Table 1 Inaccuracy of transportation project cost estimates by type of project, in constant prices.
Related Figures (5)
Figure 3: Required adjustments to cost estimates for UK rail projects as function of the maximum acceptable level of risk for cost overrun. Constant prices. Figure 4: Cost overrun in construction projects and IT projects compared.