0% found this document useful (0 votes)
55 views

SPT - Motor - Sheet2

This document contains engineering drawings for parts 27 through 35 of an elevator frame with the specifications T250x300. The drawings include dimensions, views, notes and quantities for 10 different parts that make up the elevator frame assembly. Key parts include Part 27, Part 29, Part 32 and Part 35, which range in quantity from 1 to 2 pieces. The contractor for the project is CV.Frontec Agritama Engineering and the client is PT.Seger Sumbawa 2.

Uploaded by

Ade S
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views

SPT - Motor - Sheet2

This document contains engineering drawings for parts 27 through 35 of an elevator frame with the specifications T250x300. The drawings include dimensions, views, notes and quantities for 10 different parts that make up the elevator frame assembly. Key parts include Part 27, Part 29, Part 32 and Part 35, which range in quantity from 1 to 2 pieces. The contractor for the project is CV.Frontec Agritama Engineering and the client is PT.Seger Sumbawa 2.

Uploaded by

Ade S
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1

29.54

540

10

380
60 22.75

43.58

24

10 PART 33Qty : 1

304 190

304

10

380 PART 27-pl.10 Qty : 1

380

34.50

471 PART 29-pl.10 Qty : 1

34.50
150
C

30

200

30

10

380

260 20 20
8

PART 28-pl.10 Qty : 1 25


12 12 8
R6
R6
D

4
105
12

40
130 210 210 150

PART 35Qty : 2

PART 34Qty : 2
E
DO NOT SCALE DRAWING

105

180 260

UNLESS OTHERWISE SPECIFIED: DIMENSIONS ARE IN MILLIMETERS SURFACE FINISH: TOLERANCES : LINEAR : ANGULAR :

CLIENT :

PT.Seger Sumbawa 2
DATE

DEBUR AND BREAK SHARP EDGES

CONTRACTOR :

CV.Frontec Agritama Engineering

TITLE: NAME DRAWN SIGNATURE

: 18/07/2013
REVISION :

TORO

No.Order: 00-0 Qty


MATERIAL:

SCALE NTS

ELV.FR.T250x300
PART.27-35
F
DWG NO.

PART 32-pl.3 Qty : 1

CHK'D APPV'D

SS SS

00 : 00

ELV.FR.T00-4
SHEET 1 OF 1

Size

A3
Weight: SCALE:1:5

Page 1 of 1

7/19/2013

You might also like