 120 days of construction work.

Uploaded by

Ronald Kaaku
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

2014 Capital Projects Preparation and Construction Typical Project Preparation Schedule 1 Collection of project data including site

plans, indenture/lease 2 Confirmation to proceed with work (from GSM/SS?) 3 Preparation of drawings Visit to Station 4 Approval of Drawings 5 Preparation of Traffic Impact Assessment (TIA) and Geotechnical Studies 6 Application for Various Permits(Zoning Status, Fire, EPA, ECG, GWCL, National Communication Authority (NCA) Building, Right of Way Clarification and NPA Construction) 7 Preparation of BOQ 8 Preparation of Tender Documents 9 Selection of shortlisted Contractors 10 Invitation to Quote 11 Submission of Quotations 12 Evaluation of Quotations 13 Submission and approval by Tender Board 14 Approval by Board of Directors 15 Issuing of Award of Contract letters 16 Preparation of Contract Documents 17 Signing of Contracts 18 Payment of Advance Mobilization 19 Handing over of site to Contractor 20 Commencement of Contract 21 Completion of Contract/Taking over of completed works

Item

Days 1 1 2 2 1 10

21 3 3 3 1 21 3 3 7 2 2 2 14 2 1 120