RFI Summary for NH-3 Project

The document outlines a summary of Request for Inspection (RFI) related to the construction of an 8-lane highway project from Vadape to Thane, detailing various inspections conducted on different layers of embankment and concrete work. It includes dates, RFI numbers, descriptions of work, locations, and inspection outcomes, indicating satisfactory or unsatisfactory results. The project involves multiple stakeholders including MSRDC, Lion Engineering Consultants, and Technogem Consultant.

Uploaded by

omkarjagadale588
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views41 pages

RFI Summary for NH-3 Project

The document outlines a summary of Request for Inspection (RFI) related to the construction of an 8-lane highway project from Vadape to Thane, detailing various inspections conducted on different layers of embankment and concrete work. It includes dates, RFI numbers, descriptions of work, locations, and inspection outcomes, indicating satisfactory or unsatisfactory results. The project involves multiple stakeholders including MSRDC, Lion Engineering Consultants, and Technogem Consultant.

Uploaded by

omkarjagadale588
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Project Name

Client
Concessionaire
Independent Engineer
EPC Contractor

Date of
[Link] Date of RFI Final RFI Nos.
Inspection
697 27-Feb-22 28-Feb-22 MSRDC/VTR/HW/483
699 27-Feb-22 28-Feb-22 MSRDC/VTR/HW/485
762 4-Mar-22 5-Mar-22 MSRDC/VTR/HW/542
774 4-Mar-22 5-Mar-22 MSRDC/VTR/HW/554
1765 12/Nov/22 13/Nov/22 MSRDC/VTR/HW/1270
1823 20/Nov/22 21/Nov/22 MSRDC/VTR/HW/1324
1840 22/Nov/22 23/Nov/22 MSRDC/VTR/HW/1324-R1
1852 24/Nov/22 25/Nov/22 MSRDC/VTR/HW/1352
1883 26/Nov/22 28/Nov/22 MSRDC/VTR/HW/1384
#REF! 7/Jan/23 8/Jan/23 MSRDC/VTR/HW/1973
#REF! 14/Jan/23 15/Jan/23 MSRDC/VTR/HW/2230
#REF! 25-01-23 27-01-23 MSRDC/VTR/HW/2512
04-02-23 05-02-23 MSRDC/VTR/HW/2945
09-04-23 10-04-23 MSRDC/VTR/HW/5426
MSRDC/VTR/HW/5458
10-04-23 11-04-23
15-04-23 16-04-23 MSRDC/VTR/HW/5701
SUMMARY OF REQUEST FOR INSPECTION
Constru+ction of 8 laning of existing 4 lane Vadape to Thane from KM 539.202 to K
National Highways Authority of India
MSRDC Infrastructure Project Ltd
Lion Engg Consultants Pvt. Ltd. JV with Technogem Consultant Pvt. Ltd Thane & In
MEPIDL
RFI SUMMARY SHEET

Description of Work

Inspection of C&G (MCW L3,L4)


FDD & Level Checking of OGL (MCW-L3,L4)
Fdd Checking of embankment 1st layer (MCW-L3,L4)
Fdd Checking of embankment 2nd layer (MCW-L3,L4)
Fdd Checking of EMB 3rd layer (MCW L3,L4)
Fdd Checking of EMB 4th layer (MCW L3,L4)
Fdd Checking of EMB 4th layer (MCW L3,L4)
Fdd Checking of EMB 5th layer (MCW L3,L4)
Fdd Checking of EMB 6th layer (MCW L3,L4)
Fdd Checking Of Emb 6th Layer (Mcw L3,L4)
Fdd & Level Checking of embankment Top layer (MCW L3 L4)
Fdd Checking of SG 1st layer (MCW L3 L4)
FDD & Level Checking of SG top layer (MCW L3 L4)
Inspection of Cutting up To Embankment Top (MCW L2)
Fdd & Level Checking of Embankment Top layer After Excavation
(MCW L2)
FDD & Level Checking of Subgrade Top layer (MCW L2)
OR INSPECTION
om KM 539.202 to KM 563.000 section of NH-3(New NH-848) in the state of Maharashtra to

Pvt. Ltd Thane & In association with Real Strength Infrastructure

Chainage/Location Time Side

545+760 545+860 11:00 AM RHS


545+760 545+860 11:30 AM RHS
545+760 545+860 10:00 AM RHS
545+760 545+860 5:00 PM RHS
545+760 545+860 12:30 PM RHS
545+760 545+860 11:00 AM RHS
545+760 545+860 12:00 PM RHS
545+760 545+860 RHS
545+760 545+860 3:00 PM RHS
545+760 545+860 11:00 AM RHS
545+760 545+840 3:45 PM RHS
545+760 545+860 11:00 AM RHS
545+760 545+860 3:00 PM RHS
545+760 545+940 11:30 AM RHS
545+760 545+940 1:30 PM RHS

545+760 545+940 12:00 PM RHS


he state of Maharashtra to be executed on HAM

satisfactory IE/FORTRESS CLOSE

Satisfactory * *
Satisfactory * *
Satisfactory
Satisfactory

IE
IE
RA-4 EPC
RA-2 HAM
RA-5 EPC
RA-4 HAM
RA-7 EPC
RA-8 EPC

RA-9 EPC
National Highways Authority of India
MSRDC Infrastructure Project Ltd
Lion Engg Consultants Pvt. Ltd. JV with T\chnogem Consultant Pvt. Ltd Thane & In association with Real Strength Infrastructure
MEPIDL
RFI SUMMERY
Date of
Date of RFI RFI No. DISCRIPTION Chainage/ Location Length Side satisfactory EMB / SG IE
Inspection

31-Mar-24 1-Apr-24 MSRDC/VTR/HW/10812 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 547+000 547+300 300 LHS Satisfactory DLC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10821 Laying of Pavement Quality Concrete (MCW)(LOOP-4) 000+060 000+180 120 L-4 Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10822 Laying of Dry Lean Concrete (MCW)( LANE-5 to 7 ) 560+100 560+200 100 RHS Satisfactory DLC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10823 Laying of Pavement Quality Concrete (MCW L1 L2) 541+950 542+070 120 LHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10824 Laying of Pavement Quality Concrete (MCW L1 L2) 541+950 542+070 120 RHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10825 Laying of Pavement Quality Concrete (MCW L1 L2) 548+665 548+690 25 LHS Satisfactory PQC TOP IE
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10826 Laying of Pavement Quality Concrete (MCW L3 L4) 548+640 548+665 25 LHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10827 Laying of Pavement Quality Concrete (MCW L3 L4) 548+665 548+690 25 LHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10828 Dismental of existing BT Road (MCW) 547+350 547+600 250 LHS Satisfactory BT
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10829 Profile Correction & Fdd & Level Checking of Embankment Top layer (MCW L2,L3) 547+350 547+600 250 LHS Satisfactory EMB TOP IE
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10830 Inspection of laying Kerb (MCW) 542+700 543+400 700 LHS KERB
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/INTERNAL/7652 FDD & Level & Gradiaction Checking of GSB Top layer (MCW L2,L3&L4) 561+250 561+280 30 RHS Satisfactory GSB TOP
2-Apr-24 3-Apr-24 MSRDC/VTR/HW/10839 Laying of Pavement Quality Concrete (MCW)(LOOP-5)(L3&L4) 000+240 000+300 60 L-5 Satisfactory PQC TOP
2-Apr-24 3-Apr-24 MSRDC/VTR/HW/10840 Laying of Pavement Quality Concrete (MCW)(LOOP-6) 000+050 000+270 220 L-6 RHS Satisfactory PQC TOP
2-Apr-24 3-Apr-24 MSRDC/VTR/HW/INTERNAL/5354 Fdd & Level Checking of SG Top layer (SR) 547+920 548+000 80 RHS Satisfactory SG TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10865 Laying of Pavement Quality Concrete (MCW)(LOOP-3) 000+220 000+276 56 L-3 Satisfactory PQC TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10866 Laying of Pavement Quality Concrete (MCW)(LOOP-1) 000+000 000+230 230 L-1 LHS Satisfactory PQC TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10867 Fdd Level & Gradation Checking of GSB top layer (SR) 560+230 560+340 110 RHS Satisfactory GSB TOP IE
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10868 Laying of Dry Lean Concrete (SR) 560+230 560+340 110 RHS Satisfactory DLC TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10869 Laying of Dry Lean Concrete (MCW L2,L3,L4) 561+250 561+280 30 RHS Satisfactory DLC TOP IE
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/7652/Internal Fdd Level & Gradation Checking of GSB top layer (MCW L2,L3,L4) 561+250 561+280 30 RHS Satisfactory GSB TOP
5-Apr-24 6-Apr-24 MSRDC/VTR/HW/5971/Internal Fdd Level & Gradation Checking of GSB top layer (SR) 547+920 548+000 80 RHS Satisfactory GSB TOP
5-Apr-24 6-Apr-24 MSRDC/VTR/HW/7305/Internal Laying of Dry Lean Concrete (SR) 547+920 548+000 80 RHS Not Satisfactory DLC TOP
6-Apr-24 7-Apr-24 MSRDC/VTR/HW/10898 Laying of Dry Lean Concrete (SR) 560+050 560+230 180 LHS Satisfactory DLC TOP
6-Apr-24 7-Apr-24 MSRDC/VTR/HW/10899 Profile Correction of FDD & Level checking of Embankment Top (MCW) LOOP-3 000+000 000+060 60 L-3 Satisfactory EMB TOP
6-Apr-24 7-Apr-24 MSRDC/VTR/HW/10900 FDD Checking of Subgrade 1st layer (MCW) Loop-3 000+000 000+060 60 L-3 Satisfactory SG 1st
7-Apr-24 8-Apr-24 MSRDC/VTR/HW/10904 Laying of Pavement Quality Concrete (MCW-L1,L2) 546+820 547+000 180 LHS Satisfactory PQC TOP IE
7-Apr-24 8-Apr-24 MSRDC/VTR/HW/7305/Internal Laying of Dry Lean Concrete (SR) 547+920 548+000 80 RHS Satisfactory DLC TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10915 Fdd & Level Checking of Subgrade Top layer (MCW) Loop-3 000+000 000+060 60 L-3 Not Satisfactory SG TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10916 Fdd Level & Gradation Checking of GSB top layer (MCW) Loop-3 000+000 000+060 60 L-3 Not Satisfactory GSB TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10917 Laying of Pavement Quality Concrete (MCW-L1,L2) 547+000 547+300 300 LHS Not Satisfactory PQC TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10918 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 547+300 547+350 50 LHS Satisfactory DLC TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10919 Fdd Checking of Subgrade 1st layer (MCW L2,L3) 547+350 547+600 250 LHS Satisfactory SG 1st
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10920 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 547+350 547+600 250 LHS Not Satisfactory SG TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/5106/Internal FDD & Level Checking of Subgrade Top layer (MCW L4) 547+350 547+600 250 LHS Satisfactory SG TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/10930 Inspection of Cutting up to Embankment top (SR) 548+665 548+690 25 LHS Satisfactory CUTTING
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/10931 Fdd & Level Checking of Embankment Top layer After Excavation (SR) 548+665 548+690 25 LHS Satisfactory EMB TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/10932 FDD Checking of Subgrade 1st layer (SR) 548+665 548+690 25 LHS Satisfactory SG 1st
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/7530/Internal Laying of Pavement Quality Concrete (SR) 547+680 547+720 40 LHS Satisfactory PQC TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/7362/Internal Laying of Pavement Quality Concrete (SR) 548+570 548+640 70 LHS Satisfactory PQC TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/6040/Internal Laying of Dry Lean Concrete (SR) 548+640 548+665 25 LHS Satisfactory DLC TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10936 FDD & Level Checking of Subgrade Top layer (SR) 548+665 548+690 25 LHS Satisfactory SG TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10937 Fdd Level & Gradation Checking of GSB top layer (SR) 548+665 548+690 25 LHS Satisfactory GSB TOP IE
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10938 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 547+350 547+600 250 LHS Satisfactory SG TOP IE
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10939 Fdd Level & Gradation Checking of GSB top layer (MCW L2,L3) 547+350 547+600 250 LHS Not Satisfactory GSB TOP IE
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10940 Fdd Level & Gradation Checking of GSB top layer (MCW L4) 547+430 547+600 170 LHS Not Satisfactory GSB TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10941 Fdd & Level Checking of Subgrade Top layer (MCW) Loop-3 000+000 000+060 60 L-3 Satisfactory SG TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10942 Fdd Level & Gradation Checking of GSB top layer (MCW) Loop-3 000+000 000+060 60 L-3 Satisfactory GSB TOP
National Highways Authority of India
MSRDC Infrastructure Project Ltd
Lion Engg Consultants Pvt. Ltd. JV with T\chnogem Consultant Pvt. Ltd Thane & In association with Real Strength Infrastructure
MEPIDL
RFI SUMMERY
Date of
Date of RFI RFI No. DISCRIPTION Chainage/ Location Length Side satisfactory EMB / SG IE
Inspection

9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10943 Inspection of Gabion Wall 1st lift after placing of Geotextile & Geogrid 561+650 561+860 210 LHS Satisfactory GABBION
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10944 Laying of Pavement Quality Concrete (MCW L5 to L7) 560+020 560+200 180 RHS Not Satisfactory PQC TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10945 Fdd Checking of Embankment 1st layer (SR) 560+340 560+430 90 RHS Satisfactory EMB 1st
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10946 Fdd & Level Checking of Embankment Top layer (SR) 560+340 560+430 90 RHS Satisfactory EMB TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10947 Fdd Checking of Subgrade 1st layer (SR) 560+340 560+430 90 RHS Satisfactory SG 1st
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/5999/Internal Fdd Level & Gradation Checking of GSB top layer (MCW L4) 547+350 547+430 80 LHS Not Satisfactory GSB TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10958 Laying of Dry Lean Concrete (SR) 548+665 548+690 25 LHS Satisfactory DLC TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10959 Laying of Dry Lean Concrete (MCW) Loop-03 000+000 000+060 60 L-3 Satisfactory Upto 040 DLC TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10960 FDD & Level Checking of Subgrade Top layer (SR) 560+340 560+430 90 RHS Satisfactory SG TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10961 Laying of Pavement Quality Concrete (MCW-L1,L2) 547+000 547+300 300 LHS Satisfactory PQC TOP
11-Apr-24 12-Apr-24 MSRDC/VTR/HW/10970 Fdd Level & Gradation Checking of GSB top layer (SR) 560+340 560+430 90 RHS Not Satisfactory GSB TOP IE
11-Apr-24 12-Apr-24 MSRDC/VTR/HW/10971 Laying of Pavement Quality Concrete (SR) 560+230 560+340 110 RHS Not Satisfactory PQC TOP
11-Apr-24 12-Apr-24 MSRDC/VTR/HW/10972 Laying of Pavement Quality Concrete (MCW L5 to L7) 560+020 560+230 210 RHS Satisfactory PQC TOP IE
12-Apr-24 13-Apr-24 MSRDC/VTR/HW/10984 laying of Pavement Quality Concrete (SR) 561+010 561+310 300 RHS Satisfactory PQC TOP
13-Apr-24 14-Apr-24 MSRDC/VTR/HW/11000 Laying of Pavement Quality Concrete (MCW) Loop-03 000+000 000+040 40 L-3 wrong rfi PQC TOP
Satisf
PQC
540+070 540+300 26-Mar-24 27-Mar-24 MSRDC/VTR/HW/10752 Laying of Pavement Quality Concrete (MCW-L3,L4) 230 RHS actor
Satisf TOP
IE
y PQC
540+100 540+290 16-Aug-23 17-Aug-23 MSRDC/VTR/HW/7224 Laying of Pavement Quality Concrete (MCW-L3,L4) 190 RHS actor
Satisf TOP
y PQC
540+350 540+600 24-May-23 25-May-23 MSRDC/VTR/HW/6679 Laying of Pavement Quality Concrete (MCW-L3,L4) 250 RHS actor
Satisf TOP
IE
y PQC
540+500 540+800 1-May-23 2-May-23 MSRDC/VTR/HW/6281 Laying of Pavement Quality Concrete (MCW-L3,L4) 300 RHS actor
Satisf TOP
y PQC
540+800 541+300 2-May-23 3-May-23 MSRDC/VTR/HW/6292 Laying of Pavement Quality Concrete (MCW-L3,L4) 500 RHS actor
Satisf TOP
IE
y PQC
541+300 541+355 19-May-23 20-May-23 MSRDC/VTR/HW/6597 Laying of Pavement Quality Concrete (MCW-L3,L4) 55 RHS actor
Satisf TOP
y PQC
541+355 541+700 21-May-23 22-May-23 MSRDC/VTR/HW/6610 Laying of Pavement Quality Concrete (MCW-L3,L4) 345 RHS actor
Satisf TOP
y PQC
541+700 541+980 17-May-23 18-May-23 MSRDC/VTR/HW/6580 Laying of Pavement Quality Concrete (MCW-L3,L4) 280 RHS actor
Satisf TOP
IE
y PQC
541+950 542+070 18-Mar-24 18-Mar-24 MSRDC/VTR/HW/10603 Laying of Pavement Quality Concrete (MCW L3 L4) 120 RHS actor
Satisf TOP
IE
y PQC
542+700 542+800 16-Aug-23 17-Aug-23 MSRDC/VTR/HW/7225 Laying of Pavement Quality Concrete (MCW-L3,L4) 100 RHS actor
Satisf TOP
y PQC
542+800 543+050 2-Jun-23 3-Jun-23 MSRDC/VTR/HW/6834 Laying of Pavement Quality Concrete (MCW-L3,L4) 250 RHS actor
Satisf TOP
y PQC
543+050 543+260 4-Jun-23 4-Jun-23 MSRDC/VTR/HW/6844 Laying of Pavement Quality Concrete (MCW-L3,L4) 210 RHS actor
Satisf TOP
y PQC
543+260 543+400 17-Aug-23 18-Aug-23 MSRDC/VTR/HW/7245 Laying of Pavement Quality Concrete (MCW-L3,L4) 140 RHS actor
Satisf TOP
IE
y PQC
543+400 543+700 11-Mar-24 11-Mar-24 MSRDC/VTR/HW/10458 Laying of Pavement Quality Concrete (MCW L3,L4 ) 300 RHS actor
Satisf TOP
y PQC
543+720 544+200 13-Mar-24 14-Mar-24 MSRDC/VTR/HW/10464 R1 Laying of Pavement Quality Concrete (MCW L3,L4) 480 RHS actor TOP
IE
Satisfa
y PQC
544+190 544+320 26-Mar-23 27-Mar-23 MSRDC/VTR/HW/4564 Laying of Pavement Quality Concrete (MCW-L3,L4) 130 RHS Satisf
ctory TOP
PQC
544+320 544+470 17-Aug-23 18-Aug-23 MSRDC/VTR/HW/7246 Laying of Pavement Quality Concrete (MCW-L3,L4) 150 RHS actor TOP
Satisfa
y PQC
544+470 544+860 27-Mar-23 28-Mar-23 MSRDC/VTR/HW/4630 Laying of Pavement Quality Concrete (MCW-L3,L4) 390 RHS Satisf
ctory TOP
PQC
544+860 545+305 28-Mar-23 29-Mar-23 MSRDC/VTR/HW/4780 Laying of Pavement Quality Concrete (MCW-L3,L4) 445 RHS actor
Satisf TOP
y PQC
545+305 545+560 17-Apr-23 17-Apr-23 MSRDC/VTR/HW/5744 Laying of Pavement Quality Concrete (MCW-L3,L4) 255 RHS actor
Satisf TOP
y PQC
545+560 545+920 20-Apr-23 21-Apr-23 MSRDC/VTR/HW/5930 Laying of Pavement Quality Concrete (MCW-L3,L4) 360 RHS actor
Satisf TOP
y PQC
546+800 547+030 16-Jun-23 16-Jun-23 MSRDC/VTR/HW/7023 Laying of Pavement Quality Concrete (MCW-L3,L4) 230 RHS actor
Satisf TOP
y PQC
546+860 547+030 24-Aug-23 25-Aug-23 MSRDC/VTR/HW/7527 Laying of Pavement Quality Concrete (MCW-L3,L4) 170 RHS actor
Satisf TOP
y PQC
547+030 547+360 16-Jun-23 17-Jun-23 MSRDC/VTR/HW/7026 Laying of Pavement Quality Concrete (MCW-L3,L4) 330 RHS actor
Satisf TOP
IE
y PQC
547+370 547+460 27-Aug-23 28-Aug-23 MSRDC/VTR/HW/7627 Laying of Pavement Quality Concrete (MCW-L3,L4) 90 RHS actor
Satisf TOP
y PQC
547+470 547+590 20-Jun-23 20-Jun-23 MSRDC/VTR/HW/7057 Laying of Pavement Quality Concrete (MCW-L3,L4) 120 RHS actor
Satisf TOP
y PQC
547+590 547+620 23-Aug-23 24-Aug-23 MSRDC/VTR/HW/7494 Laying of Pavement Quality Concrete (MCW-L3,L4) 30 RHS actor
Satisf TOP
IE
y PQC
548+160 548+200 27-Aug-23 28-Aug-23 MSRDC/VTR/HW/7628 Laying of Pavement Quality Concrete (MCW-L3,L4) 40 RHS actor
Satisf TOP
y PQC
548+200 548+640 20-Jun-23 21-Jun-23 MSRDC/VTR/HW/7062 Laying of Pavement Quality Concrete (MCW-L3,L4) 440 RHS actor
Satisf TOP
IE
y PQC
548+640 548+665 18-Aug-23 19-Aug-23 MSRDC/VTR/HW/7258 Laying of Pavement Quality Concrete (MCW-L3,L4) 25 RHS actor
Satisf TOP
y PQC
548+665 548+690 5-Sep-23 6-Sep-23 MSRDC/VTR/HW/7784 Laying of Pavement Quality Concrete (MCW-L3,L4) 25 RHS actor
Satisf TOP
y PQC
561+080 561+220 21-Feb-24 22-Feb-24 MSRDC/VTR/HW/10000 Laying of Pavement Quality Concrete (MCW L3,L4) 140 RHS actor
Satisf TOP
IE
y PQC
561+220 561+230 22-Feb-24 23-Feb-24 MSRDC/VTR/HW/10034 Laying of Pavement Quality Concrete (MCW L3,L4) 10 RHS actor
Satisf TOP
y PQC
561+680 562+000 26-Mar-24 26-Mar-24 MSRDC/VTR/HW/10725 Laying of Pavement Quality Concrete (MCW-L3,L4) 320 RHS actor TOP
y
RA-34
Ground Improvement
9-Feb-24 MSRDC/VTR/HW/9668 Inspection Sludge removing (MCW Toll Plaza) 559360 559380 20 LHS Satisfactory SLUDGE
9-Feb-24 MSRDC/VTR/HW/9669 Inspection of Boulder Filling Work after Removal of Sludge (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory SLUDGE IE

EMB (MCW)
26-Oct-23 MSRDC/VTR/HW/8085 Inspection of C&G (MCW L3,L4) 559360 559540 180 LHS Satisfactory C&G
9-Feb-24 MSRDC/VTR/HW/9668 Inspection Sludge removing (MCW Toll Plaza) 559360 559380 20 LHS Satisfactory SLUDGE
9-Feb-24 MSRDC/VTR/HW/9669 Inspection of Boulder Filling Work after Removal of Sludge (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory SLUDGE IE
10-Feb-24 MSRDC/VTR/HW/9688 Inspection of Level Checking of Rubble soling (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory RUBBLE
16-Feb-24 MSRDC/VTR/HW/9842 Fdd Checking of Embankment 1st layer (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory EMB 1st
17-Feb-24 MSRDC/VTR/HW/9869 Fdd Checking of Embankment 2nd layer (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory EMB 2nd
19-Feb-24 MSRDC/VTR/HW/9915 FDD Checking of Embankment 3rd layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB 3rd
19-Feb-24 MSRDC/VTR/HW/9917 FDD Checking of Embankment 4th layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB 4th
21-Feb-24 MSRDC/VTR/HW/9974 FDD Checking of Embankment 5th layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB 5th
22-Feb-24 MSRDC/VTR/HW/9998 Fdd & level Checking of embankment Top layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB TOP IE

19-Jan-24 MSRDC/VTR/HW/9241 Inspection of Sludge Removal (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory SLUDGE
19-Jan-24 MSRDC/VTR/HW/9242 Inspection of Boulder Filling Work after Removal of Sludge (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory SLUDGE IE
24-Jan-24 MSRDC/VTR/HW/9302 Fdd Checking of Embankment 1st layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS satisfactory EMB 1st IE
27-Jan-24 MSRDC/VTR/HW/9367 Fdd Checking of Embankment 2nd layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB 2nd IE
10-Feb-24 MSRDC/VTR/HW/9686 Fdd Checking of Embankment 3rd layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB 3rd IE
15-Feb-24 MSRDC/VTR/HW/9804 Fdd Checking of Embankment 4th layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB 4th IE
16-Feb-24 MSRDC/VTR/HW/9840 Fdd & Level Checking of Embankment Top layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB TOP IE

EMB (SR)
8-Jan-24 MSRDC/VTR/HW/9091 Inspection of Sludge Removal (MCW&SR) 560+200 560+350 150 RHS Satisfactory SLUDGE
8-Jan-24 MSRDC/VTR/HW/9092 Inspection of Boulder Filling Work after Removal of Sludge (MCW&SR) 560+200 560+350 150 RHS Satisfactory SLUDGE
23-Jan-24 MSRDC/VTR/HW/9295 Fdd Checking of Embankment 1st layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 1st
24-Jan-24 MSRDC/VTR/HW/9303 Fdd Checking of Embankment 2nd layer (SR) 560+200 560+340 140 RHS satisfactory EMB 2nd
27-Jan-24 MSRDC/VTR/HW/9366 Fdd Checking of Embankment 3rd layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 3rd
2-Feb-24 MSRDC/VTR/HW/9487 Fdd Checking of Embankment 4th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 4th IE
3-Feb-24 MSRDC/VTR/HW/9527 Fdd Checking of Embankment 5th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 5th IE
5-Feb-24 MSRDC/VTR/HW/9574 Fdd Checking of Embankment 6th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 6th
9-Feb-24 MSRDC/VTR/HW/9670 Fdd Checking of Embankment 7th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 7th
10-Feb-24 MSRDC/VTR/HW/9689 Fdd Checking of Embankment 8th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 8th
13-Feb-24 MSRDC/VTR/HW/9775 Fdd Checking of Embankment 9th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 9th
19-Feb-24 MSRDC/VTR/HW/9916 Fdd Checking of Embankment 10th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 10th IE

EMB (Loop)
26-Aug-23 MSRDC/VTR/HW/7584 Inspection of Cutting upto Embankment Top Loop-5 000+190 000+284 94 Loop-5 Satisfactory CUTTING
26-Aug-23 MSRDC/VTR/HW/7585 Fdd & Level Checking of Embankment Top layer After Cutting Loop-5 000+190 000+284 94 Loop-5 Satisfactory EMB TOP
21-Feb-24 MSRDC/VTR/HW/9975 Dismental of existing BT Road (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory BT
21-Feb-24 MSRDC/VTR/HW/9976 Profile Correction & Fdd & level Checking of embankment Top layer (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory EMB TOP IE

SG (Loop)
21-Feb-24 MSRDC/VTR/HW/9977 FDD Checking OF Subgrade 1st Layer (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory SG 1st
27-Feb-24 MSRDC/VTR/HW/10135 Fdd & Level Checking of Subgrade Top (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory SG TOP

EPC Representative AE Representative IE Representative


RA-34

GSB (Loop)
5-Feb-24 MSRDC/VTR/HW/9572 Fdd Level & Gradation Checking of GSB top layer (MCW LOOP-2) 000+180 000+260 80 L-2 Satisfactory GSB TOP IE
13-Feb-24 MSRDC/VTR/HW/9776 Fdd Level & Gradation Checking of GSB top layer (MCW LOOP-2) 000+260 000+290 30 L-2 Satisfactory GSB TOP

DLC (Loop)
3-Feb-24 MSRDC/VTR/HW/9525 Laying of Dry Lean Concrete (MCW LOOP-2) 000+000 000+180 180 L-2 Satisfactory DLC TOP
26-Feb-24 MSRDC/VTR/HW/10129 Laying of Dry Lean Concrete (MCW LOOP-2) 000+180 000+280 100 L-2 Satisfactory DLC TOP IE

PQC (Loop)
13-Feb-24 MSRDC/VTR/HW/9777 Laying of Pavement Quality Concrete (Loop-1) 000+750 001+100 350 L-1 LHS Satisfactory upto 050 PQC TOP

SG (MCW)
3-Feb-24 MSRDC/VTR/HW/9507 FDD Checking of Subgrade 1st Layer (MCW L1,L2,L3,L4) 542+700 542+900 200 LHS Satisfactory SG 1st
4-Feb-24 MSRDC/VTR/HW/9561 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 542+700 542+900 200 LHS Satisfactory SG TOP
3-Feb-24 MSRDC/VTR/HW/9509 FDD Checking of Subgrade 1st Layer (MCW L1,L2,L3) 542+900 543+000 100 LHS Satisfactory SG 1st
8-Feb-24 MSRDC/VTR/HW/9626 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 542+900 543+000 100 LHS Satisfactory SG TOP
30-Mar-23 MSRDC/VTR/HW/4917 FDD Checking of Subgrade 1st layer (MCW L3 L4) 542+900 543+130 230 LHS Satisfactory SG 1st
31-Mar-23 MSRDC/VTR/HW/5011 FDD & Level Checking of SG Top layer (MCW L3,L4) 542+900 543+130 230 LHS Satisfactory SG TOP IE
8-Feb-24 MSRDC/VTR/HW/9629 FDD Checking of Subgrade 1st Layer (MCW L1,L2,L3) 543+000 543+400 400 LHS Satisfactory SG 1st IE
9-Feb-24 MSRDC/VTR/HW/9665 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 543+000 543+400 400 LHS Satisfactory SG TOP IE
8-Feb-24 MSRDC/VTR/HW/9631 FDD Checking OF Subgrade 1st Layer (MCW L1,L2,L3) 548+200 548+500 300 LHS Satisfactory SG 1st
11-Feb-24 MSRDC/VTR/HW/9707 FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 548+200 548+500 300 LHS Satisfactory SG TOP
1-Apr-23 MSRDC/VTR/HW/5112 FDD Checking of Subgrade 1st layer (MCW L3 L4) 548+130 548+340 210 LHS Satisfactory SG 1st
2-Apr-23 MSRDC/VTR/HW/5163 FDD & Level Checking of SG Top layer (MCW L4) 548+130 548+340 210 LHS Satisfactory SG TOP
8-Feb-24 MSRDC/VTR/HW/9632 FDD Checking OF Subgrade 1st Layer (MCW L1,L2,L3) 548+500 548+665 165 LHS Satisfactory SG 1st
8-Feb-24 MSRDC/VTR/HW/9634 FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 548+500 548+665 165 LHS Satisfactory SG TOP
4-Apr-23 MSRDC/VTR/HW/5220 FDD Checking of Subgrade 1st layer (MCW L4) 548+340 548+665 325 LHS Satisfactory SG 1st
5-Apr-23 MSRDC/VTR/HW/5248 FDD & Level Checking of SG Top layer (MCW L4) 548+340 548+665 325 LHS Satisfactory SG TOP IE
22-Feb-24 MSRDC/VTR/HW/9999 FDD Checking OF Subgrade 1st Layer (MCW)(TOLL PLAZA) L5 TO L15 559+360 559+380 20 LHS Satisfactory SG 1st
23-Feb-24 MSRDC/VTR/HW/10035-R2 Fdd & Level Checking of Subgrade Top Layer(MCW Lane-5 TO 10) Toll Plaza 559+360 559+380 20 LHS Satisfactory SG TOP IE
20-Feb-24 MSRDC/VTR/HW/9947 FDD Checking OF Subgrade 1st Layer (MCW-L1 & L2 ) 546+800 547+000 200 RHS Satisfactory SG 1st
21-Feb-24 MSRDC/VTR/HW/9968 Fdd & Level Checking of Subgarde Top layer (MCW L1,L2) 546+800 547+000 200 RHS Satisfactory SG TOP IE
21-Feb-24 MSRDC/VTR/HW/9971 FDD Checking OF Subgrade 1st Layer (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory SG 1st
21-Feb-24 MSRDC/VTR/HW/9972 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory SG TOP
16-Feb-24 MSRDC/VTR/HW/9841 FDD Checking of Subgrade 1st layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+380 559+420 40 RHS Satisfactory SG 1st
19-Feb-24 MSRDC/VTR/HW/9919 FDD & Level Checking of Subgrade Top layer (MCW)(TOLL PLAZA) L5 TO L15 559+380 559+420 40 RHS Satisfactory SG TOP

SG (SR)
25-Jan-24 MSRDC/VTR/HW/9336 FDD Checking of Subgrade 1st layer (SR) 560+050 560+140 90 LHS Satisfactory SG 1st
25-Jan-24 MSRDC/VTR/HW/9335 FDD Checking of Subgrade 1st layer (SR) 560+140 560+230 90 LHS Satisfactory SG 1st
9-Feb-24 MSRDC/VTR/HW/9671 Fdd & Level Checking of Subgrade Top layer (SR) 560+050 560+230 180 LHS Satisfactory SG TOP
24-Aug-23 MSRDC/VTR/HW/7516 FDD Checking of Subgrade 1st layer (SR) 539+500 539+800 300 RHS Satisfactory SG 1st
25-Aug-23 MSRDC/VTR/HW/7537 FDD and level Checking of Subgrade Top layer(SR) 539+500 539+800 300 RHS Satisfactory SG TOP
5-May-23 MSRDC/VTR/HW/6335 FDD Checking of Subgrade 1st layer (SR) 548+665 548+700 35 RHS Satisfactory SG 1st
6-May-23 MSRDC/VTR/HW/6354 Fdd & Level Checking of SG Top layer (SR) 548+665 548+690 25 RHS Satisfactory SG TOP

EPC Representative AE Representative IE Representative


RA-34

GSB (MCW)
11-Feb-24 MSRDC/VTR/HW/9705 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 542+700 543+000 300 LHS Satisfactory GSB TOP
10-Feb-24 MSRDC/VTR/HW/9636-R1 Fdd Level & Gradation Checking of GSB top layer (MCW L3,L4) 542+900 543+000 100 LHS Satisfactory GSB TOP
11-Feb-24 MSRDC/VTR/HW/9708 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 543+000 543+400 400 LHS Satisfactory GSB TOP
15-Feb-24 MSRDC/VTR/HW/9807 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 548+200 548+500 300 LHS Satisfactory GSB TOP IE
15-Feb-24 MSRDC/VTR/HW/9808 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 548+500 548+665 165 LHS Satisfactory GSB TOP
1-Feb-24 MSRDC/VTR/HW/9464 Fdd Level & Gradation Checking of GSB top layer(MCW L6 TO L14) 559+380 559+480 100 LHS Satisfactory GSB TOP
23-Feb-24 MSRDC/VTR/HW/10027-R1 Fdd Level & Gradation Checking of GSB top layer (MCW L3,L4) 540+070 540+100 30 RHS Satisfactory GSB TOP IE
19-Apr-23 MSRDC/VTR/HW/5828 Fdd Level & Gradation Checking of GSB top layer (MCW L3,L4) 540+100 540+320 220 RHS Satisfactory GSB TOP IE
25-Feb-24 MSRDC/VTR/HW/10099 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 542+000 542+100 100 RHS Not Satisfactory GSB TOP
21-Feb-24 MSRDC/VTR/HW/9970 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 546+800 547+000 200 RHS Satisfactory L1,L2 GSB TOP
23-Feb-24 MSRDC/VTR/HW/10029 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory GSB TOP
27-Feb-24 MSRDC/VTR/HW/10138 FDD & Level Checking of GSB Top layer (MCW)(TOLL PLAZA) L5 TO L15 559+380 559+480 100 RHS Satisfactory GSB TOP IE

GSB (SR)
17-Feb-24 MSRDC/VTR/HW/9866 Fdd Level & Gradation Checking of GSB top layer (SR) 546+200 546+400 200 LHS Satisfactory GSB TOP
2-Feb-24 MSRDC/VTR/HW/9488 Fdd Level & Gradation Checking of GSB top layer (SR) 546+400 546+450 50 LHS Satisfactory GSB TOP IE
24-May-23 MSRDC/VTR/HW/6662 Fdd Level & Gradation Checking of GSB top layer (SR) 542+400 542+700 300 RHS Satisfactory GSB TOP
19-Aug-23 MSRDC/VTR/HW/7269 FDD, Level and Gradation Checking of GSB Top Layer (SR) 546+680 546+790 110 RHS Satisfactory GSB TOP IE
22-Apr-23 MSRDC/VTR/HW/5972 Fdd Level & Gradation Checking of GSB top layer (SR) 548+010 548+400 390 RHS Satisfactory GSB TOP
3-Mar-24 MSRDC/VTR/HW/10269 Fdd Level & Gradation Checking of GSB top layer (SR) 548+665 548+690 25 RHS Satisfactory GSB TOP

DLC (MCW)
11-Feb-24 MSRDC/VTR/HW/9709 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 542+700 543+000 300 LHS Satisfactory L1,L2 DLC TOP
13-Feb-24 MSRDC/VTR/HW/9773 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 543+000 543+400 400 LHS Satisfactory DLC TOP
17-Feb-24 MSRDC/VTR/HW/9871 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 548+200 548+500 300 LHS Satisfactory DLC TOP
17-Feb-24 MSRDC/VTR/HW/9872 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 548+500 548+665 165 LHS Satisfactory DLC TOP IE
23-Feb-24 MSRDC/VTR/HW/10030 Laying of Dry Lean Concrete (MCW L1,L2) 546+800 547+000 200 RHS Satisfactory DLC TOP IE
23-Feb-24 MSRDC/VTR/HW/10031 Laying of Dry Lean Concrete (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory DLC TOP
28-Feb-24 MSRDC/VTR/HW/10175 Laying of Dry Lean Concrete (MCW)(TOLL PLAZA) L5 TO L15 559+380 559+480 100 RHS Satisfactory DLC TOP
27-Jan-24 MSRDC/VTR/HW/9369 Laying of Dry Lean Concrete (MCW L5 to L7) 559+980 560+100 120 RHS Satisfactory DLC TOP

DLC (SR)
18-Feb-24 MSRDC/VTR/HW/9886 Laying of Dry Lean Concrete (SR) 546+200 546+400 200 LHS Satisfactory DLC TOP
2-Feb-24 MSRDC/VTR/HW/9489 Laying of Dry Lean Concrete (SR) 546+400 546+450 50 LHS Satisfactory DLC TOP
22-Aug-23 MSRDC/VTR/HW/7404 Laying of Dry Lean Concrete (SR) 546+450 546+560 110 LHS Satisfactory DLC TOP
23-Apr-23 MSRDC/VTR/HW/6038 Laying of Dry Lean Concrete (SR) 547+850 548+130 280 LHS Satisfactory DLC TOP
21-Aug-23 MSRDC/VTR/HW/7368 Laying of Dry Lean Concrete (SR) 546+680 546+790 110 RHS Satisfactory DLC TOP IE
20-Aug-23 MSRDC/VTR/HW/7304 Laying of Dry Lean Concrete (SR) 546+790 546+900 110 RHS Satisfactory DLC TOP
20-Aug-23 MSRDC/VTR/HW/7305 Laying of Dry Lean Concrete (SR) 547+690 548+170 480 RHS Satisfactory DLC TOP
3-Mar-24 MSRDC/VTR/HW/10270 Laying of Dry Lean Concrete (SR) 548+665 548+690 25 RHS Satisfactory DLC TOP

PQC (MCW)
18-Feb-24 MSRDC/VTR/HW/9906 Laying of Pavement Quality Concrete (MCW-L1,L2) 542+700 543+000 300 LHS Satisfactory PQC TOP
20-Feb-24 MSRDC/VTR/HW/9944 Laying of Pavement Quality Concrete (MCW L1,L2) 543+000 543+270 270 LHS Satisfactory PQC TOP IE
21-Feb-24 MSRDC/VTR/HW/9969 Laying of Pavement Quality Concrete (MCW L1,L2) 543+270 543+400 130 LHS Satisfactory PQC TOP IE
24-Feb-24 MSRDC/VTR/HW/10077 Laying of Pavemet Quality Concrete (MCW L1,L2) 548+200 548+665 465 LHS Satisfactory From 240 PQC TOP IE

EPC Representative AE Representative IE Representative


RA-34
15-Feb-24 MSRDC/VTR/HW/9806 Laying of Pavement Quality Concrete (MCW L1,L2) 542+800 543+010 210 RHS Satisfactory PQC TOP IE
3-Mar-24 MSRDC/VTR/HW/10268 Laying of Pavement Quality Concrete (MCW L1,L2) 546+800 547+000 200 RHS Satisfactory PQC TOP
3-Mar-24 MSRDC/VTR/HW/10273 Laying of Pavement Quality Concrete (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory PQC TOP
28-Feb-24 MSRDC/VTR/HW/10170 Laying of Pavemet Quality Concrete (MCW L7,L8) 559+540 559+740 200 RHS Satisfactory PQC TOP
27-Feb-24 MSRDC/VTR/HW/10139 Laying of Pavemet Quality Concrete (MCW L5 to L7) 559+740 560+040 300 RHS Satisfactory PQC TOP
22-Feb-24 MSRDC/VTR/HW/10000 Laying of Pavement Quality Concrete (MCW L3,L4) 561+080 561+220 140 RHS Satisfactory PQC TOP IE
23-Feb-24 MSRDC/VTR/HW/10034 Laying of Pavement Quality Concrete (MCW L3,L4) 561+220 561+230 10 RHS Satisfactory PQC TOP

PQC (SR)
20-Feb-24 MSRDC/VTR/HW/9948 Laying of Pavement Quality Concrete (SR) 544+300 544+420 120 LHS Satisfactory PQC TOP
3-Jun-23 MSRDC/VTR/HW/6828 Laying of Pavement Quality Concrete (SR) 544+600 544+780 180 LHS Satisfactory PQC TOP
20-Aug-23 MSRDC/VTR/HW/7297 Laying of Pavement Quality Concrete (SR) 545+250 545+280 30 LHS Satisfactory PQC TOP
20-Aug-23 MSRDC/VTR/HW/7298 Laying of Pavement Quality Concrete (SR) 545+280 545+410 130 LHS Satisfactory PQC TOP
22-Feb-24 MSRDC/VTR/HW/9988 Laying of Pavement Quality Concrete (SR) 545+410 545+510 100 LHS Satisfactory PQC TOP IE
8-Feb-24 MSRDC/VTR/HW/9645 Laying of Pavement Quality Concrete (SR) 545+900 546+190 290 LHS Satisfactory PQC TOP IE
25-Feb-24 MSRDC/VTR/HW/10100 Laying of Pavement Quality Concrete (SR) 546+180 546+560 380 LHS Satisfactory PQC TOP
25-Aug-23 MSRDC/VTR/HW/7530 Laying of Pavement Quality Concrete (SR) 547+440 547+850 410 LHS Satisfactory PQC TOP
14-Jan-24 MSRDC/VTR/HW/9182 Laying of Pavement Quality Concrete (SR) 539+280 539+700 420 RHS Satisfactory PQC TOP
27-Aug-23 MSRDC/VTR/HW/7598 Laying of Pavement Quality Concrete (SR) 546+190 546+230 40 RHS Satisfactory PQC TOP
8-Feb-24 MSRDC/VTR/HW/9646 Laying of Pavement Quality Concrete (SR) 546+230 546+350 120 RHS Satisfactory PQC TOP
28-Feb-24 MSRDC/VTR/HW/10177 Laying of Pavement Quality Concrete (SR) 546+760 546+910 150 RHS Satisfactory PQC TOP
27-Aug-23 MSRDC/VTR/HW/7600 Laying of Pavement Quality Concrete (SR) 547+690 548+170 480 RHS Satisfactory PQC TOP
28-Feb-24 MSRDC/VTR/HW/10178 Laying of Pavement Quality Concrete (SR) 548+170 548+210 40 RHS Satisfactory PQC TOP IE
6-Feb-24 MSRDC/VTR/HW/9592 Laying of Pavement Quality Concrete (SR) 547+590 547+690 100 RHS Satisfactory PQC TOP IE
21-Feb-24 MSRDC/VTR/HW/9973 Laying of Pavement Quality Concrete (SR) 561+280 561+620 340 RHS Satisfactory 450 TO 620 PQC TOP
20-Feb-24 MSRDC/VTR/HW/9949 Laying of Pavement Quality Concrete (SR) 561+670 561+780 110 RHS Satisfactory PQC TOP IE
19-Feb-24 MSRDC/VTR/HW/9918 Laying of Pavement Quality Concrete (SR) 561+780 561+980 200 RHS Satisfactory PQC TOP
9-Feb-24 MSRDC/VTR/HW/9667 Laying of Pavement Quality Concrete (SR) 561+930 562+010 80 RHS Satisfactory from 980 PQC TOP
5-Feb-24 MSRDC/VTR/HW/9578 Laying of Pavement Quality Concrete (SR) 561+950 562+040 90 RHS Satisfactory From 562+010 PQC TOP

EPC Representative AE Representative IE Representative


RA-31
EMBANKMENT SR
1 MSRDC/VTR/HW/2555 Inspection of C&G (SR) 560+140 560+180
2 MSRDC/VTR/HW/2556 FDD & Level checking of OGL (SR) 560+140 560+180
3 MSRDC/VTR/HW/2557 Fdd Checking of Embankment 1st layer (SR) 560+140 560+180
4 MSRDC/VTR/HW/5773 Fdd Checking of Embankment 2nd layer (SR) 560+140 560+180
5 MSRDC/VTR/HW/5776 Fdd Checking of Embankment 3rd layer (SR) 560+140 560+180
6 MSRDC/VTR/HW/6369 Fdd Checking of Embankment 4th layer (SR) 560+140 560+180
7 MSRDC/VTR/HW/6370 Fdd Checking of Embankment 5th layer (SR) 560+140 560+180
8 MSRDC/VTR/HW/8078 Fdd Checking of Embankment 6th layer (SR) 560+140 560+180
9 MSRDC/VTR/HW/8083 Fdd Checking of Embankment 7th layer (SR) 560+140 560+180
10 MSRDC/VTR/HW/8104 Fdd Checking of Embankment 8th layer (SR) 560+140 560+180
11 MSRDC/VTR/HW/8124 Fdd Checking of Embankment 9th layer (SR) 560+140 560+180
12 MSRDC/VTR/HW/8153 Fdd Checking of Embankment 10th layer (SR) 560+140 560+180
13 MSRDC/VTR/HW/8176 Fdd Checking of Embankment 11th layer (SR) 560+140 560+180
14 MSRDC/VTR/HW/8611 FDD & Level Checking of Embankment Top layer (SR) 560+140 560+180

1 MSRDC/VTR/HW/7969 Inspection of C&G Work (SR) 560+180 560+340


2 MSRDC/VTR/HW/8082 FDD & Level Checking of OGL(,SR) 560180 560+230
3 MSRDC/VTR/HW/8106 Fdd Checking of Embankment 1st layer (SR) 560180 560+230
4 MSRDC/VTR/HW/8128 Fdd & Level Checking of Embankment Top layer (SR) 560180 560+230

EMBANKMENT TOLL PLAZA


1 MSRDC/VTR/HW/6052 Inspection of Cutting up To Embankment Top (MCW) Loop-6 000+000 000+300
2 MSRDC/VTR/HW/6107 Fdd & Level Checking of Embankment Top layer after excavat 000+000 000+300
3 MSRDC/VTR/HW/7588 Fdd & Level Checking of Embankment Top layer After Cutting 000+230 000+253
RA-30
DLC SR
1 8/19/2023 7265
2 8/19/2023 7266
3 3/31/2023 4989
4 8/21/2023 7375
5 4/22/2023 5975
6 4/23/2023 6037
7 4/22/2023 5976
8 3/30/2023 4867
9 8/21/2023 7367

DLC MCW
1 11/26/2023 8377
2 11/27/2023 8389
3 8/24/2023 7507
4
5 11/28/2023 8405
6 11/19/2023 8309
7 11/25/2023 8344
8
9

PQC SR
1
2 8/28/2023 7649
3 8/28/2023 7649

4 11/19/2023 8312/8298/7497/8290
5 8/24/2023 7498/7593/7594/7595
6 8/27/2023 7596
9

PQC SR
1
2
3
4
5
6
9
12/5/2023 MSRDC/VTR/HW/8460
12/5/2023 MSRDC/VTR/HW/8461
12/5/2023 MSRDC/VTR/HW/8463
MSRDC/VTR/HW/
MSRDC/VTR/HW/
45266 45267
45266 45267
RA-30
DLC SR
Laying of Dry Lean Concrete (SR) 543+050
Laying of Dry Lean Concrete (SR) 543+200
Laying of Dry Lean Concrete (SR) 544+780
Laying of Dry Lean Concrete (SR) 545+800
Laying of Dry Lean Concrete (SR) 547+040
Laying of Dry Lean Concrete (SR) 547+470
Laying of Dry Lean Concrete (SR) 540+300
Laying of Dry Lean Concrete (SR) 540+750
Laying of Dry Lean Concrete (SR) 548+350

DLC MCW
Laying of Dry Lean Concrete (Toll Plaza)(Lane-7 TO 10) 559+070
Laying of Dry Lean Concrete (Toll Plaza)(Lane-11 TO 12) 559+200
Laying of Dry Lean Concrete (MCW L3,L4) 559+540
Laying of Dry Lean Concrete (MCW L3,L4) 542+900
Laying of Dry Lean Concrete (MCW-L1,L2) 543+000
Laying of Dry Lean Concrete (MCW-L1,L2) 548+200
Laying of Dry Lean Concrete (MCW-L1,L2) 548+420
Laying of Dry Lean Concrete (MCW-L1,L2) 548+640

PQC SR
547+040
Laying of Pavement Quality Concrete (SR) 540+300
Laying of Pavement Quality Concrete (SR) 540+850
Laying of Pavement Quality Concrete (SR) 540+860
Laying of Pavement Quality Concrete (SR) 541+570
Laying of Pavement Quality Concrete (SR) 542+680

PQC SR
Laying of Pavement Quality Concrete
Inspection of C&G (MCW L3,L4) 560500
FDD & Level Checking of OGL(MCW L3,L4) 560500
Fdd Checking of Embankment 1st layer (MCW L3,L4) 560500
MSRDC/VTR/SUR/09
543+200 LHS
543+580 LHS
544+870 LHS
545+890 LHS
547+310 LHS
547+690 LHS
540+750 RHS
540+900 RHS
548+400 RHS

559+200 LHS
559+220 LHS
559+700 LHS
543+000 RHS
543+400 RHS
548+420 RHS
548+640 RHS
548+690 RHS

547+310 LHS
540+580 RHS
540+710 RHS

541+500 RHS
542+010 RHS
542+800 RHS
560560 60 RHS satisfactory
560560 60 RHS satisfactory
560560 60 RHS satisfactory
L-6
IE

IE

IE
EMB TOP

SG TOP

SG TOP
PQC (MCW)
1 19-Oct-23 MSRDC/VTR/HW/8031 Laying of Pavement Quality Concrete (MCW-L1,L2) 540+890 541+250 360 RHS
2 20-Oct-23 MSRDC/VTR/HW/8036 Laying of Pavement Quality Concrete (MCW-L1,L2) 541+250 541+410 160 RHS
3 21-Oct-23 MSRDC/VTR/HW/8045 Laying of Pavement Quality Concrete (MCW-L1,L2) 541+410 541+540 130 RHS
4 23-Oct-23 MSRDC/VTR/HW/8071 Laying of Pavement Quality Concrete (MCW-L1,L2) 541+540 541+950 410 RHS
5 3-Nov-23 MSRDC/VTR/HW/8193 Laying of Pavement Quality Concrete (MCW-L1,L2) 545+170 545+390 220 RHS
6 29-Oct-23 MSRDC/VTR/HW/8148 Laying of Pavement Quality Concrete (MCW-L1,L2) 545+390 545+600 210 RHS
7 29-Oct-23 MSRDC/VTR/HW/8147 Laying of Pavement Quality Concrete (MCW-L1,L2) 545+600 545+800 200 RHS
8 31-Oct-23 MSRDC/VTR/HW/ Laying of Pavement Quality Concrete (MCW-L1,L2) 545+800 545+900 100 RHS
RA-28
1 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 540+300 540+800 500 LHS
2 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 540+300 540+800 500 LHS
3 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 540+800 541+300 500 LHS
4 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 540+800 541+300 500 LHS
5 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 541+300 541+960 660 LHS
6 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 541+300 541+960 660 LHS
7 4-Oct-23 MSRDC/VTR/HW/7933 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 540+300 540+550 250 RHS Satisfactory
8 4-Oct-23 MSRDC/VTR/HW/7934 FDD & Level Checking of Subgrade top Layer (MCW L1) 540+300 540+550 250 RHS Satisfactory
9 14-Sep-23 MSRDC/VTR/HW/7874 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 540+550 541+130 580 RHS Satisfactory
10 14-Sep-23 MSRDC/VTR/HW/7876 FDD & Level Checking of Subgrade top Layer (MCW L1) 540+550 541+130 580 RHS IE
11 14-Sep-23 MSRDC/VTR/HW/7883 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 541+130 541+400 270 RHS IE
12 14-Sep-23 MSRDC/VTR/HW/7884 FDD & Level Checking of Subgrade top Layer (MCW L1) 541+130 541+400 270 RHS Satisfactory
13 4-Oct-23 MSRDC/VTR/HW/7931 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 541+400 541+950 550 RHS Satisfactory
14 4-Oct-23 MSRDC/VTR/HW/7932 FDD & Level Checking of Subgrade top Layer (MCW L1) 541+400 541+950 550 RHS Satisfactory
15 MSRDC/VTR/HW/ FDD & Level Checking of SG 1st layer (MCW L1) 544+180 544+700 520 RHS
16 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 544+180 544+700 520 RHS
17 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 544+700 545+300 600 RHS
18 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 544+700 545+300 600 RHS
19 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 546+610 546+790 180 RHS
20 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 546+610 546+790 180 RHS
21 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L2) 548+665 548+690 25 RHS
22 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L2) 548+665 548+690 25 RHS
23 20-Aug-23 MSRDC/VTR/HW/7347 FDD Checking of Sub Grade 1st layer (MCW L3, L4) 559+700 559+980 280 RHS Satisfactory
24 21-Aug-23 MSRDC/VTR/HW/7387 FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 559+700 559+980 280 RHS IE

GSB TOP
1 7-Oct-23 MSRDC/VTR/HW/7950 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 540+300 540+800 500 RHS Satisfactory

2 8-Oct-23 MSRDC/VTR/HW/7962 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 540+800 541+400 600 RHS Satisfactory

3 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 541+400 541+800 400 RHS

4 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 541+800 542+000 200 RHS

5 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 544+180 544+700 520 RHS

6 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 544+700 545+300 600 RHS

7 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 545+300 545+950 650 RHS

GSB SR
1 19-Apr-23 MSRDC/VTR/HW/5826 Fdd Level & Gradation Checking of GSB top layer (SR) 540270 540420 150 RHS Satisfactory

2 19-Apr-23 MSRDC/VTR/HW/5827 Fdd Level & Gradation Checking of GSB top layer (SR) 540420 540700 280 RHS Satisfactory

3 29-Mar-23 MSRDC/VTR/HW/4781 Fdd Level & Gradation Checking of GSB top layer (SR) 540900 540950 50 RHS Satisfactory

4 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB Top Layer (SR) 541+300 541+420 120 RHS

5 18-Aug-23 MSRDC/VTR/HW/7243 FDD, Level and Gradation Checking of GSB Top Layer (SR) 541+420 541+500 80 RHS Satisfactory
6 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB Top Layer (SR) 541+500 541+600 100 RHS

7 22-Apr-23 MSRDC/VTR/HW/6000 Fdd Level & Gradation Checking of GSB top layer (SR) 541+600 541+870 270 RHS RA-25
8 20-Jun-23 MSRDC/VTR/HW/7049 Fdd Level & Gradation Checking of GSB top layer (SR) 542+700 542+900 200 RHS RA-25
9 20-Apr-23 MSRDC/VTR/HW/5886 Fdd Level & Gradation Checking of GSB top layer (SR) 543+200 543+350 150 RHS RA-25

DLC MCW
1 7-Oct-23 MSRDC/VTR/HW/7951 Laying of Dry Lean Concrete (MCW L1,L2) 540+300 540+800 000+500 RHS Satisfactory

2 9-Oct-23 MSRDC/VTR/HW/7963 Laying of Dry Lean Concrete (MCW L1,L2) 540+800 541+200 000+400 RHS Satisfactory

3 MSRDC/VTR/HW/ Laying of Dry Lean Concrete (MCW-L1,L2) 541+200 541+700 500 RHS

4 MSRDC/VTR/HW/ Laying of Dry Lean Concrete (MCW-L1,L2) 541+700 542+000 300 RHS

5 23-Apr-23 MSRDC/VTR/HW/6044 Laying of Dry Lean Concrete (MCW-L3,L4) 542+730 542+900 170 RHS RA-25
6 21-Aug-23 MSRDC/VTR/HW/7364 Laying of Dry Lean Concrete (MCW-L3,L4) 548+160 548+200 40 RHS Satisfactory

DLC SR
1 31-Mar-23 MSRDC/VTR/HW/4991 Laying of Dry Lean Concrete (SR) 540+900 541+130 230 RHS Satisfactory
2 20-Apr-23 MSRDC/VTR/HW/5894 Laying of Dry Lean Concrete (SR) 541+130 541+300 170 RHS Satisfactory
3 MSRDC/VTR/HW/ Laying of Dry Lean Concrete (SR) 541+300 541+420 120 RHS

4 20-Aug-23 MSRDC/VTR/HW/7314 Laying of Dry Lean Concrete (SR) 541+420 541+500 80 RHS Satisfactory
5 17-Aug-23 MSRDC/VTR/HW/7231 Laying of Dry Lean Concrete (SR) 541+500 541+600 100 RHS Satisfactory
6 20-Aug-23 MSRDC/VTR/HW/7300 Laying of Dry Lean Concrete (SR) 541+600 542+000 400 RHS Satisfactory
7 20-Aug-23 MSRDC/VTR/HW/7301 Laying of Dry Lean Concrete (SR) 542+600 542+800 200 RHS Satisfactory
8 23-Apr-23 MSRDC/VTR/HW/6041 Laying of Dry Lean Concrete (SR) 543+200 543+350 150 RHS RA-24

9 22-May-23 MSRDC/VTR/HW/6614 Laying of Dry Lean Concrete (SR) 546+900 547+030 130 RHS Satisfactory

10 29-Mar-23 MSRDC/VTR/HW/4787 Laying of Dry Lean Concrete (SR) 547+030 547+300 270 RHS Satisfactory
11 7-Jun-23 MSRDC/VTR/HW/6867 Laying of Dry Lean Concrete (SR) 548+170 548+310 140 RHS Satisfactory

PQC SR
1 21-Aug-23 MSRDC/VTR/HW/7392 Laying of Pavement Quality Concrete (SR) 542+695 542+900 205 LHS Satisfactory
2 15-May-23 MSRDC/VTR/HW/6547 Laying of Pavement Quality Concrete (SR) 544+150 544+230 80 LHS RA-24
3 20-Mar-23 MSRDC/VTR/HW/4278 Laying of Pavement Quality Concrete (SR) 544+230 544+300 70 LHS Satisfactory
4 19-Mar-23 MSRDC/VTR/HW/4273 Laying of Pavement Quality Concrete (SR) 544+420 544+600 180 LHS Satisfactory
5 1-Apr-23 MSRDC/VTR/HW/5074 Laying of Pavement Quality Concrete (SR) 544+780 544+870 90 LHS Satisfactory
6 17-Jun-23 MSRDC/VTR/HW/7025 Laying of Pavement Quality Concrete (SR) 544+990 545+180 190 LHS Satisfactory
7 27-Aug-23 MSRDC/VTR/HW/7596 Laying of Pavement Quality Concrete (SR) 542+600 542+800 200 RHS Satisfactory
8 17-Aug-23 MSRDC/VTR/HW/7226 Laying of Pavement Quality Concrete (SR) 542+800 543+100 300 RHS Satisfactory
9 9-Jun-23 MSRDC/VTR/HW/6920 Laying of Pavemet Quality Concrete (SR) 543+330 543+740 410 RHS Satisfactory
10 10-Jun-23 MSRDC/VTR/HW/6925 Laying of Pavemet Quality Concrete (SR) 543+740 544+220 480 RHS RA-24
11 20-Mar-23 MSRDC/VTR/HW/4279 Laying of Pavemet Quality Concrete (SR) 544+220 544+320 100 RHS Satisfactory
12 5-May-23 MSRDC/VTR/HW/6349 Laying of Pavemet Quality Concrete (SR) 544+530 544+710 180 RHS Satisfactory
13 31-Mar-23 MSRDC/VTR/HW/4988 Laying of Pavemet Quality Concrete (SR) 544+710 544+785 75 RHS Satisfactory
14 13-May-23 MSRDC/VTR/HW/6512 Laying of Pavemet Quality Concrete (SR) 544+785 544+800 15 RHS Satisfactory
15 21-Apr-23 MSRDC/VTR/HW/5926 Laying of Pavemet Quality Concrete (SR) 544+800 544+810 10 RHS Satisfactory
16 5-May-23 MSRDC/VTR/HW/6350 Laying of Pavemet Quality Concrete (SR) 544+810 544+860 50 RHS Satisfactory
17 21-Apr-23 MSRDC/VTR/HW/5929 Laying of Pavemet Quality Concrete (SR) 544+860 544+910 50 RHS Satisfactory
18 17-Mar-23 MSRDC/VTR/HW/4179-R1 Laying of Pavemet Quality Concrete (SR) 545+000 545+330 330 RHS Satisfactory
19 7-May-23 MSRDC/VTR/HW/6388 Laying of Pavemet Quality Concrete (SR) 545+330 545+340 10 RHS Satisfactory
20 22-Apr-23 MSRDC/VTR/HW/5980 Laying of Pavemet Quality Concrete (SR) 545+340 545+550 210 RHS Satisfactory
21 6-May-23 MSRDC/VTR/HW/6371 Laying of Pavemet Quality Concrete (SR) 545+550 546+040 490 RHS Satisfactory
22 MSRDC/VTR/HW/ Laying of Pavement Quality Concrete (SR) 546+925 547+005 80 RHS
23 4-Oct-23 MSRDC/VTR/HW/7930 Laying of Pavement Quality Concrete (SR) 547+005 547+350 345 RHS Satisfactory
24 6-Oct-23 MSRDC/VTR/HW/7945 Laying of Pavement Quality Concrete (SR) 547+460 547+590 130 RHS Satisfactory
25 9-Oct-23 MSRDC/VTR/HW/7964 Laying of Pavement Quality Concrete (SR) 548+170 548+310 140 RHS Satisfactory
26 9-Oct-23 MSRDC/VTR/HW/7965 Laying of Pavement Quality Concrete (SR) 548+400 548+665 265 RHS Satisfactory
MSRDC/VTR/HW/7345 A.1(a) 19-Aug-23 20-Aug-23 4:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (Toll plaza) 559+200 559+380 RHS
MSRDC/VTR/HW/7346 A.1(a) 19-Aug-23 20-Aug-23 5:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 559+540 559+700 RHS
MSRDC/VTR/HW/7347 A.1(b) 19-Aug-23 20-Aug-23 4:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 559+700 559+980 RHS
MSRDC/VTR/HW/7348 A.1(b) 19-Aug-23 20-Aug-23 3:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7349 A.1(b) 19-Aug-23 20-Aug-23 6:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+450 561+620 RHS
MSRDC/VTR/HW/7350 A.1(a) 19-Aug-23 20-Aug-23 3:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (Toll plaza) 559+040 559+360 LHS
MSRDC/VTR/HW/7351 A.1(b) 19-Aug-23 20-Aug-23 4:00 PM FDD Checking of Sub Grade 1st layer (MCW L3,L4) 559+750 559+900 LHS
MSRDC/VTR/HW/7352 A.1(b) 19-Aug-23 20-Aug-23 6:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7353 A.1(b) 19-Aug-23 20-Aug-23 2:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+450 561+620 RHS wrong rfi
MSRDC/VTR/HW/7354 A.1(a) 19-Aug-23 20-Aug-23 4:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (Toll plaza) 559+040 559+360 LHS wrong rfi
MSRDC/VTR/HW/7355 A.1(b) 19-Aug-23 20-Aug-23 6:00 PM FDD Checking of Sub Grade 1st layer (MCW L3,L4) 559+750 559+900 LHS
MSRDC/VTR/HW/7356 RE 19-Aug-23 20-Aug-23 0.645833333 Casting of RE Wall Panel (A=55, B=21, Q=9, Total= 85 Nos) 551+900 RHS
MSRDC/VTR/HW/7357 RE 19-Aug-23 20-Aug-23 0.666666667 Casting of RE Wall Panel (A=42, B=17, Total= 59 Nos) 556+900 RHS
MSRDC/VTR/HW/7358 Blank
MSRDC/VTR/HW/7359 Blank
MSRDC/VTR/HW/7360 3.(a) 20-Aug-23 21-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 548+130 548+340 LHS
MSRDC/VTR/HW/7361 3.(a) 20-Aug-23 21-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 548+340 548+580 LHS
MSRDC/VTR/HW/7362 3.(a) 20-Aug-23 21-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 548+580 548+665 LHS
MSRDC/VTR/HW/7363 3.(b) 20-Aug-23 21-Aug-23 3:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 547+370 547+460 RHS
MSRDC/VTR/HW/7364 3.(b) 20-Aug-23 21-Aug-23 4:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 548+160 548+200 RHS
MSRDC/VTR/HW/7365 3.(b) 20-Aug-23 21-Aug-23 11:00 AM Laying of Dry Lean Concrete (MCW-L3,L4) 549+780 549+800 RHS
MSRDC/VTR/HW/7366 3.(b) 20-Aug-23 21-Aug-23 12:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 549+830 549+860 RHS
MSRDC/VTR/HW/7367 3.(b) 20-Aug-23 21-Aug-23 1:00 PM Laying of Dry Lean Concrete (SR) 548+310 548+400 RHS
MSRDC/VTR/HW/7368 3.(b) 20-Aug-23 21-Aug-23 2:00 PM Laying of Dry Lean Concrete (SR) 546+680 546+790 RHS
MSRDC/VTR/HW/7369 3.(b) 20-Aug-23 21-Aug-23 3:30 PM Laying of Dry Lean Concrete (SR) 547+590 547+690 RHS
MSRDC/VTR/HW/7370 3.(b) 20-Aug-23 21-Aug-23 2:30 PM Laying of Dry Lean Concrete (SR) 550+850 550+950 RHS
MSRDC/VTR/HW/7371 3.(b) 20-Aug-23 21-Aug-23 11:00 AM Laying of Dry Lean Concrete (SR) 552+380 552+420 RHS
MSRDC/VTR/HW/7372 3.(b) 20-Aug-23 21-Aug-23 12:00 PM Laying of Dry Lean Concrete (SR) 552+550 552+620 RHS
MSRDC/VTR/HW/7373 3.(b) 20-Aug-23 21-Aug-23 1:30 PM Laying of Dry Lean Concrete (SR) 545+410 545+510 LHS
MSRDC/VTR/HW/7374 3.(b) 20-Aug-23 21-Aug-23 2:30 PM Laying of Dry Lean Concrete (SR) 545+650 545+700 LHS
MSRDC/VTR/HW/7375 3.(b) 20-Aug-23 21-Aug-23 4:00 PM Laying of Dry Lean Concrete (SR) 545+700 545+950 LHS
MSRDC/VTR/HW/7376 3.(b) 20-Aug-23 21-Aug-23 4:00 PM Laying of Dry Lean Concrete (SR) 545+950 546+200 LHS
MSRDC/VTR/HW/7377 A.1(b) 20-Aug-23 21-Aug-23 10:00 AM Fdd Checking of Subgrade 1st layer (MCW L2) 541+300 541+450 RHS
MSRDC/VTR/HW/7378 A.1(b) 20-Aug-23 21-Aug-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L2) 541+600 541+900 RHS
MSRDC/VTR/HW/7379 A.1(b) 20-Aug-23 21-Aug-23 12:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 541+900 542+000 RHS
MSRDC/VTR/HW/7380 A.1(a) 20-Aug-23 21-Aug-23 12:30 PM Fdd & Level Checking of Embankment Top layer (MCW L2) 542+700 542+850 RHS
MSRDC/VTR/HW/7381 A.1(b) 20-Aug-23 21-Aug-23 2:30 PM Fdd Checking of Subgrade 1st layer (MCW L2) 542+850 543+200 RHS
MSRDC/VTR/HW/7382 A.1(a) 20-Aug-23 21-Aug-23 4:00 PM FDD & Level Checking of Subgrade Top layer (MCW L2) 544+390 544+410 RHS
MSRDC/VTR/HW/7383 A.1(b) 20-Aug-23 21-Aug-23 1:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 545+360 545+560 RHS
MSRDC/VTR/HW/7384 A.1(b) 20-Aug-23 21-Aug-23 3:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 545+700 545+760 RHS
MSRDC/VTR/HW/7385 A.1(b) 20-Aug-23 21-Aug-23 12:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 546+860 546+950 RHS
MSRDC/VTR/HW/7386 A.1(b) 20-Aug-23 21-Aug-23 2:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 547+270 547+440 RHS
MSRDC/VTR/HW/7387 A.1(b) 20-Aug-23 21-Aug-23 6:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 559+700 559+980 RHS
MSRDC/VTR/HW/7388 A.1(b) 20-Aug-23 21-Aug-23 6:15 PM FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7389 A.1(b) 20-Aug-23 21-Aug-23 6:30 PM FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 561+450 561+620 RHS
MSRDC/VTR/HW/7390 A.1(c) 20-Aug-23 21-Aug-23 6:45 PM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 561+650 561+850 RHS wrong rfi
MSRDC/VTR/HW/7391 A.1(b) 20-Aug-23 21-Aug-23 7:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L3,L4) 559+580 559+900 LHS
MSRDC/VTR/HW/7392 3.(b) 20-Aug-23 21-Aug-23 3:00 PM Laying of Pavement Quality Concrete (SR) 542+695 542+900 LHS
MSRDC/VTR/HW/7393 RE 20-Aug-23 21-Aug-23 0.645833333 Casting of RE Wall Panel (A=65, B=26, Q=14, Total= 105 Nos) 551+900 RHS
MSRDC/VTR/HW/7394 RE 20-Aug-23 21-Aug-23 0.666666667 Casting of RE Wall Panel (A=52, B=22, Total= 74 Nos) 556+900 RHS
MSRDC/VTR/HW/7395 Blank
MSRDC/VTR/HW/7396 Blank
MSRDC/VTR/HW/7397 Blank
MSRDC/VTR/HW/7398 3.(a) 21-Aug-23 22-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 549+690 549+800 LHS
MSRDC/VTR/HW/7399 3.(a) 21-Aug-23 22-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 549+970 550+000 LHS
MSRDC/VTR/HW/7400 3.(a) 21-Aug-23 22-Aug-23 12:30 PM Laying of Pavement Quality Concrete (SR) 550+540 550+650 LHS
MSRDC/VTR/HW/7401 3.(b) 21-Aug-23 22-Aug-23 1:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 554+140 554+200 RHS
MSRDC/VTR/HW/7402 3.(b) 21-Aug-23 22-Aug-23 2:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 555+760 555+800 RHS
MSRDC/VTR/HW/7403 3.(b) 21-Aug-23 22-Aug-23 3:30 PM Laying of Dry Lean Concrete (MCW-L3,L4) 557+400 557+500 RHS
MSRDC/VTR/HW/7404 3.(b) 21-Aug-23 22-Aug-23 11:00 AM Laying of Dry Lean Concrete (SR) 546+450 546+540 LHS
MSRDC/VTR/HW/7405 3.(b) 21-Aug-23 22-Aug-23 12:00 PM Laying of Dry Lean Concrete (SR) 552+700 552+790 LHS
MSRDC/VTR/HW/7406 3.(b) 21-Aug-23 22-Aug-23 12:30 PM Laying of Dry Lean Concrete (SR) 554+140 554+200 LHS
MSRDC/VTR/HW/7407 3.(b) 21-Aug-23 22-Aug-23 1:30 PM Laying of Dry Lean Concrete (SR) 556+160 556+350 LHS
MSRDC/VTR/HW/7408 3.(b) 21-Aug-23 22-Aug-23 1:45 PM Laying of Dry Lean Concrete (SR) 556+620 556+730 LHS
MSRDC/VTR/HW/7409 3.(b) 21-Aug-23 22-Aug-23 2:30 PM Laying of Dry Lean Concrete (SR) 556+900 557+100 LHS
MSRDC/VTR/HW/7410 3.(b) 21-Aug-23 22-Aug-23 3:30 PM Laying of Dry Lean Concrete (MCW-L2,L3,L4) 550+400 550+490 RHS
MSRDC/VTR/HW/7411 3.(b) 21-Aug-23 22-Aug-23 4:00 PM Laying of Dry Lean Concrete (MCW-L2,L3,L4) 553+530 553+610 RHS
MSRDC/VTR/HW/7412 A.1(b) 21-Aug-23 22-Aug-23 11:00 AM FDD & Level Checking of Sub Grade Top layer (MCW L2) 541+300 541+450 RHS
MSRDC/VTR/HW/7413 A.1(b) 21-Aug-23 22-Aug-23 12:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 541+600 541+900 RHS
MSRDC/VTR/HW/7414 A.1(b) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 541+900 542+000 RHS
MSRDC/VTR/HW/7415 A.1(b) 21-Aug-23 22-Aug-23 1:30 PM Fdd Checking of Subgrade 1st layer (MCW L2) 542+700 542+850 RHS
MSRDC/VTR/HW/7416 A.1(b) 21-Aug-23 22-Aug-23 3:30 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 542+850 543+200 RHS
MSRDC/VTR/HW/7417 A.1(b) 21-Aug-23 22-Aug-23 2:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 545+360 545+560 RHS
MSRDC/VTR/HW/7418 A.1(b) 21-Aug-23 22-Aug-23 4:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 545+700 545+760 RHS
MSRDC/VTR/HW/7419 A.1(b) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 546+860 546+950 RHS
MSRDC/VTR/HW/7420 A.1(b) 21-Aug-23 22-Aug-23 3:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 547+270 547+440 RHS
MSRDC/VTR/HW/7421 A.1(a) 21-Aug-23 22-Aug-23 11:00 AM FDD Checking of Embankment 19 th layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7422 A.1(c) 21-Aug-23 22-Aug-23 12:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 559+700 559+980 RHS
MSRDC/VTR/HW/7423 A.1(c) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7424 A.1(c) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 561+450 561+620 RHS
MSRDC/VTR/HW/7425 i(a) 21-Aug-23 22-Aug-23 10:00 AM FDD & Level Checking of OGL After C&G (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7426 i(a) 21-Aug-23 22-Aug-23 5:00 PM FDD Checking of Embankment 1st layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7427 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7428 i(a) 21-Aug-23 22-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer (SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7429 i(b) 21-Aug-23 22-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 550+000 550+180 LHS
MSRDC/VTR/HW/7430 i(a) 21-Aug-23 22-Aug-23 10:00 AM Fdd & Level Checking of Embankment Top layer (SR) 550+650 550+790 LHS
MSRDC/VTR/HW/7431 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 551+750 551+830 LHS
MSRDC/VTR/HW/7432 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 551+940 552+060 LHS
MSRDC/VTR/HW/7433 i(a) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Embankment 3rd layer (SR) 552+380 552+500 LHS
MSRDC/VTR/HW/7434 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD Checking of Subgrade 1st layer(SR) 552+790 553+050 LHS
MSRDC/VTR/HW/7435 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD Checking of Subgrade 1st layer(SR) 553+050 553+260 LHS
MSRDC/VTR/HW/7436 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD Checking of Subgrade 1st layer(SR) 553+260 553+620 LHS
MSRDC/VTR/HW/7437 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 553+260 553+620 LHS
MSRDC/VTR/HW/7438 i(b) 21-Aug-23 22-Aug-23 10:15 AM FDD Checking of Subgrade 1st layer(SR) 556+050 556+160 LHS
MSRDC/VTR/HW/7439 i(a) 21-Aug-23 22-Aug-23 11:00 AM Inspection of Cutting up To Embankment Top (SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7440 i(b) 21-Aug-23 22-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 556+840 556+900 LHS
MSRDC/VTR/HW/7441 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7442 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer (SR) 550+400 550+500 RHS
MSRDC/VTR/HW/7443 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 552+870 552+900 RHS
MSRDC/VTR/HW/7444 i(a) 21-Aug-23 22-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer (SR) 552+870 552+900 RHS
MSRDC/VTR/HW/7445 i(b) 21-Aug-23 22-Aug-23 10:30 AM FDD Checking of Subgrade 1st layer(SR) 553+050 553+200 RHS
MSRDC/VTR/HW/7446 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 553+320 553+420 RHS
MSRDC/VTR/HW/7447 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7448 i(a) 21-Aug-23 22-Aug-23 10:00 AM FDD & Level Checking of OGL After C&G (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7449 RE 21-Aug-23 22-Aug-23 0.645833333 Casting of RE Wall Panel (A=65, B=26, Q=14, Total= 105 Nos) 551+900 RHS
MSRDC/VTR/HW/7450 RE 21-Aug-23 22-Aug-23 0.666666667 Casting of RE Wall Panel (A=52, B=22, Total= 74 Nos) 556+900 RHS
MSRDC/VTR/HW/7451 3(a) 21-Aug-23 22-Aug-23 5:30 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+680 557+900 RHS
MSRDC/VTR/HW/7452 21-Aug-23 22-Aug-23 Blank
MSRDC/VTR/HW/7453 21-Aug-23 22-Aug-23 Blank
MSRDC/VTR/HW/7454 21-Aug-23 22-Aug-23 blank
MSRDC/VTR/HW/7455 3.(a) 22-Aug-23 23-Aug-23 10:00 AM Laying of Pavement Quality Concrete (SR) 552+050 552+060 LHS
MSRDC/VTR/HW/7456 3.(a) 22-Aug-23 23-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 552+060 552+200 LHS
MSRDC/VTR/HW/7457 3.(a) 22-Aug-23 23-Aug-23 12:30 PM Laying of Pavement Quality Concrete (SR) 553+620 553+870 LHS
MSRDC/VTR/HW/7458 3.(a) 22-Aug-23 23-Aug-23 2:30 PM Laying of Pavement Quality Concrete (SR) 553+870 553+970 LHS
MSRDC/VTR/HW/7459 3.(b) 22-Aug-23 23-Aug-23 9:00 AM Laying of Dry Lean Concrete (SR) 557+100 557+250 LHS
MSRDC/VTR/HW/7460 3.(b) 22-Aug-23 23-Aug-23 10:00 AM Laying of Dry Lean Concrete (SR) 557+250 557+340 LHS
MSRDC/VTR/HW/7461 3.(b) 22-Aug-23 23-Aug-23 11:00 AM Laying of Dry Lean Concrete (SR) 557+340 557+400 LHS
MSRDC/VTR/HW/7462 3.(b) 22-Aug-23 23-Aug-23 1:50 PM Laying of Dry Lean Concrete (SR) 557+760 557+930 LHS
MSRDC/VTR/HW/7463 A.1(c) 22-Aug-23 23-Aug-23 11:00 AM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 539+200 539+300 RHS
MSRDC/VTR/HW/7464 A.1(c) 22-Aug-23 23-Aug-23 12:00 PM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 555+760 555+840 RHS
MSRDC/VTR/HW/7465 A.1(c) 22-Aug-23 23-Aug-23 1:00 PM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 561+650 561+850 RHS
MSRDC/VTR/HW/7466 A.1(b) 22-Aug-23 23-Aug-23 2:30 PM FDD & Level Checking of Subgrade Top layer (MCW L2) 542+700 542+850 RHS
MSRDC/VTR/HW/7467 A.1(a) 22-Aug-23 23-Aug-23 2:00 PM FDD & Level Checking of Embankment Top layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7468 i(a) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Embankment 2nd layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7469 i(a) 22-Aug-23 23-Aug-23 5:00 PM FDD Checking of Embankment 3rd layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7470 i(b) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7471 i(b) 22-Aug-23 23-Aug-23 10:30 AM FDD and level Checking of Subgrade Top layer(SR) 550+000 550+180 LHS
MSRDC/VTR/HW/7472 i(b) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 550+650 550+790 LHS
MSRDC/VTR/HW/7473 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 551+750 551+830 LHS
MSRDC/VTR/HW/7474 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 551+940 552+060 LHS
MSRDC/VTR/HW/7475 i(a) 22-Aug-23 23-Aug-23 11:00 AM FDD Checking of Embankment 4th layer (SR) 552+380 552+500 LHS
MSRDC/VTR/HW/7476 i(b) 22-Aug-23 23-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 552+790 553+050 LHS
MSRDC/VTR/HW/7477 i(b) 22-Aug-23 23-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 553+050 553+260 LHS
MSRDC/VTR/HW/7478 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 556+050 556+160 LHS
MSRDC/VTR/HW/7479 i(a) 22-Aug-23 23-Aug-23 3:00 PM Fdd & Level Checking of Embankment Top layer (SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7480 i(b) 22-Aug-23 23-Aug-23 3:00 PM FDD and level Checking of Subgrade Top layer(SR) 556+840 556+900 LHS
MSRDC/VTR/HW/7481 i(a) 22-Aug-23 23-Aug-23 11:00 AM Fdd & Level Checking of Embankment Top layer (SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7482 i(b) 22-Aug-23 23-Aug-23 11:30 AM Fdd & Level Checking of Subgrade Top Layer (SR) 550+400 550+500 RHS
MSRDC/VTR/HW/7483 i(b) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 552+870 552+950 RHS
MSRDC/VTR/HW/7484 i(b) 22-Aug-23 23-Aug-23 5:30 PM FDD and level Checking of Subgrade Top layer(SR) 553+050 553+200 RHS
MSRDC/VTR/HW/7485 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 553+320 553+420 RHS
MSRDC/VTR/HW/7486 i(a) 22-Aug-23 23-Aug-23 10:00 AM Fdd & Level Checking of Embankment Top layer (SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7487 i(a) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Embankment 1st layer (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7488 i(a) 22-Aug-23 23-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7489 i(a) 22-Aug-23 23-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7490 RE 22-Aug-23 23-Aug-23 0.645833333 Casting of RE Wall Panel (A=72, B=29, Q=16, Total= 117 Nos) 551+900 RHS
MSRDC/VTR/HW/7491 RE 22-Aug-23 23-Aug-23 0.666666667 Casting of RE Wall Panel (A=58, B=26, Total= 84 Nos) 556+900 RHS
MSRDC/VTR/HW/7451-R1 3.(a) 22-Aug-23 23-Aug-23 5:30 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+680 557+900 RHS
MSRDC/VTR/HW/7492 Blank
MSRDC/VTR/HW/7493 Blank
MSRDC/VTR/HW/7494 3.(a) 23-Aug-23 24-Aug-23 10:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 547+590 547+620 RHS
MSRDC/VTR/HW/7495 3.(a) 23-Aug-23 24-Aug-23 1:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 549+860 550+180 RHS
MSRDC/VTR/HW/7496 3.(a) 23-Aug-23 24-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 540+030 540+150 RHS
MSRDC/VTR/HW/7497 3.(a) 23-Aug-23 24-Aug-23 4:00 PM Laying of Pavement Quality Concrete (SR) 541+130 541+300 RHS
MSRDC/VTR/HW/7498 3.(a) 23-Aug-23 24-Aug-23 6:00 PM Laying of Pavement Quality Concrete (SR) 541+500 541+600 RHS
MSRDC/VTR/HW/7499 3.(a) 23-Aug-23 24-Aug-23 3:40 PM Laying of Pavement Quality Concrete (SR) 542+190 542+230 LHS
MSRDC/VTR/HW/7500 3.(a) 23-Aug-23 24-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 542+820 542+900 LHS
MSRDC/VTR/HW/7501 3.(a) 23-Aug-23 24-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 553+990 554+140 LHS
MSRDC/VTR/HW/7502 3.(a) 23-Aug-23 24-Aug-23 2:30 PM Laying of Pavement Quality Concrete (SR) 557+400 557+600 LHS
MSRDC/VTR/HW/7503 3.(a) 23-Aug-23 24-Aug-23 4:00 PM Laying of Pavement Quality Concrete (SR) 557+600 557+740 LHS
MSRDC/VTR/HW/7504 3.(a) 23-Aug-23 24-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 541+370 541+570 LHS wrong rfi
MSRDC/VTR/HW/7505 3.(a) 23-Aug-23 24-Aug-23 4:00 PM FDD Checking of Subgrade 1st layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7506 3.(b) 23-Aug-23 24-Aug-23 10:00 AM Laying of Dry Lean Concrete (Toll Plaza) 559+200 559+380 RHS
MSRDC/VTR/HW/7507 3.(b) 23-Aug-23 24-Aug-23 11:00 AM Laying of Dry Lean Concrete (MCW L3,L4) 559+540 559+700 RHS
MSRDC/VTR/HW/7508 3.(b) 23-Aug-23 24-Aug-23 11:00 AM Laying of Dry Lean Concrete (Toll Plaza) 559+040 559+360 LHS
MSRDC/VTR/HW/7509 A.1(a) 23-Aug-23 24-Aug-23 10:30 AM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 559+580 559+900 LHS
MSRDC/VTR/HW/7510 i(a) 23-Aug-23 24-Aug-23 10:00 AM FDD Checking of Embankment 4th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7511 i(a) 23-Aug-23 24-Aug-23 5:00 PM FDD Checking of Embankment 5th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7512 i(b) 23-Aug-23 24-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7513 i(b) 23-Aug-23 24-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 550+650 550+790 LHS
MSRDC/VTR/HW/7514 i(a) 23-Aug-23 24-Aug-23 11:30 AM FDD & Level Checking of Embankment Top layer (SR) 552+380 552+600 LHS
MSRDC/VTR/HW/7515 i(b) 23-Aug-23 24-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7516 i(b) 23-Aug-23 24-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7517 i(b) 23-Aug-23 24-Aug-23 5:30 PM FDD and level Checking of Subgrade Top layer(SR) 552+870 552+950 RHS
MSRDC/VTR/HW/7518 i(b) 23-Aug-23 24-Aug-23 10:30 AM FDD Checking of Subgrade 1st layer(SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7519 i(a) 23-Aug-23 24-Aug-23 10:30 AM FDD Checking of Embankment 2nd layer (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7520 i(a) 23-Aug-23 24-Aug-23 10:30 AM Fdd & Level Checking of Embankment Top layer (SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7521 i(a) 23-Aug-23 24-Aug-23 10:30 AM Fdd & Level Checking of Embankment Top layer (SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7522 RE 23-Aug-23 24-Aug-23 0.645833333 Casting of RE Wall Panel (A=82, B=33, Q=20, Total= 135 Nos) 551+900 RHS
MSRDC/VTR/HW/7523 RE 23-Aug-23 24-Aug-23 0.666666667 Casting of RE Wall Panel (A=68, B=32, Total= 100 Nos) 556+900 RHS
MSRDC/VTR/HW/7524 23-Aug-23 24-Aug-23 Blank
MSRDC/VTR/HW/7525 3.(a) 24-Aug-23 25-Aug-23 10:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 550+300 550+400 RHS
MSRDC/VTR/HW/7526 3.(a) 24-Aug-23 25-Aug-23 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 555+600 555+760 RHS
MSRDC/VTR/HW/7527 3.(a) 24-Aug-23 25-Aug-23 12:30 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 546+860 547+030 RHS
MSRDC/VTR/HW/7528 3.(a) 24-Aug-23 25-Aug-23 12:45 PM Laying of Pavement Quality Concrete (SR) 546+560 546+700 LHS
MSRDC/VTR/HW/7529 3.(a) 24-Aug-23 25-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 546+700 547+420 LHS
MSRDC/VTR/HW/7530 3.(a) 24-Aug-23 25-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 547+440 547+850 LHS
MSRDC/VTR/HW/7531 3.(a) 24-Aug-23 25-Aug-23 2:30 PM Laying of Pavement Quality Concrete (SR) 547+850 548+130 LHS
MSRDC/VTR/HW/7532 A.1(b) 24-Aug-23 25-Aug-23 3:00 PM FDD & Level Checking of Subgrade Top layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7533 i(a) 24-Aug-23 25-Aug-23 10:00 AM FDD Checking of Embankment 6th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7534 i(a) 24-Aug-23 25-Aug-23 5:00 PM FDD Checking of Embankment 7th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7535 i(b) 24-Aug-23 25-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 552+340 552+600 LHS
MSRDC/VTR/HW/7536 i(b) 24-Aug-23 25-Aug-23 3:00 PM FDD and level Checking of Subgrade Top layer(SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7537 i(b) 24-Aug-23 25-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7538 i(b) 24-Aug-23 25-Aug-23 10:45 AM FDD and level Checking of Subgrade Top layer(SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7539 i(a) 24-Aug-23 25-Aug-23 10:45 AM FDD & Level Checking of Embankment Top layer (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7540 i(b) 24-Aug-23 25-Aug-23 10:45 AM FDD Checking of Subgrade 1st layer(SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7541 i(b) 24-Aug-23 25-Aug-23 10:45 AM FDD Checking of Subgrade 1st layer(SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7542 A.1(a) 24-Aug-23 25-Aug-23 9:00 AM Inspection of Cutting upto Embankment Top Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7543 A.1(a) 24-Aug-23 25-Aug-23 6:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7544 A.1(a) 24-Aug-23 25-Aug-23 9:30 AM Inspection of Cutting upto Embankment Top Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7545 A.1(a) 24-Aug-23 25-Aug-23 5:30 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7546 A.1(a) 24-Aug-23 25-Aug-23 10:00 AM Inspection of Cutting upto Embankment Top Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7547 A.1(a) 24-Aug-23 25-Aug-23 10:00 AM Inspection of Cutting upto Embankment Top Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7548 A.1(a) 24-Aug-23 25-Aug-23 4:45 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7549 A.1(a) 24-Aug-23 25-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7550 A.1(a) 24-Aug-23 25-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7551 RE 24-Aug-23 25-Aug-23 0.645833333 Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7552 RE 24-Aug-23 25-Aug-23 0.666666667 Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7555 3.(a) 25-Aug-23 26-Aug-23 10:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+320 557+400 RHS
MSRDC/VTR/HW/7556 3.(a) 25-Aug-23 26-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 549+830 549+860 RHS
MSRDC/VTR/HW/7557 3.(a) 25-Aug-23 26-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 550+750 550+820 RHS
MSRDC/VTR/HW/7558 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM Inspection of Cutting upto Embankment Top (MCW L2,L3,L4) 552+050 552+240 RHS
MSRDC/VTR/HW/7559 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM FDD & Level Checking of OGL After C&G ( L2,L3,L4) 552+240 552+370 RHS
MSRDC/VTR/HW/7560 A.1(a) 25-Aug-23 26-Aug-23 3:30 PM FDD & Level Checking of Embankment Top layer ( L2,L3,L4) 552+370 552+660 RHS
MSRDC/VTR/HW/7561 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (MCW -L3,L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7562 A.1(a) 25-Aug-23 26-Aug-23 9:00 AM Inspection of Cutting up To Embankment Top (MCW L4) 552+050 552+220 LHS
MSRDC/VTR/HW/7563 A.1(a) 25-Aug-23 26-Aug-23 6:00 PM Fdd & Level Checking of Embankment Top layer After Cutting (MCW L4) 552+050 552+220 LHS
MSRDC/VTR/HW/7564 A.1(a) 25-Aug-23 26-Aug-23 9:00 AM FDD & Level Checking of OGL After C&G (L4) 552+220 552+430 LHS
MSRDC/VTR/HW/7565 A.1(a) 25-Aug-23 26-Aug-23 6:00 PM FDD Checking of Embankment 1st layer (L4) 552+220 552+430 LHS
MSRDC/VTR/HW/7566 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting up To Embankment Top (MCW L4) 552+430 552+650 LHS
MSRDC/VTR/HW/7567 A.1(a) 25-Aug-23 26-Aug-23 11:30 AM Inspection of Cutting up To Embankment Top (MCW L2,L3,L4) 555+900 556+100 LHS
MSRDC/VTR/HW/7568 A.1(a) 25-Aug-23 26-Aug-23 3:30 PM Fdd & Level Checking of Embankment Top layer (MCW L3,L4) 559+900 560+140 LHS
MSRDC/VTR/HW/7569 i(a) 25-Aug-23 26-Aug-23 10:00 AM FDD Checking of Embankment 8th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7570 i(b) 25-Aug-23 26-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 552+340 552+600 LHS
MSRDC/VTR/HW/7571 i(b) 25-Aug-23 26-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7572 i(b) 25-Aug-23 26-Aug-23 5:00 PM FDD and level Checking of Subgrade Top layer(SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7573 i(b) 25-Aug-23 26-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7574 i(b) 25-Aug-23 26-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7575 A.1(c) 25-Aug-23 26-Aug-23 12:00 PM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+000 000+250 Loop-1
MSRDC/VTR/HW/7576 A.1(b) 25-Aug-23 26-Aug-23 8:00 AM FDD Checking of Subgrade 1st layer Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7577 A.1(b) 25-Aug-23 26-Aug-23 8:00 AM FDD Checking of Subgrade 1st layer Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7578 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM Fdd & Level Checking of Embankment Top layer After Cutting Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7579 A.1(b) 25-Aug-23 26-Aug-23 9:00 AM FDD Checking of Subgrade 1st layer Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7580 A.1(b) 25-Aug-23 26-Aug-23 7:30 PM FDD and level Checking of Subgrade Top layer Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7581 A.1(b) 25-Aug-23 26-Aug-23 9:00 AM FDD Checking of Subgrade 1st layer Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7582 A.1(b) 25-Aug-23 26-Aug-23 6:30 PM FDD and level Checking of Subgrade Top layer Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7583 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7584 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7585 A.1(a) 25-Aug-23 26-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7586 A.1(b) 25-Aug-23 26-Aug-23 12:00 PM FDD Checking of Subgrade 1st layer Loop-6 000+000 000+200 Loop-6
MSRDC/VTR/HW/7587 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7588 A.1(a) 25-Aug-23 26-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7589 RE 25-Aug-23 26-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7590 RE 25-Aug-23 26-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7593 3.(a) 26-Aug-23 27-Aug-23 9:00 AM Laying of Pavement Quality Concrete (SR) 541+600 541+870 RHS
MSRDC/VTR/HW/7594 3.(a) 26-Aug-23 27-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 541+870 541+960 RHS
MSRDC/VTR/HW/7595 3.(a) 26-Aug-23 27-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 541+960 542+000 RHS
MSRDC/VTR/HW/7596 3.(a) 26-Aug-23 27-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 542+600 542+800 RHS
MSRDC/VTR/HW/7597 3.(a) 26-Aug-23 27-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 544+320 544+360 RHS
MSRDC/VTR/HW/7598 3.(a) 26-Aug-23 27-Aug-23 3:00 PM Laying of Pavement Quality Concrete (SR) 546+190 546+230 RHS
MSRDC/VTR/HW/7599 3.(a) 26-Aug-23 27-Aug-23 4:00 PM Laying of Pavement Quality Concrete (SR) 546+790 546+900 RHS
MSRDC/VTR/HW/7600 3.(a) 26-Aug-23 27-Aug-23 6:00 PM Laying of Pavement Quality Concrete (SR) 547+690 548+170 RHS
MSRDC/VTR/HW/7601 3.(a) 26-Aug-23 27-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 554+140 554+200 RHS
MSRDC/VTR/HW/7602 3.(a) 26-Aug-23 27-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 555+880 555+900 RHS
MSRDC/VTR/HW/7603 3.(a) 26-Aug-23 27-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 556+500 556+640 RHS
MSRDC/VTR/HW/7604 3.(a) 26-Aug-23 27-Aug-23 6:00 PM Laying of Pavement Quality Concrete (SR) 557+320 557+400 RHS
MSRDC/VTR/HW/7605 A.1(a) 26-Aug-23 27-Aug-23 11:00 AM FDD Checking of Embankment 1st layer ( L2,L3,L4) 552+240 552+370 RHS
MSRDC/VTR/HW/7606 A.1(b) 26-Aug-23 27-Aug-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L1,L2,L3,L4) 557+900 558+170 RHS
MSRDC/VTR/HW/7607 A.1(a) 26-Aug-23 27-Aug-23 9:00 AM Inspection of Cutting up To Embankment Top (MCW L1,L2,L3,L4) 561+250 561+300 RHS
Fdd & Level Checking of Embankment Top layer After Cutting (MCW
MSRDC/VTR/HW/7608 A.1(a) 26-Aug-23 27-Aug-23 6:00 PM 561+250 561+300 RHS
L1,L2,L3,L4)
MSRDC/VTR/HW/7609 A.1(a) 26-Aug-23 27-Aug-23 11:00 AM FDD & Level Checking of Embankment Top layer (MCW -L3,L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7610 A.1(a) 26-Aug-23 27-Aug-23 10:00 AM FDD & Level Checking of Embankment Top layer (L4) 552+220 552+430 LHS
MSRDC/VTR/HW/7611 A.1(a) 26-Aug-23 27-Aug-23 12:00 PM Fdd & Level Checking of Embankment Top layer After Cutting (MCW L4) 552+430 552+650 LHS
Fdd & Level Checking of Embankment Top layer After Cutting (MCW
MSRDC/VTR/HW/7612 A.1(a) 26-Aug-23 27-Aug-23 11:30 AM 555+900 556+100 LHS
L2,L3,L4)
MSRDC/VTR/HW/7613 i(a) 26-Aug-23 27-Aug-23 5:00 PM FDD & Level Checking of Embankment Top layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7614 i(c) 26-Aug-23 27-Aug-23 12:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7615 A.1(b) 26-Aug-23 27-Aug-23 2:30 PM FDD and level Checking of Subgrade Top layer Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7616 A.1(b) 26-Aug-23 27-Aug-23 2:30 PM FDD and level Checking of Subgrade Top layer Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7617 A.1(b) 26-Aug-23 27-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7618 A.1(a) 26-Aug-23 27-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7619 A.1(b) 26-Aug-23 27-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7620 A.1(b) 26-Aug-23 27-Aug-23 3:00 PM FDD and level Checking of Subgrade Top layer Loop-6 000+000 000+200 Loop-6
MSRDC/VTR/HW/7621 A.1(b) 26-Aug-23 27-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7622 3.(a) 26-Aug-23 27-Aug-23 9:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+400 557+680 RHS
MSRDC/VTR/HW/7623 RE 26-Aug-23 27-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7624 RE 26-Aug-23 27-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7627 3.(a) 27-Aug-23 28-Aug-24 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 547+370 547+460 RHS
MSRDC/VTR/HW/7628 3.(a) 27-Aug-23 28-Aug-24 12:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 548+160 548+200 RHS
MSRDC/VTR/HW/7629 3.(a) 27-Aug-23 28-Aug-24 2:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 549+780 549+800 RHS
MSRDC/VTR/HW/7630 3.(a) 27-Aug-23 28-Aug-24 4:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 549+830 549+860 RHS
MSRDC/VTR/HW/7631 3.(a) 27-Aug-23 28-Aug-24 11:00 AM Laying of Pavement Quality Concrete (SR) 548+310 548+400 RHS
MSRDC/VTR/HW/7632 A.1(a) 27-Aug-23 28-Aug-24 11:30 AM Level Checking of Embankment Top layer After Cutting (MCW L2,L3,L4) 552+050 552+240 RHS
MSRDC/VTR/HW/7633 A.1(a) 27-Aug-23 28-Aug-24 12:00 PM FDD & Level Checking of Embankment Top layer ( L2,L3,L4) 552+240 552+370 RHS
MSRDC/VTR/HW/7634 A.1(b) 27-Aug-23 28-Aug-24 10:30 AM FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 557+900 558+170 RHS
MSRDC/VTR/HW/7635 A.1(b) 27-Aug-23 28-Aug-24 9:00 AM FDD Checking of Subgrade 1st layer (MCW L1,L2,L3,L4) 561+250 561+300 RHS
MSRDC/VTR/HW/7636 A.1(b) 27-Aug-23 28-Aug-24 6:00 PM FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 561+250 561+300 RHS
MSRDC/VTR/HW/7637 A.1(b) 27-Aug-23 28-Aug-24 12:00 PM FDD Checking of Subgrade 1st layer (MCW L3, L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7638 i(b) 27-Aug-23 28-Aug-24 10:00 AM FDD Checking of Subgrade 1st layer(SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7639 i(b) 27-Aug-23 28-Aug-24 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7640 A.1(c) 27-Aug-23 28-Aug-24 3:00 PM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7641 A.1(c) 27-Aug-23 28-Aug-24 3:00 PM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7642 A.1(b) 27-Aug-23 28-Aug-24 12:00 AM FDD and level Checking of Subgrade Top layer Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7643 A.1(b) 27-Aug-23 28-Aug-24 9:00 AM FDD Checking of Subgrade 1st layer Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7644 A.1(b) 27-Aug-23 28-Aug-24 3:00 PM FDD and level Checking of Subgrade Top layer Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7645 A.1(b) 27-Aug-23 28-Aug-24 11:00 AM FDD and level Checking of Subgrade Top layer Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7646 RE 27-Aug-23 28-Aug-24 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7647 RE 27-Aug-23 28-Aug-24 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7650 3.(a) 28-Aug-23 29-Aug-23 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 554+140 554+200 RHS
MSRDC/VTR/HW/7651 3.(a) 28-Aug-23 29-Aug-23 12:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 555+760 555+800 RHS
FDD & Level & Gradiaction Checking of GSB Top layer (MCW
MSRDC/VTR/HW/7652 A.1(b) 28-Aug-23 29-Aug-23 12:00 PM 561+250 561+300 RHS
L1,L2,L3,L4)
MSRDC/VTR/HW/7653 A.1(b) 28-Aug-23 29-Aug-23 2:00 PM FDD & Level Checking of Subgrade Top layer (MCW L3, L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7654 3.(a) 28-Aug-23 29-Aug-23 3:30 PM Laying of Dry Lean Concrete (Loop-1) 000+680 000+750 Loop-1
MSRDC/VTR/HW/7655 A.1(C) 28-Aug-23 29-Aug-23 11:00 AM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7656 A.1(C) 28-Aug-23 29-Aug-23 6:30 PM FDD and level Checking of Subgrade Top layer Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7657 RE 28-Aug-23 29-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7658 RE 28-Aug-23 29-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7660 3.(a) 29-Aug-23 30-Aug-23 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 553+530 553+610 RHS
MSRDC/VTR/HW/7661 3.(a) 29-Aug-23 30-Aug-23 10:00 AM Laying of Dry
Inspection ForLean Concrete
RE Block (Loop-1)
Erection With Filter Media & Geogrid Laying 000+750 001+437 Loop-1
MSRDC/VTR/HW/7662 RE 29-Aug-23 30-Aug-23 11:30 AM And FDD Checking 14 th Layer
Inspection For RE Block ErectionAt With
walshind
FilterVUP Wall
Media & No
Geogrid Laying 543+422 543+521 RHS
1
And
MSRDC/VTR/HW/7663 RE 29-Aug-23 30-Aug-23 12:00 PM Inspection For RE Block Erection With Filter Media & No
FDD Checking 20 th Layer At walshind VUP Wall Geogrid Laying 543+521 543+604 RHS
MSRDC/VTR/HW/7664 RE 29-Aug-23 30-Aug-23 12:30 PM 1
And FDD Checking 23 th Layer At walshind VUP Wall No 543+604 543+702 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
1
MSRDC/VTR/HW/7665 RE 29-Aug-23 30-Aug-23 1:00 PM 547+640 547+750 RHS
Checking 7th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 1Media Laying And FDD
Filter
MSRDC/VTR/HW/7666 RE 29-Aug-23 30-Aug-23 1:30 PM 547+750 547+860 RHS
Checking 7th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 1Media Laying And FDD
Filter
MSRDC/VTR/HW/7667 RE 29-Aug-23 30-Aug-23 2:00 PM 547+860 547+940 RHS
Checking 7 For
Inspection th Layer At Saravali
RE Block VUP
Erection Wall
With No 1
Filter Media Laying And FDD
MSRDC/VTR/HW/7668 RE 29-Aug-23 30-Aug-23 2:30 PM 547+958 548+020 RHS
Checking 7th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 4Media Laying And FDD
Filter
MSRDC/VTR/HW/7669 RE 29-Aug-23 30-Aug-23 3:00 PM Inspection ForLayer
RE Block Erection With Filter 548+070 548+150 RHS
Checking 7th At Saravali VUP Wall No 4Media Laying And FDD
MSRDC/VTR/HW/7670 RE 29-Aug-23 30-Aug-23 3:00 PM Checking
InspectionEmbankment
For RE BlockTop LayerWith
Erection At Walshind VUP Laying
Filter Media Wall And FDD 543+715 543+900 RHS
MSRDC/VTR/HW/7671 RE 29-Aug-23 30-Aug-23 3:30 PM No 4
Checking Embankment Top Layer At Walshind VUP Wall And FDD 543+900 544+008 RHS
Inspection For RE Block Erection With Filter Media Laying
MSRDC/VTR/HW/7672 RE 29-Aug-23 30-Aug-23 4:00 PM No 4
Checking Embankment Top Layer At walshind VUP Wall 544+008 544+122 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7673 RE 29-Aug-23 30-Aug-23 4:30 PM No 4
Checking Embankment Top Layer At Walshind VUP Wall 544+122 544+140 RHS
MSRDC/VTR/HW/7674 RE 29-Aug-23 30-Aug-23 3:30 PM No 4 of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos)
Casting 551+900 RHS
MSRDC/VTR/HW/7675 RE 29-Aug-23 30-Aug-23 4:00 PM Casting of RE
Inspection ForWall PanelErection
RE Block (A=71, B=36,
With Total= 107 Nos)
Filter Media Laying And FDD 556+900 RHS
MSRDC/VTR/HW/7680 RE 30-Aug-23 31-Aug-23 12:00 PM Checking Embankment Top Layer At Walshind VUP Laying
Inspection For RE Block Erection With Filter Media Wall And FDD 543+422 543+521 RHS
MSRDC/VTR/HW/7681 RE 30-Aug-23 31-Aug-23 0.541666667 No 4
Checking Embankment Top Layer At Walshind VUP
Inspection For RE Block Erection With Filter Media &Wall
Geogrid Laying 543+521 543+604 RHS
MSRDC/VTR/HW/7682 RE 30-Aug-23 31-Aug-23 2:00 PM No
And4FDD Checking 24 th Layer At walshind VUP Wall No 543+604 543+702 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7683 RE 30-Aug-23 31-Aug-23 3:00 PM 2 547+640 547+750 RHS
Checking
Inspection8th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 2Media Laying And FDD
Filter
MSRDC/VTR/HW/7684 RE 30-Aug-23 31-Aug-23 2:30 PM 547+750 547+860 RHS
Checking 8th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 2Media Laying And FDD
Filter
MSRDC/VTR/HW/7685 RE 30-Aug-23 31-Aug-23 3:30 PM 547+860 547+940 RHS
Checking 8th Layer At Saravali VUP Wall No 2
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7686 RE 30-Aug-23 31-Aug-23 4:00 PM 547+958 548+020 RHS
Checking
Inspection8th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 5Media Laying And FDD
Filter
MSRDC/VTR/HW/7687 RE 30-Aug-23 31-Aug-23 4:30 PM 548+070 548+150 RHS
Checking 8th
Inspection forLayer At Saravali
RE Block ErectionVUP Wall
With NoMedia
filter 5 laying And FDD
MSRDC/VTR/HW/7688 RE 30-Aug-23 31-Aug-23 11:00 AM 542+130 542+220 RHS
Cheking 8thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 1 Media laying And FDD
filter
MSRDC/VTR/HW/7689 RE 30-Aug-23 31-Aug-23 12:00 PM 542+220 542+300 RHS
Cheking 8thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 1 Media laying And FDD
filter
MSRDC/VTR/HW/7690 RE 30-Aug-23 31-Aug-23 2:00 PM 542+300 542+410 RHS
Cheking 8th
Inspection forlayer at Yewai
RE Block VUP Wall
Erection Withno 1 Media laying And FDD
filter
MSRDC/VTR/HW/7691 RE 30-Aug-23 31-Aug-23 3:00 PM 542+425 542+500 RHS
Cheking 8thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 4 Media laying And FDD
filter
MSRDC/VTR/HW/7692 RE 30-Aug-23 31-Aug-23 3:30 PM 542+500 542+580 RHS
Cheking 8th layer at Yewai VUP Wall no 4
MSRDC/VTR/HW/7693 RE 30-Aug-23 31-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7694 RE 30-Aug-23 31-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7699 RE 31-Aug-23 1-Sep-23 1:00 PM 547+640 547+750 RHS
Checking
Inspection9th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 3Media Laying And FDD
Filter
MSRDC/VTR/HW/7700 RE 31-Aug-23 1-Sep-23 11:00 AM 547+750 547+860 RHS
Checking
Inspection9th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 3Media Laying And FDD
Filter
MSRDC/VTR/HW/7701 RE 31-Aug-23 1-Sep-23 12:00 PM 547+860 547+940 RHS
Checking 9th Layer At Saravali VUP Wall No 3Media Laying And FDD
Inspection For RE Block Erection With Filter
MSRDC/VTR/HW/7702 RE 31-Aug-23 1-Sep-23 12:30 PM 547+958 548+020 RHS
Checking
Inspection9th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 6Media Laying And FDD
Filter
MSRDC/VTR/HW/7703 RE 31-Aug-23 1-Sep-23 12:45 PM 548+070 548+150 RHS
Checking 9th Layer At Saravali VUP Wall NoMedia
Inspection for RE Block Erection With filter 6 laying And FDD
MSRDC/VTR/HW/7704 RE 31-Aug-23 1-Sep-23 11:00 AM 542+130 542+220 RHS
Cheking 9thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 2 Media laying And FDD
filter
MSRDC/VTR/HW/7705 RE 31-Aug-23 1-Sep-23 12:00 PM Inspection 542+220 542+300 RHS
Cheking 9thfor RE Block
layer Erection
at Yewai Withno
VUP Wall filter
2 Media laying And FDD
MSRDC/VTR/HW/7706 RE 31-Aug-23 1-Sep-23 2:00 PM Cheking 9th
Inspection forlayer at Yewai
RE Block VUP With filter Media laying And FDD
Erection 542+300 542+410 RHS
MSRDC/VTR/HW/7707 RE 31-Aug-23 1-Sep-23 3:00 PM Wall no 29th layer at Yewai VUP
Cheking 542+425 542+500 RHS
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7708 RE 31-Aug-23 1-Sep-23 3:30 PM Wall no 59th layer at Yewai VUP
Cheking 542+500 542+580 RHS
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7709 RE 31-Aug-23 1-Sep-23 12:00 PM Wall no 59th layer at Yewai VUP
Cheking 542+580 542+660 RHS
MSRDC/VTR/HW/7710 3.(a) 31-Aug-23 1-Sep-23 11:00 AM Wall noof5 Pavement Quality Concrete (MCW-L3,L4)
Laying 550+400 550+490 RHS
MSRDC/VTR/HW/7711 RE 31-Aug-23 1-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7712 RE 31-Aug-23 1-Sep-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7727 RE 1-Sep-23 2-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7728 RE 1-Sep-23 2-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7734 RE 2-Sep-23 3-Sep-23 1:00 PM 547+640 547+750 RHS
Checking
Inspection11th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7735 RE 2-Sep-23 3-Sep-23 1:30 PM 547+750 547+860 RHS
Checking
Inspection11th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7736 RE 2-Sep-23 3-Sep-23 2:00 PM 547+860 547+940 RHS
Checking 11th Layer At Saravali VUP Wall No 1
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7737 RE 2-Sep-23 3-Sep-23 2:30 PM 547+958 548+020 RHS
Checking
Inspection11th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 4 Laying And FDD
MSRDC/VTR/HW/7738 RE 2-Sep-23 3-Sep-23 3:00 PM 548+070 548+150 RHS
Checking 11th Layer At Saravali VUP Wall No 4 laying And FDD
Inspection for RE Block Erection With filter Media
MSRDC/VTR/HW/7739 RE 2-Sep-23 3-Sep-23 11:00 AM 542+130 542+220 RHS
Cheking 11th
Inspection forlayer at Yewai
RE Block VUP With
Erection Wall filter
no 1 Media laying And FDD
MSRDC/VTR/HW/7740 RE 2-Sep-23 3-Sep-23 12:00 PM Inspection forlayer
RE Block Erection 542+220 542+300 RHS
Cheking 10th at Yewai VUP With
Wall filter
no 1 Media laying And FDD
MSRDC/VTR/HW/7741 RE 2-Sep-23 3-Sep-23 2:00 PM Cheking 11th
Inspection for layer at Yewai
RE Block Erection With filter Media laying And FDD 542+300 542+410 RHS
VUP Wall11th
Cheking no 1
MSRDC/VTR/HW/7742 RE 2-Sep-23 3-Sep-23 3:00 PM Inspection forlayer at Yewai
RE Block Erection With filter Media laying And FDD 542+425 542+500 RHS
MSRDC/VTR/HW/7743 RE 2-Sep-23 3-Sep-23 3:30 PM VUP Wall11th
Cheking no 4layer at Yewai 542+500 542+580 RHS
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7744 RE 2-Sep-23 3-Sep-23 4:30 PM VUP Wall10th
Cheking no 4layer at Yewai 542+580 542+660 RHS
MSRDC/VTR/HW/7745 RE 2-Sep-23 3-Sep-23 3:30 PM VUP Wall
Casting ofno
RE4Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7746 RE 2-Sep-23 3-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
Fdd & Level Checking of Embankment Top layer After Cutting (MCW
MSRDC/VTR/HW/7752 A.1(a) 3-Sep-23 4-Sep-23 11:00 AM 561+300 561+450 RHS
L1,L2,L3,L4)
MSRDC/VTR/HW/7753 i(a) 3-Sep-23 4-Sep-23 2:00 PM Fdd Checking of embankment 5th layer (SR) 550+790 551+000 LHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7754 RE 3-Sep-23 4-Sep-23 1:00 PM 547+640 547+750 RHS
Checking
Inspection12th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7755 RE 3-Sep-23 4-Sep-23 1:30 PM 547+750 547+860 RHS
Checking
Inspection12th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7756 RE 3-Sep-23 4-Sep-23 2:00 PM Inspection12th
For Layer
RE Block ErectionVUP
With Filter 547+860 547+940 RHS
Checking At Saravali Wall NoMedia
1 Laying And FDD
MSRDC/VTR/HW/7757 RE 3-Sep-23 4-Sep-23 2:30 PM Checking 12th Layer At 547+958 548+020 RHS
Inspection For
Saravali VUP RE Block
Wall No 4 Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7758 RE 3-Sep-23 4-Sep-23 3:00 PM 548+070 548+150 RHS
Checking
Inspection12th Layer
for RE At Saravali
Block ErectionVUP
WithWall
filterNo 4 laying And FDD
Media
MSRDC/VTR/HW/7759 RE 3-Sep-23 4-Sep-23 11:00 AM 542+130 542+220 RHS
Cheking 12th
Inspection forlayer at Yewai
RE Block VUP With
Erection Wall filter
no 1 Media laying And FDD
MSRDC/VTR/HW/7760 RE 3-Sep-23 4-Sep-23 12:00 PM 542+220 542+300 RHS
Cheking 11th layer at Yewai VUP Wall no 1
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7761 RE 3-Sep-23 4-Sep-23 2:00 PM 542+300 542+410 RHS
Cheking 12th
Inspection for layer at Yewai
RE Block VUPWith
Erection Wallfilter
no 1 Media laying And FDD
MSRDC/VTR/HW/7762 RE 3-Sep-23 4-Sep-23 3:00 PM Inspection forlayer
RE Block Erection 542+425 542+500 RHS
Cheking 12th at Yewai VUP With
Wall filter
no 4 Media laying And FDD
MSRDC/VTR/HW/7763 RE 3-Sep-23 4-Sep-23 3:30 PM Cheking 12th layer at Yewai 542+500 542+580 RHS
Inspection
VUP Wall nofor5 RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7764 RE 3-Sep-23 4-Sep-23 4:30 PM 542+580 542+660 RHS
Cheking 11th layer at Yewai VUP Wall no 4
MSRDC/VTR/HW/7765 RE 3-Sep-23 4-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7766 RE 3-Sep-23 4-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
MSRDC/VTR/HW/7767 RE 3-Sep-23 4-Sep-23 5:30 PM Laying of Dry Lean Concrete (SR) 552+200 552+410 LHS
MSRDC/VTR/HW/7773 A.1(a) 4-Sep-23 5-Sep-23 11:00 AM Fdd & Level Checking of Embankment Top layer (MCW L1,L2) 549+900 550+180 RHS
MSRDC/VTR/HW/7774 A.1(a) 4-Sep-23 5-Sep-23 8:00 AM Inspection of Cutting upto Embankment Top (MCW L1,L2) 550+400 550+500 RHS
MSRDC/VTR/HW/7775 A.1(a) 4-Sep-23 5-Sep-23 6:00 PM Fdd & Level Checking of Embankment Top layer (MCW L1,L2) 550+300 550+550 RHS
MSRDC/VTR/HW/7776 A.1(a) 4-Sep-23 5-Sep-23 3:30 PM FDD Checking of Sub Grade 1st layer (MCW L1,L2,L3,L4) 561+300 561+450 RHS
MSRDC/VTR/HW/7777 i(a) 4-Sep-23 5-Sep-23 6:00 PM Fdd Checking of embankment 6th layer (SR) 550+790 551+000 LHS
MSRDC/VTR/HW/7778 3.(b) 4-Sep-23 5-Sep-23 2:00 PM Laying of Pavement Quality Concrete (Loop-1) 000+680 000+750 Loop-1
MSRDC/VTR/HW/7779 RE 4-Sep-23 5-Sep-23 10:00 AM FDD Cheking 1st layer at Dive VUP Wall no 2 555+966 555+990 LHS
MSRDC/VTR/HW/7780 RE 4-Sep-23 5-Sep-23 6:00 PM FDD Cheking 2nd layer at Dive VUP Wall no 2 555+966 555+990 LHS
MSRDC/VTR/HW/7781 RE 4-Sep-23 5-Sep-23 10:00 AM FDD Cheking 1st layer at Dive VUP Wall No. 2 556+173 556+310 LHS
MSRDC/VTR/HW/7782 RE 4-Sep-23 5-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7783 RE 4-Sep-23 5-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
MSRDC/VTR/HW/7789 A.1(b) 5-Sep-23 6-Sep-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L1,L2) 549+900 550+180 RHS
MSRDC/VTR/HW/7790 A.1(b) 5-Sep-23 6-Sep-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L1,L2) 550+300 550+500 RHS
MSRDC/VTR/HW/7791 A.1(b) 5-Sep-23 6-Sep-23 11:30 AM FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 561+300 561+450 RHS
MSRDC/VTR/HW/7792 i(a) 5-Sep-23 6-Sep-23 12:00 PM Fdd Checking of embankment 7th layer (SR) 550+790 551+000 LHS
MSRDC/VTR/HW/7793 3.(b) 5-Sep-23 6-Sep-23 1:30 PM Laying of Pavement Quality Concrete (Loop-1) 000+750 001+437 Loop-1
RFI SUMMARY SHEET (File No.1 to 7)
Date of
[Link] Date of RFI RFI No. Description of Work Chainage/Location Side satisfactory Remark File
Inspection
114 5-Jun-23 6-Jun-23 MSRDC/VTR/HW/6858 Laying of Pavement Quality Concrete (MCW) (Thane to Nh-4) Loop-1 000+410 000+510 L-1 Satisfactory IPC-3(MPC-3) F7
Date of REA Scan SIGN
Date of RFI DISCRIPTION Chainage / Location Length Side satisfactory EMB / SG IE CLOSE35%
Inspection DY RFI ED

Inspection For RE Block Erection With Filter Media Laying And FDD Checking 6th Layer
30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8426
VUP Wall No 1 (VUP (GS 539680)
539+320 539+410 90 RHS

Inspection For RE Block Erection With Filter Media Laying And FDD Checking 7th Layer
30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8427
VUP Wall No 1 (VUP (GS 539680)
539+320 539+410 90 RHS

30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8428 Fdd Level & Gradation Checking of GSB top layer (MCW) (Toll Plaza)(Lane-7 TO 12) 559+280 559+320 40 LHS Not satisfactory GSB TOP IE
30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8429 Fdd Level & Gradation Checking of GSB top layer (SR) 539+450 539+700 250 RHS Not satisfactory GSB TOP
1-Dec-23 2-Dec-23 MSRDC/VTR/HW/8432 Fdd Checking of Sub Grade 1st layer (SR) 539+200 539+450 250 RHS Satisfactory
1-Dec-23 2-Dec-23 MSRDC/VTR/HW/8433 Fdd & Level Checking of Sub Grade Top layer (SR) 539+200 539+450 250 RHS Not satisfactory SG TOP IE
1-Dec-23 2-Dec-23 MSRDC/VTR/HW/8434 Fdd Level & Gradation Checking of GSB top layer (SR) 539+450 539+700 250 RHS Not satisfactory GSB TOP
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8459 Inspection of C&G (SR) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8460 Inspection of C&G (MCW L3,L4) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8461 FDD & Level Checking of OGL(MCW L3,L4) 560+500 560+560 60 RHS satisfactory IE
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8462 FDD & Level checking of OGL (SR) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8463 Fdd Checking of Embankment 1st layer (MCW L3,L4) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8464 Fdd Checking of Embankment 1st layer (SR) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8467 Inspection of Layout marking excavation and laying of Utility pipe (Toll PLAZA ) 559+250 0 LHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8468 Fdd & Level Checking of Embankment Top layer (MCW L3,L4) 559+980 560+050 70 RHS satisfactory EMB TOP
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8470 Fdd Level & Gradation Checking of GSB top layer (MCW) (Toll Plaza)(Lane-7 TO 12) 559+280 559+320 40 LHS satisfactory GSB TOP IE
5-Dec-23 6-Dec-23 MSRDC/VTR/HW/8491 Fdd Level & Gradation Checking of GSB top layer (SR) 539+450 539+700 250 RHS Not satisfactory GSB TOP IE
5-Dec-23 6-Dec-23 MSRDC/VTR/HW/8492 Fdd Level & Gradation Checking of GSB top layer (SR) 543+000 543+050 50 LHS Not satisfactory GSB TOP
5-Dec-23 6-Dec-23 MSRDC/VTR/HW/8493 Fdd & Level Checking of Subgrade Top layer (SR) 539+200 539+450 250 RHS satisfactory SG TOP
6-Dec-23 6-Dec-23 MSRDC/VTR/HW/8500 Laying of Pavement Quality Concrete (MCW L1,L2) 543+010 543+300 290 RHS satisfactory PQC TOP
6-Dec-23 7-Dec-23 MSRDC/VTR/HW/8501 Fdd Level & Gradation Checking of GSB top layer (MCW)(LOOP-6) 000+100 000+200 100 L-6 RHS satisfactory GSB TOP
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8514 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 561+670 561+890 220 RHS satisfactory GSB TOP IE
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8515 Fdd Level & Gradation Checking of GSB top layer (MCW) Loop-5 000+120 000+220 100 L-5 Satisfactory GSB TOP
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8516 Fdd Checking of Embankment 8th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8517 Laying of Dry Lean Concrete (Toll Plaza)(Lane-07 TO 15) 559+280 559+320 40 LHS Satisfactory DLC TOP IE
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8518 Fdd Level & Gradation Checking of GSB top layer (Toll Plaza)(Lane-16 TO 17) 559+280 559+320 40 LHS Satisfactory GSB TOP
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8519 Laying of Dry Lean Concrete (Toll Plaza)(Lane-16 TO 17) 559+280 559+320 40 LHS Satisfactory DLC TOP IE
8-Dec-23 8-Dec-23 MSRDC/VTR/HW/8520 Laying of Dry Lean Concrete (SR) 561+670 561+890 220 RHS Not satisfactory DLC TOP
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8522 561+670 561+890 220 RHS Satisfactory DLC TOP IE
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8523 Laying of Dry Lean Concrete (MCW) Loop-5 000+120 000+220 100 L-5 Not satisfactory DLC TOP
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8524 FDD Checking of Sub Grade 1st layer (MCW L3,L4) 559+980 560+050 70 RHS Satisfactory
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8525 Fdd & Level Checking of Embankment Top layer (MCW L3, L4) 560+050 560+150 100 RHS Satisfactory EMB TOP
9-Dec-23 10-Dec-23 MSRDC/VTR/HW/8541 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 539+200 539+700 500 RHS Not satisfactory GSB TOP
9-Dec-23 10-Dec-23 MSRDC/VTR/HW/8542 Laying of Dry Lean Concrete (SR) 539+200 539+700 500 RHS Not satisfactory DLC TOP
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8568 Fdd Checking of Embankment 2nd layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8569 Fdd Checking of Embankment 2nd layer (SR) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8570 Fdd Checking of Embankment 3rd layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8571 Fdd Checking of Embankment 3rd layer (SR) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8572 Fdd Checking of Subgrade 1st layer (MCW L3, L4) 559+900 560+140 240 LHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8573 Fdd Checking of Subgrade 1st layer (SR) 561+300 561+450 150 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8575 FDD & Level Checking of Subgrade Top layer (MCW L3,L4) 559+980 560+050 70 RHS Satisfactory SG TOP
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8576 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 546+230 546+350 120 RHS Not satisfactory IE
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8590 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 539+250 539+700 450 RHS satisfactory GSB TOP IE
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8591 Laying of Dry Lean Concrete (SR) 539+250 539+700 450 RHS Satisfactory DLC TOP
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8592 Laying of Pavemet Quality Concrete (MCW L1,L2) 548+210 548+370 160 RHS satisfactory PQC TOP
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8593 Laying of Pavemet Quality Concrete (MCW L1,L2) 548+420 548+610 190 RHS Satisfactory PQC TOP IE
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8594 Dismental of existing BT Road (MCW(L1) 548+620 548+665 45 RHS satisfactory
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8595 Dismental of existing BT Road (MCW(L1) 548+665 548+690 25 RHS satisfactory
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8596 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 548+620 548+665 45 RHS satisfactory
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8597 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1,L2) 548+665 548+690 25 RHS satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8605 Fdd Checking of Subgrade 1st Layer (MCW L3, L4) 560+050 560+150 100 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8606 Fdd Checking of Embankment 4th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8607 Fdd Checking of Embankment 4th layer (SR) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8608 Fdd Checking of Embankment 5th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8609 Fdd Checking of Embankment 5th layer (SR) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8610 FDD & Level Checking of Embankment Top layer (MCW L3,L4) 560+140 560+180 40 LHS Satisfactory EMB TOP IE
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8611 FDD & Level Checking of Embankment Top layer (SR) 560+140 560+180 40 LHS Satisfactory EMB TOP
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8612 Fdd Level & Gradation Checking of GSB top layer (MCW L5-L8) 559+540 559+580 40 LHS Satisfactory GSB TOP
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8613 Dismental of existing BT Road (MCW L2,L3) 540+300 540+800 500 LHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8614 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 540+300 540+800 500 LHS Satisfactory
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8649 Dismental of existing BT Road (MCW L2,L3) 540+800 541+500 700 LHS Satisfactory
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8650 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 540+800 541+000 200 LHS Satisfactory
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8651 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 546+230 546+350 120 RHS Not satisfactory GSB TOP IE
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8652 Laying of Pavemet Quality Concrete (SR) 545+650 545+890 240 LHS Satisfactory PQC TOP IE
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8653 Laying of Dry Lean Concrete (SR) 540+150 540+270 120 RHS Not satisfactory DLC TOP
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8675 Fdd Checking of Embankment 6th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8676 Fdd Checking of Embankment 6th layer (SR) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8677 Fdd Checking of Embankment 7th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8678 Fdd Checking of Embankment 7th layer (SR) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8679 Fdd Checking of Embankment 11th layer (MCW L3,L4) 560+600 560+750 150 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8680 Fdd Checking of Embankment 10th layer (SR) 560+600 560+710 110 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8681 Fdd Checking of Embankment 7th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8682 Fdd Checking of Embankment 8th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8683 Fdd Checking of Embankment 9th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8684 FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 561+850 561+890 40 RHS Satisfactory GSB TOP IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8685 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+300 540+500 200 LHS Satisfactory GSB TOP
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8686 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 540+800 541+000 200 LHS Satisfactory SG TOP IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8687 Laying of Dry Lean Concrete (MCW L5 to L8) 559+540 559+700 160 LHS Satisfactory DLC TOP IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8651-R1 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 546+230 546+350 120 RHS Not satisfactory GSB TOP
16-Dec-23 17-Dec-23 MSRDC/VTR/HW/8704 Fdd & Level Checking of Subgrade Top layer (MCW L3,L4) 560+050 560+150 100 RHS Satisfactory SG TOP
16-Dec-23 17-Dec-23 MSRDC/VTR/HW/8705 Fdd Checking of Embankment 8th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
16-Dec-23 17-Dec-23 MSRDC/VTR/HW/8706 Laying of Dry Lean Concrete (MCW L5 to L8) 559+800 559+980 180 RHS Not satisfactory DLC TOP
17-Dec-23 17-Dec-23 MSRDC/VTR/HW/8719 Laying of Dry Lean Concrete (MCW) Loop-5 000+120 000+220 100 L-5 Satisfactory DLC TOP
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8720 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 541+300 541+700 400 LHS Not satisfactory
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8721 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+300 541+700 400 LHS Not satisfactory SG TOP
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8722 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+500 540+700 200 LHS Not satisfactory GSB TOP
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8723 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+300 540+700 400 LHS Not satisfactory DLC TOP IE
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8724 Fdd Checking of Embankment 9th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8725 Fdd Checking of Embankment 10th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8728 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+700 540+800 100 LHS Not satisfactory GSB TOP
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8729 Inspection of Layout marking excavation and laying of Utility pipe (MCW & SR ) 561+920 RHS Satisfactory
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8730 Fdd Level & Gradation Checking of GSB top layer (MCW)(LOOP-6) 000+050 000+100 50 L-6 RHS Satisfactory GSB TOP
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8731 Fdd Checking of Embankment 7th layer (MCW L3,L4) 560+500 560+560 60 RHS wrong rfi
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8732 Fdd Checking of Embankment 7th layer (SR) 560+500 560+560 60 RHS wrong rfi
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8748 Fdd Level & Gradation Checking of GSB top layer (MCW)(LOOP-4) 000+040 000+180 140 L-4 Not satisfactory GSB TOP
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8755 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 541+300 541+600 300 LHS satisfactory IE
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8756 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+300 541+600 300 LHS satisfactory SG TOP
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8757 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+500 540+700 200 LHS Satisfactory GSB TOP
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8758 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+300 540+700 400 LHS satisfactory DLC TOP
20-Dec-23 21-Dec-23 MSRDC/VTR/HW/8759 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+700 540+800 100 LHS Not satisfactory GSB TOP
20-Dec-23 21-Dec-23 MSRDC/VTR/HW/8760 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+700 540+800 100 LHS Not satisfactory DLC TOP IE
21-Dec-23 22-Dec-23 MSRDC/VTR/HW/8784 Fdd Checking of Embankment 11th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory
21-Dec-23 22-Dec-23 MSRDC/VTR/HW/8785 Fdd Checking of Embankment 10th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8805 Fdd Checking of Embankment 8th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8806 Fdd Checking of Embankment 8th layer (SR) 560+500 560+560 60 RHS Satisfactory
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8807 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 548+370 548+420 50 RHS Satisfactory GSB TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8808 Laying of Dry Lean Concrete (MCW-L1,L2) 548+370 548+420 50 RHS Satisfactory DLC TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8809 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+000 541+300 300 LHS Satisfactory SG TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8810 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+700 541+000 300 LHS Satisfactory GSB TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8811 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+700 541+000 300 LHS Satisfactory DLC TOP IE
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8812 Laying of Pavement Quality Concrete (SR) 543+400 543+580 180 LHS Satisfactory PQC TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8823 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 541+000 541+500 500 LHS Satisfactory GSB TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8824 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 541+000 541+500 500 LHS Satisfactory DLC TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8825 Dismental of existing BT Road (MCW L2,L3) 541+500 541+950 450 LHS Satisfactory
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8826 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 541+500 541+950 450 LHS Satisfactory
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8827 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+500 541+950 450 LHS Satisfactory SG TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8828 Laying of Pavement Quality Concrete (SR) 543+150 543+400 250 LHS Not satisfactory PQC TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8829 Fdd Checking of Embankment 8th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8830 FDD, Level and Gradation Checking of GSB Top Layer (SR) 561+660 561+670 10 RHS Satisfactory GSB TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8831 Laying of Dry Lean Concrete (SR) 561+660 561+670 10 RHS Not satisfactory DLC TOP
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8877 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 541+500 541+800 300 LHS Satisfactory GSB TOP IE
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8878 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 541+500 541+700 200 LHS Satisfactory DLC TOP IE
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8879 FDD & Level Checking of Subgrade Top layer (MCW L1) 548+620 548+665 45 RHS Not satisfactory SG TOP
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8880 FDD, Level and Gradation Checking of GSB Top Layer (MCW L1,L2) 548+620 548+665 45 RHS Satisfactory GSB TOP
26-Dec-23 26-Dec-23 MSRDC/VTR/HW/8892 Laying of Pavement Quality Concrete (SR) 543+200 543+500 300 LHS Satisfactory PQC TOP
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8893 Inspection of C&G (MCW) Toll Plaza 559+000 559+040 40 LHS Satisfactory
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8895 Fdd Checking of Embankment 1st layer (MCW) Toll Plaza 559+000 559+040 40 LHS Satisfactory
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8896 Fdd Checking of Embankment 11th layer (MCW L3,L4) 561+010 561+040 30 RHS Not satisfactory IE
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8897 Fdd Checking of Embankment 9th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8898 Fdd Checking of Embankment 10th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
27-Dec-23 28-Dec-23 MSRDC/VTR/HW/8924 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 541+800 541+950 150 LHS Satisfactory GSB TOP
27-Dec-23 28-Dec-23 MSRDC/VTR/HW/8925 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 541+700 541+950 250 LHS Satisfactory DLC TOP IE
28-Dec-23 29-Dec-23 MSRDC/VTR/HW/8927 Fdd Level & Gradation Checking of GSB top layer (SR) 561+450 561+550 100 RHS Satisfactory GSB TOP
28-Dec-23 29-Dec-23 MSRDC/VTR/HW/8928 Fdd Checking of Embankment 11th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
29-Dec-23 30-Dec-23 MSRDC/VTR/HW/8935 Laying of Pavement Quality Concrete (MCW L1,L2) 540+700 540+900 200 LHS Satisfactory PQC TOP IE
29-Dec-23 30-Dec-23 MSRDC/VTR/HW/8936 Dismental of existing BT Road (MCW(L2 L3) 544+200 544+950 750 LHS Satisfactory
30-Dec-23 31-Dec-23 MSRDC/VTR/HW/8970 Laying of Dry Lean Concrete (SR) 540+150 540+260 110 RHS Not satisfactory DLC TOP
30-Dec-23 31-Dec-23 MSRDC/VTR/HW/8971 Fdd & Level Checking of Subgrade 1st (MCW L1,L2,L3) 544+200 544+600 400 LHS Not satisfactory
30-Dec-23 31-Dec-23 MSRDC/VTR/HW/8972 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 544+200 544+600 400 LHS Not satisfactory SG TOP
VUP Locations
Sr. Start Chainage End Chainage Total RE Wall
No. Location VUP Length

1 Vadpe 539.280 539.685 540.070 0.790


2 YEVAE 542.140 542.413 542.660 0.520
3 VALSHIND 543.400 543.709 544.140 0.740
4 SONALE 546.020 546.400 546.730 0.710
5 SARAVALI 547.640 547.949 548.150 0.510
6 PIMPLAS 550.610 551.024 551.370
7 BHATALE / Ovali 552.000 552.360 553.500
8 DIVE / ANJUR 555.960 556.483 556.700
9 KHARIGAON 560.140 560.429 560.680 0.540
Total Length Of VUP 3.810