Cost Estimate Justification for Site Development

compliance details as required by IE

Uploaded by

Rohan Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views2 pages

Cost Estimate Justification for Site Development

compliance details as required by IE

Uploaded by

Rohan Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

IE Comments

Cost of site development works is RS 1280739.00 in the cost


Estimate submitted vide letter no. GKBPL/KABY/SITE/294, dated
1 17.05.2025 where as cost of vide development work given in cost
estimate submitted with letter no. GKBPL/KABY/SITE/455, dated
23.09.2025 is 14,99,343.00 please jutty the change cost.
Similarly cost of externed sanitary and change disposal is taken Rs.
579,294 in letter GKBPL/KABY/SITE/294, dated 17.05.2025 where as
2 estimate cost of same work is taken as Rs. 7,02,633.8 in the
estimate submitted with letter 455 dated 23.09.2025. Please justify
the change in estimate cost.

In the abstract of cost in remark reference as for item rate as given


form CPW DSOR where as the sheet attached for item rate for
3
covered structure depicts that the rates are on the basis of UPPWD-
Plinth area rates Justi fiction required item rates are from which SOR.

In rate analysis for providing at the laying of inter locking Block. Ref.
of UPPWD SOR Aligarh, 2025 is referenced as per the structure is
4 Construction in District Kasganj have SOR for the District kasganj has
to be approval and relevant referenced pages need to be attached
with cost estimate.
There are cost estimate of SOR PII attached one is showing cost Rs.
5 1,55,25.00 and other one Rs. 2,04,216.00 Please clarity which one is
correct.
In rate analysis, rate of .. machinery, materials are taken from SOR
6 25-26 Aligarh circular of PWD. Relevant pages of SOR showings rates
shall be attached as back up document.
Similarly, the rates section in cost estimate shall be suppuration with
7
Bach up documents.
Reply

The cost chagnged as per the reate anylish and rate


anylish has been attached for your referance.

There is no changed in the cost.

Noted, correction done.

Estimate of rupees 155257 is for septic tank. Corrected


sheet has been attached.

Noted, as disired pages has been attached of SOR.

Noted, Attached.

Corrected drawing has been attached.