0% found this document useful (0 votes)
195 views

Question Paper

1. A table lists activities, predecessors, and three time estimates for a construction project. It asks to draw a PERT network, determine the critical path and average expected duration, and determine the probability of completing within 35 weeks. 2. An activity-on-arrow network schedule is given and asks to draw the network, work out activity times and floats, and determine the critical path and duration. 3. Information is given about activity durations and preceding relationships with constraints. It asks to draw the network and determine the critical path and project duration.

Uploaded by

Sarath Reddy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
195 views

Question Paper

1. A table lists activities, predecessors, and three time estimates for a construction project. It asks to draw a PERT network, determine the critical path and average expected duration, and determine the probability of completing within 35 weeks. 2. An activity-on-arrow network schedule is given and asks to draw the network, work out activity times and floats, and determine the critical path and duration. 3. Information is given about activity durations and preceding relationships with constraints. It asks to draw the network and determine the critical path and project duration.

Uploaded by

Sarath Reddy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1. Following table lists the activities, their predecessors and three time estimates for a (25) construction project.

Activity A B C P Q R S T L M N i) ii) iii) iv)

Proceeding activity A A B C P B,Q R,S,M C L L

to tm tp (Weeks) (Weeks) (weeks) 2 4 6 6 8 12 5 6 9 3 6 9 4 7 10 8 10 14 5 7 9 2 3 5 4 5 6 3 5 7 4 6 8

Draw PERT network Determine the critical path and find the average expected project duration Determine the probability of completing the project with in 35 weeks What is the duration corresponding to 82% certainty of project timely completion

2. A-O-A network schedule for a project is as given below i) ii) iii) Draw A-O-A network Work out activity times and floats Determine the critical path and project duration

H 5 M 6 N 2 P

A 3 B 5 C 7

Q G 10 L 4 9

3. Draw a network on the basis of information given below and determine the critical path and project duration

Duration Acticvity (weeks) A 2 B 5 C 4 D 6 E 7 F 5 G 8 H 7

Preceding Relationship activity Constraints A FS A FS(+1) C,E SS(+4) , FF(+2) B FS E FS(-2) D FS F,G FF(+2) , FS(+1)