This field instruction document provides information for potential change orders on construction projects. It includes spaces to fill in the project number, contract number, and date. It also has checkboxes to indicate whether the change order is estimated as a lump sum or time and material cost. Signatures are required from the preparer and construction administrator if a change order is contemplated. Copies must be distributed to relevant project parties.

Uploaded by

Ailyn O. Dungog
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views2 pages

Field Instruction No.: P P N - C C N - A D

This field instruction document provides information for potential change orders on construction projects. It includes spaces to fill in the project number, contract number, and date. It also has checkboxes to indicate whether the change order is estimated as a lump sum or time and material cost. Signatures are required from the preparer and construction administrator if a change order is contemplated. Copies must be distributed to relevant project parties.

Uploaded by

Ailyn O. Dungog
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT CONTRACTOR ARCHITECT

PROJECT NO. CONTRACT NO. DATE

FIELDINSTRUCTIONNO.

If a Change Order is contemplated, fill out and check boxes as appropriate: Estimated Cost: Cost Basis: Lump Sum Time and Material
Prepared by:
Signature and Title

Date:

Copies to: Project Manager/Construction Inspector Architect Construction Administrator Contractor

If a Change Order is contemplated (or this is an item in dispute), this


instruction shall be authorized by the Construction Administrator.

Authorized by:

Signature of Construction Administrator

Construction Mgmt. 702.22 10/06

Date:

CC: