National Grid’s Post

New advice for achieving clean power by 2030. Electric fleets are more crucial than ever. And the first all-women team completes substation testing. Here is your pre-#COP29 reading 👇 #CleanEnergy

The Current: The latest from National Grid

The Current: The latest from National Grid

National Grid on LinkedIn

SHIJU KOSHY PMP® Oracle Primavera P6®

Grid work delivery manager at National Grid.sa (HVDC, Transmission line, Substations,Renewable energy & BESS)

2w

𝙶𝚛𝚎𝚊𝚝 𝚎𝚏𝚏𝚘𝚛𝚝 ...𝚛𝚎𝚊𝚕𝚕𝚢 𝚖𝚘𝚜𝚝 𝚌𝚑𝚊𝚕𝚕𝚎𝚗𝚐𝚒𝚗𝚐 𝚓𝚘𝚋 𝚒𝚗 𝚂𝚞𝚋𝚜𝚝𝚊𝚝𝚒𝚘𝚗

Taiwo Aladesiun

HARDWARE ENGINEER | PCB | R&D | POWER ELECTRONICS ENGINEER | SMPS ENGINEER | EMBEDDED SYSTEM | INSTRUCTOR | SOFTWARE DEVELOPER

2w

Love this

Ruramiso Muguta

Ethical Hacking and Cybersecurity Graduate | Professional Solutionist & Technology Enthusiast

2w

Exciting to learn more about Microsoft’s collaboration with National Grid 🤩

Like
Reply
Brian kambuze

I am a cable jointer at 11kv to 33kv and Lv cable network. I am a SAP at 33kv Currently working as a Cable Jointer at Zesco Limited

2w

Interested in cable jointer

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics