The future grid demands flexibility and speed—not just in real-time operations but in planning and interconnection. Outdated processes shouldn’t slow down the resources we need for reliability. It’s time for a smarter approach to integrating flexible generation alongside renewables and storage. #gridunity #interconnection
Severe weather and evolving capacity rules are reshaping the grid. How do we ensure reliability while accelerating interconnection? Flexible generation is key. As ISOs downgrade accredited capacity, planners must integrate fast-ramping, modular solutions to support renewables and storage. However, outdated interconnection processes can slow progress. At GridUnity, we streamline interconnection to ensure the grid is fast, flexible, and future-ready. #GridPlanning #Interconnection #FlexibleGeneration #EnergyTransition #GridResilience https://lnkd.in/gbuBKsR8
This is such an important conversation. Embracing flexibility in our grid systems is essential for a reliable future. What innovative strategies do you think could help streamline these processes?