SAP Repetitive Manufacturing With Reporting Point Backflush
SAP Repetitive Manufacturing With Reporting Point Backflush
com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------Repetitive Manufacturing
Purpose
This component can be used for production planning and control in a repetitive manufacturing
environment.
You can use repetitive manufacturing as either make-to-stock REM or make-to-order REM such
as in the automotive industry, for example.
The goals of repetitive manufacturing are the following:
_ Creation and revision of production quantities on a period and quantity basis (reduction
in individual lot and order-specific processing).
_ Reduction in the production control effort and simpler backflushing tools(with the option
of using the full scope of the PP functionality).
Reporting point backflush
Use
It makes sense to use the reporting point backflush:
If you work with longer lead times. You can use the reporting points to withdraw the components closer to
the time they are required for the operation.
To do this, operations are defined as reporting points and the backflush is carried out at these reporting points.
Prerequisites
To carry out a reporting point backflush for a material, you must have assigned an appropriate Repetitive
Manufacturing Profile to the material in the material master record.
This type of backflushing corresponds to the milestone confirmation. Therefore, in the routing, you must
select a control key which has indicator 1 (= milestone confirmation) in the confirmation field.
You must have entered the routing in the production version of the material. If you create a run schedule
quantity for the material to be produced using this routing, the operations with the control key for
milestone confirmation are then automatically copied to the run schedule header as reporting points. When
creating a run schedule header, the system first tries to copy the routing entered in the detailed planning
section. If no entry exists here, the system then uses the routing from the rate-based planning section.
Features
A separate function exists in the main menu of Repetitive Manufacturing for the reporting point backflush.
When backflushing at reporting points, the system backflushes all materials that are withdrawn and
consumed at the reporting point operation and at the previous operations. The system also determines
costs. If you backflush a production quantity, the system reduces the dependent requirements of the oldest
run schedule quantities.
In the repetitive manufacturing profile, you can set that the goods receipt is automatically posted when
backflushing the last reporting point. The system does not reduce capacity quantities until backflushing the
last reporting point.
You can also backflush actual times. The production activities are then posted on the basis of the time that
was actually taken for production.
You have two options for backflushing scrap:
o
o
Assembly scrap
Component scrap
If you backflush assembly scrap, the system backflushes production activities and the goods issues for the
components. If you backflush component scrap, the system only backflushes the goods issues for the components.
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------Configuration:Go to the following path or go to transaction code OSP2 to create REM Profile
In the profile you need to check RP backflush and need to select whether you want optional or mandatory
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------Master Data:In the MRP 4 view of material master you need to check Repetitive mfg indicator and assign the repetitive mfg profile
in REM Profile, also you need to create production version
Create Production
version
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------Routing:Also you can create Routing or Rate routing with the control key which supports milestone confirmation, In the
routing below both operations are milestone operations, One material assigned for each operation.
Product Cost Collector:Go to KKF6N to create Product Cost Collector with production version as the option to create it.
After calculation cost, system shows the BOM and routing with costs.
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------Scenario:Create Requirement in MD61 for the Material.
After MRP run planned order type PE (Run Schedule Header) is created.
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------In MF50 (Planning Table) you can see the planned order is assigned to Production Line REM001
Quantity is assigned to
Production Line
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
--------------------------------------------------------------------------------------------------------------------------------------
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------Backflush:In MFBF backflush you need to enter planned order number and click on RP Backflush and enter
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------You can correct the quantities by choosing Post with correction.
Finally Save.
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------System shows GI document at the bottom of screen
Here you observe that on first operation it shows 2 quantities are confirmed.
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
-------------------------------------------------------------------------------------------------------------------------------------Similarly select the second Reporting point.
https://sites.google.com/site/sapppdocs/
Repetitive Manufacturing with Reporting Point Backflush
--------------------------------------------------------------------------------------------------------------------------------------