100% found this document useful (5 votes)
3K views

RBS 6102 Configuration V1

The document provides instructions for configuring cabinets S444, S666, and S888. For S444, there is one DUG and three RUS to configure using the local OMT. E1 connections should connect to ports ETA and ETB on the DUG. For S666, there are two DUGs and six RUS to configure, with specific TEI and node parameter settings outlined for each DUG. A delay should be set in the second DUG. For S888, there are also two DUGs and six RUS to configure, with TEI, node parameter, and transmission settings defined for each DUG. E1 connections are described for each configuration.

Uploaded by

Minto Issac
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
3K views

RBS 6102 Configuration V1

The document provides instructions for configuring cabinets S444, S666, and S888. For S444, there is one DUG and three RUS to configure using the local OMT. E1 connections should connect to ports ETA and ETB on the DUG. For S666, there are two DUGs and six RUS to configure, with specific TEI and node parameter settings outlined for each DUG. A delay should be set in the second DUG. For S888, there are also two DUGs and six RUS to configure, with TEI, node parameter, and transmission settings defined for each DUG. E1 connections are described for each configuration.

Uploaded by

Minto Issac
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 34

S444 configuration: We have only 1 DUG and 3 RUS that are installed in the cabinet, they should be configured

d with the local OMT as shown in the below figures:

And the cabinet should look at the end defined as below:

E1 connection in the DUG: As shown in the figure below we have 2 ports for E1 connection, ETA and ETB, so the 1st E1 should be connected to ETA and the 2nd E1 should be connected to ETB.

Please make sure to tell the BSC to define port A and port C as the E1 input. Each E1 should be connected to one OVP, so the connection will be as follow: 1st E1 should be connected to first OVP on the left and from that OVP we have an RG45 connected to port ETA in the DUG. 2nd E1 should be connected to the second OVP and another RG45 should be connected between the mentioned OVP and the port ETB in the DUG.

Node Parameters: The node parameters should be like the below figure:

And the TEI value should be all the time for the first DUG 62 as showing the below figure

S666 Configuration: In the mentioned configuration we should have 2 DUG and 6 RUS installed is the cabinet, , they should be configured with the local OMT as shown in the below figures: 1. For the first DUG:

And the TEI value should be all the time for the first DUG 62 as showing the below figure

Node Parameters:

And the cabinet should look at the end defined

as below:

2. For the second DUG:

Node Parameters:

And the TEI value should be all the time for the second DUG 61 as showing the below figure

It is important to define the delay in the second DUG 4600 as shown in the figure below:

And the cabinet should look at the end defined as below:

E1 connection in the DUG: As shown in the figure below we have 2 ports for E1 connection, ETA and ETB, so the 1st E1 should be connected to ETA in the first DUG and the 2nd E1 should be connected to ETA in the second DUG.

Please make sure to tell the BSC to define port A in both DUGs as the E1 input. Each E1 should be connected to one OVP, so the connection will be as follow: 1st E1 should be connected to first OVP on the left and from that OVP we have an RG45 connected to port ETA in the first DUG. 2nd E1 should be connected to the second OVP and another RG45 should be connected between the mentioned OVP and the port ETA in the second DUG.

S888 Configuration: In the mentioned configuration we should have 2 DUG and 6 RUS installed is the cabinet, they should be configured with the local OMT as shown in the below figures:

for the first DGU:

Node Parameters:

And the TEI value should be all the time for the first DUG 62 as showing the below figure

And the cabinet should look at the end defined as below:

Transmission configuration:

for the second DUG:

Node Parameters:

And the TEI value should be all the time for the second DUG 61 as showing the below figure

It is important to define the delay in the second DUG 4600 as shown in the figure below:

And the cabinet should look at the end defined as below:

E1 connection in the DUG: As shown in the figure below we have 2 ports for E1 connection, ETA and ETB, so the 1st E1 should be connected to ETA in the first DUG and the 2nd E1 should be connected to ETA in the second DUG and the third E1 should be connected to the port ETB in the first DUG.

Please make sure to tell the BSC to define port A in both DUGs and port C in the first DUG as the E1 input. Each E1 should be connected to one OVP, so the connection will be as follow: 1st E1 should be connected to first OVP on the left and from that OVP we have an RG45 connected to port ETA in the first DUG. 2nd E1 should be connected to the second OVP and another RG45 should be connected between the mentioned OVP and the port ETA in the second DUG. 3rd E1 should be connected to the third OVP and another RG45 should be connected between the mentioned OVP and the port ETB in the first DUG.

You might also like