0% found this document useful (0 votes)
236 views3 pages

RCSP Activity Design-Lupon

The document outlines the implementation of the Retooled Community Support Program (RCSP) under Executive Order No. 70, aimed at addressing local armed conflicts through a Whole-of-Nation Approach. It details the objectives, expected participants, content, methodology, and budgetary requirements for an upcoming activity scheduled for May 12, 2025. The activity seeks to present RCSP results, strengthen collaboration among stakeholders, and ensure the sustainability of the program at the local level.

Uploaded by

DILG LUPON
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
236 views3 pages

RCSP Activity Design-Lupon

The document outlines the implementation of the Retooled Community Support Program (RCSP) under Executive Order No. 70, aimed at addressing local armed conflicts through a Whole-of-Nation Approach. It details the objectives, expected participants, content, methodology, and budgetary requirements for an upcoming activity scheduled for May 12, 2025. The activity seeks to present RCSP results, strengthen collaboration among stakeholders, and ensure the sustainability of the program at the local level.

Uploaded by

DILG LUPON
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT FM-SP-DILG-11-01

ACTIVITY DESIGN Rev. No. Eff. Date Page


00 06.15.21 1 of 3

OFFICE: DILG – LUPON


TITLE OF THE ACTIVITY: EO 70 – Implementation of Retooled Community Support Program
(RCSP): Ugnayan at Serbisyo Caravan at Barangay Bagumbayan,
Lupon, Davao Oriental

BACKGROUND AND RATIONALE


President Rodrigo Roa Duterte issued the Executive Order No. 70 “Institutionalizing the
Whole of Nation approach in attaining inclusive and sustainable peace, creating a National
Task Force to End Local Communist Armed Conflict (NTF-ELCAC), and directing the adoption
of a National Peace Framework” on December 04, 2018.

EO 70 stipulated the need to reframe and refocus government policies in order to achieve
inclusive and sustainable peace by recognizing that local armed conflicts are not only a
military concern but also symptomatic of a broader social, economic, and governance
challenges manifested by prevalence of poverty, lack of better life chances, historical
injustice, social inequities and exclusivity.

EO 70 further states the need to establish a Whole-of-Nation Approach (WNA) in addressing


the root causes of local armed conflict by prioritizing the delivery of basic government
services, social development packages, and construction of needed infrastructures with the
end-view of ushering inclusive development in the pursuit of country’s peace agenda.

DILG Memorandum Circular No. 2019-169 provided the Guidelines on the Implementation
of the Retooled Community Support Program (RCSP). In addition, DILG Memorandum
Circular No. 2020-095 with subject “Remedial Measures on the Localization of Executive
Order No. 70 and All DILG Peacebuilding Initiatives”, was issued on June 22, 2020 to ensure
the continued implementation of the C4PEACE Program. At present, the DILG is pursuing
civilian-led peacebuilding amidst the COVID-19 pandemic. Provided, that all activities shall
be consistent and adhere to the policies and protocols imposed by the national government
through the Inter-Agency Task Force on Emerging Infectious Diseases (IATF-EID), pertinent
national government agencies, and the concerned local government units.

OBJECTIVE
1. To present the results of the RCSP implementation and identify it’s facilitating and hindering
factors.
2. To strengthen the convergence among members of the RCSP Task Team in addressing the
identified challenges.
3. To agree on concrete steps to be undertaken by the RCSP Team to ensure sustainability of the
RCSP at the local level.

TARGET PARTICIPANTS

The expected participants on this activity are the following:


Office/Agency Participant Pax
DILG PO, MLGOO, Staff and 8
Secretariat
Private sector (farmers, CSOs Rep 37
Fisherfolk, PO, constituents,
etc)
Municipal Employees, PNP, AFP RCSP Core Team Members and 20
and other NGAs other officers
BLGU Punong Barangay of Barangay 15
Bagumbayan and Officials
TOTAL 80
DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT FM-SP-DILG-11-01
ACTIVITY DESIGN Rev. No. Eff. Date Page
00 06.15.21 1 of 3

A total of sixty (80) participants are expected to attend the activity.


Guaranteed number of attendees is 80% of the total number of participants.

INCLUSIVE DATE/S: 12 May 2025

CONTENT (As applicable)

 Overview of the EO-70 RCS Program


 Long-term Perspective of the RSCP
 Short Term Plans on the RCSP
 Roles of DILG on RCSP
 Policy Guidance by the DILG on RCSP
 Action Planning for the RCSP Orientation-Workshops
 LGU Experience RCSP Implementation

METHODOLOGY

The activity will be conducted through a small group and sectoral discussion/dialogue with
strict compliance with health and quarantine protocols. Lectures/presentations, workshops,
and plenary discussions will be adopted.

MONITORING AND EVALUATION (As applicable)

 Activity Feedback Form

BUDGETARY REQUIREMENTS

BUDGETARY REQUIREMENTS
EXPENDITURES PARTICULARS
RO FOU Total

Transportation/ Travel
1
Expenses
2 Food and Accommodation
Live-in
1 meal (Lunch) and 2 heavy
Live-out P48,000.00 P48,000.00
snacks (AM & PM) 80 pax
In-house
3 Communication Services
4 Honoraria
5 Supplies and Materials P22,000.00 P22,000.00
6 Rental Expenses
7 Gasoline Expenses
8 Other Expenses (please specify)

Total P70,000.00 P70,000.00


FUND SOURCE: SA NO. SR2021-09-1972

BASIS AND REFERENCES:


This activity design is prepared considering the following: REMARK
S
Schedule is not in conflict with other Department's activities YES
Reflected in and consistent with the OPB YES
Included in and consistent with the PPMP YES
Consulted and agreed upon by FOUs, if with amount for downloading YES
DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT FM-SP-DILG-11-01
ACTIVITY DESIGN Rev. No. Eff. Date Page
00 06.15.21 1 of 3

Others (specify)

Submitted by: FUNDS AVAILABLE:

MUHAMMAD RIZZAH B. ABUTAZIL APRIL JOY R. ALAMEDA


LGOO VI / MLGOO Accounting Clerk

APPROVED (As per relevant Circualrs/Issuances on Delegation of Authority)

ORLE A. CABAOBAO, CESE


Provincial Director
PER CIRCULAR 2020-19 dated1 4 July 2020 (Comprehensive Delegation of Authority -
Local Government Sector)
SILG-Exceeding P10 Million Pesos; Undersecretaries-Not exceeding P10 Million Pesos; Assistant Secretaries-Not
exceeding P5 Million Pesos; HEA - Not Exceeding P3 Million Pesos; LGA Executive Director/
Regional/Bureau Directors - Regardless of Amount; Service Directors - Not exceeding P1 Million

You might also like