PROJECT TITLE QUALITY PLAN NUMBER ITEM :OIL FILLED TRANSFORMER EXTENT OF REFERENCE ACCEPTANCE CHECK DOCUMENT NORM
SPECIFICATION : BHEL SPEC NUMBER : SPECIFICATION 11/0.433 KV,500KVA TITLE TRANSFORMER SECTION VOLUME III AGENCY REMARKS P W V
SL. NO.
FORMAT OF RECORD
1
1.0 1.1 MATERIALS
10
11
1.PHYSICAL PROPERTIES
MA
PHYSICAL TEST
SAMPLE
TEST CERT.
2,1
2.DIMENSIONS
MA
MEASUREMENT -DO-
-DO-
-DO-
-DO-
3/2
2,1
1.2
MA
VISUAL
SAMPLE
-DO-
-DO-
-DO-
3/2
MA MA
-DO-DO-
-DO-DO-
-DO-DO-
3/2 3/2
1 2,1
1.3
CONDUCTORS
3.PHYSICAL PROPERTIES
MA
PHY. TEST
SAMPLE
RELEVANT STD
RELEVANT STD
-DO-
3,2
CR
ELECT. TEST
-DO-
-DO-
-DO-
-DO-
2,1
BIDDER/VENDOR
CUSTOMER : QUALITY PLAN SHEET 2 OF 6 COMPONENT/OPERATION CHARACTERISTICS CHECK BIDDER/ VENDOR SYSTEM CAT. :
PROJECT TITLE QUALITY PLAN NUMBER PED-302-00-Q-001/02 ITEM :OIL FILLED TRANSFORMER EXTENT OF REFERENCE ACCEPTANCE CHECK DOCUMENT NORM
SPECIFICATION : BHEL SPEC NUMBER : SPECIFICATION 11/0.433 KV,500KVA TITLE TRANSFORMER SECTION VOLUME III AGENCY REMARKS P W V
SL. NO.
FORMAT OF RECORD
1
1.4
2
INSULATING OIL
3
1.ELECT.PROPT a) BDV CR
5
ELECT.TEST
6
SAMPLE
7
RELEVANT IEC/IS SPEC.
8
RELEVANT IEC /IS SPEC.
9
TEST CERT. 3/2 3 3 3,2 2
10
2,1 2,1 2,1 1 1
11
BATCH NO. & MFG./PKG. DATE TO BE VERIFIED BY BHEL. -DO-
1.5
CR MA MA
ELECT. TEST
-DO-
-DO-DO-DO-
-DO-DO-DO-
-DO-DO-DO-
1.6 1.6
MA MA
-DO-DO-
-DO-DO-
-DO-DO-
2 2
1.8
1.ROUTINE TEST
MA
100%
TEST CERT.
2,1
SOURCE. ROUTINE TEST CERTIFICATE OF INSTRUMENTS, RELAYS, BUSHINGS ETC SHALL BE VERIFIED BY BHEL
BHEL
BIDDER/VENDOR
CUSTOMER : QUALITY PLAN SHEET 3 OF6 COMPONENT/OPERATION CHARACTERISTICS CHECK BIDDER/ VENDOR SYSTEM CAT. :
PROJECT TITLE QUALITY PLAN NUMBER PED-302-00-Q-001/02 ITEM :OIL FILLED TRANSFORMER EXTENT OF REFERENCE ACCEPTANCE CHECK DOCUMENT NORM
SPECIFICATION : BHELSPEC NUMBER : SPECIFICATION 11/0.433 KV,500KVA TITLE TRANSFORMER SECTION VOLUME III AGENCY REMARKS P W V
SL. NO.
FORMAT OF RECORD
3
2.OPERATION/ FUNCTIONAL TESTS 3.DIMENSIONS 4.SURFACE CONDITION 5.RATING, MARKING MA
5
ELECT. & FUNC. 100% CHECK
6
-DO-
7
-DO-
8
-DO-
9
2
10
1
11
MA MA
-DO-DO-
-DO-DO-
-DO-DO-
2 2
1 1
MA
VISUAL
100%
-DO-
-DO-
-DO-
1.08
SHELF LIFE
MA
VISUAL
100%
-DO-
-DO-
INSP. REPORT
2.0 2.1
FABRICATION/PAINTING FABRICATED TANKS/ RADIATORS/ CONSERVATOR 1.DIMENSIONS MA MEASUREMENT 100% ----------APPROVED DRAWINGS--------INSP. REPORT -DO-DO2 1
MA CR
100% 100%
-----------RELEVANT CODE--------------BHEL TECH SPEC, CBIP STD -DOBHEL TECH SPEC, CBIP STD -DO-
2 2
1 1
CR
PRESSURE TEST
100%
-DO-
BHEL
BIDDER/VENDOR
CUSTOMER : QUALITY PLAN SHEET 4 OF 6 COMPONENT/OPERATION CHARACTERISTICS CHECK BIDDER/ VENDOR SYSTEM CAT. :
PROJECT TITLE QUALITY PLAN NUMBER PED-302-00-Q-001/02 ITEM :OIL FILLED TRANSFORMER EXTENT OF REFERENCE ACCEPTANCE CHECK DOCUMENT NORM
SPECIFICATION : BHELSPEC NUMBER : SPECIFICATION 11/0.433 KV,500KVA TITLE TRANSFORMER SECTION VOLUME III AGENCY REMARKS P W V
SL. NO.
FORMAT OF RECORD
1
2.2
2
SURFACE PREPARATION & PAINTING 1.SURFACE CONDITION
3
MA
4
VISUAL
5
100%
9
INSP. REPORT 3,2
10
1
11
--FREE FROM GREASE, SCALE, RUST AND SHALL HAVE UNIFORM ROUGH SURFACE-----------------------------------------BHEL SPEC/DATA SHEETS-------DO-DO-
2.THICKNESS 3.ADHESION 3.0 3.1 IN PROCESS CORE ASSEMBLY 1.DIMENSION 2.CORE INSULATION 3.CORE LOSS
MA MA
-DO-DO-
3,2 3,2
1 1
MA MA
QC RECORD 2 -DO2
1 1
CR
100%
RELEVANT STD
RELEVANT STD
-DO-
3.2
COIL ASSEMBLY
MA MA
-DO-DO-
2 2
1 1
MA
ELECT.TEST
100%
-DO-
-DO-
-DO-
BHEL
BIDDER/VENDOR
CUSTOMER QUALITY PLAN SHEET 5 OF 6 COMPONENT/OPERATION CHARACTERISTICS CHECK BIDDER/ VENDOR SYSTEM CAT.
: :
PROJECT TITLE QUALITY PLAN NUMBER PED-302-00-Q-001/02 ITEM :OIL FILLED TRANSFORMER EXTENT OF REFERENCE ACCEPTANCE CHECK DOCUMENT NORM
SPECIFICATION :BHELSPEC NUMBER : SPECIFICATION 11/0.433 KV,500KVA TITLE TRANSFORMER SECTION VOLUME III AGENCY REMARKS P W V
SL. NO.
FORMAT OF RECORD
1
3.3
2
CORE-COIL ASSEMBLY (FINAL DRYING & OIL FILLING
3
1.PHY. CONDITION OF COILS 2.DIMENSION 3.BRAZING CONNECTION TO TAPCHANGER 4.CLEARANCES 5.DRYNESS (IR) CR
4
VISUAL
5
100%
7
PLANT STD
8
PLANT STD -DO-
9
2
10
1
11
CR CR
-DO-DO-
2 2
1 1
CR CR
APPD. DRG.
APPD. DRG.
-DO-
2 2
1 1
BHEL SPEC/ BHEL SPEC/ -DOPLANT STD PLANT STD APPD DATA SHEET APPD DATA SHEET -DOMANUF. STD -DOMANUF. STD -DOINSP. REPORT -DO-
6.TURNS RATIO 4.0 MARSHALLING KIOSK/BOX 1.DIMENSION 2.PROPER FITNESS & WIRING 3.HV TEST (2KV) FINISH
CR MA MA
ELECT.TEST
100%
2 3,2 3,2
1 1 1
MA
TESTING
3,2
BHEL
BIDDER/VENDOR
CUSTOMER
: :
PROJECT TITLE QUALITY PLAN NUMBER PED-302-00-Q-001/02 ITEM :OIL FILLED TRANSFORMER EXTENT OF REFERENCE ACCEPTANCE CHECK DOCUMENT NORM
SPECIFICATION :BHELSPEC NUMBER : SPECIFICATION 11/0.433 KV,500KVA TITLE TRANSFORMER SECTION VOLUME III AGENCY REMARKS P W V
BHEL
QUALITY PLAN SHEET 6 OF 6 COMPONENT/OPERATION CHARACTERISTICS CHECK BIDDER/ VENDOR SYSTEM CAT. CABLE TYPE/ METHOD OF CHECK
SL. NO.
FORMAT OF RECORD
1
5.0
2
FINAL ASSEMBLY
3
1.(a)ROUTINE TEST CR
4
ELECT
5
100%
9
TEST REPORT 2
10
1 1
11
CR MA
ELECT VISUAL
-DO-DO-
MA
MEASUREMENT 100%
-DO-
-DO-
5.GEN. APPEARANCE FINISH AND WORK MANSHIP 6 .CORRECTNESS & COMPLETENESS OF ALL FITTINGS & ACCESSORIES 7 FUNCTION OF ACCESSORIES 8 PAINT SHADE THICKNESS & ADHESION OIL LEAKAGE TEST 6.0 PACKING 1.SOUNDINGS OF PACKINGS NOTE: LEGEND : P : PERFORMER
MA
VISUAL
100%
-DO-
-DO-
-DO-
NOTE: BHEL SHALL WITNESS ALL THE TESTS/CHECKS/MEASUREMENTS UNDER SL NO 5.FINAL ASSEMBLY
MA
VISUAL
100%
-DO-
-DO-
-DO-
CR
FUNCTIONAL CHECKS
100%
-DO-
-DO-
-DO-
MA
-DO-
-DO-
-DO-
MA MA
VISUAL VISUAL
100% 100%
-DOBHEL SPEC
-DOBHEL SPEC
-DO-DO-
2 2
1 -
1 1
V: VERIFIER
BIDDER/VENDOR
BHEL