Node B Integration Guide
Node B Integration Guide
1 UMTS Architecture................................................................................................................................. 2 1.1 Design Team: 2 1.2 Radio Planning Team: 2 1.3 Onsite Commissioning Team 3 1.4 Node B Integration Team: 3 1.4.1 OAM & Hardware Scripts:.....................................................................................................3 1.4.2 ARW Script: 3 1.4.3 Add Cell Network Scripts:....................................................................................................3 2.2 CCR Tool - Workflow 11 2.3 CCR Tool - Create CCR-Form Template...........................................................................................11 2.4 Loading Add_Cell Network Scripts:...................................................................................................14 3. IUB Script: 24 4. Loading License................................................................................................................................. 27 5. Adjust License.................................................................................................................................... 29 6. Update Parameters 31 7. Create back CV and set as startable on NodeB:.................................................................................32 8. Software Upgrade using SMO 34 9. Conclusion 39
INTRODUCTION: This document will describe the NodeB integration process flow which will be used when integrating a new node B, as well as demonstrating the CCR process from the delivery of data fill to the production and loading of XML and MO script.
UMTS Architecture
1.1
Design Team:
The integration team should be provided and updated with the LLD (Low Level Design) for the 3G Node B integration from the design team
LLD.xls
1.2
Has to generate the two CCR forms (excel sheet) one for Hardware Scripts and other for Cell Network.
1.3
Responsible for the installation and commissioning the NodeB, Loading OAM and External Hardware scripts
1.4
After loading OAM and Hardware script. The integration team can start the integration To generate the XML files required for the WDCMA RAN integration, a CCR web based tool is used.
1.4.1
Both scripts are generated by referring to the LLD .Those two scripts will be emailed to the onsite commissioning team to load it on to NodeB.
1.4.2
ARW Script:
Integration team will generate and load the ARW script on to the OSS Common Explorer by using the ARW (Add RBS Wizard) tool.
1.4.3
From the AddCellNetworkP7.xls CCR form, Cell scripts are generated and loaded on to the OSS Common Explorer by creating Planned Area and importing the.xml files to the planned areas.
Change the RNC SUBRACK related to your site, then click next until you reach the end of the wizard
.12
CCR TOOL
CCR Tool is the official internal tool that is used in producing .xml scripts.
2.2
CCR Tool - Create project/import CCR form CCR form is an excel spreadsheet and it will be emailed to you if you choose that option when creating a template. After CCR template is populated, you can create a project in the tool and import your spreadsheet. Select Create Project:
Your project will now appear under Projects Tab. To generate scripts, click on the Icon in the Configuration column:
- Uncheck Test Load and click Generate. - XML scripts will get generated. - Scripts will be emailed to you or you can extract them from Configuration column. - Once the scripts are generated the icon will be changed from
to
Three planned areas are created as below: 1. Create Planned Configuration for Cell :<Site_ID>_Cell
Import the following Scripts in following order ar e a s. x m l ad d _ c el l.xml add_hsdsch.xml add_eul.xml coveragerelation.xml cell update
Go to moshell and check if the cells and the channels are created
2. Create Planned Configuration for GSM Relation :<Site_ID>_GSM Import the following Scripts in following order: add_gsmcell.xml gsmcell_relations.xml
3. IUB Script:
Upload the iub script to : /var/opt/ericsson/integration/xml_scripts/iub_scripts
4. Loading License
Upload the license to : /var/opt/ericsson/integration/xml_scripts/lkf
Password: xxxxxxxx Ip Address: IP address of the master server sFile: /var/opt/ericsson/integration/xml_scripts/lkf/licensename.xml (license directory in the node)
Then execute
5. Adjust License
Go to configuration Manage HW and SW inventory software management organizer
6. Update Parameters
Open element manager tools run command file
Parameter_Setting_2_Carriers.mo
Also check the RBS parameter IubDataStreams, maxHsRate must be modified depending on the number of E1s Change the following parameter using Moshell numHsCodeResources numEulResources maxTotalOutputPower
After creating the CV we unlock the IUB and the site name
9. Conclusion
Once the upgrade is completed we list the iub status for the node ( lst . site name), we print the traffic status (get radiol), we check the license status (license lkf), we print the list of the active alarm (alt)