Nišava River Bridge Rehabilitation Guide

This document summarizes the rehabilitation of the Nišava River Bridge in Yugoslavia using carbon fiber reinforced polymer (CFRP) plates from Sika. The bridge, built in 1959-1960, was showing signs of insufficient flexural strength from increased traffic loads. Sika Romania provided over 3,000 meters of prestressed and non-prestressed CFRP plates to strengthen the bridge deck and increase its load-carrying capacity. The rehabilitation project was completed from July to October 2001 to extend the service life of the aging concrete bridge.

Uploaded by

Alin Apo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
200 views17 pages

Nišava River Bridge Rehabilitation Guide

This document summarizes the rehabilitation of the Nišava River Bridge in Yugoslavia using carbon fiber reinforced polymer (CFRP) plates from Sika. The bridge, built in 1959-1960, was showing signs of insufficient flexural strength from increased traffic loads. Sika Romania provided over 3,000 meters of prestressed and non-prestressed CFRP plates to strengthen the bridge deck and increase its load-carrying capacity. The rehabilitation project was completed from July to October 2001 to extend the service life of the aging concrete bridge.

Uploaded by

Alin Apo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd

Construction The Nišava River Bridge

Sika Romania

View

1
The Nišava River Bridge
The Project
Construction
Bridge over Nišava River, Niš Belgrade-Niš-Skopje
Highway Yugoslavia
Reinforced concrete continuous three spans
bridge: built in 1959/1960
Sika Romania
Length of the bridge
L = 14,0 + 68,0 + 14,0 = 96,0 m
Width of the bridge:
B = 18,36 m
2
Construction The Nišava River Bridge

Sika Romania

Longitudinal section

3
The Nišava River Bridge
Cross sections
Construction

Sika Romania

At mid-span Over support

4
The Nišava River Bridge
The Problem
Construction
Insufficient flexural strength due
to increased traffic load
 Over supports in longitudinal direction
 Large transversal cracks in the bridge deck
 Risque of corrosion in reinforcement steel
Sika Romania

 In the bridge deck for local bending moments due to


concentrated load

5
The Nišava River Bridge
The Solution
Construction

Prestressed CarboDur CFRP plate Typ S914


over supports

 Length of plates : max. 33,0 m


 Number of plates
Sika Romania : 108
 Total CarboDur : ca. 3200 m
 Prestressing force : Vo = 135 KN

Construction Phase: 15th. July-30th. October 2001

6
Construction The Nišava River Bridge

Consultant & Contractor


MOSTOGRADNJA Ltd. Co.
Civil Engineering and Construction Company Belgrade,
Yugoslavia
Sika Romania
Prestressing of SikaCarboDur CFRP plate S914
with a System
Developed, Tested, Manufactured and Patented by
MOSTOGRADNJA

7
The Nišava River Bridge

Longitudinal section
Construction

Sika Romania

Distribution of prestressed CarboDur CFRP plates


Length : max. 33 m

8
The Nišava River Bridge
The Solution
Construction

Traditional-non prestressed CarboDur CFRP


plate Type S914 for the bridge deck

 Length of plates: 4-5m


Sika Romania
 Number of plates: 400
 Total CarboDur: ca. 1800 m

9
Construction The Nišava River Bridge

Sika Romania

Equipment for Application


of CarboDur plates
1
0
Construction The Nišava River Bridge

Sika Romania

Application of Sikadur-30 and of CarboDur


plate on the bridge deck
1
1
Construction The Nišava River Bridge

Sika Romania

Preparation of
anchorage plates 1
2
Construction The Nišava River Bridge

Sika Romania

Detail of anchorage system


Prestressing in progress

1
3
Construction The Nišava River Bridge

Sika Romania

Prestressing in progress

1
4
Construction The Nišava River Bridge

Sika Romania

Prestressing equipment
1
5
Construction The Nišava River Bridge

Sika Romania

Anchorage system during curing of


Sikadur-30 epoxy adhesive
1
6
The Nišava River Bridge
Sika System Solution
Construction

Sika Romania

Temperature protection of Prestressed


CarboDur CFRP plate system
1
7