(A) FOOTING
Concrete Shuttering PCC quantity
[Link] Description Nos L B D Remarks
(cum) (Sqm) (cum)-M7.5
1 Footing 19.00 2.43 12.16 1.90
IP1 19.00 0.80 0.80 0.20 2.43 12.16 1.90
(B) COLUMN
Concrete Shuttering
[Link] Description Nos L B D Remarks
(cum) (Sqm)
1 Column 19 0.4 0.4 0.8 2.43 24.32
(C ) BLOCKWORK QUANTITY
[Link] DESCRIPTI UNIT NOS LENGTHDEPTH QUANTIREMARKS
Total Bloc Sqm 32.48
Wall Sqm 32.48
1 LT KIOSK Sqm 2.00 3.10 1.12 6.94
2 5- WAY RMUSqm 2.00 2.4 1.12 5.38
3 TRANS.- 01 Sqm 1.00 6 1.12 6.72
4 TRANS.- 02 Sqm 1.00 6 1.12 6.72
5 TRANS.- 03 Sqm 1.00 6 1.12 6.72
(D) PLASTERING
[Link] UNIT NOSPERIMETER DEPTHQUANTITYREMARKS
Total Plast Sqm 58.37
1 LT KIOSK Sqm 2.00 6.66 1.12 14.92
2 5- WAY RMUSqm 4.00 5.2 1.12 23.30
3 TRANS.- 01 Sqm 1.00 6 1.12 6.72
4 TRANS.- 02 Sqm 1.00 6 1.12 6.72
5 TRANS.- 03 Sqm 1.00 6 1.12 6.72
(A) FOOTING & COLUMN
Concrete
[Link] Description Nos L B D Shutterin
(cum)
g (Sqm)
1 Footing 4.00 5.85 12.92
F8 2.00 1.40 1.75 0.45 2.20 5.67
F5 1.00 2.20 2.05 0.45 2.03 3.83
F4 1.00 2.05 1.75 0.45 1.61 3.42
2 Column 4.00 3.04 28.86
C3 2 0.3 0.6 3.9 1.40 14.04
C3a 2 0.35 0.6 3.9 1.64 14.82
PCC
quantity
Remar
(cum)-
ks
M7.5
1.60
0.62
0.54
0.44
(A) PAVILION COLUMN PLASTERING
[Link] DESCRIPTION UNIT NOS PERIMETER DEPTH QUANTITYREMARKS
Total Plasterin Sqm 19.20
1 COLUMN Sqm 16.00 0.6 2.00 19.20
REMARKS
Tower angle footing
(A) FOOTING & COLUMN
Concrete
[Link] Description Nos B D Shutterin
L/AREA (cum)
g (Sqm)
1 Footing 2.00 4.46 7.67
Pedastal footing 1.00 2.50 2.50 0.50 3.13 5.00
footing
1.00 2.97 0.45 1.34 2.67
projection
2 Column 6.00 0.76 10.08
column 6.00 0.30 0.30 1.40 0.76 10.08
ng
PCC
quantity Remar
(cum)-M7.5 ks
-
-