RFI Summary for NH-3 Project
RFI Summary for NH-3 Project
Client
Concessionaire
Independent Engineer
EPC Contractor
Date of
[Link] Date of RFI Final RFI Nos.
Inspection
697 27-Feb-22 28-Feb-22 MSRDC/VTR/HW/483
699 27-Feb-22 28-Feb-22 MSRDC/VTR/HW/485
762 4-Mar-22 5-Mar-22 MSRDC/VTR/HW/542
774 4-Mar-22 5-Mar-22 MSRDC/VTR/HW/554
1765 12/Nov/22 13/Nov/22 MSRDC/VTR/HW/1270
1823 20/Nov/22 21/Nov/22 MSRDC/VTR/HW/1324
1840 22/Nov/22 23/Nov/22 MSRDC/VTR/HW/1324-R1
1852 24/Nov/22 25/Nov/22 MSRDC/VTR/HW/1352
1883 26/Nov/22 28/Nov/22 MSRDC/VTR/HW/1384
#REF! 7/Jan/23 8/Jan/23 MSRDC/VTR/HW/1973
#REF! 14/Jan/23 15/Jan/23 MSRDC/VTR/HW/2230
#REF! 25-01-23 27-01-23 MSRDC/VTR/HW/2512
04-02-23 05-02-23 MSRDC/VTR/HW/2945
09-04-23 10-04-23 MSRDC/VTR/HW/5426
MSRDC/VTR/HW/5458
10-04-23 11-04-23
15-04-23 16-04-23 MSRDC/VTR/HW/5701
SUMMARY OF REQUEST FOR INSPECTION
Constru+ction of 8 laning of existing 4 lane Vadape to Thane from KM 539.202 to K
National Highways Authority of India
MSRDC Infrastructure Project Ltd
Lion Engg Consultants Pvt. Ltd. JV with Technogem Consultant Pvt. Ltd Thane & In
MEPIDL
RFI SUMMARY SHEET
Description of Work
Satisfactory * *
Satisfactory * *
Satisfactory
Satisfactory
IE
IE
RA-4 EPC
RA-2 HAM
RA-5 EPC
RA-4 HAM
RA-7 EPC
RA-8 EPC
RA-9 EPC
National Highways Authority of India
MSRDC Infrastructure Project Ltd
Lion Engg Consultants Pvt. Ltd. JV with T\chnogem Consultant Pvt. Ltd Thane & In association with Real Strength Infrastructure
MEPIDL
RFI SUMMERY
Date of
Date of RFI RFI No. DISCRIPTION Chainage/ Location Length Side satisfactory EMB / SG IE
Inspection
31-Mar-24 1-Apr-24 MSRDC/VTR/HW/10812 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 547+000 547+300 300 LHS Satisfactory DLC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10821 Laying of Pavement Quality Concrete (MCW)(LOOP-4) 000+060 000+180 120 L-4 Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10822 Laying of Dry Lean Concrete (MCW)( LANE-5 to 7 ) 560+100 560+200 100 RHS Satisfactory DLC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10823 Laying of Pavement Quality Concrete (MCW L1 L2) 541+950 542+070 120 LHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10824 Laying of Pavement Quality Concrete (MCW L1 L2) 541+950 542+070 120 RHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10825 Laying of Pavement Quality Concrete (MCW L1 L2) 548+665 548+690 25 LHS Satisfactory PQC TOP IE
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10826 Laying of Pavement Quality Concrete (MCW L3 L4) 548+640 548+665 25 LHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10827 Laying of Pavement Quality Concrete (MCW L3 L4) 548+665 548+690 25 LHS Satisfactory PQC TOP
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10828 Dismental of existing BT Road (MCW) 547+350 547+600 250 LHS Satisfactory BT
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10829 Profile Correction & Fdd & Level Checking of Embankment Top layer (MCW L2,L3) 547+350 547+600 250 LHS Satisfactory EMB TOP IE
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/10830 Inspection of laying Kerb (MCW) 542+700 543+400 700 LHS KERB
1-Apr-24 2-Apr-24 MSRDC/VTR/HW/INTERNAL/7652 FDD & Level & Gradiaction Checking of GSB Top layer (MCW L2,L3&L4) 561+250 561+280 30 RHS Satisfactory GSB TOP
2-Apr-24 3-Apr-24 MSRDC/VTR/HW/10839 Laying of Pavement Quality Concrete (MCW)(LOOP-5)(L3&L4) 000+240 000+300 60 L-5 Satisfactory PQC TOP
2-Apr-24 3-Apr-24 MSRDC/VTR/HW/10840 Laying of Pavement Quality Concrete (MCW)(LOOP-6) 000+050 000+270 220 L-6 RHS Satisfactory PQC TOP
2-Apr-24 3-Apr-24 MSRDC/VTR/HW/INTERNAL/5354 Fdd & Level Checking of SG Top layer (SR) 547+920 548+000 80 RHS Satisfactory SG TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10865 Laying of Pavement Quality Concrete (MCW)(LOOP-3) 000+220 000+276 56 L-3 Satisfactory PQC TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10866 Laying of Pavement Quality Concrete (MCW)(LOOP-1) 000+000 000+230 230 L-1 LHS Satisfactory PQC TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10867 Fdd Level & Gradation Checking of GSB top layer (SR) 560+230 560+340 110 RHS Satisfactory GSB TOP IE
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10868 Laying of Dry Lean Concrete (SR) 560+230 560+340 110 RHS Satisfactory DLC TOP
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/10869 Laying of Dry Lean Concrete (MCW L2,L3,L4) 561+250 561+280 30 RHS Satisfactory DLC TOP IE
4-Apr-24 5-Apr-24 MSRDC/VTR/HW/7652/Internal Fdd Level & Gradation Checking of GSB top layer (MCW L2,L3,L4) 561+250 561+280 30 RHS Satisfactory GSB TOP
5-Apr-24 6-Apr-24 MSRDC/VTR/HW/5971/Internal Fdd Level & Gradation Checking of GSB top layer (SR) 547+920 548+000 80 RHS Satisfactory GSB TOP
5-Apr-24 6-Apr-24 MSRDC/VTR/HW/7305/Internal Laying of Dry Lean Concrete (SR) 547+920 548+000 80 RHS Not Satisfactory DLC TOP
6-Apr-24 7-Apr-24 MSRDC/VTR/HW/10898 Laying of Dry Lean Concrete (SR) 560+050 560+230 180 LHS Satisfactory DLC TOP
6-Apr-24 7-Apr-24 MSRDC/VTR/HW/10899 Profile Correction of FDD & Level checking of Embankment Top (MCW) LOOP-3 000+000 000+060 60 L-3 Satisfactory EMB TOP
6-Apr-24 7-Apr-24 MSRDC/VTR/HW/10900 FDD Checking of Subgrade 1st layer (MCW) Loop-3 000+000 000+060 60 L-3 Satisfactory SG 1st
7-Apr-24 8-Apr-24 MSRDC/VTR/HW/10904 Laying of Pavement Quality Concrete (MCW-L1,L2) 546+820 547+000 180 LHS Satisfactory PQC TOP IE
7-Apr-24 8-Apr-24 MSRDC/VTR/HW/7305/Internal Laying of Dry Lean Concrete (SR) 547+920 548+000 80 RHS Satisfactory DLC TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10915 Fdd & Level Checking of Subgrade Top layer (MCW) Loop-3 000+000 000+060 60 L-3 Not Satisfactory SG TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10916 Fdd Level & Gradation Checking of GSB top layer (MCW) Loop-3 000+000 000+060 60 L-3 Not Satisfactory GSB TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10917 Laying of Pavement Quality Concrete (MCW-L1,L2) 547+000 547+300 300 LHS Not Satisfactory PQC TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10918 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 547+300 547+350 50 LHS Satisfactory DLC TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10919 Fdd Checking of Subgrade 1st layer (MCW L2,L3) 547+350 547+600 250 LHS Satisfactory SG 1st
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/10920 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 547+350 547+600 250 LHS Not Satisfactory SG TOP
8-Apr-24 9-Apr-24 MSRDC/VTR/HW/5106/Internal FDD & Level Checking of Subgrade Top layer (MCW L4) 547+350 547+600 250 LHS Satisfactory SG TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/10930 Inspection of Cutting up to Embankment top (SR) 548+665 548+690 25 LHS Satisfactory CUTTING
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/10931 Fdd & Level Checking of Embankment Top layer After Excavation (SR) 548+665 548+690 25 LHS Satisfactory EMB TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/10932 FDD Checking of Subgrade 1st layer (SR) 548+665 548+690 25 LHS Satisfactory SG 1st
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/7530/Internal Laying of Pavement Quality Concrete (SR) 547+680 547+720 40 LHS Satisfactory PQC TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/7362/Internal Laying of Pavement Quality Concrete (SR) 548+570 548+640 70 LHS Satisfactory PQC TOP
9-Apr-24 9-Apr-24 MSRDC/VTR/HW/6040/Internal Laying of Dry Lean Concrete (SR) 548+640 548+665 25 LHS Satisfactory DLC TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10936 FDD & Level Checking of Subgrade Top layer (SR) 548+665 548+690 25 LHS Satisfactory SG TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10937 Fdd Level & Gradation Checking of GSB top layer (SR) 548+665 548+690 25 LHS Satisfactory GSB TOP IE
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10938 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 547+350 547+600 250 LHS Satisfactory SG TOP IE
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10939 Fdd Level & Gradation Checking of GSB top layer (MCW L2,L3) 547+350 547+600 250 LHS Not Satisfactory GSB TOP IE
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10940 Fdd Level & Gradation Checking of GSB top layer (MCW L4) 547+430 547+600 170 LHS Not Satisfactory GSB TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10941 Fdd & Level Checking of Subgrade Top layer (MCW) Loop-3 000+000 000+060 60 L-3 Satisfactory SG TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10942 Fdd Level & Gradation Checking of GSB top layer (MCW) Loop-3 000+000 000+060 60 L-3 Satisfactory GSB TOP
National Highways Authority of India
MSRDC Infrastructure Project Ltd
Lion Engg Consultants Pvt. Ltd. JV with T\chnogem Consultant Pvt. Ltd Thane & In association with Real Strength Infrastructure
MEPIDL
RFI SUMMERY
Date of
Date of RFI RFI No. DISCRIPTION Chainage/ Location Length Side satisfactory EMB / SG IE
Inspection
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10943 Inspection of Gabion Wall 1st lift after placing of Geotextile & Geogrid 561+650 561+860 210 LHS Satisfactory GABBION
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10944 Laying of Pavement Quality Concrete (MCW L5 to L7) 560+020 560+200 180 RHS Not Satisfactory PQC TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10945 Fdd Checking of Embankment 1st layer (SR) 560+340 560+430 90 RHS Satisfactory EMB 1st
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10946 Fdd & Level Checking of Embankment Top layer (SR) 560+340 560+430 90 RHS Satisfactory EMB TOP
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/10947 Fdd Checking of Subgrade 1st layer (SR) 560+340 560+430 90 RHS Satisfactory SG 1st
9-Apr-24 10-Apr-24 MSRDC/VTR/HW/5999/Internal Fdd Level & Gradation Checking of GSB top layer (MCW L4) 547+350 547+430 80 LHS Not Satisfactory GSB TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10958 Laying of Dry Lean Concrete (SR) 548+665 548+690 25 LHS Satisfactory DLC TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10959 Laying of Dry Lean Concrete (MCW) Loop-03 000+000 000+060 60 L-3 Satisfactory Upto 040 DLC TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10960 FDD & Level Checking of Subgrade Top layer (SR) 560+340 560+430 90 RHS Satisfactory SG TOP
10-Apr-24 11-Apr-24 MSRDC/VTR/HW/10961 Laying of Pavement Quality Concrete (MCW-L1,L2) 547+000 547+300 300 LHS Satisfactory PQC TOP
11-Apr-24 12-Apr-24 MSRDC/VTR/HW/10970 Fdd Level & Gradation Checking of GSB top layer (SR) 560+340 560+430 90 RHS Not Satisfactory GSB TOP IE
11-Apr-24 12-Apr-24 MSRDC/VTR/HW/10971 Laying of Pavement Quality Concrete (SR) 560+230 560+340 110 RHS Not Satisfactory PQC TOP
11-Apr-24 12-Apr-24 MSRDC/VTR/HW/10972 Laying of Pavement Quality Concrete (MCW L5 to L7) 560+020 560+230 210 RHS Satisfactory PQC TOP IE
12-Apr-24 13-Apr-24 MSRDC/VTR/HW/10984 laying of Pavement Quality Concrete (SR) 561+010 561+310 300 RHS Satisfactory PQC TOP
13-Apr-24 14-Apr-24 MSRDC/VTR/HW/11000 Laying of Pavement Quality Concrete (MCW) Loop-03 000+000 000+040 40 L-3 wrong rfi PQC TOP
Satisf
PQC
540+070 540+300 26-Mar-24 27-Mar-24 MSRDC/VTR/HW/10752 Laying of Pavement Quality Concrete (MCW-L3,L4) 230 RHS actor
Satisf TOP
IE
y PQC
540+100 540+290 16-Aug-23 17-Aug-23 MSRDC/VTR/HW/7224 Laying of Pavement Quality Concrete (MCW-L3,L4) 190 RHS actor
Satisf TOP
y PQC
540+350 540+600 24-May-23 25-May-23 MSRDC/VTR/HW/6679 Laying of Pavement Quality Concrete (MCW-L3,L4) 250 RHS actor
Satisf TOP
IE
y PQC
540+500 540+800 1-May-23 2-May-23 MSRDC/VTR/HW/6281 Laying of Pavement Quality Concrete (MCW-L3,L4) 300 RHS actor
Satisf TOP
y PQC
540+800 541+300 2-May-23 3-May-23 MSRDC/VTR/HW/6292 Laying of Pavement Quality Concrete (MCW-L3,L4) 500 RHS actor
Satisf TOP
IE
y PQC
541+300 541+355 19-May-23 20-May-23 MSRDC/VTR/HW/6597 Laying of Pavement Quality Concrete (MCW-L3,L4) 55 RHS actor
Satisf TOP
y PQC
541+355 541+700 21-May-23 22-May-23 MSRDC/VTR/HW/6610 Laying of Pavement Quality Concrete (MCW-L3,L4) 345 RHS actor
Satisf TOP
y PQC
541+700 541+980 17-May-23 18-May-23 MSRDC/VTR/HW/6580 Laying of Pavement Quality Concrete (MCW-L3,L4) 280 RHS actor
Satisf TOP
IE
y PQC
541+950 542+070 18-Mar-24 18-Mar-24 MSRDC/VTR/HW/10603 Laying of Pavement Quality Concrete (MCW L3 L4) 120 RHS actor
Satisf TOP
IE
y PQC
542+700 542+800 16-Aug-23 17-Aug-23 MSRDC/VTR/HW/7225 Laying of Pavement Quality Concrete (MCW-L3,L4) 100 RHS actor
Satisf TOP
y PQC
542+800 543+050 2-Jun-23 3-Jun-23 MSRDC/VTR/HW/6834 Laying of Pavement Quality Concrete (MCW-L3,L4) 250 RHS actor
Satisf TOP
y PQC
543+050 543+260 4-Jun-23 4-Jun-23 MSRDC/VTR/HW/6844 Laying of Pavement Quality Concrete (MCW-L3,L4) 210 RHS actor
Satisf TOP
y PQC
543+260 543+400 17-Aug-23 18-Aug-23 MSRDC/VTR/HW/7245 Laying of Pavement Quality Concrete (MCW-L3,L4) 140 RHS actor
Satisf TOP
IE
y PQC
543+400 543+700 11-Mar-24 11-Mar-24 MSRDC/VTR/HW/10458 Laying of Pavement Quality Concrete (MCW L3,L4 ) 300 RHS actor
Satisf TOP
y PQC
543+720 544+200 13-Mar-24 14-Mar-24 MSRDC/VTR/HW/10464 R1 Laying of Pavement Quality Concrete (MCW L3,L4) 480 RHS actor TOP
IE
Satisfa
y PQC
544+190 544+320 26-Mar-23 27-Mar-23 MSRDC/VTR/HW/4564 Laying of Pavement Quality Concrete (MCW-L3,L4) 130 RHS Satisf
ctory TOP
PQC
544+320 544+470 17-Aug-23 18-Aug-23 MSRDC/VTR/HW/7246 Laying of Pavement Quality Concrete (MCW-L3,L4) 150 RHS actor TOP
Satisfa
y PQC
544+470 544+860 27-Mar-23 28-Mar-23 MSRDC/VTR/HW/4630 Laying of Pavement Quality Concrete (MCW-L3,L4) 390 RHS Satisf
ctory TOP
PQC
544+860 545+305 28-Mar-23 29-Mar-23 MSRDC/VTR/HW/4780 Laying of Pavement Quality Concrete (MCW-L3,L4) 445 RHS actor
Satisf TOP
y PQC
545+305 545+560 17-Apr-23 17-Apr-23 MSRDC/VTR/HW/5744 Laying of Pavement Quality Concrete (MCW-L3,L4) 255 RHS actor
Satisf TOP
y PQC
545+560 545+920 20-Apr-23 21-Apr-23 MSRDC/VTR/HW/5930 Laying of Pavement Quality Concrete (MCW-L3,L4) 360 RHS actor
Satisf TOP
y PQC
546+800 547+030 16-Jun-23 16-Jun-23 MSRDC/VTR/HW/7023 Laying of Pavement Quality Concrete (MCW-L3,L4) 230 RHS actor
Satisf TOP
y PQC
546+860 547+030 24-Aug-23 25-Aug-23 MSRDC/VTR/HW/7527 Laying of Pavement Quality Concrete (MCW-L3,L4) 170 RHS actor
Satisf TOP
y PQC
547+030 547+360 16-Jun-23 17-Jun-23 MSRDC/VTR/HW/7026 Laying of Pavement Quality Concrete (MCW-L3,L4) 330 RHS actor
Satisf TOP
IE
y PQC
547+370 547+460 27-Aug-23 28-Aug-23 MSRDC/VTR/HW/7627 Laying of Pavement Quality Concrete (MCW-L3,L4) 90 RHS actor
Satisf TOP
y PQC
547+470 547+590 20-Jun-23 20-Jun-23 MSRDC/VTR/HW/7057 Laying of Pavement Quality Concrete (MCW-L3,L4) 120 RHS actor
Satisf TOP
y PQC
547+590 547+620 23-Aug-23 24-Aug-23 MSRDC/VTR/HW/7494 Laying of Pavement Quality Concrete (MCW-L3,L4) 30 RHS actor
Satisf TOP
IE
y PQC
548+160 548+200 27-Aug-23 28-Aug-23 MSRDC/VTR/HW/7628 Laying of Pavement Quality Concrete (MCW-L3,L4) 40 RHS actor
Satisf TOP
y PQC
548+200 548+640 20-Jun-23 21-Jun-23 MSRDC/VTR/HW/7062 Laying of Pavement Quality Concrete (MCW-L3,L4) 440 RHS actor
Satisf TOP
IE
y PQC
548+640 548+665 18-Aug-23 19-Aug-23 MSRDC/VTR/HW/7258 Laying of Pavement Quality Concrete (MCW-L3,L4) 25 RHS actor
Satisf TOP
y PQC
548+665 548+690 5-Sep-23 6-Sep-23 MSRDC/VTR/HW/7784 Laying of Pavement Quality Concrete (MCW-L3,L4) 25 RHS actor
Satisf TOP
y PQC
561+080 561+220 21-Feb-24 22-Feb-24 MSRDC/VTR/HW/10000 Laying of Pavement Quality Concrete (MCW L3,L4) 140 RHS actor
Satisf TOP
IE
y PQC
561+220 561+230 22-Feb-24 23-Feb-24 MSRDC/VTR/HW/10034 Laying of Pavement Quality Concrete (MCW L3,L4) 10 RHS actor
Satisf TOP
y PQC
561+680 562+000 26-Mar-24 26-Mar-24 MSRDC/VTR/HW/10725 Laying of Pavement Quality Concrete (MCW-L3,L4) 320 RHS actor TOP
y
RA-34
Ground Improvement
9-Feb-24 MSRDC/VTR/HW/9668 Inspection Sludge removing (MCW Toll Plaza) 559360 559380 20 LHS Satisfactory SLUDGE
9-Feb-24 MSRDC/VTR/HW/9669 Inspection of Boulder Filling Work after Removal of Sludge (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory SLUDGE IE
EMB (MCW)
26-Oct-23 MSRDC/VTR/HW/8085 Inspection of C&G (MCW L3,L4) 559360 559540 180 LHS Satisfactory C&G
9-Feb-24 MSRDC/VTR/HW/9668 Inspection Sludge removing (MCW Toll Plaza) 559360 559380 20 LHS Satisfactory SLUDGE
9-Feb-24 MSRDC/VTR/HW/9669 Inspection of Boulder Filling Work after Removal of Sludge (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory SLUDGE IE
10-Feb-24 MSRDC/VTR/HW/9688 Inspection of Level Checking of Rubble soling (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory RUBBLE
16-Feb-24 MSRDC/VTR/HW/9842 Fdd Checking of Embankment 1st layer (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory EMB 1st
17-Feb-24 MSRDC/VTR/HW/9869 Fdd Checking of Embankment 2nd layer (MCW)(TOLL PLAZA) 559360 559380 20 LHS Satisfactory EMB 2nd
19-Feb-24 MSRDC/VTR/HW/9915 FDD Checking of Embankment 3rd layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB 3rd
19-Feb-24 MSRDC/VTR/HW/9917 FDD Checking of Embankment 4th layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB 4th
21-Feb-24 MSRDC/VTR/HW/9974 FDD Checking of Embankment 5th layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB 5th
22-Feb-24 MSRDC/VTR/HW/9998 Fdd & level Checking of embankment Top layer (MCW)(TOLL PLAZA) L5 TO L15 559360 559380 20 LHS Satisfactory EMB TOP IE
19-Jan-24 MSRDC/VTR/HW/9241 Inspection of Sludge Removal (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory SLUDGE
19-Jan-24 MSRDC/VTR/HW/9242 Inspection of Boulder Filling Work after Removal of Sludge (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory SLUDGE IE
24-Jan-24 MSRDC/VTR/HW/9302 Fdd Checking of Embankment 1st layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS satisfactory EMB 1st IE
27-Jan-24 MSRDC/VTR/HW/9367 Fdd Checking of Embankment 2nd layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB 2nd IE
10-Feb-24 MSRDC/VTR/HW/9686 Fdd Checking of Embankment 3rd layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB 3rd IE
15-Feb-24 MSRDC/VTR/HW/9804 Fdd Checking of Embankment 4th layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB 4th IE
16-Feb-24 MSRDC/VTR/HW/9840 Fdd & Level Checking of Embankment Top layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+420 559+480 60 RHS Satisfactory EMB TOP IE
EMB (SR)
8-Jan-24 MSRDC/VTR/HW/9091 Inspection of Sludge Removal (MCW&SR) 560+200 560+350 150 RHS Satisfactory SLUDGE
8-Jan-24 MSRDC/VTR/HW/9092 Inspection of Boulder Filling Work after Removal of Sludge (MCW&SR) 560+200 560+350 150 RHS Satisfactory SLUDGE
23-Jan-24 MSRDC/VTR/HW/9295 Fdd Checking of Embankment 1st layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 1st
24-Jan-24 MSRDC/VTR/HW/9303 Fdd Checking of Embankment 2nd layer (SR) 560+200 560+340 140 RHS satisfactory EMB 2nd
27-Jan-24 MSRDC/VTR/HW/9366 Fdd Checking of Embankment 3rd layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 3rd
2-Feb-24 MSRDC/VTR/HW/9487 Fdd Checking of Embankment 4th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 4th IE
3-Feb-24 MSRDC/VTR/HW/9527 Fdd Checking of Embankment 5th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 5th IE
5-Feb-24 MSRDC/VTR/HW/9574 Fdd Checking of Embankment 6th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 6th
9-Feb-24 MSRDC/VTR/HW/9670 Fdd Checking of Embankment 7th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 7th
10-Feb-24 MSRDC/VTR/HW/9689 Fdd Checking of Embankment 8th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 8th
13-Feb-24 MSRDC/VTR/HW/9775 Fdd Checking of Embankment 9th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 9th
19-Feb-24 MSRDC/VTR/HW/9916 Fdd Checking of Embankment 10th layer (SR) 560+200 560+340 140 RHS Satisfactory EMB 10th IE
EMB (Loop)
26-Aug-23 MSRDC/VTR/HW/7584 Inspection of Cutting upto Embankment Top Loop-5 000+190 000+284 94 Loop-5 Satisfactory CUTTING
26-Aug-23 MSRDC/VTR/HW/7585 Fdd & Level Checking of Embankment Top layer After Cutting Loop-5 000+190 000+284 94 Loop-5 Satisfactory EMB TOP
21-Feb-24 MSRDC/VTR/HW/9975 Dismental of existing BT Road (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory BT
21-Feb-24 MSRDC/VTR/HW/9976 Profile Correction & Fdd & level Checking of embankment Top layer (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory EMB TOP IE
SG (Loop)
21-Feb-24 MSRDC/VTR/HW/9977 FDD Checking OF Subgrade 1st Layer (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory SG 1st
27-Feb-24 MSRDC/VTR/HW/10135 Fdd & Level Checking of Subgrade Top (MCW) Loop-5 000+284 000+300 16 L-5 Satisfactory SG TOP
GSB (Loop)
5-Feb-24 MSRDC/VTR/HW/9572 Fdd Level & Gradation Checking of GSB top layer (MCW LOOP-2) 000+180 000+260 80 L-2 Satisfactory GSB TOP IE
13-Feb-24 MSRDC/VTR/HW/9776 Fdd Level & Gradation Checking of GSB top layer (MCW LOOP-2) 000+260 000+290 30 L-2 Satisfactory GSB TOP
DLC (Loop)
3-Feb-24 MSRDC/VTR/HW/9525 Laying of Dry Lean Concrete (MCW LOOP-2) 000+000 000+180 180 L-2 Satisfactory DLC TOP
26-Feb-24 MSRDC/VTR/HW/10129 Laying of Dry Lean Concrete (MCW LOOP-2) 000+180 000+280 100 L-2 Satisfactory DLC TOP IE
PQC (Loop)
13-Feb-24 MSRDC/VTR/HW/9777 Laying of Pavement Quality Concrete (Loop-1) 000+750 001+100 350 L-1 LHS Satisfactory upto 050 PQC TOP
SG (MCW)
3-Feb-24 MSRDC/VTR/HW/9507 FDD Checking of Subgrade 1st Layer (MCW L1,L2,L3,L4) 542+700 542+900 200 LHS Satisfactory SG 1st
4-Feb-24 MSRDC/VTR/HW/9561 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 542+700 542+900 200 LHS Satisfactory SG TOP
3-Feb-24 MSRDC/VTR/HW/9509 FDD Checking of Subgrade 1st Layer (MCW L1,L2,L3) 542+900 543+000 100 LHS Satisfactory SG 1st
8-Feb-24 MSRDC/VTR/HW/9626 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 542+900 543+000 100 LHS Satisfactory SG TOP
30-Mar-23 MSRDC/VTR/HW/4917 FDD Checking of Subgrade 1st layer (MCW L3 L4) 542+900 543+130 230 LHS Satisfactory SG 1st
31-Mar-23 MSRDC/VTR/HW/5011 FDD & Level Checking of SG Top layer (MCW L3,L4) 542+900 543+130 230 LHS Satisfactory SG TOP IE
8-Feb-24 MSRDC/VTR/HW/9629 FDD Checking of Subgrade 1st Layer (MCW L1,L2,L3) 543+000 543+400 400 LHS Satisfactory SG 1st IE
9-Feb-24 MSRDC/VTR/HW/9665 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 543+000 543+400 400 LHS Satisfactory SG TOP IE
8-Feb-24 MSRDC/VTR/HW/9631 FDD Checking OF Subgrade 1st Layer (MCW L1,L2,L3) 548+200 548+500 300 LHS Satisfactory SG 1st
11-Feb-24 MSRDC/VTR/HW/9707 FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 548+200 548+500 300 LHS Satisfactory SG TOP
1-Apr-23 MSRDC/VTR/HW/5112 FDD Checking of Subgrade 1st layer (MCW L3 L4) 548+130 548+340 210 LHS Satisfactory SG 1st
2-Apr-23 MSRDC/VTR/HW/5163 FDD & Level Checking of SG Top layer (MCW L4) 548+130 548+340 210 LHS Satisfactory SG TOP
8-Feb-24 MSRDC/VTR/HW/9632 FDD Checking OF Subgrade 1st Layer (MCW L1,L2,L3) 548+500 548+665 165 LHS Satisfactory SG 1st
8-Feb-24 MSRDC/VTR/HW/9634 FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 548+500 548+665 165 LHS Satisfactory SG TOP
4-Apr-23 MSRDC/VTR/HW/5220 FDD Checking of Subgrade 1st layer (MCW L4) 548+340 548+665 325 LHS Satisfactory SG 1st
5-Apr-23 MSRDC/VTR/HW/5248 FDD & Level Checking of SG Top layer (MCW L4) 548+340 548+665 325 LHS Satisfactory SG TOP IE
22-Feb-24 MSRDC/VTR/HW/9999 FDD Checking OF Subgrade 1st Layer (MCW)(TOLL PLAZA) L5 TO L15 559+360 559+380 20 LHS Satisfactory SG 1st
23-Feb-24 MSRDC/VTR/HW/10035-R2 Fdd & Level Checking of Subgrade Top Layer(MCW Lane-5 TO 10) Toll Plaza 559+360 559+380 20 LHS Satisfactory SG TOP IE
20-Feb-24 MSRDC/VTR/HW/9947 FDD Checking OF Subgrade 1st Layer (MCW-L1 & L2 ) 546+800 547+000 200 RHS Satisfactory SG 1st
21-Feb-24 MSRDC/VTR/HW/9968 Fdd & Level Checking of Subgarde Top layer (MCW L1,L2) 546+800 547+000 200 RHS Satisfactory SG TOP IE
21-Feb-24 MSRDC/VTR/HW/9971 FDD Checking OF Subgrade 1st Layer (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory SG 1st
21-Feb-24 MSRDC/VTR/HW/9972 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory SG TOP
16-Feb-24 MSRDC/VTR/HW/9841 FDD Checking of Subgrade 1st layer (MCW)(TOLL PLAZA) Lane-5 to 15 559+380 559+420 40 RHS Satisfactory SG 1st
19-Feb-24 MSRDC/VTR/HW/9919 FDD & Level Checking of Subgrade Top layer (MCW)(TOLL PLAZA) L5 TO L15 559+380 559+420 40 RHS Satisfactory SG TOP
SG (SR)
25-Jan-24 MSRDC/VTR/HW/9336 FDD Checking of Subgrade 1st layer (SR) 560+050 560+140 90 LHS Satisfactory SG 1st
25-Jan-24 MSRDC/VTR/HW/9335 FDD Checking of Subgrade 1st layer (SR) 560+140 560+230 90 LHS Satisfactory SG 1st
9-Feb-24 MSRDC/VTR/HW/9671 Fdd & Level Checking of Subgrade Top layer (SR) 560+050 560+230 180 LHS Satisfactory SG TOP
24-Aug-23 MSRDC/VTR/HW/7516 FDD Checking of Subgrade 1st layer (SR) 539+500 539+800 300 RHS Satisfactory SG 1st
25-Aug-23 MSRDC/VTR/HW/7537 FDD and level Checking of Subgrade Top layer(SR) 539+500 539+800 300 RHS Satisfactory SG TOP
5-May-23 MSRDC/VTR/HW/6335 FDD Checking of Subgrade 1st layer (SR) 548+665 548+700 35 RHS Satisfactory SG 1st
6-May-23 MSRDC/VTR/HW/6354 Fdd & Level Checking of SG Top layer (SR) 548+665 548+690 25 RHS Satisfactory SG TOP
GSB (MCW)
11-Feb-24 MSRDC/VTR/HW/9705 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 542+700 543+000 300 LHS Satisfactory GSB TOP
10-Feb-24 MSRDC/VTR/HW/9636-R1 Fdd Level & Gradation Checking of GSB top layer (MCW L3,L4) 542+900 543+000 100 LHS Satisfactory GSB TOP
11-Feb-24 MSRDC/VTR/HW/9708 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 543+000 543+400 400 LHS Satisfactory GSB TOP
15-Feb-24 MSRDC/VTR/HW/9807 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 548+200 548+500 300 LHS Satisfactory GSB TOP IE
15-Feb-24 MSRDC/VTR/HW/9808 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 548+500 548+665 165 LHS Satisfactory GSB TOP
1-Feb-24 MSRDC/VTR/HW/9464 Fdd Level & Gradation Checking of GSB top layer(MCW L6 TO L14) 559+380 559+480 100 LHS Satisfactory GSB TOP
23-Feb-24 MSRDC/VTR/HW/10027-R1 Fdd Level & Gradation Checking of GSB top layer (MCW L3,L4) 540+070 540+100 30 RHS Satisfactory GSB TOP IE
19-Apr-23 MSRDC/VTR/HW/5828 Fdd Level & Gradation Checking of GSB top layer (MCW L3,L4) 540+100 540+320 220 RHS Satisfactory GSB TOP IE
25-Feb-24 MSRDC/VTR/HW/10099 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 542+000 542+100 100 RHS Not Satisfactory GSB TOP
21-Feb-24 MSRDC/VTR/HW/9970 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 546+800 547+000 200 RHS Satisfactory L1,L2 GSB TOP
23-Feb-24 MSRDC/VTR/HW/10029 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory GSB TOP
27-Feb-24 MSRDC/VTR/HW/10138 FDD & Level Checking of GSB Top layer (MCW)(TOLL PLAZA) L5 TO L15 559+380 559+480 100 RHS Satisfactory GSB TOP IE
GSB (SR)
17-Feb-24 MSRDC/VTR/HW/9866 Fdd Level & Gradation Checking of GSB top layer (SR) 546+200 546+400 200 LHS Satisfactory GSB TOP
2-Feb-24 MSRDC/VTR/HW/9488 Fdd Level & Gradation Checking of GSB top layer (SR) 546+400 546+450 50 LHS Satisfactory GSB TOP IE
24-May-23 MSRDC/VTR/HW/6662 Fdd Level & Gradation Checking of GSB top layer (SR) 542+400 542+700 300 RHS Satisfactory GSB TOP
19-Aug-23 MSRDC/VTR/HW/7269 FDD, Level and Gradation Checking of GSB Top Layer (SR) 546+680 546+790 110 RHS Satisfactory GSB TOP IE
22-Apr-23 MSRDC/VTR/HW/5972 Fdd Level & Gradation Checking of GSB top layer (SR) 548+010 548+400 390 RHS Satisfactory GSB TOP
3-Mar-24 MSRDC/VTR/HW/10269 Fdd Level & Gradation Checking of GSB top layer (SR) 548+665 548+690 25 RHS Satisfactory GSB TOP
DLC (MCW)
11-Feb-24 MSRDC/VTR/HW/9709 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 542+700 543+000 300 LHS Satisfactory L1,L2 DLC TOP
13-Feb-24 MSRDC/VTR/HW/9773 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 543+000 543+400 400 LHS Satisfactory DLC TOP
17-Feb-24 MSRDC/VTR/HW/9871 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 548+200 548+500 300 LHS Satisfactory DLC TOP
17-Feb-24 MSRDC/VTR/HW/9872 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 548+500 548+665 165 LHS Satisfactory DLC TOP IE
23-Feb-24 MSRDC/VTR/HW/10030 Laying of Dry Lean Concrete (MCW L1,L2) 546+800 547+000 200 RHS Satisfactory DLC TOP IE
23-Feb-24 MSRDC/VTR/HW/10031 Laying of Dry Lean Concrete (MCW L1,L2) 547+000 547+300 300 RHS Satisfactory DLC TOP
28-Feb-24 MSRDC/VTR/HW/10175 Laying of Dry Lean Concrete (MCW)(TOLL PLAZA) L5 TO L15 559+380 559+480 100 RHS Satisfactory DLC TOP
27-Jan-24 MSRDC/VTR/HW/9369 Laying of Dry Lean Concrete (MCW L5 to L7) 559+980 560+100 120 RHS Satisfactory DLC TOP
DLC (SR)
18-Feb-24 MSRDC/VTR/HW/9886 Laying of Dry Lean Concrete (SR) 546+200 546+400 200 LHS Satisfactory DLC TOP
2-Feb-24 MSRDC/VTR/HW/9489 Laying of Dry Lean Concrete (SR) 546+400 546+450 50 LHS Satisfactory DLC TOP
22-Aug-23 MSRDC/VTR/HW/7404 Laying of Dry Lean Concrete (SR) 546+450 546+560 110 LHS Satisfactory DLC TOP
23-Apr-23 MSRDC/VTR/HW/6038 Laying of Dry Lean Concrete (SR) 547+850 548+130 280 LHS Satisfactory DLC TOP
21-Aug-23 MSRDC/VTR/HW/7368 Laying of Dry Lean Concrete (SR) 546+680 546+790 110 RHS Satisfactory DLC TOP IE
20-Aug-23 MSRDC/VTR/HW/7304 Laying of Dry Lean Concrete (SR) 546+790 546+900 110 RHS Satisfactory DLC TOP
20-Aug-23 MSRDC/VTR/HW/7305 Laying of Dry Lean Concrete (SR) 547+690 548+170 480 RHS Satisfactory DLC TOP
3-Mar-24 MSRDC/VTR/HW/10270 Laying of Dry Lean Concrete (SR) 548+665 548+690 25 RHS Satisfactory DLC TOP
PQC (MCW)
18-Feb-24 MSRDC/VTR/HW/9906 Laying of Pavement Quality Concrete (MCW-L1,L2) 542+700 543+000 300 LHS Satisfactory PQC TOP
20-Feb-24 MSRDC/VTR/HW/9944 Laying of Pavement Quality Concrete (MCW L1,L2) 543+000 543+270 270 LHS Satisfactory PQC TOP IE
21-Feb-24 MSRDC/VTR/HW/9969 Laying of Pavement Quality Concrete (MCW L1,L2) 543+270 543+400 130 LHS Satisfactory PQC TOP IE
24-Feb-24 MSRDC/VTR/HW/10077 Laying of Pavemet Quality Concrete (MCW L1,L2) 548+200 548+665 465 LHS Satisfactory From 240 PQC TOP IE
PQC (SR)
20-Feb-24 MSRDC/VTR/HW/9948 Laying of Pavement Quality Concrete (SR) 544+300 544+420 120 LHS Satisfactory PQC TOP
3-Jun-23 MSRDC/VTR/HW/6828 Laying of Pavement Quality Concrete (SR) 544+600 544+780 180 LHS Satisfactory PQC TOP
20-Aug-23 MSRDC/VTR/HW/7297 Laying of Pavement Quality Concrete (SR) 545+250 545+280 30 LHS Satisfactory PQC TOP
20-Aug-23 MSRDC/VTR/HW/7298 Laying of Pavement Quality Concrete (SR) 545+280 545+410 130 LHS Satisfactory PQC TOP
22-Feb-24 MSRDC/VTR/HW/9988 Laying of Pavement Quality Concrete (SR) 545+410 545+510 100 LHS Satisfactory PQC TOP IE
8-Feb-24 MSRDC/VTR/HW/9645 Laying of Pavement Quality Concrete (SR) 545+900 546+190 290 LHS Satisfactory PQC TOP IE
25-Feb-24 MSRDC/VTR/HW/10100 Laying of Pavement Quality Concrete (SR) 546+180 546+560 380 LHS Satisfactory PQC TOP
25-Aug-23 MSRDC/VTR/HW/7530 Laying of Pavement Quality Concrete (SR) 547+440 547+850 410 LHS Satisfactory PQC TOP
14-Jan-24 MSRDC/VTR/HW/9182 Laying of Pavement Quality Concrete (SR) 539+280 539+700 420 RHS Satisfactory PQC TOP
27-Aug-23 MSRDC/VTR/HW/7598 Laying of Pavement Quality Concrete (SR) 546+190 546+230 40 RHS Satisfactory PQC TOP
8-Feb-24 MSRDC/VTR/HW/9646 Laying of Pavement Quality Concrete (SR) 546+230 546+350 120 RHS Satisfactory PQC TOP
28-Feb-24 MSRDC/VTR/HW/10177 Laying of Pavement Quality Concrete (SR) 546+760 546+910 150 RHS Satisfactory PQC TOP
27-Aug-23 MSRDC/VTR/HW/7600 Laying of Pavement Quality Concrete (SR) 547+690 548+170 480 RHS Satisfactory PQC TOP
28-Feb-24 MSRDC/VTR/HW/10178 Laying of Pavement Quality Concrete (SR) 548+170 548+210 40 RHS Satisfactory PQC TOP IE
6-Feb-24 MSRDC/VTR/HW/9592 Laying of Pavement Quality Concrete (SR) 547+590 547+690 100 RHS Satisfactory PQC TOP IE
21-Feb-24 MSRDC/VTR/HW/9973 Laying of Pavement Quality Concrete (SR) 561+280 561+620 340 RHS Satisfactory 450 TO 620 PQC TOP
20-Feb-24 MSRDC/VTR/HW/9949 Laying of Pavement Quality Concrete (SR) 561+670 561+780 110 RHS Satisfactory PQC TOP IE
19-Feb-24 MSRDC/VTR/HW/9918 Laying of Pavement Quality Concrete (SR) 561+780 561+980 200 RHS Satisfactory PQC TOP
9-Feb-24 MSRDC/VTR/HW/9667 Laying of Pavement Quality Concrete (SR) 561+930 562+010 80 RHS Satisfactory from 980 PQC TOP
5-Feb-24 MSRDC/VTR/HW/9578 Laying of Pavement Quality Concrete (SR) 561+950 562+040 90 RHS Satisfactory From 562+010 PQC TOP
DLC MCW
1 11/26/2023 8377
2 11/27/2023 8389
3 8/24/2023 7507
4
5 11/28/2023 8405
6 11/19/2023 8309
7 11/25/2023 8344
8
9
PQC SR
1
2 8/28/2023 7649
3 8/28/2023 7649
4 11/19/2023 8312/8298/7497/8290
5 8/24/2023 7498/7593/7594/7595
6 8/27/2023 7596
9
PQC SR
1
2
3
4
5
6
9
12/5/2023 MSRDC/VTR/HW/8460
12/5/2023 MSRDC/VTR/HW/8461
12/5/2023 MSRDC/VTR/HW/8463
MSRDC/VTR/HW/
MSRDC/VTR/HW/
45266 45267
45266 45267
RA-30
DLC SR
Laying of Dry Lean Concrete (SR) 543+050
Laying of Dry Lean Concrete (SR) 543+200
Laying of Dry Lean Concrete (SR) 544+780
Laying of Dry Lean Concrete (SR) 545+800
Laying of Dry Lean Concrete (SR) 547+040
Laying of Dry Lean Concrete (SR) 547+470
Laying of Dry Lean Concrete (SR) 540+300
Laying of Dry Lean Concrete (SR) 540+750
Laying of Dry Lean Concrete (SR) 548+350
DLC MCW
Laying of Dry Lean Concrete (Toll Plaza)(Lane-7 TO 10) 559+070
Laying of Dry Lean Concrete (Toll Plaza)(Lane-11 TO 12) 559+200
Laying of Dry Lean Concrete (MCW L3,L4) 559+540
Laying of Dry Lean Concrete (MCW L3,L4) 542+900
Laying of Dry Lean Concrete (MCW-L1,L2) 543+000
Laying of Dry Lean Concrete (MCW-L1,L2) 548+200
Laying of Dry Lean Concrete (MCW-L1,L2) 548+420
Laying of Dry Lean Concrete (MCW-L1,L2) 548+640
PQC SR
547+040
Laying of Pavement Quality Concrete (SR) 540+300
Laying of Pavement Quality Concrete (SR) 540+850
Laying of Pavement Quality Concrete (SR) 540+860
Laying of Pavement Quality Concrete (SR) 541+570
Laying of Pavement Quality Concrete (SR) 542+680
PQC SR
Laying of Pavement Quality Concrete
Inspection of C&G (MCW L3,L4) 560500
FDD & Level Checking of OGL(MCW L3,L4) 560500
Fdd Checking of Embankment 1st layer (MCW L3,L4) 560500
MSRDC/VTR/SUR/09
543+200 LHS
543+580 LHS
544+870 LHS
545+890 LHS
547+310 LHS
547+690 LHS
540+750 RHS
540+900 RHS
548+400 RHS
559+200 LHS
559+220 LHS
559+700 LHS
543+000 RHS
543+400 RHS
548+420 RHS
548+640 RHS
548+690 RHS
547+310 LHS
540+580 RHS
540+710 RHS
541+500 RHS
542+010 RHS
542+800 RHS
560560 60 RHS satisfactory
560560 60 RHS satisfactory
560560 60 RHS satisfactory
L-6
IE
IE
IE
EMB TOP
SG TOP
SG TOP
PQC (MCW)
1 19-Oct-23 MSRDC/VTR/HW/8031 Laying of Pavement Quality Concrete (MCW-L1,L2) 540+890 541+250 360 RHS
2 20-Oct-23 MSRDC/VTR/HW/8036 Laying of Pavement Quality Concrete (MCW-L1,L2) 541+250 541+410 160 RHS
3 21-Oct-23 MSRDC/VTR/HW/8045 Laying of Pavement Quality Concrete (MCW-L1,L2) 541+410 541+540 130 RHS
4 23-Oct-23 MSRDC/VTR/HW/8071 Laying of Pavement Quality Concrete (MCW-L1,L2) 541+540 541+950 410 RHS
5 3-Nov-23 MSRDC/VTR/HW/8193 Laying of Pavement Quality Concrete (MCW-L1,L2) 545+170 545+390 220 RHS
6 29-Oct-23 MSRDC/VTR/HW/8148 Laying of Pavement Quality Concrete (MCW-L1,L2) 545+390 545+600 210 RHS
7 29-Oct-23 MSRDC/VTR/HW/8147 Laying of Pavement Quality Concrete (MCW-L1,L2) 545+600 545+800 200 RHS
8 31-Oct-23 MSRDC/VTR/HW/ Laying of Pavement Quality Concrete (MCW-L1,L2) 545+800 545+900 100 RHS
RA-28
1 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 540+300 540+800 500 LHS
2 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 540+300 540+800 500 LHS
3 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 540+800 541+300 500 LHS
4 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 540+800 541+300 500 LHS
5 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 541+300 541+960 660 LHS
6 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 541+300 541+960 660 LHS
7 4-Oct-23 MSRDC/VTR/HW/7933 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 540+300 540+550 250 RHS Satisfactory
8 4-Oct-23 MSRDC/VTR/HW/7934 FDD & Level Checking of Subgrade top Layer (MCW L1) 540+300 540+550 250 RHS Satisfactory
9 14-Sep-23 MSRDC/VTR/HW/7874 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 540+550 541+130 580 RHS Satisfactory
10 14-Sep-23 MSRDC/VTR/HW/7876 FDD & Level Checking of Subgrade top Layer (MCW L1) 540+550 541+130 580 RHS IE
11 14-Sep-23 MSRDC/VTR/HW/7883 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 541+130 541+400 270 RHS IE
12 14-Sep-23 MSRDC/VTR/HW/7884 FDD & Level Checking of Subgrade top Layer (MCW L1) 541+130 541+400 270 RHS Satisfactory
13 4-Oct-23 MSRDC/VTR/HW/7931 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 541+400 541+950 550 RHS Satisfactory
14 4-Oct-23 MSRDC/VTR/HW/7932 FDD & Level Checking of Subgrade top Layer (MCW L1) 541+400 541+950 550 RHS Satisfactory
15 MSRDC/VTR/HW/ FDD & Level Checking of SG 1st layer (MCW L1) 544+180 544+700 520 RHS
16 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 544+180 544+700 520 RHS
17 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 544+700 545+300 600 RHS
18 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 544+700 545+300 600 RHS
19 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L1) 546+610 546+790 180 RHS
20 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L1) 546+610 546+790 180 RHS
21 MSRDC/VTR/HW/ Fdd Checking of Subgrade 1st layer (MCW L2) 548+665 548+690 25 RHS
22 MSRDC/VTR/HW/ FDD & Level Checking of SG Top layer (MCW L2) 548+665 548+690 25 RHS
23 20-Aug-23 MSRDC/VTR/HW/7347 FDD Checking of Sub Grade 1st layer (MCW L3, L4) 559+700 559+980 280 RHS Satisfactory
24 21-Aug-23 MSRDC/VTR/HW/7387 FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 559+700 559+980 280 RHS IE
GSB TOP
1 7-Oct-23 MSRDC/VTR/HW/7950 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 540+300 540+800 500 RHS Satisfactory
2 8-Oct-23 MSRDC/VTR/HW/7962 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 540+800 541+400 600 RHS Satisfactory
3 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 541+400 541+800 400 RHS
4 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 541+800 542+000 200 RHS
5 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 544+180 544+700 520 RHS
6 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 544+700 545+300 600 RHS
7 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 545+300 545+950 650 RHS
GSB SR
1 19-Apr-23 MSRDC/VTR/HW/5826 Fdd Level & Gradation Checking of GSB top layer (SR) 540270 540420 150 RHS Satisfactory
2 19-Apr-23 MSRDC/VTR/HW/5827 Fdd Level & Gradation Checking of GSB top layer (SR) 540420 540700 280 RHS Satisfactory
3 29-Mar-23 MSRDC/VTR/HW/4781 Fdd Level & Gradation Checking of GSB top layer (SR) 540900 540950 50 RHS Satisfactory
4 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB Top Layer (SR) 541+300 541+420 120 RHS
5 18-Aug-23 MSRDC/VTR/HW/7243 FDD, Level and Gradation Checking of GSB Top Layer (SR) 541+420 541+500 80 RHS Satisfactory
6 MSRDC/VTR/HW/ Fdd Level & Gradation Checking of GSB Top Layer (SR) 541+500 541+600 100 RHS
7 22-Apr-23 MSRDC/VTR/HW/6000 Fdd Level & Gradation Checking of GSB top layer (SR) 541+600 541+870 270 RHS RA-25
8 20-Jun-23 MSRDC/VTR/HW/7049 Fdd Level & Gradation Checking of GSB top layer (SR) 542+700 542+900 200 RHS RA-25
9 20-Apr-23 MSRDC/VTR/HW/5886 Fdd Level & Gradation Checking of GSB top layer (SR) 543+200 543+350 150 RHS RA-25
DLC MCW
1 7-Oct-23 MSRDC/VTR/HW/7951 Laying of Dry Lean Concrete (MCW L1,L2) 540+300 540+800 000+500 RHS Satisfactory
2 9-Oct-23 MSRDC/VTR/HW/7963 Laying of Dry Lean Concrete (MCW L1,L2) 540+800 541+200 000+400 RHS Satisfactory
3 MSRDC/VTR/HW/ Laying of Dry Lean Concrete (MCW-L1,L2) 541+200 541+700 500 RHS
4 MSRDC/VTR/HW/ Laying of Dry Lean Concrete (MCW-L1,L2) 541+700 542+000 300 RHS
5 23-Apr-23 MSRDC/VTR/HW/6044 Laying of Dry Lean Concrete (MCW-L3,L4) 542+730 542+900 170 RHS RA-25
6 21-Aug-23 MSRDC/VTR/HW/7364 Laying of Dry Lean Concrete (MCW-L3,L4) 548+160 548+200 40 RHS Satisfactory
DLC SR
1 31-Mar-23 MSRDC/VTR/HW/4991 Laying of Dry Lean Concrete (SR) 540+900 541+130 230 RHS Satisfactory
2 20-Apr-23 MSRDC/VTR/HW/5894 Laying of Dry Lean Concrete (SR) 541+130 541+300 170 RHS Satisfactory
3 MSRDC/VTR/HW/ Laying of Dry Lean Concrete (SR) 541+300 541+420 120 RHS
4 20-Aug-23 MSRDC/VTR/HW/7314 Laying of Dry Lean Concrete (SR) 541+420 541+500 80 RHS Satisfactory
5 17-Aug-23 MSRDC/VTR/HW/7231 Laying of Dry Lean Concrete (SR) 541+500 541+600 100 RHS Satisfactory
6 20-Aug-23 MSRDC/VTR/HW/7300 Laying of Dry Lean Concrete (SR) 541+600 542+000 400 RHS Satisfactory
7 20-Aug-23 MSRDC/VTR/HW/7301 Laying of Dry Lean Concrete (SR) 542+600 542+800 200 RHS Satisfactory
8 23-Apr-23 MSRDC/VTR/HW/6041 Laying of Dry Lean Concrete (SR) 543+200 543+350 150 RHS RA-24
9 22-May-23 MSRDC/VTR/HW/6614 Laying of Dry Lean Concrete (SR) 546+900 547+030 130 RHS Satisfactory
10 29-Mar-23 MSRDC/VTR/HW/4787 Laying of Dry Lean Concrete (SR) 547+030 547+300 270 RHS Satisfactory
11 7-Jun-23 MSRDC/VTR/HW/6867 Laying of Dry Lean Concrete (SR) 548+170 548+310 140 RHS Satisfactory
PQC SR
1 21-Aug-23 MSRDC/VTR/HW/7392 Laying of Pavement Quality Concrete (SR) 542+695 542+900 205 LHS Satisfactory
2 15-May-23 MSRDC/VTR/HW/6547 Laying of Pavement Quality Concrete (SR) 544+150 544+230 80 LHS RA-24
3 20-Mar-23 MSRDC/VTR/HW/4278 Laying of Pavement Quality Concrete (SR) 544+230 544+300 70 LHS Satisfactory
4 19-Mar-23 MSRDC/VTR/HW/4273 Laying of Pavement Quality Concrete (SR) 544+420 544+600 180 LHS Satisfactory
5 1-Apr-23 MSRDC/VTR/HW/5074 Laying of Pavement Quality Concrete (SR) 544+780 544+870 90 LHS Satisfactory
6 17-Jun-23 MSRDC/VTR/HW/7025 Laying of Pavement Quality Concrete (SR) 544+990 545+180 190 LHS Satisfactory
7 27-Aug-23 MSRDC/VTR/HW/7596 Laying of Pavement Quality Concrete (SR) 542+600 542+800 200 RHS Satisfactory
8 17-Aug-23 MSRDC/VTR/HW/7226 Laying of Pavement Quality Concrete (SR) 542+800 543+100 300 RHS Satisfactory
9 9-Jun-23 MSRDC/VTR/HW/6920 Laying of Pavemet Quality Concrete (SR) 543+330 543+740 410 RHS Satisfactory
10 10-Jun-23 MSRDC/VTR/HW/6925 Laying of Pavemet Quality Concrete (SR) 543+740 544+220 480 RHS RA-24
11 20-Mar-23 MSRDC/VTR/HW/4279 Laying of Pavemet Quality Concrete (SR) 544+220 544+320 100 RHS Satisfactory
12 5-May-23 MSRDC/VTR/HW/6349 Laying of Pavemet Quality Concrete (SR) 544+530 544+710 180 RHS Satisfactory
13 31-Mar-23 MSRDC/VTR/HW/4988 Laying of Pavemet Quality Concrete (SR) 544+710 544+785 75 RHS Satisfactory
14 13-May-23 MSRDC/VTR/HW/6512 Laying of Pavemet Quality Concrete (SR) 544+785 544+800 15 RHS Satisfactory
15 21-Apr-23 MSRDC/VTR/HW/5926 Laying of Pavemet Quality Concrete (SR) 544+800 544+810 10 RHS Satisfactory
16 5-May-23 MSRDC/VTR/HW/6350 Laying of Pavemet Quality Concrete (SR) 544+810 544+860 50 RHS Satisfactory
17 21-Apr-23 MSRDC/VTR/HW/5929 Laying of Pavemet Quality Concrete (SR) 544+860 544+910 50 RHS Satisfactory
18 17-Mar-23 MSRDC/VTR/HW/4179-R1 Laying of Pavemet Quality Concrete (SR) 545+000 545+330 330 RHS Satisfactory
19 7-May-23 MSRDC/VTR/HW/6388 Laying of Pavemet Quality Concrete (SR) 545+330 545+340 10 RHS Satisfactory
20 22-Apr-23 MSRDC/VTR/HW/5980 Laying of Pavemet Quality Concrete (SR) 545+340 545+550 210 RHS Satisfactory
21 6-May-23 MSRDC/VTR/HW/6371 Laying of Pavemet Quality Concrete (SR) 545+550 546+040 490 RHS Satisfactory
22 MSRDC/VTR/HW/ Laying of Pavement Quality Concrete (SR) 546+925 547+005 80 RHS
23 4-Oct-23 MSRDC/VTR/HW/7930 Laying of Pavement Quality Concrete (SR) 547+005 547+350 345 RHS Satisfactory
24 6-Oct-23 MSRDC/VTR/HW/7945 Laying of Pavement Quality Concrete (SR) 547+460 547+590 130 RHS Satisfactory
25 9-Oct-23 MSRDC/VTR/HW/7964 Laying of Pavement Quality Concrete (SR) 548+170 548+310 140 RHS Satisfactory
26 9-Oct-23 MSRDC/VTR/HW/7965 Laying of Pavement Quality Concrete (SR) 548+400 548+665 265 RHS Satisfactory
MSRDC/VTR/HW/7345 A.1(a) 19-Aug-23 20-Aug-23 4:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (Toll plaza) 559+200 559+380 RHS
MSRDC/VTR/HW/7346 A.1(a) 19-Aug-23 20-Aug-23 5:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 559+540 559+700 RHS
MSRDC/VTR/HW/7347 A.1(b) 19-Aug-23 20-Aug-23 4:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 559+700 559+980 RHS
MSRDC/VTR/HW/7348 A.1(b) 19-Aug-23 20-Aug-23 3:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7349 A.1(b) 19-Aug-23 20-Aug-23 6:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+450 561+620 RHS
MSRDC/VTR/HW/7350 A.1(a) 19-Aug-23 20-Aug-23 3:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (Toll plaza) 559+040 559+360 LHS
MSRDC/VTR/HW/7351 A.1(b) 19-Aug-23 20-Aug-23 4:00 PM FDD Checking of Sub Grade 1st layer (MCW L3,L4) 559+750 559+900 LHS
MSRDC/VTR/HW/7352 A.1(b) 19-Aug-23 20-Aug-23 6:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7353 A.1(b) 19-Aug-23 20-Aug-23 2:00 PM FDD Checking of Sub Grade 1st layer (MCW L3, L4) 561+450 561+620 RHS wrong rfi
MSRDC/VTR/HW/7354 A.1(a) 19-Aug-23 20-Aug-23 4:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (Toll plaza) 559+040 559+360 LHS wrong rfi
MSRDC/VTR/HW/7355 A.1(b) 19-Aug-23 20-Aug-23 6:00 PM FDD Checking of Sub Grade 1st layer (MCW L3,L4) 559+750 559+900 LHS
MSRDC/VTR/HW/7356 RE 19-Aug-23 20-Aug-23 0.645833333 Casting of RE Wall Panel (A=55, B=21, Q=9, Total= 85 Nos) 551+900 RHS
MSRDC/VTR/HW/7357 RE 19-Aug-23 20-Aug-23 0.666666667 Casting of RE Wall Panel (A=42, B=17, Total= 59 Nos) 556+900 RHS
MSRDC/VTR/HW/7358 Blank
MSRDC/VTR/HW/7359 Blank
MSRDC/VTR/HW/7360 3.(a) 20-Aug-23 21-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 548+130 548+340 LHS
MSRDC/VTR/HW/7361 3.(a) 20-Aug-23 21-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 548+340 548+580 LHS
MSRDC/VTR/HW/7362 3.(a) 20-Aug-23 21-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 548+580 548+665 LHS
MSRDC/VTR/HW/7363 3.(b) 20-Aug-23 21-Aug-23 3:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 547+370 547+460 RHS
MSRDC/VTR/HW/7364 3.(b) 20-Aug-23 21-Aug-23 4:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 548+160 548+200 RHS
MSRDC/VTR/HW/7365 3.(b) 20-Aug-23 21-Aug-23 11:00 AM Laying of Dry Lean Concrete (MCW-L3,L4) 549+780 549+800 RHS
MSRDC/VTR/HW/7366 3.(b) 20-Aug-23 21-Aug-23 12:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 549+830 549+860 RHS
MSRDC/VTR/HW/7367 3.(b) 20-Aug-23 21-Aug-23 1:00 PM Laying of Dry Lean Concrete (SR) 548+310 548+400 RHS
MSRDC/VTR/HW/7368 3.(b) 20-Aug-23 21-Aug-23 2:00 PM Laying of Dry Lean Concrete (SR) 546+680 546+790 RHS
MSRDC/VTR/HW/7369 3.(b) 20-Aug-23 21-Aug-23 3:30 PM Laying of Dry Lean Concrete (SR) 547+590 547+690 RHS
MSRDC/VTR/HW/7370 3.(b) 20-Aug-23 21-Aug-23 2:30 PM Laying of Dry Lean Concrete (SR) 550+850 550+950 RHS
MSRDC/VTR/HW/7371 3.(b) 20-Aug-23 21-Aug-23 11:00 AM Laying of Dry Lean Concrete (SR) 552+380 552+420 RHS
MSRDC/VTR/HW/7372 3.(b) 20-Aug-23 21-Aug-23 12:00 PM Laying of Dry Lean Concrete (SR) 552+550 552+620 RHS
MSRDC/VTR/HW/7373 3.(b) 20-Aug-23 21-Aug-23 1:30 PM Laying of Dry Lean Concrete (SR) 545+410 545+510 LHS
MSRDC/VTR/HW/7374 3.(b) 20-Aug-23 21-Aug-23 2:30 PM Laying of Dry Lean Concrete (SR) 545+650 545+700 LHS
MSRDC/VTR/HW/7375 3.(b) 20-Aug-23 21-Aug-23 4:00 PM Laying of Dry Lean Concrete (SR) 545+700 545+950 LHS
MSRDC/VTR/HW/7376 3.(b) 20-Aug-23 21-Aug-23 4:00 PM Laying of Dry Lean Concrete (SR) 545+950 546+200 LHS
MSRDC/VTR/HW/7377 A.1(b) 20-Aug-23 21-Aug-23 10:00 AM Fdd Checking of Subgrade 1st layer (MCW L2) 541+300 541+450 RHS
MSRDC/VTR/HW/7378 A.1(b) 20-Aug-23 21-Aug-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L2) 541+600 541+900 RHS
MSRDC/VTR/HW/7379 A.1(b) 20-Aug-23 21-Aug-23 12:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 541+900 542+000 RHS
MSRDC/VTR/HW/7380 A.1(a) 20-Aug-23 21-Aug-23 12:30 PM Fdd & Level Checking of Embankment Top layer (MCW L2) 542+700 542+850 RHS
MSRDC/VTR/HW/7381 A.1(b) 20-Aug-23 21-Aug-23 2:30 PM Fdd Checking of Subgrade 1st layer (MCW L2) 542+850 543+200 RHS
MSRDC/VTR/HW/7382 A.1(a) 20-Aug-23 21-Aug-23 4:00 PM FDD & Level Checking of Subgrade Top layer (MCW L2) 544+390 544+410 RHS
MSRDC/VTR/HW/7383 A.1(b) 20-Aug-23 21-Aug-23 1:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 545+360 545+560 RHS
MSRDC/VTR/HW/7384 A.1(b) 20-Aug-23 21-Aug-23 3:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 545+700 545+760 RHS
MSRDC/VTR/HW/7385 A.1(b) 20-Aug-23 21-Aug-23 12:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 546+860 546+950 RHS
MSRDC/VTR/HW/7386 A.1(b) 20-Aug-23 21-Aug-23 2:00 PM Fdd Checking of Subgrade 1st layer (MCW L2) 547+270 547+440 RHS
MSRDC/VTR/HW/7387 A.1(b) 20-Aug-23 21-Aug-23 6:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 559+700 559+980 RHS
MSRDC/VTR/HW/7388 A.1(b) 20-Aug-23 21-Aug-23 6:15 PM FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7389 A.1(b) 20-Aug-23 21-Aug-23 6:30 PM FDD & Level Checking of Sub Grade Top layer (MCW L3, L4) 561+450 561+620 RHS
MSRDC/VTR/HW/7390 A.1(c) 20-Aug-23 21-Aug-23 6:45 PM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 561+650 561+850 RHS wrong rfi
MSRDC/VTR/HW/7391 A.1(b) 20-Aug-23 21-Aug-23 7:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L3,L4) 559+580 559+900 LHS
MSRDC/VTR/HW/7392 3.(b) 20-Aug-23 21-Aug-23 3:00 PM Laying of Pavement Quality Concrete (SR) 542+695 542+900 LHS
MSRDC/VTR/HW/7393 RE 20-Aug-23 21-Aug-23 0.645833333 Casting of RE Wall Panel (A=65, B=26, Q=14, Total= 105 Nos) 551+900 RHS
MSRDC/VTR/HW/7394 RE 20-Aug-23 21-Aug-23 0.666666667 Casting of RE Wall Panel (A=52, B=22, Total= 74 Nos) 556+900 RHS
MSRDC/VTR/HW/7395 Blank
MSRDC/VTR/HW/7396 Blank
MSRDC/VTR/HW/7397 Blank
MSRDC/VTR/HW/7398 3.(a) 21-Aug-23 22-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 549+690 549+800 LHS
MSRDC/VTR/HW/7399 3.(a) 21-Aug-23 22-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 549+970 550+000 LHS
MSRDC/VTR/HW/7400 3.(a) 21-Aug-23 22-Aug-23 12:30 PM Laying of Pavement Quality Concrete (SR) 550+540 550+650 LHS
MSRDC/VTR/HW/7401 3.(b) 21-Aug-23 22-Aug-23 1:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 554+140 554+200 RHS
MSRDC/VTR/HW/7402 3.(b) 21-Aug-23 22-Aug-23 2:00 PM Laying of Dry Lean Concrete (MCW-L3,L4) 555+760 555+800 RHS
MSRDC/VTR/HW/7403 3.(b) 21-Aug-23 22-Aug-23 3:30 PM Laying of Dry Lean Concrete (MCW-L3,L4) 557+400 557+500 RHS
MSRDC/VTR/HW/7404 3.(b) 21-Aug-23 22-Aug-23 11:00 AM Laying of Dry Lean Concrete (SR) 546+450 546+540 LHS
MSRDC/VTR/HW/7405 3.(b) 21-Aug-23 22-Aug-23 12:00 PM Laying of Dry Lean Concrete (SR) 552+700 552+790 LHS
MSRDC/VTR/HW/7406 3.(b) 21-Aug-23 22-Aug-23 12:30 PM Laying of Dry Lean Concrete (SR) 554+140 554+200 LHS
MSRDC/VTR/HW/7407 3.(b) 21-Aug-23 22-Aug-23 1:30 PM Laying of Dry Lean Concrete (SR) 556+160 556+350 LHS
MSRDC/VTR/HW/7408 3.(b) 21-Aug-23 22-Aug-23 1:45 PM Laying of Dry Lean Concrete (SR) 556+620 556+730 LHS
MSRDC/VTR/HW/7409 3.(b) 21-Aug-23 22-Aug-23 2:30 PM Laying of Dry Lean Concrete (SR) 556+900 557+100 LHS
MSRDC/VTR/HW/7410 3.(b) 21-Aug-23 22-Aug-23 3:30 PM Laying of Dry Lean Concrete (MCW-L2,L3,L4) 550+400 550+490 RHS
MSRDC/VTR/HW/7411 3.(b) 21-Aug-23 22-Aug-23 4:00 PM Laying of Dry Lean Concrete (MCW-L2,L3,L4) 553+530 553+610 RHS
MSRDC/VTR/HW/7412 A.1(b) 21-Aug-23 22-Aug-23 11:00 AM FDD & Level Checking of Sub Grade Top layer (MCW L2) 541+300 541+450 RHS
MSRDC/VTR/HW/7413 A.1(b) 21-Aug-23 22-Aug-23 12:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 541+600 541+900 RHS
MSRDC/VTR/HW/7414 A.1(b) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 541+900 542+000 RHS
MSRDC/VTR/HW/7415 A.1(b) 21-Aug-23 22-Aug-23 1:30 PM Fdd Checking of Subgrade 1st layer (MCW L2) 542+700 542+850 RHS
MSRDC/VTR/HW/7416 A.1(b) 21-Aug-23 22-Aug-23 3:30 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 542+850 543+200 RHS
MSRDC/VTR/HW/7417 A.1(b) 21-Aug-23 22-Aug-23 2:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 545+360 545+560 RHS
MSRDC/VTR/HW/7418 A.1(b) 21-Aug-23 22-Aug-23 4:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 545+700 545+760 RHS
MSRDC/VTR/HW/7419 A.1(b) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 546+860 546+950 RHS
MSRDC/VTR/HW/7420 A.1(b) 21-Aug-23 22-Aug-23 3:00 PM FDD & Level Checking of Sub Grade Top layer (MCW L2) 547+270 547+440 RHS
MSRDC/VTR/HW/7421 A.1(a) 21-Aug-23 22-Aug-23 11:00 AM FDD Checking of Embankment 19 th layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7422 A.1(c) 21-Aug-23 22-Aug-23 12:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 559+700 559+980 RHS
MSRDC/VTR/HW/7423 A.1(c) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 561+140 561+250 RHS
MSRDC/VTR/HW/7424 A.1(c) 21-Aug-23 22-Aug-23 1:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 561+450 561+620 RHS
MSRDC/VTR/HW/7425 i(a) 21-Aug-23 22-Aug-23 10:00 AM FDD & Level Checking of OGL After C&G (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7426 i(a) 21-Aug-23 22-Aug-23 5:00 PM FDD Checking of Embankment 1st layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7427 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7428 i(a) 21-Aug-23 22-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer (SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7429 i(b) 21-Aug-23 22-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 550+000 550+180 LHS
MSRDC/VTR/HW/7430 i(a) 21-Aug-23 22-Aug-23 10:00 AM Fdd & Level Checking of Embankment Top layer (SR) 550+650 550+790 LHS
MSRDC/VTR/HW/7431 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 551+750 551+830 LHS
MSRDC/VTR/HW/7432 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 551+940 552+060 LHS
MSRDC/VTR/HW/7433 i(a) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Embankment 3rd layer (SR) 552+380 552+500 LHS
MSRDC/VTR/HW/7434 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD Checking of Subgrade 1st layer(SR) 552+790 553+050 LHS
MSRDC/VTR/HW/7435 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD Checking of Subgrade 1st layer(SR) 553+050 553+260 LHS
MSRDC/VTR/HW/7436 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD Checking of Subgrade 1st layer(SR) 553+260 553+620 LHS
MSRDC/VTR/HW/7437 i(b) 21-Aug-23 22-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 553+260 553+620 LHS
MSRDC/VTR/HW/7438 i(b) 21-Aug-23 22-Aug-23 10:15 AM FDD Checking of Subgrade 1st layer(SR) 556+050 556+160 LHS
MSRDC/VTR/HW/7439 i(a) 21-Aug-23 22-Aug-23 11:00 AM Inspection of Cutting up To Embankment Top (SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7440 i(b) 21-Aug-23 22-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 556+840 556+900 LHS
MSRDC/VTR/HW/7441 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7442 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer (SR) 550+400 550+500 RHS
MSRDC/VTR/HW/7443 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 552+870 552+900 RHS
MSRDC/VTR/HW/7444 i(a) 21-Aug-23 22-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer (SR) 552+870 552+900 RHS
MSRDC/VTR/HW/7445 i(b) 21-Aug-23 22-Aug-23 10:30 AM FDD Checking of Subgrade 1st layer(SR) 553+050 553+200 RHS
MSRDC/VTR/HW/7446 i(b) 21-Aug-23 22-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 553+320 553+420 RHS
MSRDC/VTR/HW/7447 i(a) 21-Aug-23 22-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7448 i(a) 21-Aug-23 22-Aug-23 10:00 AM FDD & Level Checking of OGL After C&G (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7449 RE 21-Aug-23 22-Aug-23 0.645833333 Casting of RE Wall Panel (A=65, B=26, Q=14, Total= 105 Nos) 551+900 RHS
MSRDC/VTR/HW/7450 RE 21-Aug-23 22-Aug-23 0.666666667 Casting of RE Wall Panel (A=52, B=22, Total= 74 Nos) 556+900 RHS
MSRDC/VTR/HW/7451 3(a) 21-Aug-23 22-Aug-23 5:30 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+680 557+900 RHS
MSRDC/VTR/HW/7452 21-Aug-23 22-Aug-23 Blank
MSRDC/VTR/HW/7453 21-Aug-23 22-Aug-23 Blank
MSRDC/VTR/HW/7454 21-Aug-23 22-Aug-23 blank
MSRDC/VTR/HW/7455 3.(a) 22-Aug-23 23-Aug-23 10:00 AM Laying of Pavement Quality Concrete (SR) 552+050 552+060 LHS
MSRDC/VTR/HW/7456 3.(a) 22-Aug-23 23-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 552+060 552+200 LHS
MSRDC/VTR/HW/7457 3.(a) 22-Aug-23 23-Aug-23 12:30 PM Laying of Pavement Quality Concrete (SR) 553+620 553+870 LHS
MSRDC/VTR/HW/7458 3.(a) 22-Aug-23 23-Aug-23 2:30 PM Laying of Pavement Quality Concrete (SR) 553+870 553+970 LHS
MSRDC/VTR/HW/7459 3.(b) 22-Aug-23 23-Aug-23 9:00 AM Laying of Dry Lean Concrete (SR) 557+100 557+250 LHS
MSRDC/VTR/HW/7460 3.(b) 22-Aug-23 23-Aug-23 10:00 AM Laying of Dry Lean Concrete (SR) 557+250 557+340 LHS
MSRDC/VTR/HW/7461 3.(b) 22-Aug-23 23-Aug-23 11:00 AM Laying of Dry Lean Concrete (SR) 557+340 557+400 LHS
MSRDC/VTR/HW/7462 3.(b) 22-Aug-23 23-Aug-23 1:50 PM Laying of Dry Lean Concrete (SR) 557+760 557+930 LHS
MSRDC/VTR/HW/7463 A.1(c) 22-Aug-23 23-Aug-23 11:00 AM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 539+200 539+300 RHS
MSRDC/VTR/HW/7464 A.1(c) 22-Aug-23 23-Aug-23 12:00 PM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 555+760 555+840 RHS
MSRDC/VTR/HW/7465 A.1(c) 22-Aug-23 23-Aug-23 1:00 PM FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 561+650 561+850 RHS
MSRDC/VTR/HW/7466 A.1(b) 22-Aug-23 23-Aug-23 2:30 PM FDD & Level Checking of Subgrade Top layer (MCW L2) 542+700 542+850 RHS
MSRDC/VTR/HW/7467 A.1(a) 22-Aug-23 23-Aug-23 2:00 PM FDD & Level Checking of Embankment Top layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7468 i(a) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Embankment 2nd layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7469 i(a) 22-Aug-23 23-Aug-23 5:00 PM FDD Checking of Embankment 3rd layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7470 i(b) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7471 i(b) 22-Aug-23 23-Aug-23 10:30 AM FDD and level Checking of Subgrade Top layer(SR) 550+000 550+180 LHS
MSRDC/VTR/HW/7472 i(b) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 550+650 550+790 LHS
MSRDC/VTR/HW/7473 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 551+750 551+830 LHS
MSRDC/VTR/HW/7474 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 551+940 552+060 LHS
MSRDC/VTR/HW/7475 i(a) 22-Aug-23 23-Aug-23 11:00 AM FDD Checking of Embankment 4th layer (SR) 552+380 552+500 LHS
MSRDC/VTR/HW/7476 i(b) 22-Aug-23 23-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 552+790 553+050 LHS
MSRDC/VTR/HW/7477 i(b) 22-Aug-23 23-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 553+050 553+260 LHS
MSRDC/VTR/HW/7478 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 556+050 556+160 LHS
MSRDC/VTR/HW/7479 i(a) 22-Aug-23 23-Aug-23 3:00 PM Fdd & Level Checking of Embankment Top layer (SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7480 i(b) 22-Aug-23 23-Aug-23 3:00 PM FDD and level Checking of Subgrade Top layer(SR) 556+840 556+900 LHS
MSRDC/VTR/HW/7481 i(a) 22-Aug-23 23-Aug-23 11:00 AM Fdd & Level Checking of Embankment Top layer (SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7482 i(b) 22-Aug-23 23-Aug-23 11:30 AM Fdd & Level Checking of Subgrade Top Layer (SR) 550+400 550+500 RHS
MSRDC/VTR/HW/7483 i(b) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 552+870 552+950 RHS
MSRDC/VTR/HW/7484 i(b) 22-Aug-23 23-Aug-23 5:30 PM FDD and level Checking of Subgrade Top layer(SR) 553+050 553+200 RHS
MSRDC/VTR/HW/7485 i(b) 22-Aug-23 23-Aug-23 11:00 AM FDD and level Checking of Subgrade Top layer(SR) 553+320 553+420 RHS
MSRDC/VTR/HW/7486 i(a) 22-Aug-23 23-Aug-23 10:00 AM Fdd & Level Checking of Embankment Top layer (SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7487 i(a) 22-Aug-23 23-Aug-23 10:00 AM FDD Checking of Embankment 1st layer (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7488 i(a) 22-Aug-23 23-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7489 i(a) 22-Aug-23 23-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7490 RE 22-Aug-23 23-Aug-23 0.645833333 Casting of RE Wall Panel (A=72, B=29, Q=16, Total= 117 Nos) 551+900 RHS
MSRDC/VTR/HW/7491 RE 22-Aug-23 23-Aug-23 0.666666667 Casting of RE Wall Panel (A=58, B=26, Total= 84 Nos) 556+900 RHS
MSRDC/VTR/HW/7451-R1 3.(a) 22-Aug-23 23-Aug-23 5:30 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+680 557+900 RHS
MSRDC/VTR/HW/7492 Blank
MSRDC/VTR/HW/7493 Blank
MSRDC/VTR/HW/7494 3.(a) 23-Aug-23 24-Aug-23 10:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 547+590 547+620 RHS
MSRDC/VTR/HW/7495 3.(a) 23-Aug-23 24-Aug-23 1:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 549+860 550+180 RHS
MSRDC/VTR/HW/7496 3.(a) 23-Aug-23 24-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 540+030 540+150 RHS
MSRDC/VTR/HW/7497 3.(a) 23-Aug-23 24-Aug-23 4:00 PM Laying of Pavement Quality Concrete (SR) 541+130 541+300 RHS
MSRDC/VTR/HW/7498 3.(a) 23-Aug-23 24-Aug-23 6:00 PM Laying of Pavement Quality Concrete (SR) 541+500 541+600 RHS
MSRDC/VTR/HW/7499 3.(a) 23-Aug-23 24-Aug-23 3:40 PM Laying of Pavement Quality Concrete (SR) 542+190 542+230 LHS
MSRDC/VTR/HW/7500 3.(a) 23-Aug-23 24-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 542+820 542+900 LHS
MSRDC/VTR/HW/7501 3.(a) 23-Aug-23 24-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 553+990 554+140 LHS
MSRDC/VTR/HW/7502 3.(a) 23-Aug-23 24-Aug-23 2:30 PM Laying of Pavement Quality Concrete (SR) 557+400 557+600 LHS
MSRDC/VTR/HW/7503 3.(a) 23-Aug-23 24-Aug-23 4:00 PM Laying of Pavement Quality Concrete (SR) 557+600 557+740 LHS
MSRDC/VTR/HW/7504 3.(a) 23-Aug-23 24-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 541+370 541+570 LHS wrong rfi
MSRDC/VTR/HW/7505 3.(a) 23-Aug-23 24-Aug-23 4:00 PM FDD Checking of Subgrade 1st layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7506 3.(b) 23-Aug-23 24-Aug-23 10:00 AM Laying of Dry Lean Concrete (Toll Plaza) 559+200 559+380 RHS
MSRDC/VTR/HW/7507 3.(b) 23-Aug-23 24-Aug-23 11:00 AM Laying of Dry Lean Concrete (MCW L3,L4) 559+540 559+700 RHS
MSRDC/VTR/HW/7508 3.(b) 23-Aug-23 24-Aug-23 11:00 AM Laying of Dry Lean Concrete (Toll Plaza) 559+040 559+360 LHS
MSRDC/VTR/HW/7509 A.1(a) 23-Aug-23 24-Aug-23 10:30 AM FDD & Level & Gradiaction Checking of GSB Top layer (MCW L3,L4) 559+580 559+900 LHS
MSRDC/VTR/HW/7510 i(a) 23-Aug-23 24-Aug-23 10:00 AM FDD Checking of Embankment 4th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7511 i(a) 23-Aug-23 24-Aug-23 5:00 PM FDD Checking of Embankment 5th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7512 i(b) 23-Aug-23 24-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 546+350 546+450 LHS
MSRDC/VTR/HW/7513 i(b) 23-Aug-23 24-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 550+650 550+790 LHS
MSRDC/VTR/HW/7514 i(a) 23-Aug-23 24-Aug-23 11:30 AM FDD & Level Checking of Embankment Top layer (SR) 552+380 552+600 LHS
MSRDC/VTR/HW/7515 i(b) 23-Aug-23 24-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7516 i(b) 23-Aug-23 24-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7517 i(b) 23-Aug-23 24-Aug-23 5:30 PM FDD and level Checking of Subgrade Top layer(SR) 552+870 552+950 RHS
MSRDC/VTR/HW/7518 i(b) 23-Aug-23 24-Aug-23 10:30 AM FDD Checking of Subgrade 1st layer(SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7519 i(a) 23-Aug-23 24-Aug-23 10:30 AM FDD Checking of Embankment 2nd layer (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7520 i(a) 23-Aug-23 24-Aug-23 10:30 AM Fdd & Level Checking of Embankment Top layer (SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7521 i(a) 23-Aug-23 24-Aug-23 10:30 AM Fdd & Level Checking of Embankment Top layer (SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7522 RE 23-Aug-23 24-Aug-23 0.645833333 Casting of RE Wall Panel (A=82, B=33, Q=20, Total= 135 Nos) 551+900 RHS
MSRDC/VTR/HW/7523 RE 23-Aug-23 24-Aug-23 0.666666667 Casting of RE Wall Panel (A=68, B=32, Total= 100 Nos) 556+900 RHS
MSRDC/VTR/HW/7524 23-Aug-23 24-Aug-23 Blank
MSRDC/VTR/HW/7525 3.(a) 24-Aug-23 25-Aug-23 10:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 550+300 550+400 RHS
MSRDC/VTR/HW/7526 3.(a) 24-Aug-23 25-Aug-23 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 555+600 555+760 RHS
MSRDC/VTR/HW/7527 3.(a) 24-Aug-23 25-Aug-23 12:30 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 546+860 547+030 RHS
MSRDC/VTR/HW/7528 3.(a) 24-Aug-23 25-Aug-23 12:45 PM Laying of Pavement Quality Concrete (SR) 546+560 546+700 LHS
MSRDC/VTR/HW/7529 3.(a) 24-Aug-23 25-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 546+700 547+420 LHS
MSRDC/VTR/HW/7530 3.(a) 24-Aug-23 25-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 547+440 547+850 LHS
MSRDC/VTR/HW/7531 3.(a) 24-Aug-23 25-Aug-23 2:30 PM Laying of Pavement Quality Concrete (SR) 547+850 548+130 LHS
MSRDC/VTR/HW/7532 A.1(b) 24-Aug-23 25-Aug-23 3:00 PM FDD & Level Checking of Subgrade Top layer (Toll plaza) 559+050 559+200 RHS
MSRDC/VTR/HW/7533 i(a) 24-Aug-23 25-Aug-23 10:00 AM FDD Checking of Embankment 6th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7534 i(a) 24-Aug-23 25-Aug-23 5:00 PM FDD Checking of Embankment 7th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7535 i(b) 24-Aug-23 25-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer(SR) 552+340 552+600 LHS
MSRDC/VTR/HW/7536 i(b) 24-Aug-23 25-Aug-23 3:00 PM FDD and level Checking of Subgrade Top layer(SR) 556+350 556+620 LHS
MSRDC/VTR/HW/7537 i(b) 24-Aug-23 25-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 539+500 539+800 RHS
MSRDC/VTR/HW/7538 i(b) 24-Aug-23 25-Aug-23 10:45 AM FDD and level Checking of Subgrade Top layer(SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7539 i(a) 24-Aug-23 25-Aug-23 10:45 AM FDD & Level Checking of Embankment Top layer (SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7540 i(b) 24-Aug-23 25-Aug-23 10:45 AM FDD Checking of Subgrade 1st layer(SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7541 i(b) 24-Aug-23 25-Aug-23 10:45 AM FDD Checking of Subgrade 1st layer(SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7542 A.1(a) 24-Aug-23 25-Aug-23 9:00 AM Inspection of Cutting upto Embankment Top Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7543 A.1(a) 24-Aug-23 25-Aug-23 6:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7544 A.1(a) 24-Aug-23 25-Aug-23 9:30 AM Inspection of Cutting upto Embankment Top Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7545 A.1(a) 24-Aug-23 25-Aug-23 5:30 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7546 A.1(a) 24-Aug-23 25-Aug-23 10:00 AM Inspection of Cutting upto Embankment Top Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7547 A.1(a) 24-Aug-23 25-Aug-23 10:00 AM Inspection of Cutting upto Embankment Top Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7548 A.1(a) 24-Aug-23 25-Aug-23 4:45 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7549 A.1(a) 24-Aug-23 25-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7550 A.1(a) 24-Aug-23 25-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7551 RE 24-Aug-23 25-Aug-23 0.645833333 Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7552 RE 24-Aug-23 25-Aug-23 0.666666667 Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7555 3.(a) 25-Aug-23 26-Aug-23 10:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+320 557+400 RHS
MSRDC/VTR/HW/7556 3.(a) 25-Aug-23 26-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 549+830 549+860 RHS
MSRDC/VTR/HW/7557 3.(a) 25-Aug-23 26-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 550+750 550+820 RHS
MSRDC/VTR/HW/7558 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM Inspection of Cutting upto Embankment Top (MCW L2,L3,L4) 552+050 552+240 RHS
MSRDC/VTR/HW/7559 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM FDD & Level Checking of OGL After C&G ( L2,L3,L4) 552+240 552+370 RHS
MSRDC/VTR/HW/7560 A.1(a) 25-Aug-23 26-Aug-23 3:30 PM FDD & Level Checking of Embankment Top layer ( L2,L3,L4) 552+370 552+660 RHS
MSRDC/VTR/HW/7561 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM Inspection of Cutting up To Embankment Top (MCW -L3,L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7562 A.1(a) 25-Aug-23 26-Aug-23 9:00 AM Inspection of Cutting up To Embankment Top (MCW L4) 552+050 552+220 LHS
MSRDC/VTR/HW/7563 A.1(a) 25-Aug-23 26-Aug-23 6:00 PM Fdd & Level Checking of Embankment Top layer After Cutting (MCW L4) 552+050 552+220 LHS
MSRDC/VTR/HW/7564 A.1(a) 25-Aug-23 26-Aug-23 9:00 AM FDD & Level Checking of OGL After C&G (L4) 552+220 552+430 LHS
MSRDC/VTR/HW/7565 A.1(a) 25-Aug-23 26-Aug-23 6:00 PM FDD Checking of Embankment 1st layer (L4) 552+220 552+430 LHS
MSRDC/VTR/HW/7566 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting up To Embankment Top (MCW L4) 552+430 552+650 LHS
MSRDC/VTR/HW/7567 A.1(a) 25-Aug-23 26-Aug-23 11:30 AM Inspection of Cutting up To Embankment Top (MCW L2,L3,L4) 555+900 556+100 LHS
MSRDC/VTR/HW/7568 A.1(a) 25-Aug-23 26-Aug-23 3:30 PM Fdd & Level Checking of Embankment Top layer (MCW L3,L4) 559+900 560+140 LHS
MSRDC/VTR/HW/7569 i(a) 25-Aug-23 26-Aug-23 10:00 AM FDD Checking of Embankment 8th layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7570 i(b) 25-Aug-23 26-Aug-23 11:30 AM FDD and level Checking of Subgrade Top layer(SR) 552+340 552+600 LHS
MSRDC/VTR/HW/7571 i(b) 25-Aug-23 26-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer(SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7572 i(b) 25-Aug-23 26-Aug-23 5:00 PM FDD and level Checking of Subgrade Top layer(SR) 561+450 561+550 RHS
MSRDC/VTR/HW/7573 i(b) 25-Aug-23 26-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 561+550 561+650 RHS
MSRDC/VTR/HW/7574 i(b) 25-Aug-23 26-Aug-23 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 561+850 562+040 RHS
MSRDC/VTR/HW/7575 A.1(c) 25-Aug-23 26-Aug-23 12:00 PM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+000 000+250 Loop-1
MSRDC/VTR/HW/7576 A.1(b) 25-Aug-23 26-Aug-23 8:00 AM FDD Checking of Subgrade 1st layer Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7577 A.1(b) 25-Aug-23 26-Aug-23 8:00 AM FDD Checking of Subgrade 1st layer Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7578 A.1(a) 25-Aug-23 26-Aug-23 10:00 AM Fdd & Level Checking of Embankment Top layer After Cutting Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7579 A.1(b) 25-Aug-23 26-Aug-23 9:00 AM FDD Checking of Subgrade 1st layer Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7580 A.1(b) 25-Aug-23 26-Aug-23 7:30 PM FDD and level Checking of Subgrade Top layer Loop-2 000+240 000+301 Loop-2
MSRDC/VTR/HW/7581 A.1(b) 25-Aug-23 26-Aug-23 9:00 AM FDD Checking of Subgrade 1st layer Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7582 A.1(b) 25-Aug-23 26-Aug-23 6:30 PM FDD and level Checking of Subgrade Top layer Loop-4 000+000 000+040 Loop-4
MSRDC/VTR/HW/7583 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7584 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7585 A.1(a) 25-Aug-23 26-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7586 A.1(b) 25-Aug-23 26-Aug-23 12:00 PM FDD Checking of Subgrade 1st layer Loop-6 000+000 000+200 Loop-6
MSRDC/VTR/HW/7587 A.1(a) 25-Aug-23 26-Aug-23 11:00 AM Inspection of Cutting upto Embankment Top Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7588 A.1(a) 25-Aug-23 26-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7589 RE 25-Aug-23 26-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7590 RE 25-Aug-23 26-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7593 3.(a) 26-Aug-23 27-Aug-23 9:00 AM Laying of Pavement Quality Concrete (SR) 541+600 541+870 RHS
MSRDC/VTR/HW/7594 3.(a) 26-Aug-23 27-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 541+870 541+960 RHS
MSRDC/VTR/HW/7595 3.(a) 26-Aug-23 27-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 541+960 542+000 RHS
MSRDC/VTR/HW/7596 3.(a) 26-Aug-23 27-Aug-23 1:00 PM Laying of Pavement Quality Concrete (SR) 542+600 542+800 RHS
MSRDC/VTR/HW/7597 3.(a) 26-Aug-23 27-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 544+320 544+360 RHS
MSRDC/VTR/HW/7598 3.(a) 26-Aug-23 27-Aug-23 3:00 PM Laying of Pavement Quality Concrete (SR) 546+190 546+230 RHS
MSRDC/VTR/HW/7599 3.(a) 26-Aug-23 27-Aug-23 4:00 PM Laying of Pavement Quality Concrete (SR) 546+790 546+900 RHS
MSRDC/VTR/HW/7600 3.(a) 26-Aug-23 27-Aug-23 6:00 PM Laying of Pavement Quality Concrete (SR) 547+690 548+170 RHS
MSRDC/VTR/HW/7601 3.(a) 26-Aug-23 27-Aug-23 11:00 AM Laying of Pavement Quality Concrete (SR) 554+140 554+200 RHS
MSRDC/VTR/HW/7602 3.(a) 26-Aug-23 27-Aug-23 12:00 PM Laying of Pavement Quality Concrete (SR) 555+880 555+900 RHS
MSRDC/VTR/HW/7603 3.(a) 26-Aug-23 27-Aug-23 2:00 PM Laying of Pavement Quality Concrete (SR) 556+500 556+640 RHS
MSRDC/VTR/HW/7604 3.(a) 26-Aug-23 27-Aug-23 6:00 PM Laying of Pavement Quality Concrete (SR) 557+320 557+400 RHS
MSRDC/VTR/HW/7605 A.1(a) 26-Aug-23 27-Aug-23 11:00 AM FDD Checking of Embankment 1st layer ( L2,L3,L4) 552+240 552+370 RHS
MSRDC/VTR/HW/7606 A.1(b) 26-Aug-23 27-Aug-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L1,L2,L3,L4) 557+900 558+170 RHS
MSRDC/VTR/HW/7607 A.1(a) 26-Aug-23 27-Aug-23 9:00 AM Inspection of Cutting up To Embankment Top (MCW L1,L2,L3,L4) 561+250 561+300 RHS
Fdd & Level Checking of Embankment Top layer After Cutting (MCW
MSRDC/VTR/HW/7608 A.1(a) 26-Aug-23 27-Aug-23 6:00 PM 561+250 561+300 RHS
L1,L2,L3,L4)
MSRDC/VTR/HW/7609 A.1(a) 26-Aug-23 27-Aug-23 11:00 AM FDD & Level Checking of Embankment Top layer (MCW -L3,L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7610 A.1(a) 26-Aug-23 27-Aug-23 10:00 AM FDD & Level Checking of Embankment Top layer (L4) 552+220 552+430 LHS
MSRDC/VTR/HW/7611 A.1(a) 26-Aug-23 27-Aug-23 12:00 PM Fdd & Level Checking of Embankment Top layer After Cutting (MCW L4) 552+430 552+650 LHS
Fdd & Level Checking of Embankment Top layer After Cutting (MCW
MSRDC/VTR/HW/7612 A.1(a) 26-Aug-23 27-Aug-23 11:30 AM 555+900 556+100 LHS
L2,L3,L4)
MSRDC/VTR/HW/7613 i(a) 26-Aug-23 27-Aug-23 5:00 PM FDD & Level Checking of Embankment Top layer (SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7614 i(c) 26-Aug-23 27-Aug-23 12:00 PM FDD & Level & Gradiaction Checking of GSB Top layer (SR) 561+050 561+300 RHS
MSRDC/VTR/HW/7615 A.1(b) 26-Aug-23 27-Aug-23 2:30 PM FDD and level Checking of Subgrade Top layer Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7616 A.1(b) 26-Aug-23 27-Aug-23 2:30 PM FDD and level Checking of Subgrade Top layer Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7617 A.1(b) 26-Aug-23 27-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7618 A.1(a) 26-Aug-23 27-Aug-23 5:00 PM Fdd & Level Checking of Embankment Top layer After Cutting Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7619 A.1(b) 26-Aug-23 27-Aug-23 11:00 AM FDD Checking of Subgrade 1st layer Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7620 A.1(b) 26-Aug-23 27-Aug-23 3:00 PM FDD and level Checking of Subgrade Top layer Loop-6 000+000 000+200 Loop-6
MSRDC/VTR/HW/7621 A.1(b) 26-Aug-23 27-Aug-23 10:00 AM FDD Checking of Subgrade 1st layer Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7622 3.(a) 26-Aug-23 27-Aug-23 9:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 557+400 557+680 RHS
MSRDC/VTR/HW/7623 RE 26-Aug-23 27-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7624 RE 26-Aug-23 27-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7627 3.(a) 27-Aug-23 28-Aug-24 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 547+370 547+460 RHS
MSRDC/VTR/HW/7628 3.(a) 27-Aug-23 28-Aug-24 12:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 548+160 548+200 RHS
MSRDC/VTR/HW/7629 3.(a) 27-Aug-23 28-Aug-24 2:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 549+780 549+800 RHS
MSRDC/VTR/HW/7630 3.(a) 27-Aug-23 28-Aug-24 4:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 549+830 549+860 RHS
MSRDC/VTR/HW/7631 3.(a) 27-Aug-23 28-Aug-24 11:00 AM Laying of Pavement Quality Concrete (SR) 548+310 548+400 RHS
MSRDC/VTR/HW/7632 A.1(a) 27-Aug-23 28-Aug-24 11:30 AM Level Checking of Embankment Top layer After Cutting (MCW L2,L3,L4) 552+050 552+240 RHS
MSRDC/VTR/HW/7633 A.1(a) 27-Aug-23 28-Aug-24 12:00 PM FDD & Level Checking of Embankment Top layer ( L2,L3,L4) 552+240 552+370 RHS
MSRDC/VTR/HW/7634 A.1(b) 27-Aug-23 28-Aug-24 10:30 AM FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 557+900 558+170 RHS
MSRDC/VTR/HW/7635 A.1(b) 27-Aug-23 28-Aug-24 9:00 AM FDD Checking of Subgrade 1st layer (MCW L1,L2,L3,L4) 561+250 561+300 RHS
MSRDC/VTR/HW/7636 A.1(b) 27-Aug-23 28-Aug-24 6:00 PM FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 561+250 561+300 RHS
MSRDC/VTR/HW/7637 A.1(b) 27-Aug-23 28-Aug-24 12:00 PM FDD Checking of Subgrade 1st layer (MCW L3, L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7638 i(b) 27-Aug-23 28-Aug-24 10:00 AM FDD Checking of Subgrade 1st layer(SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7639 i(b) 27-Aug-23 28-Aug-24 10:00 AM FDD and level Checking of Subgrade Top layer(SR) 546+200 546+350 LHS
MSRDC/VTR/HW/7640 A.1(c) 27-Aug-23 28-Aug-24 3:00 PM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+250 000+410 Loop-1
MSRDC/VTR/HW/7641 A.1(c) 27-Aug-23 28-Aug-24 3:00 PM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+680 000+750 Loop-1
MSRDC/VTR/HW/7642 A.1(b) 27-Aug-23 28-Aug-24 12:00 AM FDD and level Checking of Subgrade Top layer Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7643 A.1(b) 27-Aug-23 28-Aug-24 9:00 AM FDD Checking of Subgrade 1st layer Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7644 A.1(b) 27-Aug-23 28-Aug-24 3:00 PM FDD and level Checking of Subgrade Top layer Loop-5 000+190 000+284 Loop-5
MSRDC/VTR/HW/7645 A.1(b) 27-Aug-23 28-Aug-24 11:00 AM FDD and level Checking of Subgrade Top layer Loop-6 000+200 000+353 Loop-6
MSRDC/VTR/HW/7646 RE 27-Aug-23 28-Aug-24 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7647 RE 27-Aug-23 28-Aug-24 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7650 3.(a) 28-Aug-23 29-Aug-23 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 554+140 554+200 RHS
MSRDC/VTR/HW/7651 3.(a) 28-Aug-23 29-Aug-23 12:00 PM Laying of Pavement Quality Concrete (MCW-L3,L4) 555+760 555+800 RHS
FDD & Level & Gradiaction Checking of GSB Top layer (MCW
MSRDC/VTR/HW/7652 A.1(b) 28-Aug-23 29-Aug-23 12:00 PM 561+250 561+300 RHS
L1,L2,L3,L4)
MSRDC/VTR/HW/7653 A.1(b) 28-Aug-23 29-Aug-23 2:00 PM FDD & Level Checking of Subgrade Top layer (MCW L3, L4) 561+850 562+040 RHS
MSRDC/VTR/HW/7654 3.(a) 28-Aug-23 29-Aug-23 3:30 PM Laying of Dry Lean Concrete (Loop-1) 000+680 000+750 Loop-1
MSRDC/VTR/HW/7655 A.1(C) 28-Aug-23 29-Aug-23 11:00 AM FDD & Level & Gradiaction Checking of GSB Top layer Loop-1 000+750 001+437 Loop-1
MSRDC/VTR/HW/7656 A.1(C) 28-Aug-23 29-Aug-23 6:30 PM FDD and level Checking of Subgrade Top layer Loop-4 000+180 000+276 Loop-4
MSRDC/VTR/HW/7657 RE 28-Aug-23 29-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7658 RE 28-Aug-23 29-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7660 3.(a) 29-Aug-23 30-Aug-23 11:00 AM Laying of Pavement Quality Concrete (MCW-L3,L4) 553+530 553+610 RHS
MSRDC/VTR/HW/7661 3.(a) 29-Aug-23 30-Aug-23 10:00 AM Laying of Dry
Inspection ForLean Concrete
RE Block (Loop-1)
Erection With Filter Media & Geogrid Laying 000+750 001+437 Loop-1
MSRDC/VTR/HW/7662 RE 29-Aug-23 30-Aug-23 11:30 AM And FDD Checking 14 th Layer
Inspection For RE Block ErectionAt With
walshind
FilterVUP Wall
Media & No
Geogrid Laying 543+422 543+521 RHS
1
And
MSRDC/VTR/HW/7663 RE 29-Aug-23 30-Aug-23 12:00 PM Inspection For RE Block Erection With Filter Media & No
FDD Checking 20 th Layer At walshind VUP Wall Geogrid Laying 543+521 543+604 RHS
MSRDC/VTR/HW/7664 RE 29-Aug-23 30-Aug-23 12:30 PM 1
And FDD Checking 23 th Layer At walshind VUP Wall No 543+604 543+702 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
1
MSRDC/VTR/HW/7665 RE 29-Aug-23 30-Aug-23 1:00 PM 547+640 547+750 RHS
Checking 7th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 1Media Laying And FDD
Filter
MSRDC/VTR/HW/7666 RE 29-Aug-23 30-Aug-23 1:30 PM 547+750 547+860 RHS
Checking 7th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 1Media Laying And FDD
Filter
MSRDC/VTR/HW/7667 RE 29-Aug-23 30-Aug-23 2:00 PM 547+860 547+940 RHS
Checking 7 For
Inspection th Layer At Saravali
RE Block VUP
Erection Wall
With No 1
Filter Media Laying And FDD
MSRDC/VTR/HW/7668 RE 29-Aug-23 30-Aug-23 2:30 PM 547+958 548+020 RHS
Checking 7th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 4Media Laying And FDD
Filter
MSRDC/VTR/HW/7669 RE 29-Aug-23 30-Aug-23 3:00 PM Inspection ForLayer
RE Block Erection With Filter 548+070 548+150 RHS
Checking 7th At Saravali VUP Wall No 4Media Laying And FDD
MSRDC/VTR/HW/7670 RE 29-Aug-23 30-Aug-23 3:00 PM Checking
InspectionEmbankment
For RE BlockTop LayerWith
Erection At Walshind VUP Laying
Filter Media Wall And FDD 543+715 543+900 RHS
MSRDC/VTR/HW/7671 RE 29-Aug-23 30-Aug-23 3:30 PM No 4
Checking Embankment Top Layer At Walshind VUP Wall And FDD 543+900 544+008 RHS
Inspection For RE Block Erection With Filter Media Laying
MSRDC/VTR/HW/7672 RE 29-Aug-23 30-Aug-23 4:00 PM No 4
Checking Embankment Top Layer At walshind VUP Wall 544+008 544+122 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7673 RE 29-Aug-23 30-Aug-23 4:30 PM No 4
Checking Embankment Top Layer At Walshind VUP Wall 544+122 544+140 RHS
MSRDC/VTR/HW/7674 RE 29-Aug-23 30-Aug-23 3:30 PM No 4 of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos)
Casting 551+900 RHS
MSRDC/VTR/HW/7675 RE 29-Aug-23 30-Aug-23 4:00 PM Casting of RE
Inspection ForWall PanelErection
RE Block (A=71, B=36,
With Total= 107 Nos)
Filter Media Laying And FDD 556+900 RHS
MSRDC/VTR/HW/7680 RE 30-Aug-23 31-Aug-23 12:00 PM Checking Embankment Top Layer At Walshind VUP Laying
Inspection For RE Block Erection With Filter Media Wall And FDD 543+422 543+521 RHS
MSRDC/VTR/HW/7681 RE 30-Aug-23 31-Aug-23 0.541666667 No 4
Checking Embankment Top Layer At Walshind VUP
Inspection For RE Block Erection With Filter Media &Wall
Geogrid Laying 543+521 543+604 RHS
MSRDC/VTR/HW/7682 RE 30-Aug-23 31-Aug-23 2:00 PM No
And4FDD Checking 24 th Layer At walshind VUP Wall No 543+604 543+702 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7683 RE 30-Aug-23 31-Aug-23 3:00 PM 2 547+640 547+750 RHS
Checking
Inspection8th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 2Media Laying And FDD
Filter
MSRDC/VTR/HW/7684 RE 30-Aug-23 31-Aug-23 2:30 PM 547+750 547+860 RHS
Checking 8th
Inspection ForLayer At Saravali
RE Block VUP
Erection Wall
With No 2Media Laying And FDD
Filter
MSRDC/VTR/HW/7685 RE 30-Aug-23 31-Aug-23 3:30 PM 547+860 547+940 RHS
Checking 8th Layer At Saravali VUP Wall No 2
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7686 RE 30-Aug-23 31-Aug-23 4:00 PM 547+958 548+020 RHS
Checking
Inspection8th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 5Media Laying And FDD
Filter
MSRDC/VTR/HW/7687 RE 30-Aug-23 31-Aug-23 4:30 PM 548+070 548+150 RHS
Checking 8th
Inspection forLayer At Saravali
RE Block ErectionVUP Wall
With NoMedia
filter 5 laying And FDD
MSRDC/VTR/HW/7688 RE 30-Aug-23 31-Aug-23 11:00 AM 542+130 542+220 RHS
Cheking 8thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 1 Media laying And FDD
filter
MSRDC/VTR/HW/7689 RE 30-Aug-23 31-Aug-23 12:00 PM 542+220 542+300 RHS
Cheking 8thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 1 Media laying And FDD
filter
MSRDC/VTR/HW/7690 RE 30-Aug-23 31-Aug-23 2:00 PM 542+300 542+410 RHS
Cheking 8th
Inspection forlayer at Yewai
RE Block VUP Wall
Erection Withno 1 Media laying And FDD
filter
MSRDC/VTR/HW/7691 RE 30-Aug-23 31-Aug-23 3:00 PM 542+425 542+500 RHS
Cheking 8thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 4 Media laying And FDD
filter
MSRDC/VTR/HW/7692 RE 30-Aug-23 31-Aug-23 3:30 PM 542+500 542+580 RHS
Cheking 8th layer at Yewai VUP Wall no 4
MSRDC/VTR/HW/7693 RE 30-Aug-23 31-Aug-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7694 RE 30-Aug-23 31-Aug-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7699 RE 31-Aug-23 1-Sep-23 1:00 PM 547+640 547+750 RHS
Checking
Inspection9th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 3Media Laying And FDD
Filter
MSRDC/VTR/HW/7700 RE 31-Aug-23 1-Sep-23 11:00 AM 547+750 547+860 RHS
Checking
Inspection9th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 3Media Laying And FDD
Filter
MSRDC/VTR/HW/7701 RE 31-Aug-23 1-Sep-23 12:00 PM 547+860 547+940 RHS
Checking 9th Layer At Saravali VUP Wall No 3Media Laying And FDD
Inspection For RE Block Erection With Filter
MSRDC/VTR/HW/7702 RE 31-Aug-23 1-Sep-23 12:30 PM 547+958 548+020 RHS
Checking
Inspection9th
ForLayer At Saravali
RE Block VUP
Erection Wall
With No 6Media Laying And FDD
Filter
MSRDC/VTR/HW/7703 RE 31-Aug-23 1-Sep-23 12:45 PM 548+070 548+150 RHS
Checking 9th Layer At Saravali VUP Wall NoMedia
Inspection for RE Block Erection With filter 6 laying And FDD
MSRDC/VTR/HW/7704 RE 31-Aug-23 1-Sep-23 11:00 AM 542+130 542+220 RHS
Cheking 9thfor
Inspection layer at Yewai
RE Block VUP Wall
Erection Withno 2 Media laying And FDD
filter
MSRDC/VTR/HW/7705 RE 31-Aug-23 1-Sep-23 12:00 PM Inspection 542+220 542+300 RHS
Cheking 9thfor RE Block
layer Erection
at Yewai Withno
VUP Wall filter
2 Media laying And FDD
MSRDC/VTR/HW/7706 RE 31-Aug-23 1-Sep-23 2:00 PM Cheking 9th
Inspection forlayer at Yewai
RE Block VUP With filter Media laying And FDD
Erection 542+300 542+410 RHS
MSRDC/VTR/HW/7707 RE 31-Aug-23 1-Sep-23 3:00 PM Wall no 29th layer at Yewai VUP
Cheking 542+425 542+500 RHS
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7708 RE 31-Aug-23 1-Sep-23 3:30 PM Wall no 59th layer at Yewai VUP
Cheking 542+500 542+580 RHS
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7709 RE 31-Aug-23 1-Sep-23 12:00 PM Wall no 59th layer at Yewai VUP
Cheking 542+580 542+660 RHS
MSRDC/VTR/HW/7710 3.(a) 31-Aug-23 1-Sep-23 11:00 AM Wall noof5 Pavement Quality Concrete (MCW-L3,L4)
Laying 550+400 550+490 RHS
MSRDC/VTR/HW/7711 RE 31-Aug-23 1-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7712 RE 31-Aug-23 1-Sep-23 4:00 PM Casting of RE Wall Panel (A=71, B=36, Total= 107 Nos) 556+900 RHS
MSRDC/VTR/HW/7727 RE 1-Sep-23 2-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7728 RE 1-Sep-23 2-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7734 RE 2-Sep-23 3-Sep-23 1:00 PM 547+640 547+750 RHS
Checking
Inspection11th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7735 RE 2-Sep-23 3-Sep-23 1:30 PM 547+750 547+860 RHS
Checking
Inspection11th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7736 RE 2-Sep-23 3-Sep-23 2:00 PM 547+860 547+940 RHS
Checking 11th Layer At Saravali VUP Wall No 1
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7737 RE 2-Sep-23 3-Sep-23 2:30 PM 547+958 548+020 RHS
Checking
Inspection11th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 4 Laying And FDD
MSRDC/VTR/HW/7738 RE 2-Sep-23 3-Sep-23 3:00 PM 548+070 548+150 RHS
Checking 11th Layer At Saravali VUP Wall No 4 laying And FDD
Inspection for RE Block Erection With filter Media
MSRDC/VTR/HW/7739 RE 2-Sep-23 3-Sep-23 11:00 AM 542+130 542+220 RHS
Cheking 11th
Inspection forlayer at Yewai
RE Block VUP With
Erection Wall filter
no 1 Media laying And FDD
MSRDC/VTR/HW/7740 RE 2-Sep-23 3-Sep-23 12:00 PM Inspection forlayer
RE Block Erection 542+220 542+300 RHS
Cheking 10th at Yewai VUP With
Wall filter
no 1 Media laying And FDD
MSRDC/VTR/HW/7741 RE 2-Sep-23 3-Sep-23 2:00 PM Cheking 11th
Inspection for layer at Yewai
RE Block Erection With filter Media laying And FDD 542+300 542+410 RHS
VUP Wall11th
Cheking no 1
MSRDC/VTR/HW/7742 RE 2-Sep-23 3-Sep-23 3:00 PM Inspection forlayer at Yewai
RE Block Erection With filter Media laying And FDD 542+425 542+500 RHS
MSRDC/VTR/HW/7743 RE 2-Sep-23 3-Sep-23 3:30 PM VUP Wall11th
Cheking no 4layer at Yewai 542+500 542+580 RHS
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7744 RE 2-Sep-23 3-Sep-23 4:30 PM VUP Wall10th
Cheking no 4layer at Yewai 542+580 542+660 RHS
MSRDC/VTR/HW/7745 RE 2-Sep-23 3-Sep-23 3:30 PM VUP Wall
Casting ofno
RE4Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7746 RE 2-Sep-23 3-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
Fdd & Level Checking of Embankment Top layer After Cutting (MCW
MSRDC/VTR/HW/7752 A.1(a) 3-Sep-23 4-Sep-23 11:00 AM 561+300 561+450 RHS
L1,L2,L3,L4)
MSRDC/VTR/HW/7753 i(a) 3-Sep-23 4-Sep-23 2:00 PM Fdd Checking of embankment 5th layer (SR) 550+790 551+000 LHS
Inspection For RE Block Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7754 RE 3-Sep-23 4-Sep-23 1:00 PM 547+640 547+750 RHS
Checking
Inspection12th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7755 RE 3-Sep-23 4-Sep-23 1:30 PM 547+750 547+860 RHS
Checking
Inspection12th
For Layer At Saravali
RE Block ErectionVUP Wall
With NoMedia
Filter 1 Laying And FDD
MSRDC/VTR/HW/7756 RE 3-Sep-23 4-Sep-23 2:00 PM Inspection12th
For Layer
RE Block ErectionVUP
With Filter 547+860 547+940 RHS
Checking At Saravali Wall NoMedia
1 Laying And FDD
MSRDC/VTR/HW/7757 RE 3-Sep-23 4-Sep-23 2:30 PM Checking 12th Layer At 547+958 548+020 RHS
Inspection For
Saravali VUP RE Block
Wall No 4 Erection With Filter Media Laying And FDD
MSRDC/VTR/HW/7758 RE 3-Sep-23 4-Sep-23 3:00 PM 548+070 548+150 RHS
Checking
Inspection12th Layer
for RE At Saravali
Block ErectionVUP
WithWall
filterNo 4 laying And FDD
Media
MSRDC/VTR/HW/7759 RE 3-Sep-23 4-Sep-23 11:00 AM 542+130 542+220 RHS
Cheking 12th
Inspection forlayer at Yewai
RE Block VUP With
Erection Wall filter
no 1 Media laying And FDD
MSRDC/VTR/HW/7760 RE 3-Sep-23 4-Sep-23 12:00 PM 542+220 542+300 RHS
Cheking 11th layer at Yewai VUP Wall no 1
Inspection for RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7761 RE 3-Sep-23 4-Sep-23 2:00 PM 542+300 542+410 RHS
Cheking 12th
Inspection for layer at Yewai
RE Block VUPWith
Erection Wallfilter
no 1 Media laying And FDD
MSRDC/VTR/HW/7762 RE 3-Sep-23 4-Sep-23 3:00 PM Inspection forlayer
RE Block Erection 542+425 542+500 RHS
Cheking 12th at Yewai VUP With
Wall filter
no 4 Media laying And FDD
MSRDC/VTR/HW/7763 RE 3-Sep-23 4-Sep-23 3:30 PM Cheking 12th layer at Yewai 542+500 542+580 RHS
Inspection
VUP Wall nofor5 RE Block Erection With filter Media laying And FDD
MSRDC/VTR/HW/7764 RE 3-Sep-23 4-Sep-23 4:30 PM 542+580 542+660 RHS
Cheking 11th layer at Yewai VUP Wall no 4
MSRDC/VTR/HW/7765 RE 3-Sep-23 4-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7766 RE 3-Sep-23 4-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
MSRDC/VTR/HW/7767 RE 3-Sep-23 4-Sep-23 5:30 PM Laying of Dry Lean Concrete (SR) 552+200 552+410 LHS
MSRDC/VTR/HW/7773 A.1(a) 4-Sep-23 5-Sep-23 11:00 AM Fdd & Level Checking of Embankment Top layer (MCW L1,L2) 549+900 550+180 RHS
MSRDC/VTR/HW/7774 A.1(a) 4-Sep-23 5-Sep-23 8:00 AM Inspection of Cutting upto Embankment Top (MCW L1,L2) 550+400 550+500 RHS
MSRDC/VTR/HW/7775 A.1(a) 4-Sep-23 5-Sep-23 6:00 PM Fdd & Level Checking of Embankment Top layer (MCW L1,L2) 550+300 550+550 RHS
MSRDC/VTR/HW/7776 A.1(a) 4-Sep-23 5-Sep-23 3:30 PM FDD Checking of Sub Grade 1st layer (MCW L1,L2,L3,L4) 561+300 561+450 RHS
MSRDC/VTR/HW/7777 i(a) 4-Sep-23 5-Sep-23 6:00 PM Fdd Checking of embankment 6th layer (SR) 550+790 551+000 LHS
MSRDC/VTR/HW/7778 3.(b) 4-Sep-23 5-Sep-23 2:00 PM Laying of Pavement Quality Concrete (Loop-1) 000+680 000+750 Loop-1
MSRDC/VTR/HW/7779 RE 4-Sep-23 5-Sep-23 10:00 AM FDD Cheking 1st layer at Dive VUP Wall no 2 555+966 555+990 LHS
MSRDC/VTR/HW/7780 RE 4-Sep-23 5-Sep-23 6:00 PM FDD Cheking 2nd layer at Dive VUP Wall no 2 555+966 555+990 LHS
MSRDC/VTR/HW/7781 RE 4-Sep-23 5-Sep-23 10:00 AM FDD Cheking 1st layer at Dive VUP Wall No. 2 556+173 556+310 LHS
MSRDC/VTR/HW/7782 RE 4-Sep-23 5-Sep-23 3:30 PM Casting of RE Wall Panel (A=93, B=41, Q=20, Total= 154 Nos) 551+900 RHS
MSRDC/VTR/HW/7783 RE 4-Sep-23 5-Sep-23 4:00 PM Casting of RE Wall Panel (A=81, B=46, Total= 127 Nos) 556+900 RHS
MSRDC/VTR/HW/7789 A.1(b) 5-Sep-23 6-Sep-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L1,L2) 549+900 550+180 RHS
MSRDC/VTR/HW/7790 A.1(b) 5-Sep-23 6-Sep-23 11:00 AM Fdd Checking of Subgrade 1st layer (MCW L1,L2) 550+300 550+500 RHS
MSRDC/VTR/HW/7791 A.1(b) 5-Sep-23 6-Sep-23 11:30 AM FDD & Level Checking of Subgrade Top layer (MCW L1,L2,L3,L4) 561+300 561+450 RHS
MSRDC/VTR/HW/7792 i(a) 5-Sep-23 6-Sep-23 12:00 PM Fdd Checking of embankment 7th layer (SR) 550+790 551+000 LHS
MSRDC/VTR/HW/7793 3.(b) 5-Sep-23 6-Sep-23 1:30 PM Laying of Pavement Quality Concrete (Loop-1) 000+750 001+437 Loop-1
RFI SUMMARY SHEET (File No.1 to 7)
Date of
[Link] Date of RFI RFI No. Description of Work Chainage/Location Side satisfactory Remark File
Inspection
114 5-Jun-23 6-Jun-23 MSRDC/VTR/HW/6858 Laying of Pavement Quality Concrete (MCW) (Thane to Nh-4) Loop-1 000+410 000+510 L-1 Satisfactory IPC-3(MPC-3) F7
Date of REA Scan SIGN
Date of RFI DISCRIPTION Chainage / Location Length Side satisfactory EMB / SG IE CLOSE35%
Inspection DY RFI ED
Inspection For RE Block Erection With Filter Media Laying And FDD Checking 6th Layer
30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8426
VUP Wall No 1 (VUP (GS 539680)
539+320 539+410 90 RHS
Inspection For RE Block Erection With Filter Media Laying And FDD Checking 7th Layer
30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8427
VUP Wall No 1 (VUP (GS 539680)
539+320 539+410 90 RHS
30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8428 Fdd Level & Gradation Checking of GSB top layer (MCW) (Toll Plaza)(Lane-7 TO 12) 559+280 559+320 40 LHS Not satisfactory GSB TOP IE
30-Nov-23 1-Dec-23 MSRDC/VTR/HW/8429 Fdd Level & Gradation Checking of GSB top layer (SR) 539+450 539+700 250 RHS Not satisfactory GSB TOP
1-Dec-23 2-Dec-23 MSRDC/VTR/HW/8432 Fdd Checking of Sub Grade 1st layer (SR) 539+200 539+450 250 RHS Satisfactory
1-Dec-23 2-Dec-23 MSRDC/VTR/HW/8433 Fdd & Level Checking of Sub Grade Top layer (SR) 539+200 539+450 250 RHS Not satisfactory SG TOP IE
1-Dec-23 2-Dec-23 MSRDC/VTR/HW/8434 Fdd Level & Gradation Checking of GSB top layer (SR) 539+450 539+700 250 RHS Not satisfactory GSB TOP
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8459 Inspection of C&G (SR) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8460 Inspection of C&G (MCW L3,L4) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8461 FDD & Level Checking of OGL(MCW L3,L4) 560+500 560+560 60 RHS satisfactory IE
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8462 FDD & Level checking of OGL (SR) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8463 Fdd Checking of Embankment 1st layer (MCW L3,L4) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8464 Fdd Checking of Embankment 1st layer (SR) 560+500 560+560 60 RHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8467 Inspection of Layout marking excavation and laying of Utility pipe (Toll PLAZA ) 559+250 0 LHS satisfactory
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8468 Fdd & Level Checking of Embankment Top layer (MCW L3,L4) 559+980 560+050 70 RHS satisfactory EMB TOP
4-Dec-23 5-Dec-23 MSRDC/VTR/HW/8470 Fdd Level & Gradation Checking of GSB top layer (MCW) (Toll Plaza)(Lane-7 TO 12) 559+280 559+320 40 LHS satisfactory GSB TOP IE
5-Dec-23 6-Dec-23 MSRDC/VTR/HW/8491 Fdd Level & Gradation Checking of GSB top layer (SR) 539+450 539+700 250 RHS Not satisfactory GSB TOP IE
5-Dec-23 6-Dec-23 MSRDC/VTR/HW/8492 Fdd Level & Gradation Checking of GSB top layer (SR) 543+000 543+050 50 LHS Not satisfactory GSB TOP
5-Dec-23 6-Dec-23 MSRDC/VTR/HW/8493 Fdd & Level Checking of Subgrade Top layer (SR) 539+200 539+450 250 RHS satisfactory SG TOP
6-Dec-23 6-Dec-23 MSRDC/VTR/HW/8500 Laying of Pavement Quality Concrete (MCW L1,L2) 543+010 543+300 290 RHS satisfactory PQC TOP
6-Dec-23 7-Dec-23 MSRDC/VTR/HW/8501 Fdd Level & Gradation Checking of GSB top layer (MCW)(LOOP-6) 000+100 000+200 100 L-6 RHS satisfactory GSB TOP
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8514 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 561+670 561+890 220 RHS satisfactory GSB TOP IE
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8515 Fdd Level & Gradation Checking of GSB top layer (MCW) Loop-5 000+120 000+220 100 L-5 Satisfactory GSB TOP
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8516 Fdd Checking of Embankment 8th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8517 Laying of Dry Lean Concrete (Toll Plaza)(Lane-07 TO 15) 559+280 559+320 40 LHS Satisfactory DLC TOP IE
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8518 Fdd Level & Gradation Checking of GSB top layer (Toll Plaza)(Lane-16 TO 17) 559+280 559+320 40 LHS Satisfactory GSB TOP
7-Dec-23 8-Dec-23 MSRDC/VTR/HW/8519 Laying of Dry Lean Concrete (Toll Plaza)(Lane-16 TO 17) 559+280 559+320 40 LHS Satisfactory DLC TOP IE
8-Dec-23 8-Dec-23 MSRDC/VTR/HW/8520 Laying of Dry Lean Concrete (SR) 561+670 561+890 220 RHS Not satisfactory DLC TOP
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8522 561+670 561+890 220 RHS Satisfactory DLC TOP IE
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8523 Laying of Dry Lean Concrete (MCW) Loop-5 000+120 000+220 100 L-5 Not satisfactory DLC TOP
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8524 FDD Checking of Sub Grade 1st layer (MCW L3,L4) 559+980 560+050 70 RHS Satisfactory
8-Dec-23 9-Dec-23 MSRDC/VTR/HW/8525 Fdd & Level Checking of Embankment Top layer (MCW L3, L4) 560+050 560+150 100 RHS Satisfactory EMB TOP
9-Dec-23 10-Dec-23 MSRDC/VTR/HW/8541 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 539+200 539+700 500 RHS Not satisfactory GSB TOP
9-Dec-23 10-Dec-23 MSRDC/VTR/HW/8542 Laying of Dry Lean Concrete (SR) 539+200 539+700 500 RHS Not satisfactory DLC TOP
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8568 Fdd Checking of Embankment 2nd layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8569 Fdd Checking of Embankment 2nd layer (SR) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8570 Fdd Checking of Embankment 3rd layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8571 Fdd Checking of Embankment 3rd layer (SR) 560+500 560+560 60 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8572 Fdd Checking of Subgrade 1st layer (MCW L3, L4) 559+900 560+140 240 LHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8573 Fdd Checking of Subgrade 1st layer (SR) 561+300 561+450 150 RHS Satisfactory
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8575 FDD & Level Checking of Subgrade Top layer (MCW L3,L4) 559+980 560+050 70 RHS Satisfactory SG TOP
10-Dec-23 11-Dec-23 MSRDC/VTR/HW/8576 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 546+230 546+350 120 RHS Not satisfactory IE
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8590 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 539+250 539+700 450 RHS satisfactory GSB TOP IE
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8591 Laying of Dry Lean Concrete (SR) 539+250 539+700 450 RHS Satisfactory DLC TOP
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8592 Laying of Pavemet Quality Concrete (MCW L1,L2) 548+210 548+370 160 RHS satisfactory PQC TOP
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8593 Laying of Pavemet Quality Concrete (MCW L1,L2) 548+420 548+610 190 RHS Satisfactory PQC TOP IE
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8594 Dismental of existing BT Road (MCW(L1) 548+620 548+665 45 RHS satisfactory
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8595 Dismental of existing BT Road (MCW(L1) 548+665 548+690 25 RHS satisfactory
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8596 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1) 548+620 548+665 45 RHS satisfactory
11-Dec-23 12-Dec-23 MSRDC/VTR/HW/8597 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L1,L2) 548+665 548+690 25 RHS satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8605 Fdd Checking of Subgrade 1st Layer (MCW L3, L4) 560+050 560+150 100 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8606 Fdd Checking of Embankment 4th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8607 Fdd Checking of Embankment 4th layer (SR) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8608 Fdd Checking of Embankment 5th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8609 Fdd Checking of Embankment 5th layer (SR) 560+500 560+560 60 RHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8610 FDD & Level Checking of Embankment Top layer (MCW L3,L4) 560+140 560+180 40 LHS Satisfactory EMB TOP IE
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8611 FDD & Level Checking of Embankment Top layer (SR) 560+140 560+180 40 LHS Satisfactory EMB TOP
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8612 Fdd Level & Gradation Checking of GSB top layer (MCW L5-L8) 559+540 559+580 40 LHS Satisfactory GSB TOP
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8613 Dismental of existing BT Road (MCW L2,L3) 540+300 540+800 500 LHS Satisfactory
12-Dec-23 13-Dec-23 MSRDC/VTR/HW/8614 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 540+300 540+800 500 LHS Satisfactory
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8649 Dismental of existing BT Road (MCW L2,L3) 540+800 541+500 700 LHS Satisfactory
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8650 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 540+800 541+000 200 LHS Satisfactory
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8651 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 546+230 546+350 120 RHS Not satisfactory GSB TOP IE
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8652 Laying of Pavemet Quality Concrete (SR) 545+650 545+890 240 LHS Satisfactory PQC TOP IE
13-Dec-23 14-Dec-23 MSRDC/VTR/HW/8653 Laying of Dry Lean Concrete (SR) 540+150 540+270 120 RHS Not satisfactory DLC TOP
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8675 Fdd Checking of Embankment 6th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8676 Fdd Checking of Embankment 6th layer (SR) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8677 Fdd Checking of Embankment 7th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8678 Fdd Checking of Embankment 7th layer (SR) 560+500 560+560 60 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8679 Fdd Checking of Embankment 11th layer (MCW L3,L4) 560+600 560+750 150 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8680 Fdd Checking of Embankment 10th layer (SR) 560+600 560+710 110 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8681 Fdd Checking of Embankment 7th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8682 Fdd Checking of Embankment 8th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8683 Fdd Checking of Embankment 9th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8684 FDD, Level and Gradation Checking of GSB Top Layer (MCW-L3,L4) 561+850 561+890 40 RHS Satisfactory GSB TOP IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8685 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+300 540+500 200 LHS Satisfactory GSB TOP
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8686 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 540+800 541+000 200 LHS Satisfactory SG TOP IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8687 Laying of Dry Lean Concrete (MCW L5 to L8) 559+540 559+700 160 LHS Satisfactory DLC TOP IE
15-Dec-23 16-Dec-23 MSRDC/VTR/HW/8651-R1 FDD & Level & Gradiaction Checking of GSB Top layer (SR) 546+230 546+350 120 RHS Not satisfactory GSB TOP
16-Dec-23 17-Dec-23 MSRDC/VTR/HW/8704 Fdd & Level Checking of Subgrade Top layer (MCW L3,L4) 560+050 560+150 100 RHS Satisfactory SG TOP
16-Dec-23 17-Dec-23 MSRDC/VTR/HW/8705 Fdd Checking of Embankment 8th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
16-Dec-23 17-Dec-23 MSRDC/VTR/HW/8706 Laying of Dry Lean Concrete (MCW L5 to L8) 559+800 559+980 180 RHS Not satisfactory DLC TOP
17-Dec-23 17-Dec-23 MSRDC/VTR/HW/8719 Laying of Dry Lean Concrete (MCW) Loop-5 000+120 000+220 100 L-5 Satisfactory DLC TOP
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8720 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 541+300 541+700 400 LHS Not satisfactory
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8721 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+300 541+700 400 LHS Not satisfactory SG TOP
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8722 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+500 540+700 200 LHS Not satisfactory GSB TOP
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8723 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+300 540+700 400 LHS Not satisfactory DLC TOP IE
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8724 Fdd Checking of Embankment 9th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
17-Dec-23 18-Dec-23 MSRDC/VTR/HW/8725 Fdd Checking of Embankment 10th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8728 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+700 540+800 100 LHS Not satisfactory GSB TOP
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8729 Inspection of Layout marking excavation and laying of Utility pipe (MCW & SR ) 561+920 RHS Satisfactory
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8730 Fdd Level & Gradation Checking of GSB top layer (MCW)(LOOP-6) 000+050 000+100 50 L-6 RHS Satisfactory GSB TOP
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8731 Fdd Checking of Embankment 7th layer (MCW L3,L4) 560+500 560+560 60 RHS wrong rfi
18-Dec-23 19-Dec-23 MSRDC/VTR/HW/8732 Fdd Checking of Embankment 7th layer (SR) 560+500 560+560 60 RHS wrong rfi
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8748 Fdd Level & Gradation Checking of GSB top layer (MCW)(LOOP-4) 000+040 000+180 140 L-4 Not satisfactory GSB TOP
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8755 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 541+300 541+600 300 LHS satisfactory IE
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8756 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+300 541+600 300 LHS satisfactory SG TOP
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8757 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+500 540+700 200 LHS Satisfactory GSB TOP
19-Dec-23 20-Dec-23 MSRDC/VTR/HW/8758 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+300 540+700 400 LHS satisfactory DLC TOP
20-Dec-23 21-Dec-23 MSRDC/VTR/HW/8759 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+700 540+800 100 LHS Not satisfactory GSB TOP
20-Dec-23 21-Dec-23 MSRDC/VTR/HW/8760 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+700 540+800 100 LHS Not satisfactory DLC TOP IE
21-Dec-23 22-Dec-23 MSRDC/VTR/HW/8784 Fdd Checking of Embankment 11th layer (MCW L3,L4) 561+040 561+140 100 RHS Satisfactory
21-Dec-23 22-Dec-23 MSRDC/VTR/HW/8785 Fdd Checking of Embankment 10th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8805 Fdd Checking of Embankment 8th layer (MCW L3,L4) 560+500 560+560 60 RHS Satisfactory
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8806 Fdd Checking of Embankment 8th layer (SR) 560+500 560+560 60 RHS Satisfactory
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8807 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2) 548+370 548+420 50 RHS Satisfactory GSB TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8808 Laying of Dry Lean Concrete (MCW-L1,L2) 548+370 548+420 50 RHS Satisfactory DLC TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8809 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+000 541+300 300 LHS Satisfactory SG TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8810 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 540+700 541+000 300 LHS Satisfactory GSB TOP
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8811 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 540+700 541+000 300 LHS Satisfactory DLC TOP IE
22-Dec-23 23-Dec-23 MSRDC/VTR/HW/8812 Laying of Pavement Quality Concrete (SR) 543+400 543+580 180 LHS Satisfactory PQC TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8823 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 541+000 541+500 500 LHS Satisfactory GSB TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8824 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 541+000 541+500 500 LHS Satisfactory DLC TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8825 Dismental of existing BT Road (MCW L2,L3) 541+500 541+950 450 LHS Satisfactory
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8826 Profile Correction & FDD Checking OF Subgrade 1st Layer (MCW L2,L3) 541+500 541+950 450 LHS Satisfactory
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8827 FDD & Level Checking of Subgrade Top layer (MCW L2,L3) 541+500 541+950 450 LHS Satisfactory SG TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8828 Laying of Pavement Quality Concrete (SR) 543+150 543+400 250 LHS Not satisfactory PQC TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8829 Fdd Checking of Embankment 8th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8830 FDD, Level and Gradation Checking of GSB Top Layer (SR) 561+660 561+670 10 RHS Satisfactory GSB TOP
23-Dec-23 24-Dec-23 MSRDC/VTR/HW/8831 Laying of Dry Lean Concrete (SR) 561+660 561+670 10 RHS Not satisfactory DLC TOP
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8877 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 541+500 541+800 300 LHS Satisfactory GSB TOP IE
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8878 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 541+500 541+700 200 LHS Satisfactory DLC TOP IE
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8879 FDD & Level Checking of Subgrade Top layer (MCW L1) 548+620 548+665 45 RHS Not satisfactory SG TOP
25-Dec-23 26-Dec-23 MSRDC/VTR/HW/8880 FDD, Level and Gradation Checking of GSB Top Layer (MCW L1,L2) 548+620 548+665 45 RHS Satisfactory GSB TOP
26-Dec-23 26-Dec-23 MSRDC/VTR/HW/8892 Laying of Pavement Quality Concrete (SR) 543+200 543+500 300 LHS Satisfactory PQC TOP
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8893 Inspection of C&G (MCW) Toll Plaza 559+000 559+040 40 LHS Satisfactory
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8895 Fdd Checking of Embankment 1st layer (MCW) Toll Plaza 559+000 559+040 40 LHS Satisfactory
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8896 Fdd Checking of Embankment 11th layer (MCW L3,L4) 561+010 561+040 30 RHS Not satisfactory IE
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8897 Fdd Checking of Embankment 9th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
26-Dec-23 27-Dec-23 MSRDC/VTR/HW/8898 Fdd Checking of Embankment 10th layer (MCW L3,L4) 560+150 560+200 50 RHS Satisfactory
27-Dec-23 28-Dec-23 MSRDC/VTR/HW/8924 Fdd Level & Gradation Checking of GSB top layer (MCW L1,L2,L3,L4) 541+800 541+950 150 LHS Satisfactory GSB TOP
27-Dec-23 28-Dec-23 MSRDC/VTR/HW/8925 Laying of Dry Lean Concrete (MCW L1,L2,L3,L4) 541+700 541+950 250 LHS Satisfactory DLC TOP IE
28-Dec-23 29-Dec-23 MSRDC/VTR/HW/8927 Fdd Level & Gradation Checking of GSB top layer (SR) 561+450 561+550 100 RHS Satisfactory GSB TOP
28-Dec-23 29-Dec-23 MSRDC/VTR/HW/8928 Fdd Checking of Embankment 11th layer (MCW L3,L4) 561+010 561+040 30 RHS Satisfactory
29-Dec-23 30-Dec-23 MSRDC/VTR/HW/8935 Laying of Pavement Quality Concrete (MCW L1,L2) 540+700 540+900 200 LHS Satisfactory PQC TOP IE
29-Dec-23 30-Dec-23 MSRDC/VTR/HW/8936 Dismental of existing BT Road (MCW(L2 L3) 544+200 544+950 750 LHS Satisfactory
30-Dec-23 31-Dec-23 MSRDC/VTR/HW/8970 Laying of Dry Lean Concrete (SR) 540+150 540+260 110 RHS Not satisfactory DLC TOP
30-Dec-23 31-Dec-23 MSRDC/VTR/HW/8971 Fdd & Level Checking of Subgrade 1st (MCW L1,L2,L3) 544+200 544+600 400 LHS Not satisfactory
30-Dec-23 31-Dec-23 MSRDC/VTR/HW/8972 Fdd & Level Checking of Subgrade Top layer (MCW L1,L2,L3) 544+200 544+600 400 LHS Not satisfactory SG TOP
VUP Locations
Sr. Start Chainage End Chainage Total RE Wall
No. Location VUP Length