ZTE HYBRID Installation Guide
ZTE HYBRID Installation Guide
Liu Feng
ATS Generator2
BAT 48V
RBS 24V
MW 48V
Content Install the hybrid power system Install the power and battery cabinet Install the battery Install the load cables Install power alarm cables Install ATS Make the labels The SWAP procedure
Content
Expand bolts(total 8 bolts for each cabinet) The RD engineer will design paper footprint of the power and battery cabinet to help the subcontractor to make hole.
ZTE AC input power The specification of AC cable is 4*10mm2 and it must be outdoor used
The breaker must be off Install the battery cable The biggest screw is for the battery cable.
Battery temp sensor should be in the top of the battery cabinet( 2nd battery of top layer)
The other side of battery temp sensor should be installed here. You can see the terminal mark on the cover
The environment temp sensor should be installed in the top of the power cabinet
Install the power and battery cabinet-install cable for battery cabinet cooling
the other side of the power cable should be in fuse F204 Power cable Alarm cable for Cooling The terminals should be covered with tap very well The alarm cable should be installed here
Install the power and battery cabinet-install door alarm cable for battery cabinet
Content
Install battery
Install battery
The battery layout of top layer Battery voltage detect signal cable .each battery has Breaker one cable
The layout should strictly follow this When connect the battery to the Power ,the battery breaker must be off
Install battery
Content
ZXD 2430-1
ZXD 2430-2
ZXD 2430-3
ZXD 2430-4
ZXD 2430-5
ZXD 2430-6
INV
Dc cooling
Spare
Spare
RBS1
RBS2
RBS3
RBS4
3G
F201 16A
F201 16A
F203 16A
F204 16A
F205 10A
F206 10A
MW1
MW2
MW3
Battery cooling
DC security light
AWL
NO1 100A
RBS1
NO2 100 A
RBS2
NO3 100A
RBS3
NO4 100A
RBS4
GNDblack 35mm2)
-48V
GND
Make terminal in IDU side Make sure the -48V and GND are right
Content
8 Alarms
Generator alarm Battery alarm Rectifiers alarm System alarm High temp alarm Battery discharge Air conditioner alarm reversed
X15
alarm definition
X16
X15
Pin 2white 3blue Pin 5: white 6: orange Pin 2white 3green Pin 5: white 6: brown Pin 2red Pin 5: red 3blue 6: orange
Generator alarm Battery alarm Rectifier alarm System alarm High temp alarm Battery discharge
X16
X17
X17
X18
3green 6: brown
X18
Content
Install ATS
ATS
Dimension: 1200mm 890 mm 300 mm H W D) Weight: The whole machine < 130kg.
Green/white
Start Generator2
Brown/white
Grid feedback
Blue/white
Reserved
Content
All the cable must have label ZTE will give the label template
Content
Debug the power: Check whether the can work normally Set the parameters Check whether the generator can start when the battery charge current is 0.1C
24V +
GND
-48V
GND
Make terminal in IDU side Make sure the -48V and GND are right
After start the generator , please call MTN staff about the SWAP
24V battery +
24V battery -
Take the battery + and battery cable from RBS. And it must be covered with insulation tap
Install new 24v power cable from ZTE power Make sure the Positive and negative poles are right
AC input of 24v power module 1.Switch on the breaker of the new power cable and check the power voltage (27V)
2.Take off the A C input socket of 24V power module and check if the RF module can work
Switch on the breaker of new IDU power cable, and check the power voltage
Take AC input power cable of IDU Insert the new DC power for IDU If the IDU can not work, rollback
1.Tidy the cable and make label 2.Clean up the site 3.If there is commercial power , turn off the generator