Partition and Cladding Construction Guide
Partition and Cladding Construction Guide
PARTITION B
PARTITION CUM DOOR 1.2
F WINDOW
A A
5000
E E RUBBER GASKET
0.7
2100
GLAZING
4MM
10,000
OFFICE PLAN
40
ELEVATION
4600
F OUTSIDE
TRACK
4200
4000
ELEVATION GLASS
2100
SECTION
900
GLASS
INSIDE
SECTIONAL PLAN - EE
SECTIONAL DETAILS OF WINDOW
GLASS
23.25 23.25
1
1.05
27
31.75
31.75
18
10
1
STILE
STILE
40
GLAZING 61.85 61.85
4MM
FRAME OTER BOTTOM SHUTTER INTERLOCK
FRAME OUTER TOP & SIDE
GLASS
1.28
1.09
1.09
18
10
18
BOTTOM RAIL
18
10
UPPER RAIL 42
40
40
SECTION - FF
A C A'
DETAIL B
xx' ELEVATION
DETAIL B'
- PARTITION WALL IS DEFINED AS A WALL OR DIVISION MADE OF BRICKS,
GLASS, WOOD, ALUMINIUM OR OTHER MATERIAL. PROVIDED FOR THE
PURPOSE OF DIVIDING A ROOM OR A PORTION OF ROOM FROM ANOTHER.
- THESE WALLS ARE DESIGNED AS NON LOAD BEARING WALLS. IT MAY BE
COLLAPSIBLE, FOLDING OR FIXED.
WALLSECTION
EDGE
TRIM
(L-ANGLE)
A B B'
RECESSED LIGHT
ACCESS
WALL (12 MM THICK) PANEL
CROSS MAIN
TEE TEE
93.129
0
SECONDARY MEMBERS
CEILING
BOARD
CEILING
TILE HANGING
WIRE
SUSPENDED CEILING
CEILING PLAN
MINERAL WOOL
LIGHTS DETAIL B
CONVENTIONAL CEILING
SECTIONAL VIEW
CELOTEX OOR
SOUND PROOF CONSTRUCTION
CLADDING IS THE EXTERIOR SKIN, OR ENVELOPE OF A BUILDING AND INCLUDES ALL MOISTURE
BARRIERS AND SLIDING MATERIALS USED TO COVER THE OUTSIDE OF THE STRUCTURE. OTHER INSULATION
BOARD
HIGH NOISE CONDITIONS NOT ONLY RESULT IN
TYPES OF CLADDING: UNCOMFORTABLE LIVING CONDITIONS BUT PROLONGED
CLADDING ARE CLASSIFIED IN TWO CATEGORIES BRICK MASONARY EXPOSURE TO SUCH CONDITIONS MAY CAUSE HEARING
QUILT IMPAIRMENTS.
INTERIOR CLADDING:
CLADDING DONE ON THE INTERIOR WALLS SUCH AS TIMBER CLADDING, PVC CLADDING, STONE IT IS NECESSARY TO BE DONE IN BUILDINGS LIKE
CLADDING, CERAMIC CLADDING, WALLPAPER ETC. HOSPITALS, OFFICES, EDUCATIONAL INSTITUTES ETC.
SOUND PROOFING IS MAJOR ELEMENT IN FILM STUDIOS,
EXTERIOR CLADDING: AUDITORIUMS, THEATRES ETC.
CLADDING DONE ON THE EXTERIOR OF THE BUILDING SUCH AS STONE CLADDING, BRICK
CLADDING, METAL CLADDING, TERRACOTA CLADDING ETC. CARPET
WOODEN FLOORING
FLOORING BATTENS
ADVANTAGE: DISADVANTAGE: SAND RESILIENT LAYER
LOW MAINTENANCE INITIAL INSTALLATION IS COSTLIER THAN PAINT FLOOR SLAB
CAN BE EASILY CEANED NEEDS TIMELY MAINTENANCE CONCRETE SUB
PROTECTION FROM WEATHER INSTALLATION TIME IS HUGE DEPENDING ON THE GRADE
NOISE, HEAT CONTROL SURFACE OF THE BUILDING
LIGHT WEIGHT
JUNCTION OF CAVITY
FLOOR FINISH
AESTHETIC APPEAL WALL AND SOUND SCREED
PROOF FLOOR FLOOR SLAB
ABSORBENT QUILT
PLASTER
LIGHT WEIGHT
STEEL
DENSE TOPPING
FIRE RESISTANT SCREED
PLASTER FLOOR SLAB
WALL TIES
FLOOR FINISH
WIRE MESH
SCREED
FLOOR SLAB
MINERAL WOOL
BRICK
CLADDING FLOOR FINISH
SCREED
FLOOR SLAB
INSULATED
SHEATHING INTERIOR CLADDING
BOARD SOUND INSULATION OF FLOOR
BRICK CLADDING
50-80
Horizontal 6
STEEL ANGLE
85
REVIT BRACKET
30 ALUMINIUM CHANNEL 5
ALUMINIUM EXTRUSION ALUMINIUM EXTRUSION 50-60
SEALING MATERIAL
SCREW 3
80
ALPOLIC/fr 4mm
15
ALUMINIUM ANGLE 4
1 2 10
ALPOLIC/fr 4mm
W
HORIZONTAL SECTION W
H
4. HANGING BOLT, M5, COVERED WITH RUBBER TUBE
CLADDING IS A THIN COVERING OF STEEL ANGLE
INSULATION
10
DOORS.
ANCHOR BOLT
H
80
ANCHOR BOLT
18 mm
80 50-80
GA PANEK FIX
ALUMINIUM SHEET
HEIGHT
HORIZONTAL SECTION
8.5mm
ISOMETRIC VIEW WIDTH
18 mm
KNOCK DOWN FITTINGS - ARE THOSE WHICH HELP PUT THE FURNITURE
OR A PRODUCT TOGETHER QUICKLY AND EASILY WITHOUT USING CLAMPS OR GLUE
AND SIMPLY BY USING A SCREWDRIVER, A DRILL, A HAMMER, ETC. THE JOINTS ARE
CROOSS LAP JOINT JUST TEMPORARY AND CAN BE DISMANTELED AND ASSEMBLED WHENEVER
NECESSARY. USED MOSTLY IN CABINETS, TABELS,ETC.
FINGER JOINT
SLOT
SECOND SLOT
JOINT JOINT
SCREW
SCREWS
ADD EXPANSION STRIPS TO HEADERS AND JAMBS.
EXPANSION STRIP ANCHOR
ANCHOR EXPANSION
STRIP CHANNEL LAY A BED OF MORTAR OVER ASPHALT FOLLOWED BY
BOLT PACKING FIRST COURSE OF GLASS BLOCKS. REINFORCING
CHANNEL ROD
REINFORCING JAMB
SEALANT USE A RUBBER HAMMER TO TAP EACH BLOCK INTO
PACKING POSITION.
HEAD DETAILS ASPHALT
EMULSION SILL
JAMB DETAILS REINFORCING RODS AND ANCHOR PANELS ARE
MORTAR
REQUIRED FOR TALLER PANELS.
GLASS
BLOCK
ASPHALT STANDARD MORTAR METHOD
EMULSION
COMPLETE ALL STRIKING, SMOOTHING AND
THERE ARE THREE CLEANING. ALLOW MORTAR TO HARDEN AND ADD
MORTAR
BASIC METHODS OF PACKING MATERIAL FOLLOWED BY SEALANT.
GLASS BLOCK ELEVATION
CONSTRUCTION:
THE PLASTIC CONNECTORS ARE MADE OF
STANDARD HIGH-DESNSITY POLYETHYLENE AND SERVE TO
MORTAR REINFORCE AND ADD STRUCTURAL INTEGRITY TO
SILL DETAILS THE PANEL OF GLASS BLOCK.
MORTAR WITH PLACE THE FIRST COURSE OF GLASS BLOCK IN THE
PLASTIC SILL CHANNEL WITH STRIPS OF VERTICAL SPACERS
CONNECTORS
PLAN BETWEEN THEM. PLACE A PRECUT STRIP OF SPACING
ACROSS THE FIRST COURSE.
MORTAR-LESS PLASTIC CONNECTORS GENERALLY COME IN TWO ADD BLOCKS FOR THE SECOND COURSE, AGAIN
CHANNEL. SHAPES: THE INSERTING SPACERS BETWEEN BLOCKS AND
FIRST TYPE IS SHAPED LIKE A PLUS SIGN (+) AND FITS ACROSS THE TOP. CONTINUE THIS PROCESS UNTIL
GLASS BLOCK MASTIC SEAL GLASS BLOCK INTO INTERNAL JOINTS, AND THE OTHER IS SHAPED THE NEXT-TO-LAST COURSE, MAKING SURE TO KEEP
LIKE A CAPITAL “T” AND IS DESIGNED FOR USE JOINT LINES STRAIGHT WITH A CARPENTER’S LEVEL.
AROUND THE PERIMETER AS WELL AS FOR
GLASS BLOCKS, ALSO KNOWN AS GLASS ANCHORING PURPOSES.
BRICKS IS AN ARCHITECTURAL ELEMENT
190
ADMITTING LIGHT.
FOR THE FIRST ROW, MORTAR THE T CONNECTORS IN
MASTIC SEAL PLACE TO PREVENT [Link] FINAL STEPS OF T-CONNECTOR
EASY-FIX ADHESIVE
EASY-FIX VERTICAL SPACER THE PROCEDURE ARE REMAINS THE SAME AS THE
MORTAR BED
STANDARD MORTAR METHOD.
JOINT DETAILS
CHANNEL
CUT-OUT SECTION LAST COURSE ONCE ALL BLOCKS ARE IN PLACE, THE PANEL IS NOW FIRST
READY FOR SEALING WITH SILICONE USING A COURSE
OF CHANNEL
CAUKING GUN.
HORIZONTAL
MORTAR WITH PLASTIC CONNECTORS
SPACER STRIP METHOD
MOTAR-LESS CHANNEL METHOD WEEP HOLES
VERTICAL
SPACER STRIP
FLOOR
STICK SYSTEM
VERTICAL
RAIL INSTALLED OR STICK CURTAIN WALL SYSTEM INVOLVES ITS COMPONENTS TO BE
MULLION
SHEAR BLOCK ASSEMBLED PIECE BY PIECE ON THE BUILDING AT THE SITE.
INTERLOCKS
VERTICALLY PREFABRICATED FRAME
THESE ARE MAINLY INSTALLED IN LOW RISE BUILDING OR
SMALL REGIONS. THIS IS BECAUSE, TO REACH HIGHER
ELEVATIONS EXTERIOR ACCESS IS ESSENTIAL. THE
VISION LINE ABOVE SYSTEM GAINS THE ADVANTAGE OF LOW SHIPPING
COST AS ONSITE ADJUSTMENTS ARE POSSIBLE. BUT THE
TIME AND LABOR CONSUMPTION IS RECORDED TO BE
HIGH.
GLASS FIXING
A B
A
HORIZONTAL RAIL
EXPANSION JOINT
SNAP CAP
CORNER BLOCK
PLAN
THERMAL BREAK
DETAIL A DETAIL B