There is currently one railway in Niger, built between 2014 and 2016 between Niamey and Dosso by the French Bolloré conglomerate. The objective was to connect Niamey to the rail network in Benin and thus to the coast. But competing commercial interests by several parties resulted in endless litigation and the connection to Benin never materialized. So the 145 km Niamey-Dosso stretch now lies orphaned and unused, with the tracks ending in the middle of nowhere some 6 km south of Dosso. After 5 years of neglect the tracks are already damaged to such an extent in some places, that they have become unusable.

Property Value
dbo:abstract
  • There is currently one railway in Niger, built between 2014 and 2016 between Niamey and Dosso by the French Bolloré conglomerate. The objective was to connect Niamey to the rail network in Benin and thus to the coast. But competing commercial interests by several parties resulted in endless litigation and the connection to Benin never materialized. So the 145 km Niamey-Dosso stretch now lies orphaned and unused, with the tracks ending in the middle of nowhere some 6 km south of Dosso. After 5 years of neglect the tracks are already damaged to such an extent in some places, that they have become unusable. A rail connection from Maradi into Nigeria is being considered. (en)
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 42282660 (xsd:integer)
dbo:wikiPageLength
  • 6588 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1107419984 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • There is currently one railway in Niger, built between 2014 and 2016 between Niamey and Dosso by the French Bolloré conglomerate. The objective was to connect Niamey to the rail network in Benin and thus to the coast. But competing commercial interests by several parties resulted in endless litigation and the connection to Benin never materialized. So the 145 km Niamey-Dosso stretch now lies orphaned and unused, with the tracks ending in the middle of nowhere some 6 km south of Dosso. After 5 years of neglect the tracks are already damaged to such an extent in some places, that they have become unusable. (en)
rdfs:label
  • Railway stations in Niger (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License