The Green Line is a light rail (LRT) line under construction in Calgary, Alberta, Canada. The line will run between Calgary’s north-central and southeastern boundaries, connecting with the Red Line and Blue Line in the city’s downtown. The Green Line is the largest public infrastructure project in Calgary's history and will be the first rail line in the city to operate low-floor trains. When completed, the Green Line will comprise 29 stations spanning 46 kilometres. This will bring the total number of CTrain stations in Calgary to 74. Like the Red Line and Blue Line, the Green Line is being constructed in stages. Stage one of construction features 15 stations (9 at-grade, 4 underground, 2 elevated) and is being funded with three roughly equal contributions from the City of Calgary, the Gov

Property Value
dbo:abstract
  • The Green Line is a light rail (LRT) line under construction in Calgary, Alberta, Canada. The line will run between Calgary’s north-central and southeastern boundaries, connecting with the Red Line and Blue Line in the city’s downtown. The Green Line is the largest public infrastructure project in Calgary's history and will be the first rail line in the city to operate low-floor trains. When completed, the Green Line will comprise 29 stations spanning 46 kilometres. This will bring the total number of CTrain stations in Calgary to 74. Like the Red Line and Blue Line, the Green Line is being constructed in stages. Stage one of construction features 15 stations (9 at-grade, 4 underground, 2 elevated) and is being funded with three roughly equal contributions from the City of Calgary, the Government of Alberta, and the Government of Canada. Major construction was planned to begin in early 2021 but was delayed to April 2022 after Alberta’s United Conservative provincial government failed to contribute the province’s pledged portion of the line's funding and rebuked the project as a "line to nowhere", asserting that the City of Calgary did not have "any credible plan" despite nearly four decades of research and planning. This came after months of speculation from city officials, politicians, and journalists that the provincial government, oil tycoons and other executives associated with the United Conservative Party were attempting to stifle or cancel the Green Line despite its popular support. Due to the provincial government's actions, the City of Calgary temporarily paused the project's procurement though planning, pre-construction and public engagement continued through 2021. Delays persisted until the project received final approval from Alberta’s provincial government on July 7, 2021, hours after Prime Minister Justin Trudeau met privately with Jason Kenney in Calgary. This meant the project had full approval from all three orders of government and Prime Minister Justin Trudeau stated “The money is there and the agreements are signed, so regardless of an election, the Green Line is going to go forward." Construction of the Green Line officially began in April 2022 with PCL Construction selected as the construction management contractor. The Green Line Board released the Request for Proposals (RFP) to select a proponent to construct phase one of stage one of construction, from Shepard to Eau Claire, on September 26, 2022. Stage one of construction is expected to be completed in 2027. (en)
dbo:isPartOf
dbo:lineLength
  • 20000.000000 (xsd:double)
  • 46000.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 15 (xsd:nonNegativeInteger)
dbo:operator
dbo:owner
dbo:railwayRollingStock
dbo:routeEnd
dbo:routeStart
dbo:speedLimit
  • 80.000000 (xsd:double)
dbo:status
  • Under construction
dbo:thumbnail
dbo:type
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 56851106 (xsd:integer)
dbo:wikiPageLength
  • 50476 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1120127233 (xsd:integer)
dbo:wikiPageWikiLink
dbp:character
  • At-grade, elevated, underground, street running (en)
dbp:dailyRidership
  • 65000 (xsd:integer)
dbp:electrification
  • Overhead lines, 600 V DC (en)
dbp:end
dbp:linelength
  • (en)
  • 20.0
dbp:locale
  • Calgary, Alberta, Canada (en)
dbp:logo
  • G .png (en)
dbp:logoWidth
  • 30 (xsd:integer)
dbp:mapName
  • Map diagram (en)
dbp:mapState
  • collapsed (en)
dbp:name
  • Green Line (en)
dbp:operator
  • Calgary Transit (en)
dbp:owner
dbp:routenumber
  • 203 (xsd:integer)
dbp:start
  • 16 (xsd:integer)
dbp:stations
  • 15 (xsd:integer)
dbp:status
  • Under construction (en)
dbp:stock
  • CAF Urbos 100 (en)
dbp:system
dbp:type
dbp:wikiPageUsesTemplate
dcterms:subject
rdf:type
rdfs:comment
  • The Green Line is a light rail (LRT) line under construction in Calgary, Alberta, Canada. The line will run between Calgary’s north-central and southeastern boundaries, connecting with the Red Line and Blue Line in the city’s downtown. The Green Line is the largest public infrastructure project in Calgary's history and will be the first rail line in the city to operate low-floor trains. When completed, the Green Line will comprise 29 stations spanning 46 kilometres. This will bring the total number of CTrain stations in Calgary to 74. Like the Red Line and Blue Line, the Green Line is being constructed in stages. Stage one of construction features 15 stations (9 at-grade, 4 underground, 2 elevated) and is being funded with three roughly equal contributions from the City of Calgary, the Gov (en)
rdfs:label
  • Green Line (Calgary) (en)
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Green Line (en)
is dbo:servingRailwayLine of
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is dbp:line of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License