Thanks, and I did read that, but wasn't sure if asking how long project transferring normally took counted as that. I'll leave that out if I ever make another post, but asking if the ticket was lost/missed also seems to be quite similar (which is basically what transfer posts are)?
That said, I'm still wondering if there's anything else I can or should be doing to speed the process up?