100% found this document useful (2 votes)
7K views8 pages

Partition and Cladding Construction Guide

This document contains plans and details for an aluminum partition door and window. The plans show the partition and window layout within an office space, including dimensions. Sectional details are provided showing the frame construction and glazing of the window unit. Dimensions are provided for the window frame and components.

Uploaded by

Ayush Gour
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
7K views8 pages

Partition and Cladding Construction Guide

This document contains plans and details for an aluminum partition door and window. The plans show the partition and window layout within an office space, including dimensions. Sectional details are provided showing the frame construction and glazing of the window unit. Dimensions are provided for the window frame and components.

Uploaded by

Ayush Gour
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
  • Aluminum Partition Door and Window
  • Wood and Aluminum Partition
  • False Ceiling
  • Sound Proof Construction and Cladding
  • Aluminum Cladding
  • Knock-Down Furniture
  • Glass Blocks
  • Curtain Wall

ALUMINUM PARTITION DOOR AND WINDOW

PARTITION B
PARTITION CUM DOOR 1.2

F WINDOW

A A

5000
E E RUBBER GASKET

0.7
2100

GLAZING
4MM
10,000

OFFICE PLAN

40
ELEVATION
4600
F OUTSIDE
TRACK

4200
4000
ELEVATION GLASS

2100
SECTION

900
GLASS
INSIDE

SECTION A-A PLAN

SECTIONAL PLAN - EE
SECTIONAL DETAILS OF WINDOW

GLASS

23.25 23.25

1
1.05

27
31.75

31.75

18
10
1
STILE
STILE
40
GLAZING 61.85 61.85
4MM
FRAME OTER BOTTOM SHUTTER INTERLOCK
FRAME OUTER TOP & SIDE

GLASS

1.28

1.09
1.09

18

10
18
BOTTOM RAIL

18
10
UPPER RAIL 42
40
40

GLASS FIXING DETAIL GLASS FIXING DETAIL


SHUTTER TO FIX BOTH
ISOMETRIC VIEW ISOMETRIC VIEW SHUTTER BOTTOM SIDE GLASS
SHUTTER TOP SIDE

SECTION - FF

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010
ALUMINUM PARTITION DOOR AND WINDOW VII SEM,IV YEAR
BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR
WOOD PARTITION ALUMINUM PARTITION
x B

A C A'

DETAIL B

x' ELEVATION' Section B'

xx' ELEVATION

DETAIL B'
- PARTITION WALL IS DEFINED AS A WALL OR DIVISION MADE OF BRICKS,
GLASS, WOOD, ALUMINIUM OR OTHER MATERIAL. PROVIDED FOR THE
PURPOSE OF DIVIDING A ROOM OR A PORTION OF ROOM FROM ANOTHER.
- THESE WALLS ARE DESIGNED AS NON LOAD BEARING WALLS. IT MAY BE
COLLAPSIBLE, FOLDING OR FIXED.

WOOD PARTITIONS- ALUMINIUM PARTITIONS-


- LIGHTER IN WEIGHT - LIGHT IN WEIGHT , FIREPROOF AND STRONG.
- EASY TO CONSTRUCT - EASY TO CONSTRUCT AND SHIFT. DETAIL B'
DETAIL A DETAIL C
- NEITHER SOUND PROOF, - INSULATED MATERIAL CAN BE FILLED TO
- NOR FIRE PROOF HOLLOW SPACES.
- NOT SUITABLE FOR DAMP - USED IN OFFICES AND INDUSTRIAL BUILDINGS.
LOCATIONS.

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010
WOOD AND ALUMINIUM PARTITION VII SEM,IV YEAR
BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR
TYPES OF FALSE ELEMENTS OF FALL CEILING OR DROPPED CEILING
CEILING SYSTEMS FALSE CEILING IS THE SECONDARY CEILING HUNG
PLENUM SPACE

1. EXPOSED IT CONSISTS OF BELOW THE MAIN STRUCTURE.


GRID THREE PARTS:
THE AREA DROPPED BELOW THE FALL BOARD OR PANEL

2. CONCEALED 1. PRIMARY CEILING IS CALLED AS PLENUM SPACE. EXPOSED SECTION

GRID MEMBERS EXPOSED GRID SECTION


2. SECONDARY IT IMPROVES AESTHETICAL APPEARANCE,
MEMBERS PROVIDES BETTER INSULATION FROM,
HELPS IN ACOUSTICAL IMPROVEMENT. CONCEALED SECTION
3. CEILING
MATERIAL BOARD OR PANEL

CONCEALED GRID SECTION


ROOM SECTION
18,11

PRIMARY MEMBERS HANGING MEMBER


8.623
1

WALLSECTION
EDGE
TRIM
(L-ANGLE)
A B B'
RECESSED LIGHT
ACCESS
WALL (12 MM THICK) PANEL

CROSS MAIN
TEE TEE
93.129
0

SECONDARY MEMBERS

CEILING
BOARD
CEILING
TILE HANGING
WIRE

SUSPENDED CEILING

CEILING PLAN

WALL (120 MM THICK)

SECTION PANEL BOARD


WALL ANGLE
STEEL ANCHOR BOLTS

MILD STEEL ANGLE


(50MMx30MMx0.06MM)
HANGER RODS
CEILING
MAIN CROSS BOARD
TEE TEE
SELF TAPPING SCREWS DETAIL A

CEILING CHANNEL SECTION


(500MMx500MM SPACING)

MINERAL WOOL

MILD STEEL ANGLE

NON-COMBUSTIBLE MINERAL BOARD


(12MM THICK)

CEILING CHANNEL SECTION


CONCEALED GRID SUSPENDED CEILING RECESSED LIGHT FITTING

LIGHTS DETAIL B
CONVENTIONAL CEILING
SECTIONAL VIEW

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010
FALSE CEILING VII SEM,IV YEAR
BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR
CLADDING

CELOTEX OOR
SOUND PROOF CONSTRUCTION
CLADDING IS THE EXTERIOR SKIN, OR ENVELOPE OF A BUILDING AND INCLUDES ALL MOISTURE
BARRIERS AND SLIDING MATERIALS USED TO COVER THE OUTSIDE OF THE STRUCTURE. OTHER INSULATION
BOARD
HIGH NOISE CONDITIONS NOT ONLY RESULT IN
TYPES OF CLADDING: UNCOMFORTABLE LIVING CONDITIONS BUT PROLONGED
CLADDING ARE CLASSIFIED IN TWO CATEGORIES BRICK MASONARY EXPOSURE TO SUCH CONDITIONS MAY CAUSE HEARING
QUILT IMPAIRMENTS.
INTERIOR CLADDING:
CLADDING DONE ON THE INTERIOR WALLS SUCH AS TIMBER CLADDING, PVC CLADDING, STONE IT IS NECESSARY TO BE DONE IN BUILDINGS LIKE
CLADDING, CERAMIC CLADDING, WALLPAPER ETC. HOSPITALS, OFFICES, EDUCATIONAL INSTITUTES ETC.
SOUND PROOFING IS MAJOR ELEMENT IN FILM STUDIOS,
EXTERIOR CLADDING: AUDITORIUMS, THEATRES ETC.
CLADDING DONE ON THE EXTERIOR OF THE BUILDING SUCH AS STONE CLADDING, BRICK
CLADDING, METAL CLADDING, TERRACOTA CLADDING ETC. CARPET
WOODEN FLOORING
FLOORING BATTENS
ADVANTAGE: DISADVANTAGE: SAND RESILIENT LAYER
LOW MAINTENANCE INITIAL INSTALLATION IS COSTLIER THAN PAINT FLOOR SLAB
CAN BE EASILY CEANED NEEDS TIMELY MAINTENANCE CONCRETE SUB
PROTECTION FROM WEATHER INSTALLATION TIME IS HUGE DEPENDING ON THE GRADE
NOISE, HEAT CONTROL SURFACE OF THE BUILDING
LIGHT WEIGHT
JUNCTION OF CAVITY
FLOOR FINISH
AESTHETIC APPEAL WALL AND SOUND SCREED
PROOF FLOOR FLOOR SLAB
ABSORBENT QUILT
PLASTER

LIGHT WEIGHT
STEEL
DENSE TOPPING
FIRE RESISTANT SCREED
PLASTER FLOOR SLAB

WALL TIES

FLOOR FINISH
WIRE MESH

SCREED
FLOOR SLAB

MINERAL WOOL

BRICK
CLADDING FLOOR FINISH
SCREED
FLOOR SLAB
INSULATED
SHEATHING INTERIOR CLADDING
BOARD SOUND INSULATION OF FLOOR
BRICK CLADDING

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010

SOUND PROOF CONSTRUCTION AND CLADDING VII SEM,IV YEAR


BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR
INTERNAL WALL CLADDING-HANGING METHOD
EXTERNAL WALL CLADDING - WET SEALANT JOINT ALUMINIUM CLADDING
THIS INSTALLATION SYSTEM, WITH TRAY TYPE (ROUT AND RETURN) PANELS AND SEALING JOINTS, IS ONE OF THE MOST EXTERNAL WALL CLADDING - HANGING METHOD ALPOLIC/FR LT IS INSTALLED ON INTERIOR GYPSUM BOARD
COMMON METHODS AND IT IS AVAILABLE FOR A WIDE RANGE OF NEW BUILDINGS AND RENOVATION PROJECTS. AFTER WITH HANGING METHOD. CONCEAL THE VERTICAL JOINT WITH A JOINT COVER OF THE SAME
THE HANGING SYSTEM IS ALSO ONE OF THE MOST COMMON FIXING METHODS. MATERIAL. IN RENOVATION PROJECTS, “STUD DETECTOR” WILL HELP YOU TO FIND
FIXING ALPOLIC/FR PANELS ON THE SUBSTRUCTURE, WE APPLY A SUITABLE SEALING MATERIAL TO THE JOINTS IN IT SIMPLIFIES THE INSTALLATION WORKAT THE CONSTRUCTION SITE AND OUT THE POSITION OF STUDDING CONCEALED BEHIND GYPSUM BOARD. STUD DETECTOR IS A SMALL
HENCE WE CAN SHORTEN THE INSTALLATION PERIOD. IT IS EASY TO LOOSEN TOOL WORKING WITH AN ELECTROMAGNETIC SENSOR. NOT ONLY SOLID AND METALLIC COLORS
ORDER TO ENSURE WATER-TIGHTNESS.
THE MOVEMENT DUE TO THERMAL EXPANSION/CONTRACTION WITH THIS BUT ALSO STONE AND TIMBER-PATTERNED PANELS ARE SUITABLE FOR THIS METHOD.
METHOD, BECAUSE PANELS ARE NOT TIGHTLY FASTENED TO THE SUB-FRAME
BUT ARE SIMPLY SUSPENDED.
INSULATION
ANCHOR BOLT

50-80
Horizontal 6
STEEL ANGLE
85

REVIT BRACKET
30 ALUMINIUM CHANNEL 5
ALUMINIUM EXTRUSION ALUMINIUM EXTRUSION 50-60
SEALING MATERIAL
SCREW 3

80
ALPOLIC/fr 4mm
15
ALUMINIUM ANGLE 4
1 2 10
ALPOLIC/fr 4mm
W
HORIZONTAL SECTION W

HORIZONTAL SECTION HORIZONTAL SECTION


ALPOLIC/fr 4mm

ALUMINIUM CLADDING IS THE IDEAL


CHOICE FOR BUILDINGS WITH A 1
CONTEMPORARY DESIGN CONCEPT.
ALUMINIUM COMPOSITE OR ACM 3
5
MATERIAL IS A TYPE OF CLADDING 1. ALPOLIC/FR LT 3MM
STEEL ANGLE
CONCRETE BRACKET
MADE FROM TWO FACES OF 2. JOINT COVER, ALPOLIC/FR LT STRIP ADHERED ON 4
REVIT
ALUMINUM L-9×20 WITH VHB TAPE 6
ALUMINIUM BONDED TO A CENTRAL SEALING MATERIAL
FIXING BOLT

DARK NEOPRENE [Link] VERTICAL SECTION 3. HOLDER, ALUMINUM C-30×30

H
4. HANGING BOLT, M5, COVERED WITH RUBBER TUBE
CLADDING IS A THIN COVERING OF STEEL ANGLE
INSULATION

ALUMINUM THAT'S COMMONLY PUT ALPOLIC/fr 4mm 5. GYPSUM BOARD


6. STUD
ON BUILDINGS, WINDOWS, AND CONCRETE

10
DOORS.
ANCHOR BOLT

VERTICAL SECTION ALUMINIUM EXTRUSION


30

H
80

ANCHOR BOLT

18 mm

80 50-80
GA PANEK FIX

ALUMINIUM SHEET
HEIGHT

HORIZONTAL SECTION

GA PANEK FIX 8.5mm


20 mm

8.5mm
ISOMETRIC VIEW WIDTH
18 mm

BOARD SUPPLIED FITTED BY OTHERS

DOUBLE FOLDED VERTICAL SECTION


TRAYS SINGLE FOLDED TRAYS VERTICAL SECTION
INTERIOR WALL CLADDING FRONT ISOMETRIC VIEW
VERTICAL SECTION

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010
ALUMINUM CLADDING VII SEM,IV YEAR
BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR
TRADITIONAL KNOCK DOWN FURNITURE WOODEN JOINTS
KNOCK - DOWN FURNITURE
READY-TO-ASSEMBLE FURNITURE (RTA), ALSO KNOWN AS KNOCK-DOWN
FURNITURE (KD), FLAT PACK FURNITURE OR KIT FURNITURE, IS A FORM
OFFURNITURE THAT REQUIRES CUSTOMER ASSEMBLE

KNOCK DOWN FITTINGS - ARE THOSE WHICH HELP PUT THE FURNITURE
OR A PRODUCT TOGETHER QUICKLY AND EASILY WITHOUT USING CLAMPS OR GLUE
AND SIMPLY BY USING A SCREWDRIVER, A DRILL, A HAMMER, ETC. THE JOINTS ARE
CROOSS LAP JOINT JUST TEMPORARY AND CAN BE DISMANTELED AND ASSEMBLED WHENEVER
NECESSARY. USED MOSTLY IN CABINETS, TABELS,ETC.
FINGER JOINT

RIGID JOINT: THESE ARE NORMALLY MOULDED


IN PLASTIC WHICH MAKES THEM STRONG.
SCREWS PASS THROUGH THE FOUR HOELS
WHICH HOLD THE SIDES AT EACH CORNER
FIRMLY TOGETHER.
END LAP JOINT

SLOT
SECOND SLOT

TRADITIONAL TABLE FIXED


PERMANENTLY USING MORTICE SHAFT
AND TENON JOINT.
THROUGH DOVETAIL MORTICE AND TENON DISK

JOINT JOINT
SCREW

FIRST SIDE SECOND SIDE


LAP- DOVETAIL MORTICE AND TENON
JOINT JOINT CAM LOCKS: THE DISK FITS INTO A RECESS IN
THE FIRST SIDE OF THE CABINET, IT ROTATES
BY INSETING A SCREWDRIVER INTO THE SLOT
IN ITS SIDE. THE SHAFT IS SCREWED INTO THE
SECOND SIDE OF THE CABINET. THE COLLAR
THE ‘TABLE PLATE’ FITTING IS USED TO
OF THE SHAFT IS PASSED THROUGH THE HOLE
ASSEMBLE RAILS TO LEGS IN FLAT
PACK TABLES. IN THE SECOND SLOT IN THE DISK. WHEN THE
DISK ROTATES THE SHAFT IS LOCKED.
DOWEL JOINT

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010

KNOCK- DOWN FURNITURE VII SEM,IV YEAR


BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR
EXPANSION STRIP  START BY COATING THE SURFACE WITH
WATER-BASED ASPHALT EMULSION. EXPANSION
STRIP

SCREWS
 ADD EXPANSION STRIPS TO HEADERS AND JAMBS.
EXPANSION STRIP ANCHOR
ANCHOR EXPANSION
STRIP CHANNEL  LAY A BED OF MORTAR OVER ASPHALT FOLLOWED BY
BOLT PACKING FIRST COURSE OF GLASS BLOCKS. REINFORCING
CHANNEL ROD
REINFORCING JAMB
SEALANT  USE A RUBBER HAMMER TO TAP EACH BLOCK INTO
PACKING POSITION.
HEAD DETAILS ASPHALT
EMULSION SILL
JAMB DETAILS  REINFORCING RODS AND ANCHOR PANELS ARE
MORTAR
REQUIRED FOR TALLER PANELS.
GLASS
BLOCK
ASPHALT STANDARD MORTAR METHOD
EMULSION
 COMPLETE ALL STRIKING, SMOOTHING AND
THERE ARE THREE CLEANING. ALLOW MORTAR TO HARDEN AND ADD
MORTAR
BASIC METHODS OF PACKING MATERIAL FOLLOWED BY SEALANT.
GLASS BLOCK ELEVATION
CONSTRUCTION:
 THE PLASTIC CONNECTORS ARE MADE OF
 STANDARD HIGH-DESNSITY POLYETHYLENE AND SERVE TO
MORTAR REINFORCE AND ADD STRUCTURAL INTEGRITY TO
SILL DETAILS THE PANEL OF GLASS BLOCK.
 MORTAR WITH  PLACE THE FIRST COURSE OF GLASS BLOCK IN THE
PLASTIC SILL CHANNEL WITH STRIPS OF VERTICAL SPACERS
CONNECTORS
PLAN BETWEEN THEM. PLACE A PRECUT STRIP OF SPACING
ACROSS THE FIRST COURSE.
 MORTAR-LESS  PLASTIC CONNECTORS GENERALLY COME IN TWO  ADD BLOCKS FOR THE SECOND COURSE, AGAIN
CHANNEL. SHAPES: THE INSERTING SPACERS BETWEEN BLOCKS AND
FIRST TYPE IS SHAPED LIKE A PLUS SIGN (+) AND FITS ACROSS THE TOP. CONTINUE THIS PROCESS UNTIL
GLASS BLOCK MASTIC SEAL GLASS BLOCK INTO INTERNAL JOINTS, AND THE OTHER IS SHAPED THE NEXT-TO-LAST COURSE, MAKING SURE TO KEEP
LIKE A CAPITAL “T” AND IS DESIGNED FOR USE JOINT LINES STRAIGHT WITH A CARPENTER’S LEVEL.
AROUND THE PERIMETER AS WELL AS FOR
GLASS BLOCKS, ALSO KNOWN AS GLASS ANCHORING PURPOSES.
BRICKS IS AN ARCHITECTURAL ELEMENT
190

MADE FROM GLASS. GLASS BLOCKS


PROVIDE VISUAL OBSCURATION WHILE
190

ADMITTING LIGHT.
 FOR THE FIRST ROW, MORTAR THE T CONNECTORS IN
MASTIC SEAL PLACE TO PREVENT [Link] FINAL STEPS OF T-CONNECTOR
EASY-FIX ADHESIVE
EASY-FIX VERTICAL SPACER THE PROCEDURE ARE REMAINS THE SAME AS THE
MORTAR BED
STANDARD MORTAR METHOD.
JOINT DETAILS
CHANNEL

ISOMETRIC VIEW HORIZONTAL +CONNECTOR JAMB


SPACER
 IN THE TOP CHANNEL, CUT OUT AN 8 1/2-INCH
SECTION USING A HACKSAW A DISTANCE OF 7 3/4 VERTICAL
CHANNEL
INCHES FROM ONE END. THIS CREATES A NOTCH SPACER
THAT WILL ALLOW YOU TO SLIDE THE LAST COURSE
SCREW OF GLASS BLOCK. SILL

CUT-OUT SECTION LAST COURSE  ONCE ALL BLOCKS ARE IN PLACE, THE PANEL IS NOW FIRST
READY FOR SEALING WITH SILICONE USING A COURSE
OF CHANNEL
CAUKING GUN.

HORIZONTAL
MORTAR WITH PLASTIC CONNECTORS
SPACER STRIP METHOD
MOTAR-LESS CHANNEL METHOD WEEP HOLES
VERTICAL
SPACER STRIP

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010
GLASS BLOCKS VII SEM,IV YEAR
BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR
CURTAIN WALL
CURTAIN WALL SYSTEMS ARE FACTORY PRE CASTED
CURTAIN WALL
PREFABRICATED FRAME SYSTEMS. THEY ARE BOUGHT TO THE SITE AND C FLOOR
ASSEMBLED. THESE ARE OF TWO TYPES BASED ON THE
WAY EACH COMPONENT IS ASSEMBLED.
ANCHOR
 STICK CURTAIN WALL SYSTEM
 UNITIZED SYSTEM

FLOOR
STICK SYSTEM
VERTICAL
RAIL INSTALLED OR STICK CURTAIN WALL SYSTEM INVOLVES ITS COMPONENTS TO BE
MULLION
SHEAR BLOCK ASSEMBLED PIECE BY PIECE ON THE BUILDING AT THE SITE.
INTERLOCKS
VERTICALLY PREFABRICATED FRAME
THESE ARE MAINLY INSTALLED IN LOW RISE BUILDING OR
SMALL REGIONS. THIS IS BECAUSE, TO REACH HIGHER
ELEVATIONS EXTERIOR ACCESS IS ESSENTIAL. THE
VISION LINE ABOVE SYSTEM GAINS THE ADVANTAGE OF LOW SHIPPING
COST AS ONSITE ADJUSTMENTS ARE POSSIBLE. BUT THE
TIME AND LABOR CONSUMPTION IS RECORDED TO BE
HIGH.

GLASS FIXING
A B
A

HORIZONTAL RAIL

GLASS FIXING DETAIL


VISION LINE

PRESSURE PLATE THERMAL BREAK


ELEVATION SECTION CC
SNAP CAP
C
EXPANSION JOINT PRESSURE PLATE

EXPANSION JOINT
SNAP CAP
CORNER BLOCK

PLAN
THERMAL BREAK
DETAIL A DETAIL B

REMARKS DATE SHEET NO.


AYUSH GOUR, 0901AR161010
CURTAIN WALL VII SEM,IV YEAR
BUILDING CONSTRUCTION - VI
[Link],MITS GWALIOR

You might also like