0% found this document useful (0 votes)
81 views5 pages

Details For Transportation and Dispatch:: Energy Sector 2-84700-76771-00

Drawings of the powerplant installation basic

Uploaded by

mohan_krishna372
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views5 pages

Details For Transportation and Dispatch:: Energy Sector 2-84700-76771-00

Drawings of the powerplant installation basic

Uploaded by

mohan_krishna372
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

ENERGY SECTOR

Zus tndige Stelle : ber nehm ende Stelle : nder ung :B Dok . Ar t :

2-84700-76771-00
Einor dnungs - Nr .: Spr ac he : Seite :

EO IP GRN ENN2
Er s tellt : G epr f t : Fr eigegeben :

27.04.11
G ltig f r :

Lindner
Standort

27.04.11
Ents tand aus :

Wolf

27.04.11
Ers atz f r :

Globus System
Klas s if ik at.-Nr.: Datei:

1/5

Nrnberg

Details for transportation and dispatch:


Projectnumber: Project: Type: 76771 Essar Hazira Unit 1, HP-Turbine SST 600 , G&V G50

Informations for transport: Dimensions: Length: Wide: Height: Load: 5800 4720 4100 600 mm mm mm KN

Lifting lugs 1- 4 or 5- 8: The lifting lugs 1-4 or 5-8 are the main lifting lugs of the Kolli. They are designed to carry the full load of the turbine with baseframe. General remarks: The position of the center of gravity could not exactly be calculated. To lift the turbine the transport contractor has to adjust the tackle blocks in order to keep the turbine horizontally. During the lifting process the contractor has to regard the ropes carefully. If the ropes touch the turbine body the turbine has to be protected by means of wood pieces. If the ropes touch any piping of the turbine, the contractor has to decide about using other rope length or spreader beams in order not to damage the turbine internal pipes. The ropes 1-4 are the main lifting ropes and have to carry the full load of the turbine with baseframe. It is transport contractors responsibility to choose the right ropes.

Informations for dispatch: The following parts are to be dismantled for dispatch: Basic Packing Procedures for Suppliers F12-F1069 Emergency Stop valve Main Oil pump HP-Servo 1-4 and ESV Servo 1 and 2 Piping outside the baseframe See dispatch guidelines 1CW_ _ _ _ _ _ _ _ Page _ _/_ _

B A
nd

Second option added Wedges not applicable


Text

08.12.11 Lindn 13.10.11 Lindn


Datum Name Archiv nd Text Datum Name Archiv

Fr dieses Dokument und den darin dargestellten Gegenstand behalten wir uns alle Rechte vor. Vervielfltigungen, Bekanntgabe an Dritte oder Verwertung seines Inhalts sind ohne unsere ausdrckliche Zustimmung verboten. SIEMENS AG
Vd3662 / 92-11

nderung :B

Sprache :

Seite :

de

2-84700-76771-00

first Option

Vd2522 91-08

nderung :B

Sprache :

Seite :

de

2-84700-76771-00

Vd2522 91-08

nderung :B

Sprache :

Seite :

de

2-84700-76771-00

2 nd. Option

Vd2522 91-08

nderung :B

Sprache :

Seite :

de

2-84700-76771-00

Vd2522 91-08

You might also like