This checklist provides requirements for cement plastering of 12mm and 6mm thickness on concrete surfaces. It lists 16 items to check including having proper scaffolding, preparing the surface, fixing chicken mesh on joints, filling holes, providing level and plumb marks, ensuring the finished plaster is true and plumb, and minimum thickness. It also requires keeping the plaster wet for 7 days of curing and recording the date, quantity to be plastered, and remarks. Site supervisors from the construction and developer companies must sign off to verify the requirements are met.

Uploaded by

sankuj5354
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
196 views

Plaster Check List

This checklist provides requirements for cement plastering of 12mm and 6mm thickness on concrete surfaces. It lists 16 items to check including having proper scaffolding, preparing the surface, fixing chicken mesh on joints, filling holes, providing level and plumb marks, ensuring the finished plaster is true and plumb, and minimum thickness. It also requires keeping the plaster wet for 7 days of curing and recording the date, quantity to be plastered, and remarks. Site supervisors from the construction and developer companies must sign off to verify the requirements are met.

Uploaded by

sankuj5354
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECK LIST FOR CEMENT PLASTERING 12mm Th.

& 6mm ON CONCRETE SURFACE

Name of Project
BUILDING NAME Location of Work Area of Plastering Type of Plastering

:
: : : :

S.No.
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

Description
Cement Plastering 12 mm : Scaffolding is available Cement Plastering - 6mm : Stage Scaffolding is available Surface is properly prepared before Plastering. The concrete surface shall be bull marked. Chicken Mesh is fixed on RCC/ BLOCK junction. All shuttering material/ ply are removed before start of the work. Mortar mix as per specified. Grading of Sand as per specified. All put-log holes & chases shall be properly filled. Level marks & plumb marks shall be provided. Plaster to be finished to a true and plumb surface and to the proper degree of smoothness. The minimum thickness over any portion of the surface shall not be less than specified thickness by more than 3 mm in case of 12 th plaster & shall not be less than 5 mm in case of 6mm th. Plaster. Plastering of Ceiling shall not be commenced until the slab has been finished and centring has been removed. The average thickness of plaster shall not be less than the specified thickness. Check work visually after completion. Mark date of the work to control curing. The Plaster shall be kept wet for a period of 7 days.

Complies with Requirements

Remarks

11.

12. 13. 14. 15. 16.

Total Qty. of Plastering to be done: Todays Quantity: Balance Quantity: Remarks:

Mfar construction Engineer Date:

Mfar developer Engineer Date: