100% found this document useful (1 vote)
246 views

Parker Kill Sheet

This document contains well information for Rig Number P110 including details on drill pipe, drill collars, casing, mud properties, pump specifications, pressure calculations, and a leak-off test summary. It lists the measured depth, true vertical depth, hole size and footage. It also provides calculations for maximum safe casing pressure, estimated mud weights, pump rates and pressures, and leak-off test parameters.

Uploaded by

scrbdgharavi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
246 views

Parker Kill Sheet

This document contains well information for Rig Number P110 including details on drill pipe, drill collars, casing, mud properties, pump specifications, pressure calculations, and a leak-off test summary. It lists the measured depth, true vertical depth, hole size and footage. It also provides calculations for maximum safe casing pressure, estimated mud weights, pump rates and pressures, and leak-off test parameters.

Uploaded by

scrbdgharavi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Date Well Name Rig Number

Well Information Form


Drill Pipe 2: 5.00 " OD 49.3 lb/ft 902.64 ft 0.00883 bbl/ft Cap 0.01794 bbl/ft Dis 0.02677 bbl/ft Tot Casing " OD lb/ft Gr. ft MD ft TVD IYP bbl/ft Cap Drill Collars 1: 6.50 " OD 2.81 " ID 205.87 ft 0.00768 bbl/ft Cap 0.03336 bbl/ft Dis 0.04104 bbl/ft Tot Liner " OD lb/ft Gr. ft MD ft TVD IYP bbl/ft Cap

Company Man Rig Manager

Drill Pipe 1: 5.00 " OD 19.5 lb/ft 11,671 ft 0.01776 bbl/ft Cap 0.00812 bbl/ft Dis 0.02589 bbl/ft Tot Drill Collars 2: " OD " ID ft 0.00000 bbl/ft Cap 0.00000 bbl/ft Dis 0.00000 bbl/ft Tot 0 0

Measured Depth: 12,780 ft True Vert. Depth: 12,275 ft Hole: size Open Hole Footage ft. TVD bbl/ft Cap

9.63 53.5 P110 11881 11579 10900 0.07080

8.50 899 12,275 0.0702

Mud Weight: 15 ppg 0.7800 psi/ft

Pump #1: 6.5 in. liner 12 in. stroke 95 % Eff. 0.11704 bbl/stroke Pump #2: 6.5 in. liner 12 in. stroke 95 % Eff. 0.11704 bbl/stroke Pump #3: 0 in. liner 0 in. stroke 0 % Eff. 0.00000 bbl/stroke

Slow Pump Information 1: bbl/ min strokes/min psi 2.34 20 325 2.93 25 425 3.51 30 575 Slow Pump Information 2: bbl/ min strokes/min psi 2.93 25 425 3.51 30 575 4.68 40 800 Slow Pump Information 3: bbl/ min strokes/min psi 0.00 0 0 0.00 0 0 0.00 0 0 15.0 15.6 0.8133

MAXIMUM SAFE CASING PRESSURE: LOWEST INTERNAL YIELD psi X .70 = 7630 A Mud Grad - .47 = 0.31 B SHOE TVD X B = 3589 C *A - C = 4041 PSI

SPR TAKEN @ Depth

12699

**LOST CIRCULATION WILL OCCUR with **Maximum EQUIVALENT MUD Weight Maximum Gradient Drill String: Drill Pipe 1 Drill Pipe 2 D Collar 1 D Collar 2

ppg mud @ ppg. psi/ft

385

psi on Csg Gauge.

1) 2) 3) 4)

11671.49 902.64 205.87 0

ft. X ft. X ft. X ft. X

0.01776 bbl/ft = 0.00883 bbl/ft = 0.00768 bbl/ft = 0.00000 bbl/ft = INSIDE DRILL STRING TOTALS =

bbls 207 8 2 0 216.8 bbls 524 0 9 30 0 6 0 0 569.5

stk 1771 68 14 0 1852.8 stk 4479 0 79 257 0 51 0 0 4866.2

min 71 3 1 0 74.1 min 179 0 3 10 0 2 0 0 194.6

Annuluses: DP1-CSG DP1-OH DP2-CSG DP2-OH DC1-CSG DC1-OH DC2-CSG DC2-OH

1) 2) 3) 4) 5) 6) 7) 8)

11671.49 0 209.51 693.13 0 205.87 0 0

ft. X ft. X ft. X ft. X ft. X ft. X ft. X ft. X

0.04492 bbl/ft = 0.04430 bbl/ft = 0.04404 bbl/ft = 0.04342 bbl/ft = 0.02976 bbl/ft = 0.02914 bbl/ft = 0.07080 bbl/ft = 0.07019 bbl/ft = ANNULUS TOTALS = Surface to Bit: strokes =

Well sections strokes and minutes: Bit to Shoe: strokes = 308 Bit to Surface: strokes =

min =

12

1853

min =

74

4866

min =

195

Surface to Surface: strokes = 6719

min =

269

PRESSURE CONTROL WORK SHEET


1 PRE-RECORDED INFORMATION: FROM WELL INFORMATION FORM: LOST CIRCULATION WILL OCCUR WITH 15 PPG MUD AT =385.06988 PSI BELOW CSG. SHOE TRUE VERTICAL DEPTH = MEASURED DEPTH = SLOW PUMP INFORMATION 2.34 BBL/MIN 2.93 BBL/MIN 3.51 BBL/MIN 20 STK/MIN= 25 STK/MIN= 30 STK/MIN= 325 PSI 425 PSI 575 PSI
SURF TO BIT BIT TO SHOE= BIT - SURF= SURF -SURF=

FROM WELL INFORMATION FORM: ESTIMATED MAXIMUM SAFE CASING PRESSURE=

4041

PSI 15 0.78 STROKES PPG PS/FT. MINUTES@ MINUTES@ 25 1853 308 4866 6719 74 12 195 269 0 30 62 10 162 224

MUD WT. IN DRILL STRING= MUD GRADIENT= WELL CIRCULATION:

12,275 12,780

SHUT IN DRILL PIPE PRESSURE = PITE VOLUME INCREASE= 0

0 BBL'S

PSI

SHUT IN CSG. PRESS.=

3 @
@ @

INITIAL CIRCULATING PRESS (ICP) = SLOW PUMP PRESS +SHUT IN DRILL PIPE PRESSURE (SIDPP) 20 25 30 STK/MIN] STR/MIN ] STK/MIN ] 325 425 575 PSI + PSI + PSI + 0 0 0 PSI= PSI= PSI= 325 425 575 PSI PSI PSI

MUD WEIGHT INCREASE = SHUT IN DRILLPIPE PRESSURE X19.23 DIVIDED BY TRUE VERTICLE DEPTH FT. 0 PSI X19.23 DIVIDED BY 12,275 FT. = 0.0 PPG. 15 PPG. 15.0 PPG.

ADD ORIGINAL MUD WEIGHT =

5 6
25 30

NEW MUD WEUGHT=

FINAL CIRCULATING PRESS (FCP) =SLOW PUMP PSI X KILL MUD WEIGHT DIV. ORIGINAL MUD WEIGHT STK/MIN STK/MIN 425 575 PSI X PSI X 15.0 PPG DIV. BY 15.0 PPG DIV. BY 15 15 PGG PGG 426 577

PSI PSI

3000
INITIAL CIRCULATING PRESSURE

2000

1000 575 425 0 575 425 575 425 576 425 576 426 576 426 576 426 576 426 576 426 577 426

PRESS 1 MINUTE STROKES PRESS 2 MINUTE

425 0 0 575 0

425 8 206 575 7

425 16 412 575 14

425 25 618 576 21

426 33 823 576 27

426 41 1029 576 34

426 49 1235 576 41

426 58 1441 576 48

426 66 1647 576 55

426 74 1853 577 62

PARKER DRILLING COMPANY ( LEAK-OFF TEST )


WELL # 0 9 5/8 53.5 P110 11881 11579 10900 DATE OF TEST
5. 7. 8. MUD WT. IN CASING= TEST MUD WT.= TEST MUD GRAD.= 15 0.78 15.6 0.8112 PPG. PSI./FT. PPG. PSI./FT.

CSG OD INCHES= WT. LB'S/FT.= GRADE = LENGTH IN FT. = TVD IN FT.=


1. MIN.INT. YIELD PSI=
2. 3.

6.MUD IN CASING GRAD=

MMS CASING TEST PRESSURE: 9. LINE 1 X .70= LINE 6 - .47= LINE 4 X LINE 10= LINE 9 - LINE 11= 7630 0.31 3589 4041 PSI. / FT. PSI. / FT. PSI. / FT. PSI. / FT. 10. 11.

ROT. KEL. BUSH. - MUD LINE= MUD LINE TO CASING SHOE= =

4. TVD OF CASING SHOE IN FT.

11,579

12.

LEAK-OFF TEST:

RECORD LEAK-OFF PRESS.=

361

PSI

LEAK-OFF PRESSURE (PSI) X 19.23 DIVIDED BY TOTAL TVD OF CASING. SHOE = MUD WEIGHT INCREASE.(PPG) 361 PSI X 19.23 DIVIDED BY LEAK-OFF PRESS. 11579 (LINE 4) FEET = 0.6 PPG. 361 15 0 15.6 MUD WT INCREASE

MUD WEIGHT INCREASE (PPG.) + MUD WT. IN CASING (PPG.) = MAXIMUM MUD WEIGHT (PPG.) 0.6 PPG + 15 ( LINE 5) PPG = 15.6 MAX. MUD WT. PPG MUD WT INCREASE

MAXIMUM MUD WEIGHT (PPG.) X .052 = MAXIMUM GRADIENT (PSI/ FT) 15.6 PPG X .052= 0.8133 PSI/FT.

TOTAL TRUE VERTICAL DEPTH OF CASING SHOE X MAXIMUM GRADIENT = TEST PRESSURE ON FORMATION 11579 ( LINE 4) FEET X 0.8133 PSI/FT= 9417 PSI MAX. GRADIENT

TEST PRESSURE ON FORMATION + 500 PSI = MINIMUM PRESSURE FOR LINER LAP TEST 9417 PSI + 500 PSI = 9917 PSI

FIT
MAX. CSG. PRESS.
400 350 300 250 200 150 100 50 0 9 9.5 1010.51111.51212.51313.51414.51515.51616.51717.51818.519 MUD WT.