Bill of Materials for Residential Build

The document outlines a detailed bill of materials for a proposed two-storey residential building, including various construction categories such as site works, concrete works, steel structures, roofing, masonry, and ceiling works. Each category lists specific items, their specifications, quantities, unit costs, and total costs, although many total costs are not filled in. The document also includes provisions for overhead, profit, and value-added tax calculations.

Uploaded by

goghunknown
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
202 views32 pages

Bill of Materials for Residential Build

The document outlines a detailed bill of materials for a proposed two-storey residential building, including various construction categories such as site works, concrete works, steel structures, roofing, masonry, and ceiling works. Each category lists specific items, their specifications, quantities, unit costs, and total costs, although many total costs are not filled in. The document also includes provisions for overhead, profit, and value-added tax calculations.

Uploaded by

goghunknown
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

KEYSTONE CONSTRUCTION AND SUPPLY

Address:
Email:
Contact No.

Project Title: PROPOSED TWO-STOREY RESIDENTIAL BUILDING


Project Owner:
Project Location:

BILL OF MATERIALS
Item Item Description Specifications Quantity Unit Unit Cost Total Cost
I SITE WORKS AND EARTH WORKS
1.1 Site Works and Earth Works
Clearing sqm ₱ 80.00 ₱ -
Layout sqm ₱ 44.00 ₱ -
Excavation cu.m ₱ 450.00 ₱ -
Soil Filling Materials cu.m ₱ 350.00 ₱ -
Unsuitable Materials Hauling lot ₱ 15,000.00 ₱ -
Ground Base Preparation sqm ₱ 150.00 ₱ -
Dewatreing lot ₱ 10,000.00 ₱ -
Gravel cu.m ₱ 1,350.00 ₱ -
DIRECT COST ₱ -
Overhead, contingency and misc.=5% ₱ -
Profit=5% ₱ -
Value Added Tax (VAT)= 7.5% ₱ -
TOTAL COST ₱ -

Item Item Description Specifications Quantity Unit Unit Cost Total Cost
II CONCRETE WORKS (SUBSTRUCTURE)
2.1 Isolated Footings ( Concrete Class AA-28 days) cu.m
Portand Cement (40kgs) bgs. ₱ 255.00
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00
Gravel (G1 Coarse Aggregates) cu.m ₱ 1,350.00
Rebar 16mm dia. GR-40 (6.0 meters) pcs. ₱ 505.00
GI Tie Wire No. 16 kg ₱ 100.00

2.1.1 Formworks
1/4" thk. Ordinary Plywood pc ₱ 395.00 ₱ -
2x2x10 Coco Lumber pc ₱ 150.00 ₱ -
4" Common Nails kg ₱ 85.00 ₱ -
1"Common Nails kg ₱ 60.00 ₱ -

2.2 Wall Footings ( Concrete Class A-28 days) cu.m


Portand Cement (40kgs) bgs. ₱ 255.00
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00
Gravel (G1 Coarse Aggregates) cu.m ₱ 1,350.00
Rebar 10mm dia. GR-33 (6.0meters) pc ₱ 200.00 ₱ -
GI Tie Wire No. 16 kg ₱ 100.00 ₱ -
2.3 Column ( Concrete Class AA-28 days) cu.m
Portand Cement (40kgs) bgs. ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00
Gravel (3/4 Coarse Aggregates) cu.m ₱ 1,350.00 ₱ -
Rebar 16mm dia. GR-40 (6.0 meters) cu.m ₱ 505.00 ₱ -
Rebar 10mm dia. GR-33 (6.0 meters) cu.m ₱ 200.00 ₱ -
GI Tie Wire No. 16 cu.m ₱ 100.00 ₱ -
2.3.1 Formworks
1/4" thk. Ordinary Plywood pc ₱ 395.00 ₱ -
2x2x10 Coco Lumber pc ₱ 150.00 ₱ -
4" Common Nails kg ₱ 85.00 ₱ -
1"Common Nails kg ₱ 60.00 ₱ -

2.4 Tie Beam cu.m


Portand Cement (40kgs) bgs. ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Gravel (3/4 Coarse Aggregates) cu.m ₱ 1,350.00 ₱ -
Rebar 12mm dia. GR-33 (6.0 meters) pc ₱ 290.00 ₱ -
Rebar 10mm dia. GR-33 (6.0 meters) pc ₱ 200.00 ₱ -
GI Tie Wire No. 16 kg ₱ 100.00 ₱ -
2.4.1 Formworks
1/4" thk. Ordinary Plywood pc ₱ 395.00 ₱ -
2x2x3x10 Coco Lumber pc ₱ 150.00 ₱ -
4" Common Nails kg ₱ 85.00 ₱ -
1"Common Nails kg ₱ 60.00 ₱ -

2.5 Slab on Fill ( Concrete Class C-28 days) cu.m


Portand Cement (40kgs) bgs. ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00
Gravel (3/4 Coarse Aggregates) cu.m ₱ 1,350.00 ₱ -
Rebar 10mm dia. GR-33 (6.0 meters) cu.m ₱ 200.00 ₱ -
GI Tie Wire No. 16 cu.m ₱ 100.00 ₱ -
DIRECT COST ₱ -
Overhead, contingency and misc.=5% ₱ -
Profit=5% ₱ -
Value Added Tax (VAT)= 7.5% ₱ -
TOTAL COST ₱ -
Item Item Description Specifications Quantity Unit Unit Cost Total Cost
III CONCRETE WORKS (SUPERSTRUCTURE)
3.1 Roof Beam ( Concrete Class B-28 days) cu.m
Portand Cement (40kgs) bgs. ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Gravel (G1 Coarse Aggregates) cu.m ₱ 1,350.00 ₱ -
Rebar 10mm dia. GR-33 (6.0 meters) pc ₱ 200.00 ₱ -
GI Tie Wire No. 16 kg ₱ 100.00 ₱ -

3.2 Suspended Slab ( Concrete Class A-28 days) cu.m


Portand Cement (40kgs) bgs. ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Gravel (G1 Coarse Aggregates) cu.m ₱ 1,350.00 ₱ -
Rebar 10mm dia. GR-33 (6.0 meters) pc ₱ 200.00 ₱ -
GI Tie Wire No. 16 kg ₱ 100.00 ₱ -
3/4 Marine Plywood pc ₱ 1,300.00 ₱ -
C-Purlins 2x6x1.5 pc ₱ 1,225.00 ₱ -

3.3 Concrete Stairs ( Concrete Class A-28 days) cu.m


Portand Cement (40kgs) bgs. ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Gravel (G1 Coarse Aggregates) cu.m ₱ 1,350.00 ₱ -
Rebar 10mm dia. GR-33 (6.0 meters) pc ₱ 180.00 ₱ -
Rebar 12mm dia. GR-33 (6.0 meters) pc ₱ 250.00 ₱ -
Rebar 16mm dia. GR-40 (6.0 meters) pc ₱ 385.00 ₱ -
GI Tie Wire No. 16 kg ₱ 100.00 ₱ -

3.4 2nd Floor Beams ( Conrete Class A-28 days) cu.m


Portand Cement (40kgs) bgs. ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Gravel (G1 Coarse Aggregates) cu.m ₱ 1,350.00 ₱ -
Rebar 10mm dia. GR-33 (6.0 meters) pc ₱ 180.00 ₱ -
Rebar 16mm dia. GR-40 (6.0 meters) pc ₱ 385.00 ₱ -
GI Tie Wire No. 16 kg ₱ 100.00 ₱ -
DIRECT COST ₱ -
Overhead, contingency and misc.=5% ₱ -
Profit=5% ₱ -
Value Added Tax (VAT)= 7.5% ₱ -

TOTAL COST ₱ -
Item Item Description Specifications Quantity Unit Unit Cost Total Cost
IV STEEL STRUCTURES
4.1 Stair Railings ₱ -
8mm square bars (6.0 meters) pc ₱ 207.00 ₱ -
3mm thick x 20mm x 6m flat bars pc ₱ 238.00 ₱ -
50mm Square Tubular Stainless (6.0 meters) pc ₱ 805.00 ₱ -
Red oxide Primer gal ₱ 450.00 ₱ -
paint thinner liter ₱ 80.00 ₱ -
3" paint brush pc ₱ 65.00 ₱ -
cutting off disk (4") box ₱ 550.00 ₱ -
Welding Rod 2.0mm E6011 box ₱ 290.00 ₱ -
DIRECT COST ₱ -

Item Item Description Specifications Quantity Unit Unit Cost Total Cost
V ROOF AND ROOF FRAMING
5.1 Roof Framing ₱ -
Angle Bar 32mmx32(4mm thick 6 .0 meters) pc ₱ 660.00 ₱ -
Rebar 12mm dia. GR-33 ( 6.0 meters) pc ₱ 290.00 ₱ -
Welding Rod 2.5mm E6011 box ₱ 2,090.00 ₱ -
cutting off disk (12") box ₱ 550.00 ₱ -
Red oxide Primer gal. ₱ 450.00 ₱ -
2" x 3" C-Purlins(1.5mm thk.) pc ₱ 875.00 ₱ -
Sanding Disk (4" dia.) pc ₱ 135.00 ₱ -
paint thinner gal. ₱ 320.00 ₱ -
3" paint brush pc ₱ 65.00 ₱ -

5.2 Roofing
Long Span Roofing Rib Type, Pre-Painted, 0.40mm sheet ₱ 2,842.00 ₱ -
Teckscrew 63.50mm pc ₱ 1.50 ₱ -
Fabricated GI Flashing Cover sheet ₱ 420.00 ₱ -
1/8 x 3/4 Bind Rivets box ₱ 280.00 ₱ -
DIRECT COST ₱ -
Overhead, contingency and misc.=5% ₱ -
Profit=5% ₱ -
Value Added Tax (VAT)= 7.5% ₱ -
TOTAL COST ₱ -

Item Item Description Specifications Quantity Unit Unit Cost Total Cost
VI MASONRY
6.1 Exterior Walls
CHB wall
CHB 150 x 200 x 400mm pc ₱ 19.00 ₱ -
CHB 100 x 200 x 400mm pc ₱ 14.00 ₱ -
Portand Cement (40kgs) pc ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Gravel 3/4 (Course Aggregates) cu.m ₱ 1,350.00 ₱ -
10 mm ø Reinforcing Steel Bars Deformed G33 pc ₱ 200.00 ₱ -
GI Tie Wire #16 kg ₱ 100.00 ₱ -

6.1.1 Plastering
Portand Cement (40kgs) pc ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,350.00 ₱ -
Skim Coat bag ₱ 600.00 ₱ -

6.2 Interior Walls


CHB wall
CHB 100 x 200 x 400mm pc ₱ 14.00 ₱ -
Portand Cement (40kgs) bag ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Gravel 3/4 (Course Aggregates) cu.m ₱ 1,350.00 ₱ -
10 mm ø Reinforcing Steel Bars Deformed G33 pc ₱ 180.00 ₱ -

6.2.1 Plastering
Portand Cement (40kgs) bags ₱ 255.00 ₱ -
Wash Sand (Fine Aggregates) cu.m ₱ 1,250.00 ₱ -
Skim Coat bag ₱ 600.00 ₱ -
DIRECT COST ₱ -
Overhead, contingency and misc.=5% ₱ -
Profit=5% ₱ -
Value Added Tax (VAT)= 7.5% ₱ -
TOTAL COST ₱ -

Item Item Description Specifications Quantity Unit Unit Cost Total Cost
VII CEILING WORKS
7.1 Ceiling
Fiber Cement Board pc ₱ 495.00 ₱ -
Wall Angle, 0.40mmx25mmx25mmx2.40m. pc ₱ 170.00 ₱ -
Metal Furring Channel, 0.40mmx19mmx50mmx5m. pc ₱ 145.00 ₱ -
Metal Carrying Channel, 0.80mmx12mmx38mmx5m pc ₱ 140.00 ₱ -
W-Clip pc ₱ 6.00 ₱ -
Concrete Nails # 2 kg ₱ 80.00 ₱ -
1/8 x 3/4 Bind Rivets box ₱ 650.00 ₱ -
DIRECT COST ₱ -
Overhead, contingency and misc.=5% ₱ -
Profit=5% ₱ -
Value Added Tax (VAT)= 7.5% ₱ -
TOTAL COST ₱ -

Item Item Description Specifications Quantity Unit Unit Cost Total Cost
VIII PAINTING WORKS
8.1 MASONRY PAINTING
Concrete Neutralizer gal ₱ 422.00 ₱ -
Flat Wall Latex Primer gal ₱ 550.00 ₱ -
Semi-Gloss Latex gal ₱ 665.00 ₱ -
Tinting Color Latex liter ₱ 182.00 ₱ -
Paint Brush 4" pc ₱ 75.00 ₱ -
Sand paper #120 dozen ₱ 130.00 ₱ -
Paint Brush 2" pc ₱ 35.00 ₱ -
Paint Roller Brush (152mm) w pan pc ₱ 150.00 ₱ -
₱ -
Consumable (5% material Cost) ₱ -

8.2 WOOD PAINTING


Flat Wall Enamel gal ₱ 600.00 ₱ -
Enamel Quick Dry gal ₱ 750.00 ₱ -
Tinting Color Oil liter ₱ 182.00 ₱ -
Paint Thinner gal ₱ 286.00 ₱ -
Paint Roller Brush w/ tray pc ₱ 150.00 ₱ -
KEYSTONE CONSTRUCTION
Address:
Email:
Contact No.

Project Title: PROPOSED TWO-STOREY RESIDENTIAL BUILDING


Project Owner:
Project Location:

BILL OF MATERIALS WITH MANPOW

Item Item Description Specifications


I SITE WORKS AND EARTH WORKS
1.1 Site Works and Earth Works
Clearing, Layout, & Mobilization
Excavation
Soil Filling Materials
Dewatering
Gravel
2.1 Labor Cost
Foreman 1
Skilled 3
Laborer 6

Item Item Description Specifications


II SUBSTRUCTURE FOUNDATION
2.1 Isolated Footings Concrete Class AA-28 days
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (G1 Coarse Aggregates)
Rebar 16mm dia. GR-40 (6.0 meters)
GI Tie Wire
2.2 Wall Footings Concrete Class A-28 days
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (G1 Coarse Aggregates)
Rebar 10mm dia. GR-33 (6.0meters)
GI Tie Wire No. 16
2.3 Tie Beam
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (3/4 Coarse Aggregates)
Rebar 12mm dia. GR-33 (6.0 meters)
Rebar 10mm dia. GR-33 (6.0 meters)
GI Tie Wire No. 16
3.1 Labor
Foreman 1
Skilled 3
Laborer 6
3.2 Rentals
Bagger Mixer 1

Item Item Description Specifications


III GROUND FLOOR SLAB
3.1 Slab on Fill Concrete Class C-28 days
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (3/4 Coarse Aggregates)
Rebar 10mm dia. GR-33 (6.0 meters)
GI Tie Wire No. 16
4.1 Labor
Foreman 1
Skilled 4
Laborer 6
4.2 Rentals
Bagger Mixer 1
Vibrator 1

Item Item Description Specifications


IV CONCRETE COLUMNS
4.1 Column Concrete Class AA-28 days
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (3/4 Coarse Aggregates)
Rebar 16mm dia. GR-40 (6.0 meters)
Rebar 10mm dia. GR-33 (6.0 meters)
GI Tie Wire No. 16
5.1 Labor
Foreman 1
Skilled 4
Laborer 6
5.2 Rentals
Bagger Mixer 1
Vibrator 1

Item Item Description Specifications


V SECOND FLOOR BEAMS AND SLABS
5.1 2nd Floor Beams Conrete Class A-28 days
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (G1 Coarse Aggregates)
Rebar 10mm dia. GR-33 (6.0 meters)
Rebar 16mm dia. GR-40 (6.0 meters)
GI Tie Wire No. 16

5.2 Suspended Slab Concrete Class A-28 days


Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (G1 Coarse Aggregates)
Rebar 10mm dia. GR-33 (6.0 meters)
GI Tie Wire No. 16
3/4 Marine Plywood
C-Purlins 2x6x1.5
6.1 Labor
Foreman 1
Skilled 5
Laborer 7
6.2 Rentals
Bagger Mixer 1
Vibrator 1

Item Item Description Specifications


VI ROOF BEAMS
6.1 Roof Beam Concrete Class B-28 days
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (G1 Coarse Aggregates)
Rebar 10mm dia. GR-33 (6.0 meters)
GI Tie Wire No. 16
7.1 Labor
Foreman 1
Skilled 5
Laborer 7
7.2 Rentals
Bagger Mixer 1

Item Item Description Specifications


VII CARPENTRY
7.1 Formworks
1/4" thk. Ordinary Plywood - 3 uses
2x2x10 Coco Lumber - 3 uses
4" Common Nails
1"Common Nails
8.1 Labor
Foreman 1
Skilled 5
Laborer 7

Item Item Description Specifications


VIII ROOF AND ROOF FRAMING
8.1 Roof Framing
Angle Bar 32mmx32(4mm thick 6 .0 meters)
Rebar 12mm dia. GR-33 ( 6.0 meters)
Welding Rod 2.5mm E6011
cutting off disk (12")
Red oxide Primer
2" x 3" C-Purlins(1.5mm thk.)
Sanding Disk (4" dia.)
paint thinner
3" paint brush
8.2 Roofing
Long Span Roofing Rib Type, Pre-Painted, 0.40mm
Teckscrew 63.50mm
Fabricated GI Flashing Cover
1/8 x 3/4 Bind Rivets
9.1 Labor
Foreman 1
Skilled 5
Laborer 4
9.2 Rentals
Welding Machine 1

Item Item Description Specifications


IX REINFORCED CONCRETE STAIR
9.1 Concrete Stairs Concrete Class A-28 days
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel (G1 Coarse Aggregates)
Rebar 10mm dia. GR-33 (6.0 meters)
Rebar 12mm dia. GR-33 (6.0 meters)
Rebar 16mm dia. GR-40 (6.0 meters)
GI Tie Wire No. 16
10.1 Labor
Foreman 1
Skilled 2
Laborer 2

Item Item Description Specifications


X STEEL STRUCTURES
10.1 Stair Railings
8mm square bars (6.0 meters)
3mm thick x 20mm x 6m flat bars
50mm Square Tubular Stainless (6.0 meters)
Red oxide Primer
paint thinner
3" paint brush
cutting off disk (4")
Welding Rod 2.0mm E6011
11.1 Labor
Foreman 1
Skilled 1
9.2 Rentals
Welding Machine 1

Item Item Description Specifications


XI MASONRY
11.1 Exterior CHB Walls
CHB 150 x 200 x 400mm
CHB 100 x 200 x 400mm
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel 3/4 (Course Aggregates)
10 mm ø Reinforcing Steel Bars Deformed G33
GI Tie Wire #16
11.1.1 Plastering
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Skim Coat
11.2 Interior CHB Walls
CHB 100 x 200 x 400mm
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Gravel 3/4 (Course Aggregates)
10 mm ø Reinforcing Steel Bars Deformed G33
11.2.1 Plastering
Portand Cement (40kgs)
Wash Sand (Fine Aggregates)
Skim Coat
12.1 Labor
Foreman 1
Skilled 5
Laborer 7
12.2 Rentals
Vibrator 1

Item Item Description Specifications


XII CEILING WORKS
12.1 Ceiling
Fiber Cement Board
Wall Angle, 0.40mmx25mmx25mmx2.40m.
Metal Furring Channel, 0.40mmx19mmx50mmx5m.
Metal Carrying Channel, 0.80mmx12mmx38mmx5m
W-Clip
Concrete Nails # 2
1/8 x 3/4 Bind Rivets
13.1 Labor
Foreman 1
Skilled 5
Laborer 3

Item Item Description Specifications


XIII TERMITE CONTROL WORK
13.1 Soil Poisoning
Soil Poisoning
14.1 Labor
Foreman 1
Laborer 2

Item Item Description Specifications


XIV DOORS, WINDOWS, AND GLASSWORKS
14.1 DOORS
D1- Wooden Panel Door
D2- Wooden Panel Door
D3- PVC Flush Door
D4- PVC Flush Door
D5- PVC Flush Door
14.2 WINDOWS
W1- Glass Sliding Window
W2- Glass Sliding Window
W3- Glass Sliding Window
15.1 Labor
Foreman 1
Skilled 3

Item Item Description Specifications


XV TILE WORKS
15.1 Floor Tiles
600mm x 600mm Tiles Granite
Portland Cement (40kgs)
Washed Sand (Fine Aggregates)
Tile Grout
16.1 Labor
Foreman 1
Skilled 5
Laborer 4

Item Item Description Specifications


XVI PAINTING WORKS
16.1 MASONRY PAINTING
Concrete Neutralizer
Flat Wall Latex Primer
Semi-Gloss Latex
Tinting Color Latex
Paint Brush 4"
Sand paper #120
Paint Brush 2"
Paint Roller Brush (152mm) w pan

Consumable (5% material Cost)

16.2 WOOD PAINTING


Flat Wall Enamel
Enamel Quick Dry
Tinting Color Oil
Paint Thinner
Paint Roller Brush w/ tray
Paint Brush 4"
Paint Brush 2"

Consumable (5% material Cost)


17.1 Labor
Foreman 1
Laborer 5

Item Item Description Specifications


XVII PLUMBING WORKS
17.1 Sewer Lines & Fittings
Pvc Pipe Atlanta 100 x 3M
Pvc WYE 100 MM
Pvc Clean Out 100 MM
Pvc Elbow 50 MM
Pvc Trap 50 MM
Pvc Solvent cement 200 GM/CM
17.2 Water Lines & Fittings
Ppr Pipe Atlanta 1'' x 6 M
Ppr Coupling 1''
Ppr Elbow 1''
Ppr Tee 1/2''
Ppr Reducer 1'' x 1/2''
Gate Valve Brass 1''
Angle Valve '3/3
17.3 Fixtures
Water Closet Complete with Fittings
Lavatory with Faucet
Stainlesss Kitchen Sink With Faucet
Shower Valve & Shower Head
Hose Bibb Faucet
18.1 Labor
Foreman 1
Plumber 1
Laborer 2

Item Item Description Specifications


XVIII ELECTRICAL WORKS
18.1 Item
Circuit Breaker Acb 200A 2P MAIN
Branches 15A 2P; 20A 2P
wires NO. 38.0, NO. 100.C
NO.14.0
NO. 3.5
NO.2.0
Locknut & Bushing 32 mm
Nonmetallic Flexible Hose 15 mm. 0
Nonmetallic Elbow 20 mm x 90
Weather Head cap 32 mm.0
Aircon Outlet FLUSH TYPE
NonMetallic Utility Box with Cover
Switches SINGLE POLE
DUPLEX
3 WAY
Pvc Solvent Cement 100ML
Modern lamp 24w
Pinlight PL 18w
Plastic Electrical tape
19.1 Labor
Foreman 1
Electrician 1
Skilled 2
ONSTRUCTION AND SUPPLY

AL BUILDING

LS WITH MANPOWER

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ -
sqm ₱ 350.00 ₱ -
cu.m ₱ 450.00 ₱ -
cu.m ₱ 350.00 ₱ -
lot ₱ 10,000.00 ₱ -
cu.m ₱ 1,350.00 ₱ -
Sub-total Cost: ₱ 4,950.00
1 days ₱ 600.00 ₱ 600.00
3 days ₱ 550.00 ₱ 1,650.00
6 days ₱ 450.00 ₱ 2,700.00

Specifications Quantity Unit Unit Cost Total Cost

ncrete Class AA-28 days 4.84 cu.m Sub-total Cost: ₱ 28,665.00


51 bgs. ₱ 255.00 ₱ 13,005.00
2.5 cu.m ₱ 1,250.00 ₱ 3,125.00
4.5 cu.m ₱ 1,350.00 ₱ 6,075.00
16 pcs. ₱ 505.00 ₱ 6,160.00
3 kg ₱ 100.00 ₱ 300.00
oncrete Class A-28 days 4.04 cu.m Sub-total Cost: ₱ 25,085.00
32 bgs. ₱ 255.00 ₱ 8,160.00
2 cu.m ₱ 1,250.00 ₱ 2,500.00
3.5 cu.m ₱ 1,350.00 ₱ 4,725.00
46 pc ₱ 200.00 ₱ 9,200.00
5 kg ₱ 100.00 ₱ 500.00
5.53 cu.m Sub-total Cost: ₱ 30,190.00
6 bgs. ₱ 255.00 ₱ 1,530.00
0.5 cu.m ₱ 1,250.00 ₱ 625.00
0.5 cu.m ₱ 1,350.00 ₱ 675.00
54 pc ₱ 290.00 ₱ 15,660.00
53 pc ₱ 200.00 ₱ 10,600.00
11 kg ₱ 100.00 ₱ 1,100.00
Sub-total Cost: ₱ 29,700.00
1 6 days ₱ 600.00 ₱ 3,600.00
3 6 days ₱ 550.00 ₱ 9,900.00
6 6 days ₱ 450.00 ₱ 16,200.00
Sub-total Cost: ₱ 2,100.00
1 6 days ₱ 350.00 ₱ 2,100.00

Specifications Quantity Unit Unit Cost Total Cost

oncrete Class C-28 days 18 cu.m Sub-total Cost: ₱ 61,270.00


109 bgs. ₱ 255.00 ₱ 27,795.00
9 cu.m ₱ 1,250.00 ₱ 4,375.00
18 cu.m ₱ 1,350.00 ₱ 24,300.00
23 cu.m ₱ 200.00 ₱ 4,600.00
2 cu.m ₱ 100.00 ₱ 200.00
Sub-total Cost: ₱ 22,000.00
1 4 days ₱ 600.00 ₱ 2,400.00
4 4 days ₱ 550.00 ₱ 8,800.00
6 4 days ₱ 450.00 ₱ 10,800.00
Sub-total Cost: ₱ 1,802.00
1 4 days ₱ 350.00 ₱ 1,400.00
1 1 days ₱ 402.00 ₱ 402.00

Specifications Quantity Unit Unit Cost Total Cost

ncrete Class AA-28 days 6.93 cu.m Sub-total Cost: ₱ 114,790.00


76 bgs. ₱ 255.00 ₱ 19,380.00
3.5 cu.m ₱ 1,250.00 ₱ 4,375.00
6.5 cu.m ₱ 1,350.00 ₱ 8,775.00
112 cu.m ₱ 505.00 ₱ 56,560.00
122 cu.m ₱ 200.00 ₱ 24,400.00
13 cu.m ₱ 100.00 ₱ 1,300.00
Sub-total Cost: ₱ 33,000.00
1 6 days ₱ 600.00 ₱ 3,600.00
4 6 days ₱ 550.00 ₱ 13,200.00
6 6 days ₱ 450.00 ₱ 16,200.00
Sub-total Cost: ₱ 1,802.00
1 4 days ₱ 350.00 ₱ 1,400.00
1 1 days ₱ 402.00 ₱ 402.00

Specifications Quantity Unit Unit Cost Total Cost

onrete Class A-28 days 3.35 cu.m Sub-total Cost: ₱ 49,300.00


37 bgs. ₱ 255.00 ₱ 9,435.00
1.5 cu.m ₱ 1,250.00 ₱ 1,875.00
3 cu.m ₱ 1,350.00 ₱ 4,050.00
56 pc ₱ 180.00 ₱ 10,080.00
56 pc ₱ 385.00 ₱ 21,560.00
23 kg ₱ 100.00 ₱ 2,300.00

oncrete Class A-28 days 18.87 cu.m Sub-total Cost: ₱ 147,070.00


149 bgs. ₱ 255.00 ₱ 37,995.00
8 cu.m ₱ 1,250.00 ₱ 10,000.00
16 cu.m ₱ 1,350.00 ₱ 21,600.00
92 pc ₱ 200.00 ₱ 18,400.00
4 kg ₱ 100.00 ₱ 400.00
31 pc ₱ 1,300.00 ₱ 40,300.00
15 pc ₱ 1,225.00 ₱ 18,375.00
Sub-total Cost: ₱ 65,000.00
1 10 days ₱ 600.00 ₱ 6,000.00
5 10 days ₱ 550.00 ₱ 27,500.00
7 10 days ₱ 450.00 ₱ 31,500.00
Sub-total Cost: ₱ 2,852.00
1 7 days ₱ 350.00 ₱ 2,450.00
1 1 days ₱ 402.00 ₱ 402.00

Specifications Quantity Unit Unit Cost Total Cost

oncrete Class B-28 days 3.52 cu.m Sub-total Cost: ₱ 30,070.00


39 bgs. ₱ 255.00 ₱ 9,945.00
2 cu.m ₱ 1,250.00 ₱ 2,500.00
3.5 cu.m ₱ 1,350.00 ₱ 4,725.00
55 pc ₱ 200.00 ₱ 11,000.00
19 kg ₱ 100.00 ₱ 1,900.00
Sub-total Cost: ₱ 13,000.00
1 2 days ₱ 600.00 ₱ 1,200.00
5 2 days ₱ 550.00 ₱ 5,500.00
7 2 days ₱ 450.00 ₱ 6,300.00
Sub-total Cost: ₱ 350.00
1 1 days ₱ 350.00 ₱ 350.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 29,140.00


46 pc ₱ 395.00 ₱ 18,170.00
64 pc ₱ 150.00 ₱ 9,600.00
14 kg ₱ 85.00 ₱ 1,190.00
3 kg ₱ 60.00 ₱ 180.00
Sub-total Cost: ₱ 6,500.00
1 1 days ₱ 600.00 ₱ 600.00
5 1 days ₱ 550.00 ₱ 2,750.00
7 1 days ₱ 450.00 ₱ 3,150.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 27,750.00


13 pc ₱ 660.00 ₱ 8,580.00
6 pc ₱ 290.00 ₱ 1,740.00
1 box ₱ 2,090.00 ₱ 2,090.00
1 box ₱ 550.00 ₱ 550.00
3 gal. ₱ 450.00 ₱ 1,350.00
14 pc ₱ 875.00 ₱ 12,250.00
5 pc ₱ 135.00 ₱ 675.00
1 gal. ₱ 320.00 ₱ 320.00
3 pc ₱ 65.00 ₱ 195.00
Sub-total Cost: ₱ 36,820.00
10 sheet ₱ 2,842.00 ₱ 28,420.00
1120 pc ₱ 1.50 ₱ 1,680.00
14 sheet ₱ 420.00 ₱ 5,880.00
3 box ₱ 280.00 ₱ 840.00
Sub-total Cost: ₱ 25,750.00
1 5 days ₱ 600.00 ₱ 3,000.00
5 5 days ₱ 550.00 ₱ 13,750.00
4 5 days ₱ 450.00 ₱ 9,000.00
Sub-total Cost: ₱ 500.00
1 1 days ₱ 500.00 ₱ 500.00

Specifications Quantity Unit Unit Cost Total Cost

oncrete Class A-28 days 0.84 cu.m Sub-total Cost: ₱ 10,385.00


7 bgs. ₱ 255.00 ₱ 1,785.00
0.5 cu.m ₱ 1,250.00 ₱ 625.00
1 cu.m ₱ 1,350.00 ₱ 1,350.00
12 pc ₱ 180.00 ₱ 2,160.00
3 pc ₱ 250.00 ₱ 750.00
9 pc ₱ 385.00 ₱ 3,465.00
2.5 kg ₱ 100.00 ₱ 250.00
Sub-total Cost: ₱ 5,200.00
1 2 days ₱ 600.00 ₱ 1,200.00
2 2 days ₱ 550.00 ₱ 2,200.00
2 2 days ₱ 450.00 ₱ 1,800.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 3,022.00


2 pc ₱ 207.00 ₱ 414.00
1 pc ₱ 238.00 ₱ 238.00
1 pc ₱ 805.00 ₱ 805.00
1 gal ₱ 450.00 ₱ 450.00
1 liter ₱ 80.00 ₱ 80.00
3 pc ₱ 65.00 ₱ 195.00
1 box ₱ 550.00 ₱ 550.00
1 box ₱ 290.00 ₱ 290.00
Sub-total Cost: ₱ 3,450.00
1 3 days ₱ 600.00 ₱ 1,800.00
1 3 days ₱ 550.00 ₱ 1,650.00
Sub-total Cost: ₱ 1,500.00
1 3 days ₱ 500.00 ₱ 1,500.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 90,333.00


335 pc ₱ 19.00 ₱ 6,365.00
2707 pc ₱ 14.00 ₱ 37,898.00
74 pc ₱ 255.00 ₱ 18,870.00
4.5 cu.m ₱ 1,250.00 ₱ 5,625.00
8.5 cu.m ₱ 1,350.00 ₱ 11,475.00
44 pc ₱ 200.00 ₱ 8,800.00
13 kg ₱ 100.00 ₱ 1,300.00
Sub-total Cost: ₱ 23,850.00
45 pc ₱ 255.00 ₱ 11,475.00
2.5 cu.m ₱ 1,350.00 ₱ 3,375.00
15 bag ₱ 600.00 ₱ 9,000.00
Sub-total Cost: ₱ 52,446.00
1739 pc ₱ 14.00 ₱ 24,346.00
36 bag ₱ 255.00 ₱ 9,180.00
2.5 cu.m ₱ 1,250.00 ₱ 3,125.00
4.5 cu.m ₱ 1,350.00 ₱ 6,075.00
54 pc ₱ 180.00 ₱ 9,720.00
Sub-total Cost ₱ 16,775.00
30 bags ₱ 255.00 ₱ 7,650.00
2.5 cu.m ₱ 1,250.00 ₱ 3,125.00
10 bags ₱ 600.00 ₱ 6,000.00
Sub-total Cost: ₱ 65,000.00
1 10 days ₱ 600.00 ₱ 6,000.00
5 10 days ₱ 550.00 ₱ 27,500.00
7 10 days ₱ 450.00 ₱ 31,500.00
Sub-total Cost: ₱ 4,020.00
1 10 days ₱ 402.00 ₱ 4,020.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 46,215.00


42 pc ₱ 495.00 ₱ 20,790.00
31 pc ₱ 170.00 ₱ 5,270.00
23 pc ₱ 145.00 ₱ 3,335.00
67 pc ₱ 140.00 ₱ 9,380.00
90 pc ₱ 6.00 ₱ 540.00
5 kg ₱ 80.00 ₱ 400.00
10 box ₱ 650.00 ₱ 6,500.00
Sub-total Cost: ₱ 18,800.00
1 4 days ₱ 600.00 ₱ 2,400.00
5 4 days ₱ 550.00 ₱ 11,000.00
3 4 days ₱ 450.00 ₱ 5,400.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 7,200.00


90 sq.m. ₱ 80.00 ₱ 7,200.00
Sub-total Cost: ₱ 1,500.00
1 1 days ₱ 600.00 ₱ 600.00
2 1 days ₱ 450.00 ₱ 900.00

Specifications Quantity Unit Unit Cost Total Cost


Sub-total Cost: ₱ 29,967.00
1 Unit ₱ 3,000.00 ₱ 3,000.00
7 Unit ₱ 2,805.00 ₱ 19,635.00
2 Unit ₱ 1,833.00 ₱ 3,666.00
1 Unit ₱ 1,833.00 ₱ 1,833.00
1 Unit ₱ 1,833.00 ₱ 1,833.00
Sub-total Cost: ₱ 114,778.00
8 Unit ₱ 10,508.00 ₱ 84,064.00
3 Unit ₱ 4,938.00 ₱ 14,814.00
2 Unit ₱ 7,950.00 ₱ 15,900.00
Sub-total Cost: ₱ 9,000.00
1 4 days ₱ 600.00 ₱ 2,400.00
3 4 days ₱ 550.00 ₱ 6,600.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 131,420.00


Granite 500 pc ₱ 240.00 ₱ 120,000.00
29 bags ₱ 255.00 ₱ 7,395.00
3 cu.m. ₱ 1,250.00 ₱ 3,750.00
5 bags ₱ 55.00 ₱ 275.00
Sub-total Cost: ₱ 25,750.00
1 5 days ₱ 600.00 ₱ 3,000.00
5 5 days ₱ 550.00 ₱ 13,750.00
4 5 days ₱ 450.00 ₱ 9,000.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 55,910.40


16 gal ₱ 422.00 ₱ 6,752.00
32 gal ₱ 550.00 ₱ 17,600.00
32 gal ₱ 665.00 ₱ 21,280.00
8 liter ₱ 182.00 ₱ 1,456.00
20 pc ₱ 75.00 ₱ 1,500.00
12 dozen ₱ 130.00 ₱ 1,560.00
20 pc ₱ 35.00 ₱ 700.00
16 pc ₱ 150.00 ₱ 2,400.00
Total: ₱ 53,248.00
₱ 2,662.40

Sub-total Cost: ₱ 4,966.50


3 gal ₱ 600.00 ₱ 1,800.00
2 gal ₱ 750.00 ₱ 1,500.00
2 liter ₱ 182.00 ₱ 364.00
1 gal ₱ 286.00 ₱ 286.00
3 pc ₱ 150.00 ₱ 450.00
3 pc ₱ 75.00 ₱ 225.00
3 pc ₱ 35.00 ₱ 105.00
Total: ₱ 4,730.00
₱ 236.50
Sub-total Cost: ₱ 22,800.00
1 8 days ₱ 600.00 ₱ 4,800.00
5 8 days ₱ 450.00 ₱ 18,000.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 13,365.00


100 x 3M 10 LENTHS ₱ 650.00 ₱ 6,500.00
100 MM 8 pc ₱ 130.00 ₱ 1,950.00
100 MM 5 pc ₱ 90.00 ₱ 630.00
50 MM 8 pc ₱ 60.00 ₱ 600.00
50 MM 7 pc ₱ 55.00 ₱ 385.00
200 GM/CM 7 can ₱ 220.00 ₱ 3,300.00
Sub-total Cost: ₱ 6,645.00
1'' x 6 M 7 LENTHS ₱ 225.00 ₱ 1,575.00
1'' 15 pcs. ₱ 50.00 ₱ 1,500.00
1'' 20 pcs. ₱ 50.00 ₱ 1,000.00
1/2'' 10 pcs. ₱ 50.00 ₱ 500.00
1'' x 1/2'' 6 pcs. ₱ 50.00 ₱ 300.00
1'' 2 pcs. ₱ 280.00 ₱ 520.00
'3/3 5 pc ₱ 250.00 ₱ 1,250.00
Sub-total Cost: ₱ 77,100.00
3 set ₱ 11,500.00 ₱ 34,500.00
3 set ₱ 4,500.00 ₱ 13,500.00
1 set ₱ 7,500.00 ₱ 7,500.00
3 set ₱ 3,600.00 ₱ 10,800.00
3 set ₱ 3,600.00 ₱ 10,800.00
Sub-total Cost: ₱ 15,060.00
1 5 days ₱ 600.00 ₱ 3,000.00
1 40 hours ₱ 189.00 ₱ 7,560.00
2 5 days ₱ 450.00 ₱ 4,500.00

Specifications Quantity Unit Unit Cost Total Cost

Sub-total Cost: ₱ 259,380.00


200A 2P MAIN set ₱ 25,000.00
15A 2P; 20A 2P ₱ 85,000.00
NO. 38.0, NO. 100.C 3 roll ₱ 4,500.00 ₱ 13,500.00
NO.14.0 3 roll ₱ 3,700.00 ₱ 11,100.00
NO. 3.5 3 roll ₱ 2,800.00 ₱ 8,400.00
NO.2.0 3 roll ₱ 2,200.00 ₱ 6,600.00
32 mm 21 roll ₱ 350.00 ₱ 7,350.00
15 mm. 0 7 roll ₱ 450.50 ₱ 3,150.00
20 mm x 90 21 pcs. ₱ 80.00 ₱ 1,680.00
32 mm.0 1 pc. ₱ 150.00 ₱ 150.00
FLUSH TYPE 7 set ₱ 450.00 ₱ 3,150.00
15 pcs. ₱ 50.00 ₱ 750.00
SINGLE POLE 2 set ₱ 350.00 ₱ 700.00
DUPLEX 1 set ₱ 375.00 ₱ 375.00
3 WAY 4 set ₱ 350.00 ₱ 1,400.00
100ML 10 can ₱ 395.00 ₱ 3,950.00
7 set ₱ 11,500.00 ₱ 80,500.00
10 set ₱ 550.00 ₱ 5,500.00
15 roll ₱ 75.00 ₱ 1,125.00
Sub-total Cost: ₱ 36,528.00
1 12 days ₱ 600.00 ₱ 7,200.00
1 96 hours ₱ 168.00 ₱ 16,128.00
2 12 days ₱ 550.00 ₱ 13,200.00
KEYSTONE CONSTRUCTION A
Address:
Email:
Contact No.

Project Title: Proposed Two-Storey Residential Building


Project Owner:
Project Location:

BILL OF MATERIALS

SUMMARY COST ESTIMATES FOR MATERIALS, AND OTHER CONSTRUCTION EXPE


A Description
I Site Works and Earth Works
II Concrete Works (Substructure)
III Concrete Works (Superstructure)
IV Steel Structure
V Roof and Roof Framing
VI Masonry
VII Ceiling Works
VIII Painting Works
IX Plumbing Works
X Electrical Works
Total:
Direct Cost
Overhead, contingency and misc.=5%
Profit=5%
Value Added Tax (VAT)= 7.5%
TOTAL CONSTRUCTION COST
TRUCTION AND SUPPLY

CONSTRUCTION EXPENSES
Material Cost
₱ 136,367.56
₱ 339,739.50
₱ 327,569.38
₱ 3,022.00
₱ 75,869.75
₱ 215,499.70
₱ 54,302.63
₱ 139,654.51
₱ 60,806.25
₱ 30,696.00
otal: ₱ 1,383,527.28
₱ 1,383,527.28
₱ 69,176.36
₱ 69,176.36
₱ 103,764.55
₱ 1,625,644.55
KEYSTONE CONSTRUCTION A
Address:
Email:
Contact No.

Project Title: Proposed Two-Storey Residential Building


Project Owner:
Project Location:

BILL OF MATERIALS

SUMMARY COST ESTIMATES FOR MATERIALS, AND OTHER CONSTRUCTION


A Description
I Site Works and Earth Works
II Concrete Works (Substructure)
III Concrete Works (Superstructure)
IV Steel Structure
V Roof and Roof Framing
VI Masonry
VII Ceiling Works
VIII Painting Works
IX Plumbing Works
X Electrical Works
Total:
Total Labor Cost
Total Direct Cost
Overhead, contingency and misc.=5%
Profit=5%
Value Added Tax (VAT)= 7.5%
TOTAL CONSTRUCTION COST
TRUCTION AND SUPPLY

RIALS

OTHER CONSTRUCTION EXPENSES


Material Cost Labor Cost Material + Labor
₱ 136,367.56 ₱ 15,250.00 ₱ 151,617.56
₱ 339,739.50 ₱ 66,000.00 ₱ 405,739.50
₱ 327,569.38 ₱ 65,000.00 ₱ 392,569.38
₱ 3,022.00 ₱ 3,660.00 ₱ 6,682.00
₱ 75,869.75 ₱ 10,300.00 ₱ 86,169.75
₱ 215,499.70 ₱ 55,000.00 ₱ 270,499.70
₱ 54,302.63 ₱ 9,450.00 ₱ 63,752.63
₱ 139,654.51 ₱ 11,700.00 ₱ 151,354.51
₱ 60,806.25 ₱ 9,048.00 ₱ 69,854.25
₱ 30,696.00 ₱ 28,440.00 ₱ 59,136.00
₱ 1,383,527.28 ₱ 273,848.00 ₱ 1,657,375.28
₱ 273,848.00
₱ 1,657,375.28
₱ 82,868.76
₱ 82,868.76
₱ 124,303.15
₱ 2,221,263.95
2.1.1 Formworks
1/4" thk. Ordinary Plywood - 3 uses
2x2x10 Coco Lumber - 3 uses
4" Common Nails
1"Common Nails
Sub-total Cost: ###
46 pc ₱ 395.00 ###
64 pc ₱ 150.00 ###
14 kg ₱ 85.00 ###
3 kg ₱ 60.00 ₱ 180.00