0% found this document useful (0 votes)
257 views5 pages

LT Calculation

The document outlines the Instrument Calculation for the Caustic Settler as part of the Future Growth Project/Wellhead Pressure Management Project by Tengizchevroil. It includes details on design specifications, approvals, and revision history, indicating that it is a controlled document issued for design purposes. The document emphasizes the importance of compliance with specified standards and requirements for the installation and operation of the level measurement instruments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
257 views5 pages

LT Calculation

The document outlines the Instrument Calculation for the Caustic Settler as part of the Future Growth Project/Wellhead Pressure Management Project by Tengizchevroil. It includes details on design specifications, approvals, and revision history, indicating that it is a controlled document issued for design purposes. The document emphasizes the importance of compliance with specified standards and requirements for the installation and operation of the level measurement instruments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Kazakh Projects Joint Venture

ТЕНГИЗШЕВРОЙЛ
Limited
TENGIZCHEVROIL

Проект будущего расширения/


Проект управления устьевым давлением
(ПБР/ПУУД)
Future Growth Project/
Wellhead Pressure Management Project
(FGP/WPMP)

СРР 042

Instrument Calculation - 42-F-262


Caustic Settler

Данный документ является контролируемым. Не вносить неутвержденных изменений.


Данный документ выполнен на двух языках. Убедитесь, что изменения внесены в обе версии.
This is a controlled document. No un-authorized modifications.
This document is dual language. Ensure both versions are modified.

№ документа_ Ред: № проекта:


042-0260-JJJ-CAL-000-000-00003-00_L01 X-000-059-08
Document No_ Rev: Project Number:

Статус документа / Life Cycle Status: Issued for Design / Выпущено для проектирования

Защита информации / IP Security: Company Confidential / Конфиденциальная информация компании

Supplier Doc No: Supplier Doc Rev:


Purchase Order No: Contract/AWO No: CW839800
CTR No: Equip No:

Translation Requirement As per DRS: Russian


explain on next page if different) As per this document: Russian
ТЕНГИЗШЕВРОЙЛ Doc. No._Rev:
TENGIZCHEVROIL 042-0260-JJJ-CAL-000-000-00003-00_L01
СРР 042
Instrument Calculation - 42-F-262 Company Confidential / Конфиденциальная информация компании

Информация о документе
Document Information

Согласование документа Подрядчиком / Contractor Approvals:


ФИО/ должность Подпись Дата
Name/Title Signature Date

Подготовил / Originator: PARAG REDKAR 22/12/2016

Проверил / Checked: ANURAG GUPTA 22/12/2016

Утвердил / Approved: ARTHUR WILLIAMS 22/12/2016

Согласование документа в ПБР / TCO FGP Approvals:


ФИО/ должность Подпись Дата
Name/Title Signature Date
Утвердил
Approved

Данные о редакциях документа / Revision History:


Редакция Дата Статус Подготовил Проверил Утвердил
Revision Date Status Originator Checked Approved

L01 22/12/2016 Issued for Design PR AG AW

K02 04/11/2016 Issued for Client Review PR AG AW

K01 22/02/2016 Issued for Client Review PR AG AW

для внутренней
проверки/междисциплинарно
J02 04/11/2015 ABG AG SD
й проверки (МДП) / Inter
Discipline Check

© 2011 by Tengizchevroil LLP. UNCONTROLLED WHEN PRINTED Page 2 of 5


ТЕНГИЗШЕВРОЙЛ Doc. No._Rev:
TENGIZCHEVROIL 042-0260-JJJ-CAL-000-000-00003-00_L01
СРР 042
Instrument Calculation - 42-F-262 Company Confidential / Конфиденциальная информация компании

ПЕРЕЧЕНЬ РЕДАКЦИЙ
REVISION DESCRIPTION

РЕВ / REV PG СTP ОПИСАНИЕ РЕДАКЦИЙ / REVISION DESCRIPTION


J01 4 Inter Discipline Check

J02 5 Inter Discipline Check

K01 5 Issued for Client Review

K02 5 Issued for Client Review

L01 5 Issued for Design

Уточнения
Holds
Уточн. №/
Описание уточнения/ Hold Description Стр./ Page
Hold no.

© 2011 by Tengizchevroil LLP. UNCONTROLLED WHEN PRINTED Page 3 of 5


NOTES

1 LEVEL MEASUREMENT IS BASED ON GUIDED WAVE RADAR TECHNOLOGY AND FOR NOZZLE/MOUNTING REQUIREMENTS REFER TO 'INSTRUMENT DETAILS' TABLE BELOW.
2 THE ARRANGEMENT OF VESSEL, NOZZLES AND FITTINGS ARE INDICATIVE ONLY AND ARE TO BE DETAILED AND SUPPLIED BY MECHANICAL.
3 ALL ELEVATIONS ARE GIVEN WITH RESPECT TO THE BOTTOM LINE AT INSIDE OF VESSEL SHELL (I.E. THE LOWEST INTERNAL SURFACE). ELEVATIONS BELOW THE BTL HAVE NEGATIVE VALUES
4 DIMENSIONS ARE GIVEN IN MM UNLESS OTHERWISE STATED.
5 NOZZLES SHALL BE LOCATED SUCH THAT PROBES ARE CLEAR OF ALL INTERNAL STRUCTURES. ALL INTERNAL CLEARANCES TO BE SUBJECT TO MANUFACTURER'S RECOMMENDATIONS.
6 THE CALIBRATED RANGE MUST NOT OVERLAP THE UPPER AND LOWER TRANSITION ZONES. THESE ARE MEASURED DOWNWARD FROM FLANGE FACE (UTZ) AND UP FROM END OF PROBE (LTZ)
7 INSTRUMENT INSTALLATION SHALL COMPLY WITH THE LEVEL INSTRUMENT SPECIFICATION ICM-DU-5083-TCO, SECTION 15 (GUIDED WAVE RADAR INSTRUMENTS)
8 FOR PROCESS CONDITIONS, REFER TO INSTRUMENT DATASHEET. FOR VESSEL INTERNALS REFER TO VESSEL G/A

LEGEND:
BY INSTRUMENTS

SCOPE
BY OTHERS

VTC - VENDOR TO CONFIRM

GENERAL DETAILS
VESSEL TAG NO. 42-F-262
TRIM 42-0260-PHC-012376-300K21-HCW5
SERVICE CAUSTIC SETTLER
DESIGN HV/40.0 BARG / -40/90°C
OPERATING 13.32 BARG / 38°C
TAN-TAN 12000 mm
DIAMETER 4000 mm
REFERENCE DOCUMENTS
P&ID 042-0260-BBB-PID-000-000-00004-01_L01
VESSEL G/A 042-0260-CCC-DSH-000-000-00008-00_U02
SPEC.: PRESSURE MEASUREMENT CRITERIA ICM-DU-5076-TCO
SPEC.: LEVEL INSTRUMENTS ICM-DU-5083-TCO
SPEC.: INST. IMPLEMENTATION BASIS ICM-DU-6003-TCO

INSTRUMENT DETAILS

NOZZLE LEVEL INSTRUMENT DETAILS L01 22/12/16 ISSUED FOR DESIGN PR AG AW

TAG No. SIZE/ RATING REMARKS K02 04/11/16 ISSUED FOR CLIENT REVIEW PR AG AW
HEIGHT STILLING INTERFACE INTERFACE CALIBRATION
IDENT MOUNTING PROBE TYPE PROBE LENGTH SERVICE
'H' mm WELL DISTANCE LEVEL RANGE AG
PROCESS INSTRUMENT K01 22/02/16 ISSUED FOR CLIENT REVIEW PR AW

STILLING GUIDED WAVE 0 to 3800 mm SD


LIT-6031 L3 BY MECH 3" 300# 3" 300# REQUIRED 3800+VTC INTERFACE LEVEL 1350 mm YES INDICATION AND CONTROL J02 04/11/15 INTERDISCIPLINE CHECK ABG AG
WELL/ TOP RADAR (0-100%)
STILLING GUIDED WAVE 0 to 3800 mm AG/SD
LIT-6080 L4 BY MECH 3" 300# 3" 300# REQUIRED 3800+VTC INTERFACE LEVEL 1350 mm YES SHUTDOWN J01 23/12/14 INTERDISCIPLINE CHECK MSG AG
WELL/ TOP RADAR (0-100%)
REV DATE REVISION BY CHK APPD
PRDJ NO.
X-000-059-08
REV
DOCUMENT NO. 042-0260-JJJ-CAL-000-000-00003-00 L01

© 2011 by Tengizchevroil LLP. UNCONTROLLED WHEN PRINTED Page 4 of 5


NOTES
1 THE ARRANGEMENT AND SPACING, ETC, OF VALVES, PIPES AND FITTINGS ARE INDICATIVE ONLY AND THESE WILL BE DETAILED AND SUPPLIED BY PIPING.
2 THE ARRANGEMENT OF VESSEL, NOZZLES AND FITTINGS ARE INDICATIVE ONLY AND WILL BE DETAILED AND SUPPLIED BY MECHANICAL.
3 ALL ELEVATIONS ARE GIVEN WITH RESPECT TO THE BOTTOM LINE AT INSIDE OF VESSEL SHELL. ELEVATIONS BELOW THE BTL HAVE NEGATIVE VALUES
4 DIMENSIONS ARE STATED IN MM UNLESS OTHERWISE STATED.
5 LEVEL GAUGE IS INSTALLED TO INDICATE PRESENCE OF LIQUID
6 PIPING ISOLATION VALVE TYPE AND SIZE SHALL BE IN ACCORDANCE WITH P&ID AND L-ST-2055
7 MECHANICAL TO ENSURE THAT ALL LEVEL NOZZLES SHALL BE JIG SET AND INCLUDE A SUITABLE NOTE IN VESSEL DATASHEET

LEGEND:
BY INSTRUMENTS
SCOPE
BY OTHERS

GENERAL DETAILS
VESSEL TAG NO. 42-F-262
TRIM 42-0260-PHC-012376-300K21-HCW5
SERVICE CAUSTIC SETTLER
DESIGN HV/40.0 BARG / -40/90°C
OPERATING 13.32 BARG / 38°C
TAN-TAN 12000 mm
DIAMETER 4000 mm
REFERENCE DOCUMENTS
P&ID 042-0260-BBB-PID-000-000-00004-01_L01
VESSEL G/A 042-0260-CCC-DSH-000-000-00008-00_U02
SPEC.: PRESSURE MEASUREMENT CRITERIA ICM-DU-5076-TCO
SPEC.: LEVEL INSTRUMENTS ICM-DU-5083-TCO
SPEC.: INST. IMPLEMENTATION BASIS ICM-DU-6003-TCO

INSTRUMENT DETAILS

NOZZLE IDENT. SIZE / RATING NOZZLE CL-CL / CONNECTION LOCATION


TYPE/ DIAPHRAGM FLUSHING
TAG NUMBER MOUNTING VISIBLE LENGTH REMARKS
DESCRIPTION SEAL RING L01 22/12/16 PR AG AW
UPPER LOWER PROCESS INSTRUMENT (mm) UPPER LOWER ISSUED FOR DESIGN

LG-6077 L1 L2 DIRECT MAGNETIC --- 3" 300# 1" 300# --- 2900 SIDE SIDE INDICATION K02 04/11/16 ISSUED FOR CLIENT REVIEW PR AG AW

K01 22/02/16 ISSUED FOR CLIENT REVIEW PR AG AW

J02 04/11/15 INTER DISCIPLINE CHECK ABG AG SD

J01 23/12/14 INTER DISCIPLINE CHECK MSD AG AG/SD

REV DATE REVISION BY CHK APPD


PROJ NO.
X-000-059-08
DOCUMENT NO. REV
042-0260-JJJ-CAL-000-000-00003-00 L01

© 2011 by Tengizchevroil LLP. UNCONTROLLED WHEN PRINTED Page 5 of 5

You might also like