2009 Growth Policy Growing Smarter
2009 Growth Policy Growing Smarter
Growing Smarter
Planning Board Status Report
May 28, 2009
• What’s changing?
• Why change?
• Staff Draft Recommendations
• Smart Growth Criteria
• APFO Transportation
• Impact Tax Transportation
• APFO Schools
• Outreach Efforts
2009 Growth Policy
APFO – WHAT’S CHANGING?
Relative Arterial Mobility: (Congested Auto Speed / Free Flow Auto Speed)
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 110% 120% 130%
F E D C B A
0 25% 40% 55% 70% 85% 100%
PAMR: Arterial Level of
Service
1
00% A
85
% B
70
%
C
55
%
D
40
%
E
25%
F
0%
Arterial Level of
Service: Free-
flow Conditions
• 2.7 miles
• 40 mph
• 4 minutes
Arterial Level of
Service: LOS C
• 55% of free-
flow speed
• 22 mph
• 1.5 miles
• 4 minutes
Arterial Level of
Service: LOS D
• 40% of free-
flow speed
• 16 mph
• 1.1 miles
• 4 minutes
PAMR: Transit Level of Service
Transit speeds
F E D C B A
0% 42.5 50 60 75 1
% % % % 00%
Scoring Policy Areas Using
PAMR
1
00% A
85
% B
70
%
C
Arterial LOS
55
%
D
40
%
E
25%
F
F E D C B A
0%
0% 42.5 50 60 75 1
% % % % 00% Transit LOS
Relationship of Transit and
Arterial Levels of Service
TRANSIT ARTERIAL
A FFD
B FED
C D
D C
E B
FF E A
Scoring Policy Areas Using
PAMR
1
00% A
85
% B
70
%
C
Arterial LOS
55
%
D
40
%
E
25%
F
F E D C B A
0%
0% 42.5 50 60 75 1
% % % % 00% Transit LOS
Scoring Policy Areas Using
PAMR
1
00% A
85 Acceptable
% B
70
%
C
Arterial LOS
55
%
D
40
%
E
25%
Acceptable with full
mitigation
F E D C B A
0%
0% 42.5 50 60 75 1
% % % % 00% Transit LOS
Scoring Policy Areas Using
PAMR
1
00% A
85 Acceptable
% B
70
%
C
Arterial LOS
55
%
D
40
%
E
25%
Acceptable with full
mitigation
F E D C B A
0%
0% 42.5 50 60 75 1
% % % % 00% Transit LOS
2009 Growth Policy
APFO – BACKROUND
TRANSIT ARTERIAL
A D
B D
C D
D C
E B
E A
2009 Growth Policy
APFO – WHY CHANGE?
- Encourage residential
development in urban areas
TRANSIT ARTERIAL
A D
B D
C D
D C
E B
E A
2009 Growth Policy
APFO TRANSPORTATION - BALANCE
The Symmetrical
PAMR allows
LOS E for
Relative Arterial
Mobility
TRANSIT ARTERIAL
A F
B E
C D
D C
E B
F A
2009 Growth Policy
APFO TRANSPORTATION - BALANCE
TRANSIT ARTERIAL
A D
B D
C D
D C
E B
E A
2009 Growth Policy
APFO TRANSPORTATION - BALANCE
The Symmetrical
PAMR requires
mitigation in 11
policy areas
TRANSIT ARTERIAL
A F
B E
C D
D C
E B
F A
2009 Growth Policy
APFO TRANSPORTATION – NON-AUTO FACILITIES
Non-auto facilities
other than
sidewalks and
bike paths
valued at
$11,000 per trip
2009 Growth Policy
APFO TRANSPORTATION - TRANSFERABILITY
PAMR could be
satisfied in Urban
Areas by
demonstration of
mobility
standards on
affected arterials
through adjacent
communities
2009 Growth Policy
APFO TRANSPORTATION – TRIP GENERATION RATES
Establishment of
residential trip
generation rates
in Urban Areas
at 80% of
Countywide rates
based on
MWCOG
Household
Travel Survey
information on
vehicle trips.
2009 Growth Policy
APFO TRANSPORTATION – WHITE FLINT APF APPROVALS
Reduce
transportation
impact taxes for
residential
development in
Urban Areas
(other than
MSPAs or
Clarksburg) by
33% from
General rates
based on
MWCOG
Household
Travel Survey
information on
VMT.
2009 Growth Policy
APFO - SCHOOLS
Current School Tests
Compares projected 2014
enrollment with 2014
classroom capacity for
each of the 25 high school
clusters at the elementary,
middle and high levels.
If projected enrollment at
any level exceeds 105% of
program capacity,
residential subdivisions in
the affected cluster will be
required to make a school
facility payment.
If projected enrollment at
any level exceeds 120% of
program capacity,
residential subdivisions in
the affected cluster will be
under moratorium
2009 Growth Policy
APFO - SCHOOLS
Current School Tests