dbo:abstract
|
- Kaheawa Wind Power is one of the largest wind farms in Hawaii. It is located on the island of Maui above the town of Maalaea in the West Maui Mountains. Phase one (KWP I) of the project was completed in 2006 by developer and operator First Wind and produces 30 MW from 20 GE Energy 1.5 MW wind turbines. Phase two (KWP II), completed in July 2012, built 14 turbines below phase one with an additional 21 MW for a total capacity of 51 MW serving 18,700 homes.Kaheawa is the first wind farm in the United States to use a Habitat Conservation Plan (HCP) to protect the long term health of local species, including three endemic birds and one endemic bat. (en)
|
dbo:averageAnnualGeneration
|
- 691200000000000.000000 (xsd:double)
|
dbo:buildingStartDate
|
- 2011 (II)
- October 28, 2005 (I)
|
dbo:buildingStartYear
|
- 2005-01-01 (xsd:gYear)
- 2011-01-01 (xsd:gYear)
|
dbo:capacityFactor
| |
dbo:installedCapacity
|
- 51000000.000000 (xsd:double)
|
dbo:location
| |
dbo:openingDate
|
- 2006-06-08 (xsd:date)
- 2012-07-02 (xsd:date)
|
dbo:openingYear
|
- 2006-01-01 (xsd:gYear)
- 2012-01-01 (xsd:gYear)
|
dbo:status
|
- Operational (I)
- Operational (II)
|
dbo:thumbnail
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 10630 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:commissioned
|
- 2006-06-08 (xsd:date)
- 2012-07-02 (xsd:date)
|
dbp:constructionBegan
|
- 2011 (xsd:integer)
- 2005-10-28 (xsd:date)
|
dbp:cost
| |
dbp:country
| |
dbp:imageCaption
| |
dbp:location
| |
dbp:name
| |
dbp:owner
| |
dbp:psAnnualGeneration
| |
dbp:psElectricalCapFac
| |
dbp:psElectricalCapacity
| |
dbp:psUnitsManuModel
| |
dbp:psUnitsOperational
| |
dbp:status
| |
dbp:website
| |
dbp:wikiPageUsesTemplate
| |
dbp:windFarmType
| |
dbp:windSiteUsage
| |
dcterms:subject
| |
gold:hypernym
| |
georss:point
|
- 20.81361111111111 -156.5511111111111
|
rdf:type
| |
rdfs:comment
|
- Kaheawa Wind Power is one of the largest wind farms in Hawaii. It is located on the island of Maui above the town of Maalaea in the West Maui Mountains. Phase one (KWP I) of the project was completed in 2006 by developer and operator First Wind and produces 30 MW from 20 GE Energy 1.5 MW wind turbines. (en)
|
rdfs:label
| |
owl:sameAs
| |
geo:geometry
|
- POINT(-156.55111694336 20.813611984253)
|
geo:lat
| |
geo:long
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:homepage
| |
foaf:isPrimaryTopicOf
| |
foaf:name
| |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |