0% found this document useful (0 votes)
35 views

Memorandum Assignment: Pramit Kumar Das 0930170030 Bus251.5

Our generator broke down and caught fire on June 30th, damaging the machine room. This prevents normal production during the daily 3 hours of scheduled blackouts in our industrial area. To maintain our production rates and meet delivery deadlines, I request immediate replacement of the generator.

Uploaded by

Samiur Rahman
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

Memorandum Assignment: Pramit Kumar Das 0930170030 Bus251.5

Our generator broke down and caught fire on June 30th, damaging the machine room. This prevents normal production during the daily 3 hours of scheduled blackouts in our industrial area. To maintain our production rates and meet delivery deadlines, I request immediate replacement of the generator.

Uploaded by

Samiur Rahman
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

MEMORANDUM ASSIGNMENT

Pramit Kumar Das 0930170030 bus251.5

MEMORANDUM

To: XX YZ, Managing Director, Head office, Dhaka From: Pramit Das, Manager, Gazipur factory Date: 10th June 2013 Subject: Request for replacement of the generator

PMT

Suddenly on 30th June our heavy performed generator broke down and caught fire causing considerable damage to the machine room. So, to continue our normal production following decision need to take immediately: At 8 pm on 30th June suddenly smoke came out from the generator and caught fire with in few seconds before taking any action and completely destroyed our generator and the whole machine room. Now the condition is we can run the production only with the main electricity connection but during load-shedding we have no alternate source of power. In Gazipur industrial area there are 3 hours of load-shedding occurs in a day on average. So it is not possible to deliver our orders within due date according to the condition going on. So replacing a genitor is very much need to maintain our normal production rate.

After analyzing all matters, my request is to replace a generator as soon as possible otherwise it is impossible to maintain the effective production rate and delivering the product with in the due date. Thank you.