2021 HSE Statistics Report - Al Babtain

The HSE Statistic Report for Al Babtain Projects in 2021 indicates a total of 5,948 man-hours worked with no lost time injuries or fatalities reported. There were 5 first aid cases and 138 HSE observations reported throughout the year. Proactive measures included 262 toolbox talks conducted and 14 risk assessments completed.

Uploaded by

hsedupanav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
462 views18 pages

2021 HSE Statistics Report - Al Babtain

The HSE Statistic Report for Al Babtain Projects in 2021 indicates a total of 5,948 man-hours worked with no lost time injuries or fatalities reported. There were 5 first aid cases and 138 HSE observations reported throughout the year. Proactive measures included 262 toolbox talks conducted and 14 risk assessments completed.

Uploaded by

hsedupanav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

SS8357 - Arid AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 616 1270 1466 1376 1220 5948


Manpower

2 Total Man-hours Worked 6160 12700 14660 13760 12200 59480


3 Man-hours worked since last LTI 6160 12700 14660 13760 12200 59480
4 No. of First Aid Cases 1 1 1 1 1 5
5 No. of Medical Treatment Cases 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 1 1 1 1 1 5


12 No. of Near miss Acted 1 1 1 1 1 5
13 No. of Vehicle Accident 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0
17 No. of HSE Observation Reported 20 34 25 29 30 138
18 No. of HSE Observation Acted 18 24 21 24 28 115
19 No. of Nonconformity Reported 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0
21 HSE Induction 3 2 3 3 2 13
22 No. of employees received Inhouse -Train 0 0 0 0 0 0
23 Training Hours for the above mentioned 0 0 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 47 38 59 57 61 262


25 No. of Employees attended during TBT 1224 1822 3188 3008 2408 11650
26 HSE Committee Meetings conducted 1 1 1 1 1 5
27 Internal Audit conducted 0 0 0 0 0 0
28 No. of Risk Assessment Done 4 3 3 2 2 14
29 No. of Job Safety Analysis Done 4 3 3 2 2 14

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
6
First Aid 5 PPE 0 80
70
Medical Treatment 0 5 Strike Against or by 0
60
Lost Time Injury 0 4 Caught in / Between 0 50 45% 55%
40% 40
Serious Injury 0 Slip, Trip & Fall 2
3 30
Occupational Illness 0 Fall from height 3 20
2 60% 10
Fatality Accidents 0 Electrical hazard 0
0
Vehicle Accident 0 1 Fire Safety Hazard 0 1 2 3 4
Property Damage 0 Environmental 0
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure 0
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 5 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 76 20 0 42 138
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 68 12 0 35 115

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
23% Civil Elec Mech
15% Inter-
Other 32 2% Head 0 0 0 Tool Box Talk 262
nal 0
Tools & Equipment 25
6% Eye 0 0 0 HSE Induction 13
Com
Audit
mittee
Job Safety Meet-
5
Floor Openings 5 4% Face 0 0 0 14 In-
Analysis ing
house
Train-
0
PPE 7 Hand 3 0 0 Risk Assessment 14 Risk
ing
As-
9% 18% 14
Equipment Certification 2 Finger 1 0 0 Inhouse Training 0 sess-
5% 5% Job
7% Committee ment
Safety
Access/Egress 7 Chest 0 0 0
Meeting
5
Analy-
14
4% HSE
sis
Work At Height 9 1% Back 0 0 0 Internal Audit 0 Induc- 13
tion
Tool
Barrication 13 Leg 1 0 0
Other Tools & Equipment Box 262
Welfare Facilities 6 Floor Openings PPE Knee 0 0 0 5 Talk
Equipment Certification Access/Egress 0 50 100 150 200 250 300
Material Stacking 8 Toe 0 0 0
Work At Height Barrication
Electrical Connections 3 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 21 Total 5 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
70000
Head 0 Other 0
59,480 59,480 Tools &
60000 Eye 0 Equipment 0

Face 0 Floor Openings 0


50000
Hand 0 PPE 0
40000 Equipment
Finger 0 0
Certification
30000 Chest 0 Access/Egress 0
Other 0
Back 0 Work At Height 0 Tools & Equipment 0
20000 Floor Openings 0
Leg 0 Barrication 0 PPE 0
Equipment Certification 0
10000 Access/Egress 0
Knee 0 Welfare Facilities 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 0 Housekeeping 0
380KV - Jandal AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 728 600 780 2108


Manpower

2 Total Man-hours Worked 5824 4800 6240 16864


3 Man-hours worked since last LTI 5824 4800 6240 16864
4 No. of First Aid Cases 0 0 0 0
5 No. of Medical Treatment Cases 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0
9 No. of Occupational Illness 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 0 0 0 0


12 No. of Near miss Acted 0 0 0 0
13 No. of Vehicle Accident 0 0 0 0
14 No. of Property Damage 0 0 0 0
15 No. of Fire Incidents 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0
17 No. of HSE Observation Reported 2 2 1 5
18 No. of HSE Observation Acted 2 2 1 5
19 No. of Nonconformity Reported 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0
21 HSE Induction 2 3 5 10
22 No. of employees received Inhouse -Train 0 0 0 0
23 Training Hours for the above mentioned 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 4 4 4 12


25 No. of Employees attended during TBT 102 96 120 318
26 HSE Committee Meetings conducted 0 0 0 0
27 Internal Audit conducted 0 0 0 0
28 No. of Risk Assessment Done 2 1 2 5
29 No. of Job Safety Analysis Done 0 0 1 1

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 0 5
Medical Treatment 0 Strike Against or by 0 4
Lost Time Injury 0 Caught in / Between 0 3 50% 50%
Serious Injury 0 Slip, Trip & Fall 0 2
Occupational Illness 0 Fall from height 0
1
Fatality Accidents 0 Electrical hazard 0
0
Vehicle Accident 0 Fire Safety Hazard 0 1 2 3 4
Property Damage 0 Environmental 0
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure 0
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 0 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 0 5 0 0 5
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 0 5 0 0 5

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
Other 0 Head 0 0 0 Tool Box Talk 12 Inter-
40% nal 0
Com
Audit
Tools & Equipment 2 Eye 0 0 0 HSE Induction 10
mittee
Job Safety Meet-
0
Floor Openings 0 Face 0 0 0 1 In-
Analysis ing
house
Train-
0
PPE 0 Hand 0 0 0 Risk Assessment 5 Risk
60% ing
As-
Equipment Certification 0 Finger 0 0 0 Inhouse Training 0 sess-
5
Job
Committee ment
Safety
Access/Egress 0 Chest 0 0 0
Meeting
0
Analy-
1
HSE
sis
Work At Height 0 Back 0 0 0 Internal Audit 0 Induc- 10
tion
Tool
Barrication 0 Leg 0 0 0
Other Tools & Equipment Box 12
Welfare Facilities 0 Floor Openings PPE Knee 0 0 0 Talk
Equipment Certification Access/Egress 0 2 4 6 8 10 12 14
Material Stacking 0 Toe 0 0 0
Work At Height Barrication
Electrical Connections 0 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 3 Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
18000 16,864 16,864 Head 0 Other 0
16000 Tools &
Eye 0 Equipment 0
14000
Face 0 Floor Openings 0
12000 Hand 0 PPE 0
10000 Finger 0
Equipment
0
Certification
8000 Chest 0 Access/Egress 0
Other 0
6000 Back 0 Work At Height 0 Tools & Equipment 0
Floor Openings 0
4000 Leg 0 Barrication 0 PPE 0
Equipment Certification 0
2000 Knee 0 Welfare Facilities 0 Access/Egress 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 0 Housekeeping 0
SS 9046 - Remal AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 4848 5157 5237 4487 4504 5859 4313 6499 6161 6736 6133 5749 65683
Manpower

2 Total Man-hours Worked 38784 41256 41896 35896 36032 46872 34504 51992 49288 53888 49064 45992 525464
3 Man-hours worked since last LTI 38784 41256 41896 35896 36032 46872 34504 51992 49288 53888 49064 45992 525464
4 No. of First Aid Cases 0 0 1 0 0 0 0 1 1 3 0 0 6
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 0 10 8 1 0 0 4 0 0 0 0 1 24


12 No. of Near miss Acted 0 10 8 1 0 0 0 0 0 0 0 1 20
13 No. of Vehicle Accident 0 0 0 0 0 0 0 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 146 123 94 135 105 121 76 94 103 106 77 85 1265
18 No. of HSE Observation Acted 146 123 94 135 105 121 76 94 103 106 77 85 1265
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0 0 0 0 0 0
21 HSE Induction 32 25 31 19 27 16 23 29 34 26 33 19 314
22 No. of employees received Inhouse -Train 0 0 0 0 0 0 0 0 0 0 0 0 0
23 Training Hours for the above mentioned 0 0 0 0 0 0 0 0 0 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 143 180 287 302 302 381 393 455 419 409 395 391 4057
25 No. of Employees attended during TBT 1260 1900 3227 3319 3312 3109 2990 3515 3490 3235 3195 3187 35739
26 HSE Committee Meetings conducted 1 1 1 1 1 1 1 1 1 1 1 1 12
27 Internal Audit conducted 0 0 0 0 0 0 0 0 0 0 0 0 0
28 No. of Risk Assessment Done 2 3 5 4 3 3 1 5 4 2 0 1 33
29 No. of Job Safety Analysis Done 2 3 5 4 3 3 1 5 4 2 0 1 33

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
5%
7 14%
First Aid 6 PPE 3 450
6 400
Medical Treatment 0 Strike Against or by 1 350
5% 300
Lost Time Injury 0 5 Caught in / Between 0
250 50% 50%
Serious Injury 0 4 Slip, Trip & Fall 8 200
38% 150
Occupational Illness 0 3 Fall from height 8 100
50
Fatality Accidents 0 2 Electrical hazard 1
0
Vehicle Accident 0 1 Fire Safety Hazard 0 1 2 3 4
38%
Property Damage 0 Environmental 0
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure 0
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 21 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 426 393 56 390 1265
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 426 393 56 390 1265

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
23% 18%
Other 224 Head 0 0 0 Tool Box Talk 4057 Inter-
nal 0
Com
Audit
Tools & Equipment 124 10% Eye 0 0 0 HSE Induction 314
mittee
4% Job Safety Meet-
12
Floor Openings 48 Face 0 0 0 33 In-
Analysis ing
house
Train-
0
PPE 64 4% Hand 1 1 0 Risk Assessment 33 Risk
12% ing
As-
Equipment Certification 28 5% Finger 2 1 0 Inhouse Training 0 sess-
33
6% 6% 8% 2
Job
ment
2% Committee Safety
Access/Egress 98
4% Chest 0 0 0
Meeting
12
Analy-
33
HSE
sis
Work At Height 73 Back 0 0 0 Internal Audit 0 Induc- 314
4 tion
Tool
Barrication 74 Leg 1 0 0
Other Tools & Equipment Box 4057
Welfare Facilities 52 Floor Openings PPE Knee 0 0 0 Talk
Equipment Certification Access/Egress 0 1000 2000 3000 4000 5000
Material Stacking 148 Toe 0 0 0
Work At Height Barrication
Electrical Connections 46 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 286 Total 4 2 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
600000 17%
Head 0 Other 0
525,464 525,464
Tools &
500000 Eye 0 33% Equipment 0

Face 0 Floor Openings 0


400000 Hand 2 PPE 0
Equipment
Finger 3 0
300000 Certification
Chest 0 Access/Egress 0
Other 0
200000 Back 0 Work At Height 0 Tools & Equipment 0
Floor Openings 0
Leg 1 Barrication 0 PPE 0
100000 Equipment Certification 0
Knee 0 50% Welfare Facilities 0 Access/Egress 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 6 Housekeeping 0
SS8358 - MISK AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 314 462 925 1604 2130 5435


Manpower

2 Total Man-hours Worked 2512 3696 7400 12832 17040 43480


3 Man-hours worked since last LTI 2512 3696 7400 12832 17040 43480
4 No. of First Aid Cases 0 0 1 1 2 4
5 No. of Medical Treatment Cases 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 0 0 1 2 1 4


12 No. of Near miss Acted 0 0 1 2 1 4
13 No. of Vehicle Accident 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0
17 No. of HSE Observation Reported 9 13 28 54 28 132
18 No. of HSE Observation Acted 9 13 28 45 20 115
19 No. of Nonconformity Reported 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0
21 HSE Induction 15 12 30 30 16 103
22 No. of employees received Inhouse -Train 0 0 1 3 61 65
23 Training Hours for the above mentioned 0 0 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 16 25 24 26 24 115


25 No. of Employees attended during TBT 218 251 425 726 1163 2783
26 HSE Committee Meetings conducted 1 1 1 1 1 5
27 Internal Audit conducted 0 0 0 0 0 0
28 No. of Risk Assessment Done 5 6 9 12 15 47
29 No. of Job Safety Analysis Done 5 6 9 12 15 47

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
5
First Aid 4 PPE 0 70
Medical Treatment 0 Strike Against or by 0 25% 60
4
50
Lost Time Injury 0 Caught in / Between 0 47% 53%
40
3
Serious Injury 0 Slip, Trip & Fall 3 30
Occupational Illness 0 Fall from height 0 20
2
10
Fatality Accidents 0 Electrical hazard 0
0
Vehicle Accident 0
1 Fire Safety Hazard 1 1 2 3 4
75%
Property Damage 0 Environmental 0
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure 0
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 4 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 68 30 1 33 132
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 63 19 1 32 115

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
7% Civil Elec Mech
9% 11% 9% Inter-
Other 14 Head 0 0 0 Tool Box Talk 115
nal 0
Com
Audit
Tools & Equipment 12 12% 6% Eye 0 0 0 HSE Induction 103
mittee
Job Safety Meet-
5
Floor Openings 8 Face 0 0 0 47 In-
Analysis ing
house
5% Train-
65
PPE 6 Hand 1 0 0 Risk Assessment 47 Risk
ing
As-
Equipment Certification 2 11% 2% Finger 3 0 0 Inhouse Training 65 sess-
47
7% Job
14% 9% ment
Committee Safety
Access/Egress 9 Chest 0 0 0
Meeting
5
Analy-
47
HSE
sis
Work At Height 12 Back 0 0 0 Internal Audit 0 Induc- 103
tion
Tool
Barrication 18 Leg 0 0 0
Other Tools & Equipment Box 115
Welfare Facilities 14 Floor Openings PPE Knee 0 0 0 4 Talk
Equipment Certification Access/Egress 0 20 40 60 80 100 120 140
Material Stacking 16 Toe 0 0 0
Work At Height Barrication
Electrical Connections 9 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 12 Total 4 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
50000
Head 0 Other 0
43,480 43,480 25%
45000 Tools &
Eye 0 Equipment 0
40000
Face 0 Floor Openings 0
35000
Hand 1 PPE 0
30000
Equipment
Finger 3 0
25000 Certification

20000 Chest 0 Access/Egress 0


Other 0
Tools & Equipment 0
15000 Back 0 Work At Height 0
Floor Openings 0
10000 Leg 0 Barrication 0 PPE 0
75% Equipment Certification 0
5000 Knee 0 Welfare Facilities 0 Access/Egress 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 4 Housekeeping 0
132KV - MODON AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 416 462 972 936 936 1195 1716 6633
Manpower

2 Total Man-hours Worked 3328 3696 7776 7488 7488 9568 13728 53072
3 Man-hours worked since last LTI 3328 3696 7776 7488 7488 9568 13728 53072
4 No. of First Aid Cases 0 1 1 1 1 0 0 4
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 1 1 2 2 2 1 2 11


12 No. of Near miss Acted 1 1 2 2 2 1 2 11
13 No. of Vehicle Accident 0 0 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 17 22 28 26 28 32 38 191
18 No. of HSE Observation Acted 17 22 28 26 28 32 38 191
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0
21 HSE Induction 10 4 10 4 6 10 15 59
22 No. of employees received Inhouse -Train 6 3 0 5 3 4 0 21
23 Training Hours for the above mentioned 12 9 0 15 0 12 0 48
Pro-Active Measures

24 No. of Tool Box Talk Conducted 24 20 28 30 30 32 33 197


25 No. of Employees attended during TBT 192 160 420 445 425 450 480 2572
26 HSE Committee Meetings conducted 1 1 1 1 1 1 1 7
27 Internal Audit conducted 0 0 0 0 0 0 0 0
28 No. of Risk Assessment Done 5 3 7 8 9 9 9 50
29 No. of Job Safety Analysis Done 5 3 7 8 9 9 9 50

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
5 9% 9%
First Aid 4 PPE 80
70
Medical Treatment 0 4 Strike Against or by 1
60
Lost Time Injury 0 Caught in / Between 50
50% 50%
3 40
Serious Injury 0 Slip, Trip & Fall 9
30
Occupational Illness 0
2 Fall from height 1 20
10
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0
1 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure 82% HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 11 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 78 46 16 51 191
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 78 46 16 51 191

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
27% 15% Inter-
Other 29 6% Head 0 0 0 Tool Box Talk 197
0
nal
Com
Audit
Tools & Equipment 12 2% Eye 0 0 0 HSE Induction 59
mittee
Job Safety Meet-
7
Floor Openings 4 4% Face 0 0 0
Analysis
50 In-
ing
house
Train-
21
PPE 8 Hand 1 0 0 Risk Assessment 50 Risk
7% 2% ing
As-
Equipment Certification 3 7% Finger 3 0 0 Inhouse Training 21 sess-
50
6% Job
11% 8% Committee ment
Safety
Access/Egress 14 Chest 0 0 0
Meeting
7
Analy-
50
4% HSE
sis
Work At Height 16 Back 0 0 0 Internal Audit 0 Induc- 59
tion
Tool
Barrication 12 Leg 0 0 0
Other Tools & Equipment Box 197
Welfare Facilities 7 Floor Openings PPE Knee 0 0 0 4 Talk
Equipment Certification Access/Egress 0 50 100 150 200 250
Material Stacking 21 Toe 0 0 0
Work At Height Barrication
Electrical Connections 13 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 52 Total 4 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
60000
Head 0 Other 0
53,072 53,072 25%
Tools &
50000 Eye 0 Equipment 0

Face 0 Floor Openings 0


40000 Hand 1 PPE 0
Equipment
Finger 3 0
30000 Certification
Chest 0 Access/Egress 0
Other 0
20000 Back 0 Work At Height 0 Tools & Equipment 0
Floor Openings 0
Leg 0 Barrication 0 PPE 0
10000 75% Equipment Certification 0
Knee 0 Welfare Facilities 0 Access/Egress 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 4 Housekeeping 0
SS1521 - Abqaiq AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 6736 6202 6054 5839 5460 6233 5337 7811 7092 5358 6611 7954 76687
Manpower

2 Total Man-hours Worked 53992 49616 49576 46712 43680 48624 41560 62488 56168 42864 52888 58440 606608
3 Man-hours worked since last LTI 53992 49616 49576 46712 43680 48624 41560 62488 56168 42864 52888 58440 606608
4 No. of First Aid Cases 2 1 0 0 0 0 0 0 4 2 1 2 12
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 4 4 4 3 2 3 1 1 2 2 2 1 29


12 No. of Near miss Acted 4 4 4 3 2 3 1 1 2 2 2 1 29
13 No. of Vehicle Accident 0 0 0 0 0 0 0 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 79 83 63 60 84 84 46 42 54 28 59 65 747
18 No. of HSE Observation Acted 79 83 63 60 84 84 46 42 54 28 59 65 747
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0 0 0 0 0 0
21 HSE Induction 17 10 23 13 12 10 12 14 13 7 17 24 172
22 No. of employees received Inhouse -Train 5 5 5 5 5 5 5 5 5 5 5 5 60
23 Training Hours for the above mentioned 1 1 1 1 1 1 1 1 1 1 1 1 12
Pro-Active Measures

24 No. of Tool Box Talk Conducted 4 4 4 4 4 4 4 4 4 5 4 4 49


25 No. of Employees attended during TBT 532 422 412 353 427 572 361 527 499 379 427 470 5381
26 HSE Committee Meetings conducted 1 1 1 1 1 1 1 1 1 1 1 1 12
27 Internal Audit conducted 0 0 0 0 0 0 1 0 0 0 0 0 1
28 No. of Risk Assessment Done 5 5 5 5 5 2 2 2 6 3 6 4 50
29 No. of Job Safety Analysis Done 5 5 5 5 5 2 2 2 6 3 6 4 50

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
13 3% 3% 3%
First Aid 12
12 PPE 400
11 350
Medical Treatment 0 Strike Against or by 1 21% 300
10
Lost Time Injury 0 9 Caught in / Between 250
50% 50%
8 200
Serious Injury 0 7 Slip, Trip & Fall 6
150
Occupational Illness 0
6 Fall from height 20 100
5
50
Fatality Accidents 0 4 Electrical hazard 1
3 0
Vehicle Accident 0 2 Fire Safety Hazard 1 1 2 3 4
1
Property Damage 0
0 Environmental 69%
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 29 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 364 238 32 113 747
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 364 238 32 113 747

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
20% 21% Civil Elec Mech
Other 155 Head 1 1 0 Tool Box Talk 49 Inter-
nal 1
Tools & Equipment 49
3% Eye 0 0 0 HSE Induction 172
Com
Audit
7% mittee
Job Safety Meet-
12
Floor Openings 27 Face 0 0 0 50 In-
Analysis ing
house
11% 4% Train-
60
PPE 22 Hand 3 1 0 Risk Assessment 50 Risk
ing
3% As-
50
Equipment Certification 12 11% Finger 3 2 0 Inhouse Training 60 sess-
6% 7% 6% 2% Job
Committee ment
Safety
Access/Egress 44 Chest 0 0 0 5 Meeting
12
Analy-
50
HSE
sis
Work At Height 53 Back 0 0 0 7 Internal Audit 1 Induc- 172
tion
Tool
Barrication 84 Leg 0 1 0
Other Tools & Equipment Box 49
Welfare Facilities 42 Floor Openings PPE Knee 0 0 0 Talk
Equipment Certification Access/Egress
Material Stacking 83 Toe 0 0 0
Work At Height Barrication
Electrical Connections 24 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 152 Total 7 5 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
8%
700000 17%
Head 2 Other 0
606,608 606,608 Tools &
600000 Eye 0 Equipment 0

Face 0 Floor Openings 0


500000
Hand 4 PPE 0
400000 Equipment
Finger 5 0
Certification
300000 Chest 0 Access/Egress 0
42% Other 0
Back 0 Work At Height 0 Tools & Equipment 0
200000 33% Floor Openings 0
Leg 1 Barrication 0 PPE 0
Equipment Certification 0
100000 Access/Egress 0
Knee 0 Welfare Facilities 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 12 Housekeeping 0
SS 8236 Industrial
Area AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 454 134 204 348 392 500 302 242 95 112 310 538 3631
Manpower

2 Total Man-hours Worked 3632 1072 1632 2784 3136 4000 2416 1936 706 896 2480 4304 28994
3 Man-hours worked since last LTI 3632 1072 1632 2784 3136 4000 2416 1936 706 896 2480 4304 28994
4 No. of First Aid Cases 4 0 1 1 1 1 1 1 0 0 0 0 10
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 1 0 1 2 1 1 0 1 0 0 0 0 7


12 No. of Near miss Acted 1 0 1 2 1 1 0 1 0 0 0 0 7
13 No. of Vehicle Accident 0 0 0 0 0 0 0 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 68 45 70 60 48 50 41 55 29 16 16 19 517
18 No. of HSE Observation Acted 68 45 70 60 48 50 41 55 29 16 16 19 517
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0 0 0 0 0 0
21 HSE Induction 0 0 0 0 0 0 0 0 0 0 0 0 0
22 No. of employees received Inhouse -Train 0 0 0 0 0 0 0 0 0 0 0 0 0
23 Training Hours for the above mentioned 0 0 0 0 0 0 0 0 0 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 24 24 24 24 22 25 20 24 22 15 10 10 244


25 No. of Employees attended during TBT 345 96 210 400 442 465 380 350 106 60 28 35 2917
26 HSE Committee Meetings conducted 0 0 0 0 0 0 0 0 0 0 0 0 0
27 Internal Audit conducted 0 0 0 0 0 0 0 0 0 0 0 0 0
28 No. of Risk Assessment Done 5 3 5 5 5 5 5 5 3 2 2 3 48
29 No. of Job Safety Analysis Done 5 3 5 5 5 5 5 5 3 2 2 3 48

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
11
First Aid 10 PPE 0 200
10
Medical Treatment 0 9 Strike Against or by 2 29% 150
Lost Time Injury 0
8 Caught in / Between 0
7 50% 50%
100
Serious Injury 0 6 Slip, Trip & Fall 1

Occupational Illness 0 5 Fall from height 4 50


4 57%
Fatality Accidents 0 3 Electrical hazard 0
0
Vehicle Accident 0 2 Fire Safety Hazard 0 14% 1 2 3 4
1
Property Damage 0 Environmental 0
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure 0
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 7 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 194 181 58 84 517
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 194 181 58 84 517

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
25% 21% Civil Elec Mech
Other 110 Head 0 0 0 Tool Box Talk 244 Inter-
nal 0
Com
Audit
Tools & Equipment 42 Eye 0 0 0 HSE Induction 0
mittee
8% Job Safety Meet-
0
Floor Openings 29 Face 0 0 0 48 In-
Analysis ing
house
7%
Train-
0
PPE 18 Hand 0 4 1 Risk Assessment 48 Risk
1 ing
6% 2 As-
48
Equipment Certification 6 10% Finger 2 3 0 Inhouse Training 0 sess-
9% 3% Job
Committee ment
Safety
Access/Egress 12 1 Chest 0 0 0 0 48
4 3 2% Meeting Analy-
% %
HSE
sis
Work At Height 14 % Back 0 0 0 Internal Audit 0 Induc- 0
tion
Tool
Barrication 52 Leg 0 0 0
Other Tools & Equipment Box 244
Welfare Facilities 22 Floor Openings PPE Knee 0 0 0 7 Talk
Equipment Certification Access/Egress 0 50 100 150 200 250 300
Material Stacking 48 Toe 0 0 0
Work At Height Barrication
Electrical Connections 34 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 130 Total 2 7 1

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
35000
Head 0 Other 0

30000 28,994 28,994 Eye 0


Tools &
0
Equipment
Face 0 Floor Openings 0
25000
Hand 5 PPE 0
20000 50% 50% Equipment
Finger 5 0
Certification
15000 Chest 0 Access/Egress 0
Other 0
Back 0 Work At Height 0 Tools & Equipment 0
10000 Floor Openings 0
Leg 0 Barrication 0 PPE 0
Equipment Certification 0
5000 Access/Egress 0
Knee 0 Welfare Facilities 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 10 Housekeeping 0
SS8278 - Malqa AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 1106 1018 1106 529 414 887 781 828 938 1082 1240 1578 11507
Manpower

2 Total Man-hours Worked 11060 10180 11060 5290 4140 8870 7810 8280 9380 10820 12400 15780 115070
3 Man-hours worked since last LTI 11060 10180 11060 5290 4140 8870 7810 8280 9380 10820 12400 15780 115070
4 No. of First Aid Cases 2 1 1 1 1 1 1 1 1 1 1 1 13
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 1 1 1 1 1 1 1 1 1 1 1 0 11


12 No. of Near miss Acted 1 1 1 1 1 1 1 1 1 1 1 0 11
13 No. of Vehicle Accident 0 0 0 0 0 0 0 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 25 58 60 51 59 52 40 40 46 45 45 59 580
18 No. of HSE Observation Acted 25 46 57 48 57 47 40 40 42 45 45 52 544
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0 0 0 0 0 0
21 HSE Induction 14 18 12 13 6 4 7 9 3 13 8 12 119
22 No. of employees received Inhouse -Train 0 0 0 0 0 0 0 0 0 0 0 0 0
23 Training Hours for the above mentioned 0 0 0 0 0 0 0 0 0 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 50 23 23 39 47 52 87 25 84 25 65 100 620


25 No. of Employees attended during TBT 700 805 783 363 322 322 384 855 560 503 1618 6356 13571
26 HSE Committee Meetings conducted 1 1 1 1 1 0 0 1 1 1 1 1 10
27 Internal Audit conducted 0 0 0 0 0 0 0 0 0 0 0 0 0
28 No. of Risk Assessment Done 10 15 13 11 10 6 5 9 10 10 10 10 119
29 No. of Job Safety Analysis Done 10 15 13 11 10 6 5 9 10 10 10 10 119

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
14
First Aid 13 PPE 250
12
Medical Treatment 0 Strike Against or by 200
Lost Time Injury 0 10 Caught in / Between 36% 150 48% 52%
Serious Injury 0 8 Slip, Trip & Fall 4 100
Occupational Illness 0 6 Fall from height 7
50
Fatality Accidents 0 4 Electrical hazard
64% 0
Vehicle Accident 0 2 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 11 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 168 123 42 247 580
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 151 121 39 233 544

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
22% 19% Civil Elec Mech
Other 112 Head 0 0 0 Tool Box Talk 620 Inter-
nal 0
7% Com
Audit
Tools & Equipment 38 Eye 0 0 0 HSE Induction 119
mittee
5% Job Safety Meet-
10
Floor Openings 28 Face 0 0 0 119 In-
Analysis ing
house
5%
Train-
0
PPE 12 Hand 1 2 0 Risk Assessment 119 Risk
10% ing
As-
Equipment Certification 12 2% Finger 4 3 0 Inhouse Training 0 sess-
119
6% 10% Job
5% 7% 2% ment
Committee Safety
Access/Egress 42 Chest 0 0 0
Meeting
10
Analy-
119
7 6 HSE
sis
Work At Height 58 Back 0 0 0 Internal Audit 0 Induc- 119
tion
Tool
Barrication 34 Leg 1 2 0
Other Tools & Equipment Box 620
Welfare Facilities 27 Floor Openings PPE Knee 0 0 0 Talk
Equipment Certification Access/Egress 0 100 200 300 400 500 600 700
Material Stacking 58 Toe 0 0 0
Work At Height Barrication
Electrical Connections 31 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 128 Total 6 7 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
140000
Head 0 23% 23% Other 0
115,070 115,070 Tools &
120000 Eye 0 Equipment 0

Face 0 Floor Openings 0


100000
Hand 3 PPE 0
80000 Equipment
Finger 7 0
Certification
60000 Chest 0 Access/Egress 0
Other 0
Back 0 Work At Height 0 Tools & Equipment 0
40000 Floor Openings 0
Leg 3 Barrication 0 PPE 0
Equipment Certification 0
20000 Access/Egress 0
Knee 0 Welfare Facilities 0
Work At Height 0
54%
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 13 Housekeeping 0
Wind - Jandal AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 112 122 342 524 476 567 421 390 364 358 190 165 4031
Manpower

2 Total Man-hours Worked 912 992 2752 4208 3824 4552 3384 3136 2928 2880 1536 1336 32440
3 Man-hours worked since last LTI 912 992 2752 4208 3824 4552 3384 3136 2928 2880 1536 1336 32440
4 No. of First Aid Cases 0 0 0 1 0 0 0 0 0 0 0 0 1
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 2 2 2 0 1 4 0 0 2 1 0 0 14


12 No. of Near miss Acted 2 2 2 0 1 4 0 0 2 1 0 0 14
13 No. of Vehicle Accident 0 0 0 0 0 0 0 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 12 15 12 8 7 15 6 5 6 4 2 0 92
18 No. of HSE Observation Acted 10 15 12 7 7 15 6 5 6 4 2 0 89
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0 0 0 0 0 0
21 HSE Induction 2 12 23 31 22 31 12 6 7 5 1 1 153
22 No. of employees received Inhouse -Train 3 0 3 0 12 4 2 0 13 0 0 0 37
23 Training Hours for the above mentioned 1 0 2 0 1 2 1 0 7 0 0 0 14
Pro-Active Measures

24 No. of Tool Box Talk Conducted 16 21 28 35 21 36 21 19 17 12 5 2 233


25 No. of Employees attended during TBT 17 32 51 76 32 48 30 25 22 18 6 5 362
26 HSE Committee Meetings conducted 1 1 1 1 1 1 1 1 1 1 0 0 10
27 Internal Audit conducted 0 0 0 0 0 0 0 0 0 0 0 0 0
28 No. of Risk Assessment Done 4 2 4 2 1 3 1 0 2 0 0 0 19
29 No. of Job Safety Analysis Done 3 4 5 1 3 5 2 0 3 0 0 0 26

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
2 7% 7%
First Aid 1 PPE 1 45
40
Medical Treatment 0 Strike Against or by 2 14% 35
Lost Time Injury 0 Caught in / Between
30
25 49% 51%
Serious Injury 0 Slip, Trip & Fall 6
29% 20
1 15
Occupational Illness 0 Fall from height 4 10
5
Fatality Accidents 0 Electrical hazard 1
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0 43%
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 14 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 33 43 4 12 92
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 32 42 4 11 89

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
13% 20% Civil Elec Mech
7% Inter-
Other 18 Head 0 0 0 Tool Box Talk 233
nal 0
Com
Audit
Tools & Equipment 9 Eye 0 0 0 HSE Induction 153
mittee
10% Job Safety Meet-
10
Floor Openings 8 12% Face 0 0 0 26 In-
Analysis ing
house
Train-
37
PPE 5 Hand 1 0 0 Risk Assessment 19 Risk
ing
As-
Equipment Certification 2 3% Finger 0 0 0 Inhouse Training 37 19
9% sess-
Job
5% 9% ment
5% 5% Committee Safety
Access/Egress 8 Chest 0 0 0
Meeting
10
Analy-
26
2% HSE
sis
Work At Height 5 Back 0 0 0 Internal Audit 0 Induc- 153
tion
Tool
Barrication 5 Leg 0 0 0
Other Tools & Equipment Box 233
Welfare Facilities 3 Floor Openings PPE Knee 0 0 0 1 Talk
Equipment Certification Access/Egress 0 50 100 150 200 250
Material Stacking 11 Toe 0 0 0
Work At Height Barrication
Electrical Connections 6 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 12 Total 1 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
35000 32,440 32,440 Head 0 Other 0
Tools &
30000 Eye 0 Equipment 0

Face 0 Floor Openings 0


25000
Hand 1 PPE 0
20000 Equipment
Finger 0 0
Certification
15000 Chest 0 Access/Egress 0
Other 0
Back 0 Work At Height 0 Tools & Equipment 0
10000 Floor Openings 0
Leg 0 Barrication 0 PPE 0
Equipment Certification 0
5000 Access/Egress 0
Knee 0 Welfare Facilities 0
Work At Height 0
100%
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 1 Housekeeping 0
Khafji - UGC AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 962 977 870 944 809 1158 1072 1117 1685 1675 11269
Manpower

2 Total Man-hours Worked 9620 9970 8700 9440 8090 11580 10720 11170 16850 16750 112890
3 Man-hours worked since last LTI 9620 9970 8700 9440 8090 11580 10720 11170 16850 16750 112890
4 No. of First Aid Cases 0 0 0 0 0 0 1 1 0 0 2
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 0 0 0 1 0 2 2 2 0 0 7


12 No. of Near miss Acted 0 0 0 1 0 2 2 2 0 0 7
13 No. of Vehicle Accident 0 0 0 1 0 0 0 0 0 0 1
14 No. of Property Damage 0 0 0 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 57 43 31 33 33 34 33 30 35 32 361
18 No. of HSE Observation Acted 57 43 31 33 33 34 33 30 35 32 361
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0 0 0 0
21 HSE Induction 35 10 7 9 3 28 3 5 22 10 132
22 No. of employees received Inhouse -Train 4 3 0 0 5 5 0 0 10 0 27
23 Training Hours for the above mentioned 16 12 0 0 20 20 0 0 40 0 108
Pro-Active Measures

24 No. of Tool Box Talk Conducted 18 45 18 32 20 36 24 45 43 47 328


25 No. of Employees attended during TBT 695 832 754 703 695 898 905 874 1371 1389 9116
26 HSE Committee Meetings conducted 1 1 1 1 1 1 1 1 1 1 10
27 Internal Audit conducted 0L 0 0 0 0 0 0 0 0 0 0
28 No. of Risk Assessment Done 3 0 2 3 0 4 2 1 6 3 24
29 No. of Job Safety Analysis Done 3 0 2 3 0 4 2 1 6 3 24

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
3 14%
First Aid 2 PPE 250
Medical Treatment 0 Strike Against or by 200
Lost Time Injury 0 2 Caught in / Between 150 50% 50%
Serious Injury 0 Slip, Trip & Fall 6 100
Occupational Illness 0 Fall from height 1
50
Fatality Accidents 0
1 Electrical hazard
0
Vehicle Accident 1 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0 86%
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 7 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 223 77 0 61 361
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 223 77 0 61 361

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
17% Civil Elec Mech
Other 134 Head 0 0 0 Tool Box Talk 328 Inter-
3% 37% nal 0
Com
Audit
Tools & Equipment 15 4% Eye 0 0 0 HSE Induction 132
mittee
Job Safety Meet-
10
Floor Openings 8 Face 0 0 0 24 In-
Analysis ing
house
8% Train-
27
PPE 12 Hand 0 0 0 Risk Assessment 24 Risk
ing
As-
Equipment Certification 14 Finger 2 0 0 Inhouse Training 27 sess-
24
5% Job
12% 4% Committee ment
Safety
Access/Egress 18 Chest 0 0 0
Meeting
10
Analy-
24
Work At Height 0 4% 3% 2% Back 0 0 0 Internal Audit 0
HSE
sis
Induc- 132
tion
Tool
Barrication 42 Leg 0 0 0
Other Tools & Equipment Box 328
Welfare Facilities 28 Floor Openings PPE Knee 0 0 0 2 Talk
Equipment Certification Access/Egress 0 50 100 150 200 250 300 350
Material Stacking 16 Toe 0 0 0
Work At Height Barrication
Electrical Connections 12 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 62 Total 2 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
120000 112,890 112,890 Head 0 Other 0
Tools &
100000 Eye 0 Equipment 0

Face 0 Floor Openings 0


80000 Hand 0 PPE 0
Equipment
Finger 2 0
60000 Certification
Chest 0 Access/Egress 0
Other 0
40000 Back 0 Work At Height 0 Tools & Equipment 0
Floor Openings 0
Leg 0 Barrication 0 PPE 0
20000 Equipment Certification 0
Knee 0 Welfare Facilities 0 Access/Egress 0
Work At Height 0
100%
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 2 Housekeeping 0
SS8915 - Noura AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 1448 1280 1690 1144 1146 1409 1073 1448 1301 1176 699 13814
Manpower

2 Total Man-hours Worked 14480 13390 16900 11440 11460 14090 10379 14480 12446 11577 6894 137536
3 Man-hours worked since last LTI 14480 13390 16900 11440 11460 14090 10379 14480 12446 11577 6894 137536
4 No. of First Aid Cases 0 0 0 0 0 0 0 0 0 0 0 0
5 No. of Medical Treatment Cases 0 0 0 0 0 0 0 0 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0 0 0 0 0 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0 0 0 0 0 0 0 0 0
9 No. of Occupational Illness 0 0 0 0 0 0 0 0 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0 0 0 0 0 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 0 1 0 0 2 0 0 1 1 0 0 5


12 No. of Near miss Acted 0 1 0 0 2 0 0 1 1 0 0 5
13 No. of Vehicle Accident 0 0 0 0 0 0 0 0 0 0 0 0
14 No. of Property Damage 0 0 0 0 0 0 0 0 0 0 0 0
15 No. of Fire Incidents 0 0 0 0 0 0 0 0 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0 0 0 0 0 0 0 0 0
17 No. of HSE Observation Reported 39 60 50 25 24 35 20 20 27 31 32 363
18 No. of HSE Observation Acted 39 60 48 25 22 35 20 20 25 31 25 350
19 No. of Nonconformity Reported 0 0 0 0 0 0 0 0 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0 0 0 0 0 0 0 0 0
21 HSE Induction 9 6 8 3 4 6 4 6 0 2 0 48
22 No. of employees received Inhouse -Train 0 0 0 0 0 0 0 0 0 0 0 0
23 Training Hours for the above mentioned 0 0 0 0 0 0 0 0 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 85 135 67 94 81 30 100 85 60 87 26 850


25 No. of Employees attended during TBT 495 900 1287 564 598 871 577 495 800 811 172 7570
26 HSE Committee Meetings conducted 1 1 1 1 1 1 1 1 1 0 0 9
27 Internal Audit conducted 0 0 0 0 0 0 0 0 0 0 0 0
28 No. of Risk Assessment Done 6 9 3 1 2 4 6 4 2 0 0 37
29 No. of Job Safety Analysis Done 6 9 3 1 2 4 6 4 2 0 0 37

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 200
20%
Medical Treatment 0 Strike Against or by
150
Lost Time Injury 0 Caught in / Between
40% 49% 51%
100
Serious Injury 0 Slip, Trip & Fall 2

Occupational Illness 0 Fall from height 2 50


Fatality Accidents 0 Electrical hazard 1
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental 40%
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 5 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 114 197 29 23 363
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 114 184 29 23 350

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
31% Civil Elec Mech
33% Inter-
Other 121 Head 0 0 0 Tool Box Talk 850
nal 0
Com
Audit
Tools & Equipment 20 Eye 0 0 0 HSE Induction 48
mittee
Job Safety Meet-
9
Floor Openings 12 Face 0 0 0 37 In-
Analysis ing
house
Train-
0
PPE 8 Hand 0 0 0 Risk Assessment 37 Risk
ing
As-
3% 37
Equipment Certification 3 Finger 0 0 0 Inhouse Training 0 sess-
8% 6% Job
Committee ment
Safety
Access/Egress 16 3 Chest 0 0 0
Meeting
9
Analy-
37
2 3% 2 %
% 4% 4% 1% % HSE
sis
Work At Height 13 Back 0 0 0 Internal Audit 0 Induc- 48
tion
Tool
Barrication 12 Leg 0 0 0
Other Tools & Equipment Box 850
Welfare Facilities 6 Floor Openings PPE Knee 0 0 0 Talk
Equipment Certification Access/Egress 0 200 400 600 800 1000
Material Stacking 28 Toe 0 0 0
Work At Height Barrication
Electrical Connections 12 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 112 Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
160000
Head 0 Other 0
137,536 137,536
140000 Eye 0
Tools &
0
Equipment
120000 Face 0 Floor Openings 0

100000 Hand 0 PPE 0


Equipment
Finger 0 0
80000 Certification
Chest 0 Access/Egress 0
60000 Other 0
Back 0 Work At Height 0 Tools & Equipment 0
Floor Openings 0
40000 PPE 0
Leg 0 Barrication 0
Equipment Certification 0
20000 Access/Egress 0
Knee 0 Welfare Facilities 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 0 Housekeeping 0
National Guard -
UGC AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 636 780 780 2196


Manpower

2 Total Man-hours Worked 5088 6240 6240 17568


3 Man-hours worked since last LTI 5088 6240 6240 17568
4 No. of First Aid Cases 0 0 0 0
5 No. of Medical Treatment Cases 0 0 0 0
6 No. of Lost Time Injury Cases 0 0 0 0
7 No. of Man hours lost due to LTI 0 0 0 0
8 No. of Serious Injury Cases 0 0 0 0
9 No. of Occupational Illness 0 0 0 0
10 No. of Fatality Accidents 0 0 0 0
Re- Active Measures

11 No. of Near miss Reported 1 3 0 4


12 No. of Near miss Acted 1 3 0 4
13 No. of Vehicle Accident 0 0 0 0
14 No. of Property Damage 0 0 0 0
15 No. of Fire Incidents 0 0 0 0
16 No. of Environmental Incidents 0 0 0 0
17 No. of HSE Observation Reported 20 15 16 51
18 No. of HSE Observation Acted 20 15 16 51
19 No. of Nonconformity Reported 0 0 0 0
20 No. of Corrective Action Taken 0 0 0 0
21 HSE Induction 2 7 2 11
22 No. of employees received Inhouse -Train 0 0 0 0
23 Training Hours for the above mentioned 0 0 0 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 26 26 22 74


25 No. of Employees attended during TBT 294 408 330 1032
26 HSE Committee Meetings conducted 1 1 1 3
27 Internal Audit conducted 0 0 0 0
28 No. of Risk Assessment Done 0 0 0 0
29 No. of Job Safety Analysis Done 0 0 0 0

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 25
Medical Treatment 0 Strike Against or by 20
Lost Time Injury 0 Caught in / Between 15 50% 50%
Serious Injury 0 Slip, Trip & Fall 4 10
Occupational Illness 0 Fall from height
5
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure 100% HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total 4 PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 9 22 0 20 51
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 9 22 0 20 51

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
24% 20% Civil Elec Mech
Other 10 Head 0 0 0 Tool Box Talk 74 Inter-
nal 0
Com
Audit
Tools & Equipment 4 8% Eye 0 0 0 HSE Induction 11
mittee
Job Safety Meet-
3
Floor Openings 2 6% Face 0 0 0 0 In-
Analysis ing
house
4% Train-
0
PPE 4 Hand 0 0 0 Risk Assessment 0 Risk
ing
As-
Equipment Certification 2 Finger 0 0 0 Inhouse Training 0 sess-
0
16% 6% 8% Job
Committee ment
Safety
Access/Egress 2 Chest 0 0 0 3 0
4% Meeting Analy-
2% 4% HSE
sis
Work At Height 0 Back 0 0 0 Internal Audit 0 Induc- 11
tion
Tool
Barrication 3 Leg 0 0 0
Other Tools & Equipment Box 74
Welfare Facilities 1 Floor Openings PPE Knee 0 0 0 Talk
Equipment Certification Access/Egress 0 10 20 30 40 50 60 70 80
Material Stacking 8 Toe 0 0 0
Work At Height Barrication
Electrical Connections 3 Welfare Facilities Material Stacking Other 0 0 0
Electrical Connections Housekeeping
Housekeeping 12 Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
20000
Head 0 Other 0
18000 17,568 17,568
Tools &
Eye 0 Equipment 0
16000
Face 0 Floor Openings 0
14000
Hand 0 PPE 0
12000
Equipment
Finger 0 0
10000 Certification

8000 Chest 0 Access/Egress 0


Other 0
Tools & Equipment 0
6000 Back 0 Work At Height 0
Floor Openings 0
4000 Leg 0 Barrication 0 PPE 0
Equipment Certification 0
2000 Knee 0 Welfare Facilities 0 Access/Egress 0
Work At Height 0
0 Toe 0 Material Stacking 0
Barrication 0
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities 0
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking 0
Other 0 Other 0
Connections Electrical Connections 0
Housekeeping 0
Total 0 Housekeeping 0
Tawdiya - OHTL AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 0


Manpower

2 Total Man-hours Worked 0


3 Man-hours worked since last LTI 0
4 No. of First Aid Cases 0
5 No. of Medical Treatment Cases 0
6 No. of Lost Time Injury Cases 0
7 No. of Man hours lost due to LTI 0
8 No. of Serious Injury Cases 0
9 No. of Occupational Illness 0
10 No. of Fatality Accidents 0
Re- Active Measures

11 No. of Near miss Reported 0


12 No. of Near miss Acted 0
13 No. of Vehicle Accident 0
14 No. of Property Damage 0
15 No. of Fire Incidents 0
16 No. of Environmental Incidents 0
17 No. of HSE Observation Reported 0
18 No. of HSE Observation Acted 0
19 No. of Nonconformity Reported 0
20 No. of Corrective Action Taken 0
21 HSE Induction 0
22 No. of employees received Inhouse -Train 0
23 Training Hours for the above mentioned 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 0


25 No. of Employees attended during TBT 0
26 HSE Committee Meetings conducted 0
27 Internal Audit conducted 0
28 No. of Risk Assessment Done 0
29 No. of Job Safety Analysis Done 0

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 10
Medical Treatment 0 Strike Against or by 8
Lost Time Injury 0 Caught in / Between 6
Serious Injury 0 Slip, Trip & Fall 4
Occupational Illness 0 Fall from height
2
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 0
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 0

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
Other Head Tool Box Talk Inter-
nal
Com
Audit
Tools & Equipment Eye HSE Induction
mittee
Job Safety Meet-
In-
Floor Openings Face
Analysis ing
house
PPE Hand Risk Assessment Train-
Risk
ing
As-
Equipment Certification Finger Inhouse Training sess-
Job
Committee ment
Safety
Access/Egress Chest
Meeting Analy-
HSE
sis
Work At Height Back Internal Audit Induc-
tion
Tool
Barrication Leg
Other Tools & Equipment Box
Welfare Facilities Floor Openings PPE Knee Talk
Equipment Certification Access/Egress 0 2 4 6 8 10 12
Material Stacking Toe
Work At Height Barrication
Electrical Connections Welfare Facilities Material Stacking Other
Electrical Connections Housekeeping
Housekeeping Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
1
Head Other
0.9 Tools &
Eye Equipment
0.8
Face Floor Openings
0.7
Hand PPE
0.6
Equipment
Finger
0.5 Certification

0.4 Chest Access/Egress


Other
Tools & Equipment
0.3 Back Work At Height
Floor Openings
0.2 Leg Barrication PPE
Equipment Certification
0.1 Knee Welfare Facilities Access/Egress
0 0 Work At Height
0 Toe Material Stacking
Barrication
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking
Other Other Connections Electrical Connections
Housekeeping
Total 0 Housekeeping
SS 9083 - KSP AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 0


Manpower

2 Total Man-hours Worked 0


3 Man-hours worked since last LTI 0
4 No. of First Aid Cases 0
5 No. of Medical Treatment Cases 0
6 No. of Lost Time Injury Cases 0
7 No. of Man hours lost due to LTI 0
8 No. of Serious Injury Cases 0
9 No. of Occupational Illness 0
10 No. of Fatality Accidents 0
Re- Active Measures

11 No. of Near miss Reported 0


12 No. of Near miss Acted 0
13 No. of Vehicle Accident 0
14 No. of Property Damage 0
15 No. of Fire Incidents 0
16 No. of Environmental Incidents 0
17 No. of HSE Observation Reported 0
18 No. of HSE Observation Acted 0
19 No. of Nonconformity Reported 0
20 No. of Corrective Action Taken 0
21 HSE Induction 0
22 No. of employees received Inhouse -Train 0
23 Training Hours for the above mentioned 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 0


25 No. of Employees attended during TBT 0
26 HSE Committee Meetings conducted 0
27 Internal Audit conducted 0
28 No. of Risk Assessment Done 0
29 No. of Job Safety Analysis Done 0

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 10
Medical Treatment 0 Strike Against or by 8
Lost Time Injury 0 Caught in / Between 6
Serious Injury 0 Slip, Trip & Fall 4
Occupational Illness 0 Fall from height
2
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 0
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 0

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
Other Head Tool Box Talk Inter-
nal
Com
Audit
Tools & Equipment Eye HSE Induction
mittee
Job Safety Meet-
In-
Floor Openings Face
Analysis ing
house
PPE Hand Risk Assessment Train-
Risk
ing
As-
Equipment Certification Finger Inhouse Training sess-
Job
Committee ment
Safety
Access/Egress Chest
Meeting Analy-
HSE
sis
Work At Height Back Internal Audit Induc-
tion
Tool
Barrication Leg
Other Tools & Equipment Box
Welfare Facilities Floor Openings PPE Knee Talk
Equipment Certification Access/Egress 0 2 4 6 8 10 12
Material Stacking Toe
Work At Height Barrication
Electrical Connections Welfare Facilities Material Stacking Other
Electrical Connections Housekeeping
Housekeeping Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
1
Head Other
0.9 Tools &
Eye Equipment
0.8
Face Floor Openings
0.7
Hand PPE
0.6
Equipment
Finger
0.5 Certification

0.4 Chest Access/Egress


Other
Tools & Equipment
0.3 Back Work At Height
Floor Openings
0.2 Leg Barrication PPE
Equipment Certification
0.1 Knee Welfare Facilities Access/Egress
0 0 Work At Height
0 Toe Material Stacking
Barrication
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking
Other Other Connections Electrical Connections
Housekeeping
Total 0 Housekeeping
SS 9098 - Wessam AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 0


Manpower

2 Total Man-hours Worked 0


3 Man-hours worked since last LTI 0
4 No. of First Aid Cases 0
5 No. of Medical Treatment Cases 0
6 No. of Lost Time Injury Cases 0
7 No. of Man hours lost due to LTI 0
8 No. of Serious Injury Cases 0
9 No. of Occupational Illness 0
10 No. of Fatality Accidents 0
Re- Active Measures

11 No. of Near miss Reported 0


12 No. of Near miss Acted 0
13 No. of Vehicle Accident 0
14 No. of Property Damage 0
15 No. of Fire Incidents 0
16 No. of Environmental Incidents 0
17 No. of HSE Observation Reported 0
18 No. of HSE Observation Acted 0
19 No. of Nonconformity Reported 0
20 No. of Corrective Action Taken 0
21 HSE Induction 0
22 No. of employees received Inhouse -Train 0
23 Training Hours for the above mentioned 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 0


25 No. of Employees attended during TBT 0
26 HSE Committee Meetings conducted 0
27 Internal Audit conducted 0
28 No. of Risk Assessment Done 0
29 No. of Job Safety Analysis Done 0

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 10
Medical Treatment 0 Strike Against or by 8
Lost Time Injury 0 Caught in / Between 6
Serious Injury 0 Slip, Trip & Fall 4
Occupational Illness 0 Fall from height
2
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 0
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 0

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
Other Head Tool Box Talk Inter-
nal
Com
Audit
Tools & Equipment Eye HSE Induction
mittee
Job Safety Meet-
In-
Floor Openings Face
Analysis ing
house
PPE Hand Risk Assessment Train-
Risk
ing
As-
Equipment Certification Finger Inhouse Training sess-
Job
Committee ment
Safety
Access/Egress Chest
Meeting Analy-
HSE
sis
Work At Height Back Internal Audit Induc-
tion
Tool
Barrication Leg
Other Tools & Equipment Box
Welfare Facilities Floor Openings PPE Knee Talk
Equipment Certification Access/Egress 0 2 4 6 8 10 12
Material Stacking Toe
Work At Height Barrication
Electrical Connections Welfare Facilities Material Stacking Other
Electrical Connections Housekeeping
Housekeeping Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
1
Head Other
0.9 Tools &
Eye Equipment
0.8
Face Floor Openings
0.7
Hand PPE
0.6
Equipment
Finger
0.5 Certification

0.4 Chest Access/Egress


Other
Tools & Equipment
0.3 Back Work At Height
Floor Openings
0.2 Leg Barrication PPE
Equipment Certification
0.1 Knee Welfare Facilities Access/Egress
0 0 Work At Height
0 Toe Material Stacking
Barrication
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking
Other Other Connections Electrical Connections
Housekeeping
Total 0 Housekeeping
132KV - Jandal AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 0


Manpower

2 Total Man-hours Worked 0


3 Man-hours worked since last LTI 0
4 No. of First Aid Cases 0
5 No. of Medical Treatment Cases 0
6 No. of Lost Time Injury Cases 0
7 No. of Man hours lost due to LTI 0
8 No. of Serious Injury Cases 0
9 No. of Occupational Illness 0
10 No. of Fatality Accidents 0
Re- Active Measures

11 No. of Near miss Reported 0


12 No. of Near miss Acted 0
13 No. of Vehicle Accident 0
14 No. of Property Damage 0
15 No. of Fire Incidents 0
16 No. of Environmental Incidents 0
17 No. of HSE Observation Reported 0
18 No. of HSE Observation Acted 0
19 No. of Nonconformity Reported 0
20 No. of Corrective Action Taken 0
21 HSE Induction 0
22 No. of employees received Inhouse -Train 0
23 Training Hours for the above mentioned 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 0


25 No. of Employees attended during TBT 0
26 HSE Committee Meetings conducted 0
27 Internal Audit conducted 0
28 No. of Risk Assessment Done 0
29 No. of Job Safety Analysis Done 0

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 10
Medical Treatment 0 Strike Against or by 8
Lost Time Injury 0 Caught in / Between 6
Serious Injury 0 Slip, Trip & Fall 4
Occupational Illness 0 Fall from height
2
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 0
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 0

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
Other Head Tool Box Talk Inter-
nal
Com
Audit
Tools & Equipment Eye HSE Induction
mittee
Job Safety Meet-
In-
Floor Openings Face
Analysis ing
house
PPE Hand Risk Assessment Train-
Risk
ing
As-
Equipment Certification Finger Inhouse Training sess-
Job
Committee ment
Safety
Access/Egress Chest
Meeting Analy-
HSE
sis
Work At Height Back Internal Audit Induc-
tion
Tool
Barrication Leg
Other Tools & Equipment Box
Welfare Facilities Floor Openings PPE Knee Talk
Equipment Certification Access/Egress 0 2 4 6 8 10 12
Material Stacking Toe
Work At Height Barrication
Electrical Connections Welfare Facilities Material Stacking Other
Electrical Connections Housekeeping
Housekeeping Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
1
Head Other
0.9 Tools &
Eye Equipment
0.8
Face Floor Openings
0.7
Hand PPE
0.6
Equipment
Finger
0.5 Certification

0.4 Chest Access/Egress


Other
Tools & Equipment
0.3 Back Work At Height
Floor Openings
0.2 Leg Barrication PPE
Equipment Certification
0.1 Knee Welfare Facilities Access/Egress
0 0 Work At Height
0 Toe Material Stacking
Barrication
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking
Other Other Connections Electrical Connections
Housekeeping
Total 0 Housekeeping
380KV - Afif AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 0


Manpower

2 Total Man-hours Worked 0


3 Man-hours worked since last LTI 0
4 No. of First Aid Cases 0
5 No. of Medical Treatment Cases 0
6 No. of Lost Time Injury Cases 0
7 No. of Man hours lost due to LTI 0
8 No. of Serious Injury Cases 0
9 No. of Occupational Illness 0
10 No. of Fatality Accidents 0
Re- Active Measures

11 No. of Near miss Reported 0


12 No. of Near miss Acted 0
13 No. of Vehicle Accident 0
14 No. of Property Damage 0
15 No. of Fire Incidents 0
16 No. of Environmental Incidents 0
17 No. of HSE Observation Reported 0
18 No. of HSE Observation Acted 0
19 No. of Nonconformity Reported 0
20 No. of Corrective Action Taken 0
21 HSE Induction 0
22 No. of employees received Inhouse -Train 0
23 Training Hours for the above mentioned 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 0


25 No. of Employees attended during TBT 0
26 HSE Committee Meetings conducted 0
27 Internal Audit conducted 0
28 No. of Risk Assessment Done 0
29 No. of Job Safety Analysis Done 0

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 10
Medical Treatment 0 Strike Against or by 8
Lost Time Injury 0 Caught in / Between 6
Serious Injury 0 Slip, Trip & Fall 4
Occupational Illness 0 Fall from height
2
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 0
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 0

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
Other Head Tool Box Talk Inter-
nal
Com
Audit
Tools & Equipment Eye HSE Induction
mittee
Job Safety Meet-
In-
Floor Openings Face
Analysis ing
house
PPE Hand Risk Assessment Train-
Risk
ing
As-
Equipment Certification Finger Inhouse Training sess-
Job
Committee ment
Safety
Access/Egress Chest
Meeting Analy-
HSE
sis
Work At Height Back Internal Audit Induc-
tion
Tool
Barrication Leg
Other Tools & Equipment Box
Welfare Facilities Floor Openings PPE Knee Talk
Equipment Certification Access/Egress 0 2 4 6 8 10 12
Material Stacking Toe
Work At Height Barrication
Electrical Connections Welfare Facilities Material Stacking Other
Electrical Connections Housekeeping
Housekeeping Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
1
Head Other
0.9 Tools &
Eye Equipment
0.8
Face Floor Openings
0.7
Hand PPE
0.6
Equipment
Finger
0.5 Certification

0.4 Chest Access/Egress


Other
Tools & Equipment
0.3 Back Work At Height
Floor Openings
0.2 Leg Barrication PPE
Equipment Certification
0.1 Knee Welfare Facilities Access/Egress
0 0 Work At Height
0 Toe Material Stacking
Barrication
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking
Other Other Connections Electrical Connections
Housekeeping
Total 0 Housekeeping
380KV - Afif AL BABTAIN PROJECTS HSE STATISTIC REPORT YEAR - 2021

[Link] Description January February March April May June July August September October November December TOTAL

1 Total Manpower Worked 0


Manpower

2 Total Man-hours Worked 0


3 Man-hours worked since last LTI 0
4 No. of First Aid Cases 0
5 No. of Medical Treatment Cases 0
6 No. of Lost Time Injury Cases 0
7 No. of Man hours lost due to LTI 0
8 No. of Serious Injury Cases 0
9 No. of Occupational Illness 0
10 No. of Fatality Accidents 0
Re- Active Measures

11 No. of Near miss Reported 0


12 No. of Near miss Acted 0
13 No. of Vehicle Accident 0
14 No. of Property Damage 0
15 No. of Fire Incidents 0
16 No. of Environmental Incidents 0
17 No. of HSE Observation Reported 0
18 No. of HSE Observation Acted 0
19 No. of Nonconformity Reported 0
20 No. of Corrective Action Taken 0
21 HSE Induction 0
22 No. of employees received Inhouse -Train 0
23 Training Hours for the above mentioned 0
Pro-Active Measures

24 No. of Tool Box Talk Conducted 0


25 No. of Employees attended during TBT 0
26 HSE Committee Meetings conducted 0
27 Internal Audit conducted 0
28 No. of Risk Assessment Done 0
29 No. of Job Safety Analysis Done 0

Re- Active Measures - Incident Details Re-Active Measures- Nearmiss Analysis Re - Active Measures -HSE Observation Report
Cases Numbers Measures Numbers
1
First Aid 0 PPE 10
Medical Treatment 0 Strike Against or by 8
Lost Time Injury 0 Caught in / Between 6
Serious Injury 0 Slip, Trip & Fall 4
Occupational Illness 0 Fall from height
2
Fatality Accidents 0 Electrical hazard
0
Vehicle Accident 0 Fire Safety Hazard 1 2 3 4
Property Damage 0 Environmental
0
Fire Incidents 0 First Med- Lost Se- Oc- Fatal- Ve- Prop Fire Envi- Procedure
HSE Observation Reported HSE Observation Acted
Aid ical Time ri- cupa- ity hicle erty Inci- ron-
Treat In- ous tional Acci- Ac- Dam- dents men-
Environmental Incide 0 ment jury In- Ill- dents ciden age tal Total PPE Strike Against or by Caught in / Between Observation Civil Elec Mech Other Total
jury ness t Inci-
dents Slip, Trip & Fall Fall from height Electrical hazard
HSE Observation Reported 0
Fire Safety Hazard Environmental Procedure
HSE Observation Acted 0

Details of HSE Observation Report Re-Active Measures - First Aid Analysis by Department Pro - Active Measures - General
Issues Numbers Body Civil Elec Mech Measures Numbers
Civil Elec Mech
Other Head Tool Box Talk Inter-
nal
Com
Audit
Tools & Equipment Eye HSE Induction
mittee
Job Safety Meet-
In-
Floor Openings Face
Analysis ing
house
PPE Hand Risk Assessment Train-
Risk
ing
As-
Equipment Certification Finger Inhouse Training sess-
Job
Committee ment
Safety
Access/Egress Chest
Meeting Analy-
HSE
sis
Work At Height Back Internal Audit Induc-
tion
Tool
Barrication Leg
Other Tools & Equipment Box
Welfare Facilities Floor Openings PPE Knee Talk
Equipment Certification Access/Egress 0 2 4 6 8 10 12
Material Stacking Toe
Work At Height Barrication
Electrical Connections Welfare Facilities Material Stacking Other
Electrical Connections Housekeeping
Housekeeping Total 0 0 0

Man-hours Analysis First Aid Analysis Details of Nonconformity Report


Body cases Nonconformance Numbers
1
Head Other
0.9 Tools &
Eye Equipment
0.8
Face Floor Openings
0.7
Hand PPE
0.6
Equipment
Finger
0.5 Certification

0.4 Chest Access/Egress


Other
Tools & Equipment
0.3 Back Work At Height
Floor Openings
0.2 Leg Barrication PPE
Equipment Certification
0.1 Knee Welfare Facilities Access/Egress
0 0 Work At Height
0 Toe Material Stacking
Barrication
Head Eye Face Hand Finger Chest Back Leg Knee Toe Welfare Facilities
Total Man-hours Worked Man-hours worked since last LTI Electrical Material Stacking
Other Other Connections Electrical Connections
Housekeeping
Total 0 Housekeeping