Lab On Open Circuit Test
Lab On Open Circuit Test
Owais Qayum
ROLL 10
LAB 3 Title: Transformer Tests Using MATLAB/Simulink And Their Integration Into Undergraduate Electric Machinery Courses.
Background:
Transformer tests: There are various transformer tests some of them are as under: 1. Winding resistance test. 2. Primary test. 3. Open circuit test (Main concern) 4. Short circuit test. 5. Load test. Here we will discuss only about open circuit test.
Method:
The secondary of the transformer is left open-circuited. A wattmeter is connected to the primary. An ammeter is connected in series with the primary winding. A voltmeter is optional since the applied voltage is the same as the voltmeter reading. Rated voltage is applied at primary.
Matlab simulation:
We have to implement the following circuit.
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:
In this step unmark 3 windings option .
Step 7:
In this step two elements are used I. II. 1 Scope 3 displays
Step 9:
Step 10:
Step 11:
We will need power (phasor) for calculating real and apparent power.
Simulation results:
S.NO 1 2 3 4 5
Parameter Name Vrms (Primary) Irms (primary) Real power Reactive power Irms (secondary)
2) There are two components of current namely real current Icand imaginary current Im.
Ic = Voc / Rc =2497/36.1K =0.069A =69 mA Im= sqrt(Ioc2 - Ic2) = sqrt (0.0782 0.0692 ) =sqrt (0.000139 ) =0.0117 A 3) Xm = Voc/Im = 2497/ 0.472 = 5290.2
Conclusion:
This procedure assumes that all measurements weretaken on the Primary side of the transformer and hence the solution will give all values referred tothe Primary side of the transformer.