JED IT Infrastructure Proposal by ICX

ICX has submitted a technical proposal for a business analysis and requirement gathering project for Jos Electricity Distribution Company (JED), aimed at assessing current business processes and improving them through IT solutions. The project will involve various activities including seminars, training, workflow surveys, and joint application development sessions, with an estimated completion time of 60 working days. ICX emphasizes its industry expertise, local knowledge, and structured methodology to ensure successful project delivery and alignment with JED's strategic goals.

Uploaded by

olabodeogun
Copyright
© All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views30 pages

JED IT Infrastructure Proposal by ICX

ICX has submitted a technical proposal for a business analysis and requirement gathering project for Jos Electricity Distribution Company (JED), aimed at assessing current business processes and improving them through IT solutions. The project will involve various activities including seminars, training, workflow surveys, and joint application development sessions, with an estimated completion time of 60 working days. ICX emphasizes its industry expertise, local knowledge, and structured methodology to ensure successful project delivery and alignment with JED's strategic goals.

Uploaded by

olabodeogun
Copyright
© All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Jos Electricity Distribution

Company

Lot 1
Business Analysis and Requirement Gathering
Project

Technical Proposal
Submitted By
ICX

22 December 2025
JED Business Analysis and Requirement Gathering

Table of Contents
1. Executive Summary.........................................................................3
2. Introduction.......................................................................................4
2.1 Background................................................................................................................4
2.2 Objectives..................................................................................................................4
2.3 Why ICX?...................................................................................................................5

3. Implementation Framework.............................................................7
3.1 Business Process Model...........................................................................................7
3.2 Requirement Gathering.............................................................................................8
3.3 Scope of Activities.....................................................................................................9
3.4 Project Work Plan: activity description, estimated duration and resources...............9
3.5 Work Products.........................................................................................................12
3.6 Staffing.....................................................................................................................12

4. Communication..............................................................................14
4.1 Progress Report.......................................................................................................14
4.2 Project Review Meeting...........................................................................................14
4.3 End Project Report..................................................................................................14

5. Changes & Review.........................................................................15


6. Appendix A: Business Analysis and Requirement Gathering
Vision Statement..................................................................................16
7. Appendix B: About ICX..................................................................17
8. Appendix C: Project Management Framework............................18
8.1 Methodology............................................................................................................18

9. Appendix: Profile of Key Project Personnel................................21


10. Appendix: Risk and Measures......................................................23
11. Appendix: Sampled list of Completed projects...........................24

2|Page confidential and proprietary


JED Business Analysis and Requirement Gathering

1. Executive Summary
ICX is pleased to offer our technical and financial proposal in response to Jos
Electricity Distribution Company (JED) request for proposal for the Provision of
Short Term Information Technology (IT) Infrastructure and Consultancy
Services – Business Analysis and Requirement Gathering.

The goal of the business analysis project is to do a current state assessment of


JED’s business processes (As-IS business model), which will provide the basis
for an appraisal for process improvement leading to a future state (T0-Be
business Model) – to be driven by technology. These project goals are
described in more detail in Section 2 of this document.

Working with JED project team, our proposed implementation strategy includes:

 Seminar on Business Process Excellence (BPE), which will be


organized for JED’s Executive Management to highlight the topical
nature of process leadership and the role of management in attaining
this.

 Process analysis and design training for operational knowledge


workers (Subject Matter Experts), representing all functional business
units within JED.

 IT infrastructure needs assessments and skills audit, to identify gaps


and develop a technology roadmap.

 Workflow survey and documentation of current business processes,


key actors and their pain points.

 Joint Application Development (JAD) sessions, to elicit and document


business requirements/needs for the acquisition of IT systems that is
needed to support JED’s business operations.

This project is estimated to be completed and delivered in not more than sixty
(60) working days (weekends and holidays excluded). For more information
about the project plan, team and work products, please refer to section 3 of this
document.

We believe that JED will benefit immensely from our industry expertise, thought
leadership, cutting edge methodology and our past experience delivering
projects of this nature to organizations across Nigeria.

3|Page confidential and proprietary


JED Business Analysis and Requirement Gathering

2. Introduction

2.1 Background

Jos Electricity Distribution Company (JED) is embarking on a program of


Information Technology (IT) development initiatives to modernize its business
operations, improve internal work processes and provide staff with requisite IT
tools that will enable it to meet growing customer expectations on reliability and
qualitative service delivery.

In modern organizations, IT plays an increasingly important role in enabling


business processes and proper deployment of IT across the enterprise can
substantially boost competitiveness and profitability.

However, IT projects that impact the whole organization can be very expensive.
Not only do organizations have to decide whether or not to green-light an
expensive project, sometimes they have to choose between several big ticket
projects all vying for the same scarce resources.

We understand the challenges that JED faces in trying to align IT investments


with its strategic business goals. JED is seeking the service of an innovative
technology partner to help take a holistic look at the organization’s Business
Processes, conduct IT project requirement gathering exercise, and provide IT
advisory service on its planned technology deployment and Business Process
Re-engineering (BPR). The end goal is an environment that integrates
business processes across all functional business units but leverages IT assets
to meet the company’s needs and delivers a positive return on investment
(ROI).

This is a major challenge. The IT strategy must meet JED business needs for
today and deliver a foundation that is extendable to meet future requirements.
Considerations for the strategy must include the development of human
capacity to take advantage of the huge business benefits that IT offers, reduce
IT cost to the business, and seamlessly absorbs new business needs – within a
conceptualized, easy to manage technology platform.

4|Page confidential and proprietary


JED Business Analysis and Requirement Gathering

2.2 Objectives

We have identified that the primary objective of this project is to present JED
with cost effective IT consultancy service for the comprehensive review and
documentation of its business processes and the expected outcome of this
engagement include to:
 identify key business processes both internal and external processes
 identify and document key processes and actors (internal and external)
including process inputs, outputs, activities, critical success factors, key
indicators of process performance and the systems that currently
support those processes
 identify inputs and outputs of every business activities
 perform a gap analysis of JED processes analyzing and documenting
the “as is” situation of JED’s business operations
 develop a business case outlining the objectives, criteria and the
justification for the reengineering of the business processes and the
modernization of the IT infrastructure
 conduct an organization wide business process analysis, document
processes and recommend best practice procedures
 identify and document critical assumptions/risks and constraints
associated with the implementation of IT solutions
 create activities models and benchmark every processes
 identify priority processes that can be quickly automated and that have
the potential for greatest impact on JED’s performance
 determine JED’s requirements and goal for every process
 develop a technology implementation roadmap with timeline and key
deliverables
 develop high level design of data and messaging architecture and
interfaces required to support automation of key processes
 develop high level design of application architecture security
requirements
 develop high level design of monitoring technology and architecture

2.3 Why ICX?

“Effective, Accurate, and Well-formed requirement is paramount to the


success of an IT project.” JED needs industry-specific knowledge and best
practices to actualize its goals, as well as an IT partner that can provide
innovative skills, assistance, and a disciplined structured approach. ICX is
uniquely positioned to deliver these important assets to JED.

Our value propositions in respect of this submission are:


5|Page confidential and proprietary
JED Business Analysis and Requirement Gathering

 Industry Expertise: our access to a thriving ecosystem of technology


partners, major Original Equipment Manufacturers (OEMs) such as
IBM, Oracle, SAP and HP are always available to provide us with all
necessary support regarding this engagement.

 Thought leadership: at ICX, we believe every project is unique and


different – in what it is trying to achieve, in its pressures, constraints
and in the individuals involved. There is no single ‘right way’. The very
essence of success lies in the project team’s ability to apply sound
process and proven disciplines in a flexible way to suit particular
characteristics of each project.

 Local knowledge: ICX team consists of a skilled pool of seasoned and


dedicated IT professionals that are providing consultancy services to
public and private sector organizations in Nigeria.

 Our Methodology: in order to make sure that the objectives of this


project are achieved successfully, in time and with a superior edge.
ICX makes use of a very strong Enterprise Architecture development
framework, supported with templates, comprehensive set of tools and
process guides, for the design, planning, implementation and
governance of enterprise architecture. We will Strike the right balance
with education, workshops, and professional guidance.

 Past experience: JED will benefit from our extensive experience,


providing similar services to organizations across Nigeria.

6|Page confidential and proprietary


JED Business Analysis and Requirement Gathering

3. Implementation Framework

3.1 Business Process Model

HOW do WHEN
WHY are WHAT
we do WHERE are are we
we doing things
what we WHO is of the locations required
what we are of
do or interest to us? of interest to to do
are interest
need to us what we
doing? to us?
do? do?
Strategies Processe Materials Roles & Locations Events
& Goals s & Things Responsibilitie &Geography &Triggers
&Activities s
Describe The
Business

Define the
relationships
Specify
Components &
Services
Identify
Technology
Select
Solution

7|Page confidential and proprietary


JED Business Analysis and Requirement Gathering

3.2 Requirement Gathering

Inputs Functionality Outputs


Business Rules
Data

What do other people give What do you do? What do you give other
you? What rules apply? people?
What do you need to keep
8|Page confidential and proprietary
JED Business Analysis and Requirement Gathering

track of?

3.3 Scope of Activities

The under listed activities would be carried out by ICX consultants other to meet the
objectives associated with this engagement.
 Business Process Excellence Leadership Seminar
 Process Analysis & Design Training
 Workflow Surveys
 Process Interviews
 Peer (Team) Reviews
 Process Review Workshops
 Current IT infrastructure and staff skills audit
 Joint application development (JAD) session
 Submission of As-Is Report
 Submission of To-Be Report and recommendation

3.4 Project Work Plan: activity description, estimated duration and


resources

Module I
Project Launch
Activity Description  Business Process Excellence (BPE) leadership
seminar
 Inaugurate Working group
 Review project Terms of Reference (TOR),
Brainstorm
 Design, Review Tools & Resources
 Quick visits of the various departments at head office
 Hold review sessions with members of working group
 Handout Questionnaires
 Schedule Meetings, Interviews and Site visits
Participants/Resources  ICX consultants
 Working Group
 Projector, Whiteboard and meeting room.
Estimated duration 5-8 days

9|Page confidential and proprietary


JED Business Analysis and Requirement Gathering

Module II
Determine "As Is" Situation
Activity Description  Analysis and documentation of JED business:
mandate, goals, organization structure, business
objectives, stakeholders, KPIs, etc.
 Review current business strategy documents
 Conduct Site Visits
 Assess various branch IT infrastructure, hardware,
and software requirements.
 Determine technology adoption levels and
challenges to adoption
 Interview and administer questionnaire to operational
knowledge workers (SMEs)
 Assess Training and Human Capacity Building
Needs
Participants/Resources  SMEs from each department/business units
 ICX consultants
Estimated Duration 10-15 days

Module III
“SITUATION Analysis” & Interim Findings
Activity Description
 Determine IT resources necessary for JED to
effectively execute its mandate, goals, objectives,
etc.
 Brainstorm on data gathered
 Determine level of implementation and readiness
of both JED, consultants and staff
 Determine level of adoption
 Determine prevailing challenges especially
process issues and workflow adequacies
 Determine IT capacity among staff
 Determine Infrastructure needs
 Identify IT training requirements
 Document and present Interim Report
 Identify inconsistencies/loopholes in the
information gathered.
 Seek clarification on information supplied by
respondents.
Estimated Duration 10-15days
Resources  ICX
10 | P a g e confidential and proprietary
JED Business Analysis and Requirement Gathering

Module IV-
Conduct “Joint Application Development” Workshop
Activity Description  Determine functional requirements for business
applications
 Determine non-functional requirements business
requirements
 Develop “Use Cases” models for knowledge workers
Estimated Duration 5-8 days
Participants/  ICX consultants
Resources  Working Group
 Knowledge workers/SME/IT leaders
 Meeting room/Projector/White

Module V
Determine "To Be" :
Activity Description  Research on feasible solutions
 Benchmark and conduct Cost-Benefit Analysis
 Review findings
 Make recommendations and identify “Quick
Wins”
 Validate findings and draft report
 Articulate all information gathered into a
comprehensive IT strategy document.
Estimated Duration 10 days
Resources  ICX consultants
 Working Group

Module VIII:
Finalization and Project Closure
Activity Description  Presentation of draft IT Strategic Plan to
management. Brainstorm and agree on next
steps
 Submit Final Report
 Based on feed backs and input from previous
module VII, necessary corrections and
adjustment are made to the ICT strategy
document Finalization of the IT Strategic Plan
 Presentation of the final IT Strategic Plan

11 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

 Close project
Estimated Duration 5-8 days
Participants/Resources  ICX
 Working Group
 Executive Management
 Meeting room
 Projector

3.5 Work Products

 IT Vision and Project Roadmap


This document describes JED’s vision and the future of its IT. The
roadmap describes how the vision will be realised in terms of projects.

 Business Process Models

 Project High level Architecture Blueprint

 Project Hardware recommendations

 Project Software recommendations

 Final report including, recommendations for future-state business


process models, IT strategic plan and implementation roadmap

3.6 Staffing

ICX will utilize a maximum of five (5) IT consultants to complete this


engagement.

 A Project Manager that will interface between ICX and JED to


coordinate incident responses, resolve problems, manage and make
sure that all expectations are met.

 Four (4) technical consultants, with experience in Business Process


Management.

 A project administrator, also working as the team scribe

ICX reserves the right to change engagement personnel during the course of
the project without the prior approval of JED. Responsibilities include:

12 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

 JED Business Leaders – As Project sponsors must provide input for


the verification of business issues that are to be solved, success
factors for the project and time lines.

 JED IT Leaders – The current business process that has been


operationalized by IT in some way. As much of this will be leveraged
as possible, hence IT department’s input is required.

 Business Architects – The business architecture describes how


strategy is operationalized. Business architects are the people who
understand strategy and can turn this into operational processes.

 Enterprise Architect(s) - Enterprise Architects work with stakeholders,


both leadership and subject matter experts, to build a holistic view of
the organization's strategy, processes, information, and information
technology assets.

 ICX– ICX will take lead the workshop, and lead staff roles and will
transfer knowledge to participants of workshops.

13 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

4. Communication
Effective communication is necessary to make sure that expectations of project
stakeholders are adequately met. All issues, concern or technical requirements
must be provided to ICX in written format. Email is included as written format.
Receipt of all correspondence will be confirmed by phone wherever possible.

The following reporting activities will form part project of work activities and
deliverables, this is to ensure adequate and effective communication between
ICX and JED management.

4.1 Progress Report

ICX will provide JED with a weekly progress report that gives an overall
summary of the following:

 Project health.
 Ongoing activities.
 Completed tasks.
 Issues, Challenges and Mitigation steps taken
 Upcoming milestones and events.
 Risk identification and mitigation plan.
 Action items across different project areas.

4.2 Project Review Meeting

Metrics will be tracked by ICX, summarized in a dashboard format, and


discussed in a bi- weekly project meeting. This activity includes the following:

 Tracking unresolved issues which has significant impact on the project


 Updating project progress and resolving critical issues.
 Capturing agreements and disagreements and items needing
escalation.

4.3 End Project Report

The end project report will include a review and appraisal of project objectives,
detailed documentation of project activities, work products and a formal hand-
over note.

14 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

5. Changes & Review


Changes to this document may be proposed by JED or ICX; however, no
amendments will be made without approval from both parties. This document
will be regularly reviewed for currency and effectiveness.

Any requested deviation from the project scope and specified tasks in the
proposal will be subject to a formal review through the following Change
Control Process:

The objectives of the Change Control (Change) process are to:

 Assess the impact on all parties' schedules, resources, project


duration and project price

 Provide a formal vehicle for approval to proceed with any changes to


the Scope of Work

When either ICX or JED determines that a material change is required, ICX will
complete a Change Request Form and provide that completed Form to the
JED. Both ICX and JED must provide written approval of the Change detailed
in the Form, including the impact of the Change on the schedules, resources,
and the Quotation for Services, before ICX can make the change.

Upon acceptance of the Change set forth in the Form, JED will be required to
modify their Purchase Order as requested by ICX. However, if the Change is
not accepted by JED, and such Change does not impact the success of the
project, both ICX and JED will complete their obligations as detailed in the
most recent and mutually-approved Statement of Work.

15 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

6. Appendix A: Business Analysis and Requirement


Gathering Vision Statement
For several years, the Nigeria power sector was plagued with series of challenges;
old and dilapidated power generating plants/Transmission and Distribution network,
financial performance/lack of investment of funds in the power sector, low
institutional capacity, high technical and non-technical losses, power maintenance
and lack of transparency.

In an effort to address these challenges the Federal Government of Nigeria, took a


bold step at reforming the power sector by handing it over to private ownership with
the goal of increasing commercial viability of the power sector, ensuring fair tariffs to
all end users, increasing access to electricity, improving efficiency by increasing tariff
collection, reducing technical and non-technical losses, reducing cost, improving
private sector investment and customer service delivery.

Information Technology (IT) is a key component for addressing some of these


challenges; JED is taking the needed action, to make the required investment in IT,
we realise that the investment needed to transform JED into a world class electricity
distribution company is substantial. Our ultimate vision for this project is to:

 ensure that JED gains Maximum Business Value from Every IT


Investment, and
 help design a Technology Architecture that will be a model for other power
distribution companies in Nigeria

Our team is committed to working assiduously, in collaboration with JED staff; be the
JED’s go-to technology partner and see to a fruitful completion all technology
development efforts that JED intent on embarking on and we look forward to being a
part of JED transformation success story.

16 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

7. Appendix B: About ICX

Mission Statement
To provide all customers with a top level professional IT services in a timely manner
which exceeds our customers’ expectations.

Vision Statement
To be the global IT Solutions Company most admired for its Clients, Partnership and
performance by constantly fortifying our competencies and deliver superior customer
satisfaction.

Executive Summary
ICX Solutions Limited is a private limited liability company, duly registered under
the Company and Allied Matters Act of the Federal Republic of Nigeria to carry out
business as a Consulting, Project Management and Outsourcing Technology
Company.
ICX Solutions is involved in providing technology services in the areas of Strategic
Planning Services/Consultancy to offer to the Public and Private Sector. ICX has
identified the value and impact of information technology in the implementation of
automated and transparent concepts that made lots of companies achieve their
business goals. ICX Solutions with our strategic partners has the ability to offer
cutting edge technology services that has to do with proper planning, implementation
and management of business processes. Part of ICX Solutions expertise is offering
services that cut across IT Security, implementation of IT policies and penetration
testing. This aspect of securing an organizations’ network and intellectual property
by proper positioning of IT services goes a long way shaping an organization and
positioning it in line with business goals; which are the key features needed to
achieve business goals delivered by a well streamlined organizational work flow.

Our Services
 Project Management

To accomplish task efficiently involving less personnel within a short time span, as
well as improving productivity through quality decision making and strategic risk
management for effective solution delivery.

17 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

 IT and Business Strategies

Policy analysis is considered paramount for the growth and proper utilization of
technological resources to meet up with organizational requirements as part of its
overall corporate and business strategy in reviewing an existing IT system while
controlling cost.

 System Integration

Analyzes information requirements and provides solutions using the most effective
tools, techniques and methodologies. Furthermore, convergence of useful
information generated from various sources is harnessed to achieve the required
objective of amplifying existing sub-systems into a whole.

 IT Consulting

The company is set up to help recommend on how best to use information


technology to meet business objectives providing advice, often on managerial
decisions and operations through the service of talented and well-seasoned IT
professionals.

 IT Outsourcing

We take into account business change and infrastructural management to achieve


business transformation. Operating strategies and specific goals, overhead
reduction, staff flexibility, operational control, internal staffing, continuity and risk
management are not negligible.

 IT Management

Create a user friendly atmosphere for business managers to traditionally manage


basic parameters involved in IT such as time, processing speed and capacity to
meet customers’ satisfaction within a given period of time and establish
collaborations in specific areas.

 Knowledge and Capacity Building

ICX Solutions focuses on understanding the obstacles that restrain people,


government and organizations from realizing their developmental goals while

18 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

enhancing the abilities that will allow them to achieve measurable and sustainable
results, by way of strengthening their abilities, competencies and skills.

 IT Security and cybercrime

ICX Solutions partners with International organizations that offer a wide range of IT
security services which includes but not limited to:
 White Box Penetration testing
 Grey Box Penetration Testing and
 Black Box Penetration Testing
ICX Solutions not only provides its clients with these services, but goes further to
making recommendations based on the results gathered from the exercise.

1.0 IT CONSULTANCY SERVICES AND PORTFOLIO MANAGEMENT


ICX Solutions having identified key areas of improvement in good services by
creating the right mix of investments to properly use limited resources while
providing the maximum business benefit, which till date is the ultimate challenge for
IT leaders. We have identified that in standardizing the processes of IT portfolio
management which entails balancing resources, technology, business needs, and
changing situations while simultaneously maximizing returns and minimizing risk as
a means of boosting a Company’s return of Investments. It may seem that meeting
these goals would require the rhetorical talents of Socrates to understand the
nuances of current and future business demands; at ICX Solutions we are dedicated
to adding value to an organizations workflow process and also to actualize goals and
meet demands of our prospective clients.

ICX Solutions approach to offering services of Portfolio Management for


organizations is to craft the IT portfolio, which has to do with a series of “buy, sell, or
hold” decisions that are critical to the organizations’ goals, which also has to do with
balancing the needs, resources, and risk tolerance of the organization. What makes
our IT Portfolio management services unique is our approach in the unified view of IT
spending in its entirety. As such, IT portfolio management is a new and nascent field,
but one that will grow in awareness and importance over the next five to 10 years.

19 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

Fig.1 Diagram illustrating how ICX Solutions Inter relates IT Processes in an


organization

ICX solutions approach to rendering consultancy services and steps taken for
formulation of IT Strategy Plan includes but not limited to:

 Preliminary Study
 As-Is Process Study
 Draft IT Strategy Plan
 Final IT Strategy Plan
 Technical Specifications
 Request for Proposals

2.0 DEMAND MANAGEMENT SERVICES AND OUTSOURCING

Having noted that the demand for IT resources appears to be immune from business
and economic cycles as technology becomes embedded within every aspect of the
business; ICX Solutions to this approach shaping and orienting an organization on
the critical need and importance of the making top management staff in organization
to make IT decisions that would impact the business outcome of the organization.

Organizations are finding it difficult to meet the increasing demands for technology
given that resources available to fuel innovation are tighter than ever. This is due to
20 | P a g e confidential and proprietary
JED Business Analysis and Requirement Gathering

global competition and the difficulty of managing operational costs associated with
legacy systems and the buying frenzy of the late ‘90s. The impact of these trends on
organizations is significant, as reflected in research carried out by ICX solutions top
management staff that provide such consultancy services; which also identifies the
top barriers to success of businesses.

In ICX, we define Demand management as the process of allocating limited capital


and human resources to the overall benefit of the enterprise while improving the
relationships among IT and its business partners. When fully implemented, demand
management provides executives the information and capabilities to understand IT
costs, evaluate potential investments and convert IT-enabled investments into
business results. In a nutshell, ICX has identified that demand management ensures
the right work gets Identified, funded and done.

Having Identified the barriers to success in most businesses both Public and Private
which are attributed to: -
 Overwhelming backlog of requests/projects
 Inadequate budgets
 Shortage of time for strategic thinking/planning
 Unrealistic/unknown expectations from the business
 Lack of key technical skill sets
 Overwhelming pace of technology change
 Lack of alignment between business goals/IT efforts
 Difficulty proving value of IT

ICX Solutions group of experts have studied these drawbacks and have confidently
been able to come up with strategies that looks into all of the above stated
challenges in line with 21st century IT Best Practices.

3.0 SYSTEM INTEGRATION AND ICT SERVICES MANAGEMENT

As global business strategies place a new emphasis on growth, organizations


understand that IT needs to change versus return to the way it was prior to the
economic downturn. Experts deem 80 percent of planned external IT services
spending as “necessary,” and know they need to make a move or miss the
opportunity to get back on track. At ICX we understand that operational flexibility is
required for organizations to effectively balance new opportunities for growth,
including attracting and retaining new customers, with risk and cost challenges.

21 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

We offer services of System Integration which has to do with merging different


technologies and consolidating them in events that companies running different
business applications are in a process of going into a merger agreement. We come
in as intermediaries and our team of experts in all aspects of IT application and
Infrastructure compatibility assessment carry out impact analysis and system
integration processes and procedures bearing in mind the effects of possible
downtime in operational processes. We have strategic alliances with International
technology Companies including Microsoft, IBM, Cisco, Juniper and Oracle which
are partners that have the ability to offer wide range of systems Integration concepts
and benefits such as: -

 Virtualization Technology
 Offsite datacenter support services
 System Integration Concepts and Best practice

4.0 INFRASTRUCTURE CONSOLIDATION AND VIRTUALIZATION

The data center infrastructure is a good place to start with any assessment because
some degree of inefficiency and waste exists in practically every IT environment.
Server rooms and datacenters still bulge with servers, storage devices, power supply
systems, cables and more. Accumulation of equipment leaves companies strapped
with high energy costs, escalating management requirements and dwindling floor
space. For companies facing data center sprawl, consolidation is often a critical step
toward regaining control and reducing costs. At ICX solutions we offer intermediary
services of Datacenter collocation and subscription services, providing you with
state-of-the-art infrastructure and minimal if not Zero Downtime. Our international
Partners Worldwide have all it takes to offer Datacenter migration and maintenance
services at affordable prices, hence minimizing organizations’ financial costs of
managing its datacenter locally.

Our Strategic Alliances

 Microsoft Corporations Inc.


 Cisco
 Oracle
 IBM
 Redpages Consulting

22 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

23 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

8. Appendix C: Project Management Framework


 ICX methodology provides an industry leading process and toolkit for
successfully managing projects. By managing projects in a consistent
and professional manner, ICX ensures service delivery to the highest
standard of customer service whilst facilitating the objectives of the
company and its personnel.

 The ICX Primer methodology is compliant with the Project


Management Body of Knowledge (PMBOK), which is published by the
Project Management Institute (USA).

The PMBOK is the global de facto industry standard for project


management. The Project Management Institute has (in the PMBOK)
summarized the following ten key functional areas of project management:
1. Integration management
2. Scope management
3. Time management
4. Cost management
5. Quality management
6. Human resource management
7. Communications management
8. Risk management
9. Procurement management
10. Stakeholder management
 Within each of the ten functional areas there are five integrated
processes that should be applied:
1. Initiating
2. Planning
3. Executing
4. Controlling
5. Closing

8.1 Methodology

In undertaking the above objectives, we a methodology-neutral Business


Process Excellence model, comprising of process improvement best practices
and tools and techniques gathered from known and established methodologies
—Zachman’s framework, lean-sigma, TOGAF, BPM and Outside-In. The aim is
to ensure an approach that is driven by the requirements of JED’s key
constituents—customers and its diverse stakeholders

24 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

The Zachman Framework is an enterprise architecture framework which


provides a formal and structured way of viewing and defining an enterprise

Contextual
1. (Why) Goal List – primary high level organization goals
2. (How) Process List – list of all known processes
3. (What) Material List – list of all known organizational entities
4. (Who) Organizational Unit & Role List – list of all organization units, sub-
units, and identified roles
5. (Where) Geographical Locations List – locations important to organization;
can be large and small
6. (When) Event List – list of triggers and cycles important to organization

Conceptual

1. (Why) Goal Relationship Model – identifies hierarchy of goals that support


primary goals
2. (How) Process Model – provides process descriptions, input processes,
output processes
3. (What) Entity Relationship Model – identifies and describes the
organizational materials and their relationships
4. (Who) Organizational Unit & Role Relationship Model – identifies
enterprise roles and units and the relationships between them
25 | P a g e confidential and proprietary
JED Business Analysis and Requirement Gathering

5. (Where) Locations Model – identifies enterprise locations and the


relationships between them
6. (When) Event Model – identifies and describes events and cycles related
by time

Logical

1. (Why) Rules Diagram – identifies and describes rules that apply


constraints to processes and entities without regard to physical or
technical implementation
2. (How) Process Diagram – identifies and describes process transitions
expressed as verb-noun phrases without regard to physical or technical
implementation
3. (What) Data Model Diagram – identifies and describes entities and their
relationships without regard to physical or technical implementation
4. (Who) Role Relationship Diagram – identifies and describes roles and their
relations to other roles by types of deliverables without regard to physical
or technical implementation
5. (Where) Locations Diagram – identifies and describes locations used to
access, manipulate, and transfer entities and processes without regard to
physical or technical implementation
6. (When) Event Diagram – identifies and describes events related to each
other in sequence, cycles occur within and between events, without regard
to physical or technical implementation

Physical

1. (Why) Rules Specification – expressed in a formal language; consists of


rule name and structured logic to specify and test rule state
2. (How) Process Function Specification – expressed in a technology specific
language, hierarchical process elements are related by process calls
3. (What) Data Entity Specification – expressed in a technology specific
format; each entity is defined by name, description, and attributes; shows
relationships
4. (Who) Role Specification – expresses roles performing work and workflow
components at the work product detailed specification level
5. (Where) Location Specification – expresses the physical infrastructure
components and their connections
6. (When) Event Specification – expresses transformations of event states of
interest to the enterprise

26 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

9. Appendix: Profile of Key Project Personnel


Khalifa Galadanci

27 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

OGUN OLABODE, PMP

Professional Profile

Olabode Ogun has a strong foundation in industry leading IBM’s groupware solutions (Lotus
Domino administration, Lotus Domino application development, IBM Connections, Domino
Document Manager, IBM Sametime instant messaging and web conferencing administration
and support); Websphere Portal and Linux administration. He is Certified Project
Management Professional, Linux Professional and Lotus Domino Administrator. His
technical skills cover hardware, software and network infrastructure management and
design. His professional experiences include IT infrastructure support both in the public and
private sector, IT infrastructure design, Business Process Management, IT strategic
planning, technical specification and capacity building.

Summary of Experience

He was one of team of 3 members on the Federal Mortgage Bank of Nigeria IT


modernization project, the team provided advisory, Network and data centre design, bids
evaluation, vendor selection and overall project management services to the FMBN. As a
team leader, he coordinated activities involved in the design and development of a
comprehensive registration database in Access and SQL Server Express for the Digitization
of over 90,000 PDP membership records. He has also provided on-site client IT
infrastructure support for Ethiopian Embassy, The Regent Group Corporate Ventures, Peace
Keeping Department (Nigeria Police Force), Central Bank of Nigeria (CBN), National
Insurance Commission (NAICOM) and National Health Insurance Scheme (NHIS).

As a consultant/trainer, He played a key role in the Mobil/NNPC/Akwa-Ibom Graduate


Assistant Programme (GAP) and FCTA-IBM GradUp capacity building programme, where
he was responsible for the development of curriculum, candidate recruitment; performance
assessment and mentoring. He was a team leader during the Military Pensioners’
Verification Exercise (MPVE) and parastatal Pensioners Verification Exercise (PPVE); these
involved verification, enrolment and Biometric data capture of over 130,000 military and
civilian pensioners of parastatal under the Federal Ministry of Education and Ministry of
Health. He was also responsible for the successful implementation of IBM Lotus Domino,
web content filtering and bandwidth management solution (using Squid Proxy server),
Central data storage, and Quickbooks Professional accounting system for The Regent
Group Corporate Ventures.

He worked as a lead consultant and member of the project management team in the
NAICOM Project E-Regulation, where he assisted with the development of Project
Management Plan, Medium-Term IT Strategy, Project technical specifications, the
development of an IT Management Strategy document, and data centre design, amongst
other contributions. My experience also includes working as an IT consultant and project
manager on several IT development program within NHIS.

28 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

10. Appendix: Risk and Measures

29 | P a g e confidential and proprietary


JED Business Analysis and Requirement Gathering

11. Appendix: Sampled list of Completed projects

Our Clients and Some of the Major Project Work:

 Central Bank of Nigeria (CBN)


 Quality Assurance for the provision of Electronic Data Management
Services (EDMS)
 Centre for Management Development (CMD)
 Database Implementation Project
 National Judicial Institute (NJI)
 Oracle Web Center Implementation Project
 Infrastructure Concession Regulatory Commission (ICRC)
 Nigeria Deposit Insurance Corporation (NDIC)
 the e-FILMS implementation

30 | P a g e confidential and proprietary

Common questions

Powered by AI

IT security services provided by ICX play a critical role in shaping organizational success by ensuring the protection and secure management of a company's network and intellectual property. Through offerings such as white, grey, and black box penetration testing, ICX identifies vulnerabilities and provides recommendations to mitigate security risks. This aligns IT services with business goals by safeguarding assets and fostering a secure environment that promotes business continuity and trust among clients .

The Zachman Framework supports enterprise architecture by providing a formal and structured way to view and define an enterprise. It does so through its contextual, conceptual, logical, and physical perspectives that address critical components such as goals, processes, entities, organizational roles, locations, and events. It structures these elements across different levels of abstraction, offering a comprehensive view of an organization's operational structure and aiding in effective decision-making and strategic planning .

ICX employs a strong Enterprise Architecture development framework for project management, which is supported by templates, tools, and process guides. This methodology contributes to achieving project goals by ensuring effective design, planning, implementation, and governance of enterprise architecture. It balances project education, workshops, and professional guidance, which helps in striking the right balance to meet project objectives efficiently and with a competitive edge .

Through its services in IT consultancy and portfolio management, ICX aims to achieve strategic objectives such as enhancing clients' utilization of technological resources, reducing operational overhead, achieving staff flexibility, and improving risk management. This involves advising on IT strategies that align with business goals, offering recommendations to optimize IT investments, and fostering secure and efficient IT operations to drive organizational transformation and business success .

System integration benefits organizations by converging information from various sources to create cohesive systems that amplify existing subsystems. By analyzing information requirements and providing tailored solutions, ICX’s system integration services ensure that organizational objectives are met efficiently. This facilitates seamless operations across departments, enhances productivity, and supports strategic goals by harnessing technology effectively .

The Federal Government of Nigeria aimed to address several challenges by reforming the power sector, including enhancing commercial viability, ensuring fair tariffs, increasing electricity access, improving efficiency through better tariff collection, reducing both technical and non-technical losses, cutting costs, enhancing private sector investment, and improving customer service delivery. Handing the power sector over to private ownership was a significant reform measure intended to tackle these issues .

ICX is considered a suitable partner for JED due to its industry-specific knowledge and best practices, access to a network of technology partners, experience with major OEMs like IBM, Oracle, SAP, and HP, and its methodology that emphasizes flexibility and sound process discipline. Additionally, ICX offers strong enterprise architecture frameworks and has extensive experience providing similar services across Nigeria, making them uniquely capable of delivering innovative skills and structured support to JED .

The potential risks and constraints in implementing IT solutions at JED include unforeseen gaps in current process documentation, underestimated technology infrastructure requirements, opposition to change from employees, and alignment issues with JED’s strategic objectives. Additionally, constraints may arise from budget limitations, technical compatibility issues with existing systems, and potential disruptions during transitions .

Conducting a comprehensive business process analysis at JED involves several key steps: identifying inputs and outputs of every business activity, performing a gap analysis of JED's processes to document the 'as is' situation, developing a business case outlining objectives and justifications for reengineering processes, documenting current processes, recommending best practice procedures, and identifying priority processes for automation. Additionally, it includes determining JED’s requirements and goals for every process, developing a technology implementation roadmap, and designing data, messaging, application architecture, security, and monitoring technology to support automation .

ICX's extensive project management experience with past clients enhances their capability to serve JED by providing a wealth of proven strategies and insights garnered from successful engagements. ICX has managed major IT infrastructure projects for prominent organizations such as the Central Bank of Nigeria and the National Judicial Institute, where they offered services in project management, network and data center design, and technical support. This experience ensures ICX can efficiently navigate complexities and deliver solutions that align with JED's objectives .

You might also like