100% found this document useful (1 vote)
2K views

Builders: Demolition Excavation Hauling Design Painting

M.C.A. Builders provides a quotation for the demolition of a 2-story apartment building in Manila, including hauling debris away. The scope of work involves razing the 3-unit apartment building to ground level and cleaning the site. The total project cost is PHP 320,000 to be paid in two installments - 50% upon signing and 50% on weekly progress billings. Salvageable materials and demolition permits will be in favor of the contractor.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views

Builders: Demolition Excavation Hauling Design Painting

M.C.A. Builders provides a quotation for the demolition of a 2-story apartment building in Manila, including hauling debris away. The scope of work involves razing the 3-unit apartment building to ground level and cleaning the site. The total project cost is PHP 320,000 to be paid in two installments - 50% upon signing and 50% on weekly progress billings. Salvageable materials and demolition permits will be in favor of the contractor.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

M.C.A.

Builders
459 Verdad Street, Sampaloc, Manila Services Offered :

Demolition * Excavation * Hauling * Design * Painting


July 9, 2012 Attention Subject Sir, This has reference with your request for the quotation for demolition of 2 Storey apartment building including hauling and clearing located at A.H. Lacson Street, Sampaloc, Manila. We are pleased to offer our proposal for your consideration. A. SCOPE OF WORKS 1. Demolition of 2 Storey Apartment Building raze to ground level ( 3 units of 2 storey concrete apartment ) 2. Cleaning of all debris 3. Hauling of debris ______________ Php 320,000.00 AMOUNT : Archt. Voltaire Vitug : Demolition of 2 Storey Apartment Building

Total Project Cost B. CONTRACT AMOUNT

1. Lump sum contract amount for demolition works amounting to THREE HUNDRED TWENTY THOUSAND PESOS (Php 320,000.00) only. C. TERMS & CONDITION 1. All salvageable materials are in favor to the demolition contractor. 2. Demolition permits are in favor for the demolition contractor. D. TERMS OF PAYMENT 1. 50% upon signing of contract 2. 50% balance on a weekly progress billing. 3. Any additional works shall be billed separately

We hope our proposal will meet your requirements and we trust for your favorable action in this matter. Thank you so much.

Respectfully yours, Melvin A. Ramos

Conforme, Archt. Voltaire Vitug

You might also like