RRU5517t Installation Guide

The RRU5517t Installation Guide provides detailed instructions for installing the RRU5517t remote radio unit, including preparations, installation procedures, and necessary tools. It is intended for base station installation engineers and covers topics such as unpacking checks, cable installations, and powering on the device. The document emphasizes the importance of proper training and familiarity with the equipment before installation.

Uploaded by

escobarbsystems
Copyright
© All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views149 pages

RRU5517t Installation Guide

The RRU5517t Installation Guide provides detailed instructions for installing the RRU5517t remote radio unit, including preparations, installation procedures, and necessary tools. It is intended for base station installation engineers and covers topics such as unpacking checks, cable installations, and powering on the device. The document emphasizes the importance of proper training and familiarity with the equipment before installation.

Uploaded by

escobarbsystems
Copyright
© All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

RRU5517t

Installation Guide

Issue Draft A
Date 2022-12-31

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2023. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: [Link]
Email: support@[Link]

Issue Draft A Copyright © Huawei Technologies Co., Ltd. i


(2022-12-31)
RRU5517t
Installation Guide Contents

Contents

1 RRU5517t Installation Guide................................................................................................ 1


1.1 Changes in RRU5517t Installation Guide........................................................................................................................ 2
1.2 Installation Preparations....................................................................................................................................................... 2
1.2.1 Reference Documents.........................................................................................................................................................3
1.2.2 Tools and Instruments........................................................................................................................................................ 3
1.2.3 Skills Requirements for Installation Personnel.......................................................................................................... 5
1.3 Information to Be Known Before the Installation........................................................................................................5
1.3.1 Exterior.................................................................................................................................................................................... 5
1.3.2 Ports..........................................................................................................................................................................................7
1.3.3 Indicators................................................................................................................................................................................ 9
1.3.4 RRU Mounting Kit and Attachment Plate.................................................................................................................11
[Link] Enhanced Mounting Kit for Triple-RRU Combined Installation..................................................................... 12
[Link] Enhanced Mounting Kit for Separate RRU Installation.................................................................................... 13
[Link] Attachment Plate........................................................................................................................................................... 13
1.3.5 Installation Scenario......................................................................................................................................................... 14
1.3.6 Installation Clearance Requirements.......................................................................................................................... 24
[Link] Installation Clearance for a Single RRU................................................................................................................. 24
[Link] Installation Clearance for Multiple RRUs...............................................................................................................27
[Link] Installation Clearance Between RRUs..................................................................................................................... 31
1.4 Unpacking Check.................................................................................................................................................................. 32
1.5 Installation Procedure......................................................................................................................................................... 34
1.6 Installing an Optical Module............................................................................................................................................ 35
1.7 Preparing PGND and Power Cables................................................................................................................................38
1.8 Hoisting the RRU and Related Cables........................................................................................................................... 38
1.8.1 Hoisting an RRU.................................................................................................................................................................38
1.8.2 Hoisting Optical Fibers.................................................................................................................................................... 44
1.8.3 Hoisting Power Cables..................................................................................................................................................... 46
1.9 Installing the RRU (Combined Installation)................................................................................................................ 49
1.9.1 Installing a Single RRU on a Pole................................................................................................................................ 50
1.9.2 Installing Two RRUs on a Pole...................................................................................................................................... 56
1.9.3 Installing Multiple RRUs on a Pole..............................................................................................................................63
1.10 Installing the RRU (Separate Installation)................................................................................................................. 68
1.10.1 Installing the RRU on a Pole....................................................................................................................................... 68

Issue Draft A Copyright © Huawei Technologies Co., Ltd. ii


(2022-12-31)
RRU5517t
Installation Guide Contents

[Link] Installing a Single RRU.............................................................................................................................................. 68


[Link] Installing Two RRUs.................................................................................................................................................... 74
1.10.2 Installing an RRU on U-Steel...................................................................................................................................... 79
1.10.3 Installing an RRU on Angle Steel.............................................................................................................................. 86
1.10.4 Installing an RRU on a Wall........................................................................................................................................ 93
1.11 Installing RRU Cables......................................................................................................................................................101
1.11.1 Cabling Requirements................................................................................................................................................. 101
1.11.2 Cable Connections........................................................................................................................................................ 109
1.11.3 Cable List......................................................................................................................................................................... 112
1.11.4 Installing an RRU PGND Cable................................................................................................................................ 113
1.11.5 Installing an RRU RF Jumper.................................................................................................................................... 114
1.11.6 (Optional) Installing an AISG Multi-Wire Cable for the RRU....................................................................... 119
1.11.7 Installing a CPRI Optical Fiber................................................................................................................................. 120
1.11.8 Installing an RRU Power Cable................................................................................................................................ 128
1.12 Checking the RRU Installation..................................................................................................................................... 131
1.13 Powering On an RRU...................................................................................................................................................... 131
1.14 Appendix............................................................................................................................................................................. 133
1.14.1 Adding an Outdoor Quick-Lock Power Connector to the RRU Power Cable on the RRU Side......... 133
1.14.2 Assembling the OT Terminal and the Power Cable.......................................................................................... 140

Issue Draft A Copyright © Huawei Technologies Co., Ltd. iii


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

1 RRU5517t Installation Guide

Overview
This document describes how to install a DC blade RRU5517t (referred to as RRU
in this document). RRU is short for remote radio unit. For details about auxiliary
devices of the RRU, such as power modules and distribution equipment, see "RRU
Auxiliary Devices" in the corresponding RRU hardware description document.

Product Versions
The following table lists the product versions related to this document.

Product Name Solution Version Product Version

RRU5517t SRAN17.1 and later V100R017C10 and later

Intended Audience
This document is intended for:

Base station installation engineers

Organization
1.1 Changes in RRU5517t Installation Guide
This section describes changes between document versions, including the new,
modified, and deleted contents.
1.2 Installation Preparations
Before the installation, make sure that reference documents and required tools
and instruments are ready and installation personnel has passed related training
to ensure a smooth installation.
1.3 Information to Be Known Before the Installation
Before installing an RRU, you must be familiar with its exterior, ports, indicators,
mounting kit, installation scenarios, and installation clearance requirements.
1.4 Unpacking Check

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 1


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

This section describes how to unpack the delivered equipment, components, or


parts and check whether all the materials are included and intact.
1.5 Installation Procedure
This section describes the RRU installation procedure, which involves installing the
RRU and RRU cables, checking the RRU installation, and powering on the RRU.
1.6 Installing an Optical Module
Before installing an RRU, you need to install its optical module.
1.7 Preparing PGND and Power Cables
Before installing the RRU, you need to prepare PGND and power cables.
1.8 Hoisting the RRU and Related Cables
This section describes the procedure for hoisting an RRU and related cables onto a
tower.
1.9 Installing the RRU (Combined Installation)
This section describes the procedure for installing the RRU using a mounting kit
for combined installation. It is recommended that two installation engineers
perform the operation.
1.10 Installing the RRU (Separate Installation)
This section describes the procedure for installing the RRU using a mounting kit
for separate installation. It is recommended that two installation engineers
perform the operation.
1.11 Installing RRU Cables
The RRU cables include PGND cables, RF jumpers, optical fibers, and power cables.
1.12 Checking the RRU Installation
After the RRU is installed, you need to check the device installation, protection,
and cables.
1.13 Powering On an RRU
This section describes the procedure and precautions for powering on an RRU.
1.14 Appendix

1.1 Changes in RRU5517t Installation Guide


This section describes changes between document versions, including the new,
modified, and deleted contents.

Draft A (2022-12-31)
This is a draft.

1.2 Installation Preparations


Before the installation, make sure that reference documents and required tools
and instruments are ready and installation personnel has passed related training
to ensure a smooth installation.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 2


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

1.2.1 Reference Documents


Before the installation, you must be familiar with the following reference
documents.
The following reference documents are required for RRU installation:
● Safety Information
● Installation Reference
● RRU5517t Hardware Description
● Installation guide of the corresponding base station, for example, DBS3900 &
DBS5900 Installation Guide

1.2.2 Tools and Instruments


The following primary and auxiliary installation tools must be ready before the
installation.
Different models of RRU modules are suitable in different installation scenarios.
Select tools based on the actual RRU installation scenario.

Primary Installation Tools


The primary installation tools must be provided for onsite installation, such as
tools for drilling holes, preparing cables, and fastening. The primary installation
tools are classified into basic tools and extended tools, as listed in the following
tables.

Table 1-1 Basic tools


Multi-purpose wire Torque screwdriver (0.4 Torque wrench (1 N·m to
stripper N·m to 15 N·m [3.54 lbf·in. 50 N·m [8.85 lbf·in. to
(for stripping wires, to 132.76 lbf·in.]) 442.54 lbf·in.])
cutting wires, and
crimping OT
terminals) Size: 10 mm (0.39 in.), 13
mm (0.51 in.), 14 mm
3 mm (0.12 in.), 5 mm (0.55 in.), 16 mm (0.63
(0.20 in.) in.), 17 mm (0.67 in.), 18
mm (0.71 in.), 19 mm
(0.75 in.), 21 mm (0.83
M2.5 to M6 in.), 22 mm (0.87 in.), 32
mm (1.26 in.), 33 mm
(1.30 in.), 35 mm (1.38
in.)
M2.5 to M6

Heat gun Level Measuring tape

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 3


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Table 1-2 Extended tools

Installed on Pole/U- Installed on Wall Installed on Tower


Steel/Angle Steel

None Torque socket (1 N·m to 50 Rope


N·m [8.85 lbf·in. to 442.54
lbf·in.])

M6, M8, M10, M12

Hammer drill (Ф 4.5 bit, Ф 8 Fixed pulley (load


bit, Ф 12 bit, Ф 14 bit, Ф 16 bearing capacity > 500
bit) kg [1102.50 lb])

- Mechanical device (such


as a winch)

Auxiliary Installation Tools


The auxiliary installation tools provide protection or facilitate the installation, as
listed in the following table.

Table 1-3 Auxiliary installation tools

Protective gloves ESD gloves Vacuum cleaner

Diagonal pliers Marker (diameter ≤ 10 mm Hammer


[0.39 in.])

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 4


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Utility knife Multimeter -

1.2.3 Skills Requirements for Installation Personnel


Installation personnel must be qualified and trained. Before performing any
operation, installation personnel must be familiar with correct operation methods
and safety precautions.
The customer must pay attention to the following points before the installation:
● The customer's installation personnel must be trained by Huawei and be
familiar with the proper installation and operation methods.
● The number of installation personnel depends on the engineering schedule
and installation environment. In most cases, four to five people are required.

1.3 Information to Be Known Before the Installation


Before installing an RRU, you must be familiar with its exterior, ports, indicators,
mounting kit, installation scenarios, and installation clearance requirements.

1.3.1 Exterior
The RRU has a blade structure.
The following figure shows an RRU.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 5


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-1 RRU exterior

The following figure shows RRU dimensions.

Figure 1-2 RRU dimensions

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 6


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

You can obtain the RRU name, frequency band and power supply information
from the nameplate on the cover plate of the cabling cavity. The following figure
shows the position of the nameplate on the RRU.
NOTE

The nameplate on the RRU in the figure is only for reference.

Figure 1-3 RRU nameplate

(1) Nameplate (2) Module name (3) Frequency band (4) Power supply

1.3.2 Ports
The external ports are located at the bottom of the RRU, including the RF port,
optical fiber port, and power port.
The following figure shows the ports on the RRU panels.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 7


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-4 Ports on the panels

The following table describes the ports on the RRU.

Table 1-4 Ports on the RRU


Silkscreen Connector Description

A T012/R012 4.3-10 female TX/RX RF port A, supporting RET signal


connector (OOK signal) transmission

C T012/R012 4.3-10 female TX/RX RF port C


connector

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 8


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Silkscreen Connector Description

D T012/R012 4.3-10 female TX/RX RF port D


connector

B T012/R012 4.3-10 female TX/RX RF port B


connector

RET DB9 female Communication port for the RET


connector antenna, supporting RET signal
transmission (RS485 signals)

CPRI0 SFP female connector Optical port, connected to the BBU or an


upper-level RRU

CPRI1 SFP female connector Optical port, connected to a lower-level


RRU or the BBU

PWR Outdoor quick-lock Power input port


power connector

1.3.3 Indicators
There are six indicators on an RRU. They indicate the running status of the RRU.
The following figure shows the indicators on the RRU.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 9


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-5 Indicators

The following table describes the RRU indicators.

Table 1-5 RRU indicators


Silkscre Color Status Description
en

RUN Green Steady on There is power supply, but the module


is faulty.

Steady off There is no power supply, or the


module is faulty.

Blinking (on for The module is running properly.


1s and off for
1s)

Blinking (on for Software is being loaded to the


0.125s and off module, or the module is not started.
for 0.125s)

ALM Red Steady on Alarms are generated and the module


needs to be replaced.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 10


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Silkscre Color Status Description


en

Steady off No alarm is generated.

Blinking (on for Alarms are generated. The alarms may


1s and off for be caused by faults on the module or
1s) port. Therefore, you need to locate the
fault before deciding whether to
replace the module.

ACT Green Steady on The module is working properly when


TX channels are enabled or when
software is being loaded to the module
that is not started.

Blinking (on for The module is functioning properly


1s and off for with TX channels disabled.
1s)

VSWR Red Steady off No voltage standing wave ratio


(VSWR) alarm is generated.

Steady on VSWR alarms are generated.

CPRI0/ Red or Steady green The CPRI link is functioning properly.


CPRI1 green
Steady red An optical module fails to receive or
transmit signals because the optical
module is faulty or the optical fiber is
broken.

Blinking red (on The CPRI link is out of lock because of


for 1s and off mutual lock of dual-mode clock
for 1s) sources or mismatched data rates over
CPRI ports (you are advised to check
the system configuration to identify
the fault).

Steady off The optical module is not properly


installed.

1.3.4 RRU Mounting Kit and Attachment Plate


Two types of mounting kits are available for RRU installation: enhanced mounting
kit for triple-RRU combined installation and enhanced mounting kit for separate
RRU installation. Use the delivered mounting kit for installation.

NOTICE

In new deployment scenarios, the required RRU mounting kits (described in this
document) are used to install the RRU described in this document.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 11


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

[Link] Enhanced Mounting Kit for Triple-RRU Combined Installation


An enhanced mounting kit for triple-RRU combined installation (mounting kit for
combined installation for short) is used to assemble RRUs on a pole.
The following figure shows the exterior of the mounting kit for combined
installation.

Figure 1-6 Mounting kit for combined installation

(1) (2) M12 screw (3) Main (4) Bolt (5) Auxiliary
Attachment on the bracket bracket
plate attachment
plate

(6) Flat (7) Spring (8) M12 nut (9) Plastic -


washer washer screw cap

As shown in the preceding figure, the mounting kit for combined installation is
delivered with three attachment plates by default. The attachment plates are
removed based on site requirements. The number of attachment plates to be
removed is determined by the number of RRUs to be installed. The removed
attachment plate is used to replace the attachment plate delivered with a 12 L, 18
L, 24 L, or 29 L RRU, if assembled with the RRU5517t.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 12


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTICE

During RRU installation, do not remove components from the RRU mounting kit
unless otherwise specified in this document.

The weight of the mounting kit for combined installation (including three
attachment plates) is 27.5 kg (60.64 lb).

[Link] Enhanced Mounting Kit for Separate RRU Installation


An enhanced mounting kit for separate RRU installation (mounting kit for
separate installation for short) is used to install an RRU on a pole, U-steel, angle
steel, or wall in scenarios other than combined installation.
The following figure shows the exterior of the mounting kit for separate
installation.

Figure 1-7 Mounting kit for separate installation

(1) Connection (2) Main bracket (3) Bolt (4) Auxiliary


plate bracket

(5) Flat washer (6) Spring washer (7) M12 nut (8) Plastic screw
cap

The weight of the mounting kit for separate installation is 7.3 kg (16.10 lb).

[Link] Attachment Plate


An RRU is equipped with an attachment plate by default. The attachment plate is
used with a mounting kit for combined installation or a mounting kit for separate
installation.
The following figure shows the exterior and position of an RRU attachment plate.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 13


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-8 Exterior and position of an RRU attachment plate

(1) Front view (2) Side view (3) Attachment plate

The weight of the attachment plate is 3.0 kg (6.62 lb).

1.3.5 Installation Scenario


This section describes the RRU installation modes, installation restrictions, and
installation scenarios.

Installation Mode
The following table lists the installation modes supported by the two types of RRU
mounting kits.

Table 1-6 RRU installation modes

Mounting Mounting on a Mounting Mounting on Mounting on


Kit Pole on U-Steel Angle Steel a Wall

Mounting Supported (only Not Not Not


kit for side-mounted supported supported supported
combined installation)
installation

Mounting Supported (both Supported Supported Supported


kit for side-mounted (only reverse (only reverse (recommende
separate installation and installation) installation) d: only
installation reverse reverse
installation) installation)

The following figure shows an example of how to install an RRU on a pole using a
mounting kit for separate installation.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 14


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-9 RRU installation

NOTE

The attachment plate on the RRU in the preceding figure is for reference only.

Restrictions
Application Scenarios
To ensure proper heat dissipation of the RRU, the following requirements must be
met:
● Do not install it in an enclosed indoor or outdoor cabinet without a cooling
system, as shown in Figure 1-10.
● Do not install it in an enclosed camouflage box.
● Do not install it in an enclosed equipment room without a cooling system
(including a weak-current well or a stuffy roof).
● An RRU is a professional communication device and cannot be installed in
areas that are easily accessible to the general public. Therefore, RRU
installation involves safety considerations. For details about the requirements
and precautions, see Safety Information.
If the module is installed in an unsuitable environment, the module will have poor
heat dissipation and may not work properly.
Installation Restrictions
● The specifications of installation supports described in this document are
based only on the exterior and dimensions of the mounting kits. Before
installing equipment, assess the strength and reliability of the installation
support to determine whether it can support the weight of the equipment.
● To ensure heat dissipation of the RRU and waterproofing of the ports at the
bottom of the RRU, the RRU must be installed at a vertical deviation angle
not exceeding 10°. See Figure 1-11.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 15


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● In tower mounting scenarios, if the mounting kit for separate installation is


used to install an RRU, the RRU can be installed on a pole, U-steel, or angle
steel.
● Combined installation of multiple RRUs is not allowed in indoor scenarios.
● In outdoor scenarios, combined installation of multiple RRUs is allowed only
on a pole, and a maximum of three RRUs can be combined using a mounting
kit.

Figure 1-10 Unsuitable environment

Figure 1-11 Vertical deviation angle requirements of an RRU

(1) RRU (2) Installation support

Installation on a Pole (Mounting Kit for Combined Installation)


The following figure shows the pole diameter required for installation on a pole.
The diameter of a pole for installing an RRU ranges from 60 mm (2.36 in.) to 114
mm (4.49 in.). The recommended diameter is 80 mm (3.15 in.). The recommended
thickness of the pole wall is 3.5 mm (0.14 in.) or above. Before installing multiple
RRUs on a pole, assess the strength and reliability of the installation support to
determine whether it can support the weight of the equipment to be installed.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 16


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-12 Diameter of a pole

The following figure shows a single RRU installed on a pole.

Figure 1-13 Single RRU installed on a pole (mounting kit for combined
installation)

The following figure shows two RRUs installed on a pole.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 17


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-14 Two RRUs installed on a pole (mounting kit for combined
installation)

The following figure shows three RRUs installed on a pole.

Figure 1-15 Three RRUs installed on a pole (mounting kit for combined
installation)

The following figure shows an example of assembling the RRU5517t with a 12 L,


18 L, 24 L, or 29 L RRU on a pole.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 18


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-16 RRU5517t assembled with an RRU of different volume (mounting kit
for combined installation)

Installation on a Pole (Mounting Kit for Separate Installation)


The following figure shows the pole diameter required for installation on a pole.
The diameter of a pole for installing an RRU ranges from 60 mm (2.36 in.) to 114
mm (4.49 in.). The recommended diameter is 80 mm (3.15 in.). The recommended
thickness of the pole wall is 3.5 mm (0.14 in.) or above.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 19


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-17 Diameter of a pole

If a single RRU is installed on a pole, it is installed in side-mounted mode by


default.
The following figure shows a single RRU installed on a pole.

Figure 1-18 Single RRU installed on a pole (mounting kit for separate installation)

If two RRUs are installed on a pole, it is recommended that they be installed in


reverse mode.
The following figure shows two RRUs installed on a pole.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 20


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-19 Two RRUs installed on a pole (mounting kit for separate installation)

Installation on U-Steel (Mounting Kit for Separate Installation)


The following figure shows the U-steel specifications required for installation on
U-steel.

Figure 1-20 U-steel specifications

NOTICE

Only one RRU can be installed on a piece of U-steel and the RRU is installed in
reverse mode.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 21


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

The following figure shows the RRU installed on U-steel.

Figure 1-21 RRU installed on U-steel (mounting kit for separate installation)

Installation on Angle Steel (Mounting Kit for Separate Installation)


The following figure shows the angle steel specifications required for installation
on angle steel.

Figure 1-22 Angle steel specifications

NOTICE

Only one RRU can be installed on a piece of angle steel and the RRU is installed in
reverse mode.

The following figure shows the RRU installed on angle steel.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 22


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-23 RRU installed on angle steel (mounting kit for separate installation)

Installation on a Wall (Mounting Kit for Separate Installation)


The wall on which an RRU is installed must meet the following requirements:
● For each RRU, the wall must be able to support four times the weight of one
RRU and bear the bolt pulling force of 3.0 kN (675 lbf) vertical to the wall.
● When expansion bolts are tightened to 45 N·m (398.28 lbf·in.), the bolts work
properly without causing cracks on the wall.
● If a wall (such as a hollow brick wall or thermal insulation wall) does not
meet the load bearing requirements, the bolts may fail to work, the wall may
be damaged, or the device may fall off. Select an appropriate installation
mode based on site conditions.
If an RRU is installed on a wall, it is recommended that it be installed in reverse
mode.
The following figure shows the RRU installed on a wall.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 23


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-24 RRU installed on a wall (mounting kit for separate installation)

1.3.6 Installation Clearance Requirements


This section describes the clearance requirements for installing a single RRU and
multiple RRUs as well as the clearance between RRUs.

● The recommended clearance ensures proper equipment running and provides


sufficient space for operation and maintenance (O&M). If there is sufficient
installation space, maintain the recommended clearance.
● The minimum clearance ensures proper equipment running and heat
dissipation, but does not ensure O&M activities (such as checking indicators).
If installation space is limited, ensure at least the minimum clearance.
● The following describes the space requirements for installing an RRU above
non-asphalted ground. Please note that if an RRU is installed above asphalt
ground, the RRU must be at least 500 mm (19.69 in.) (700 mm [27.56 in.] or
more is recommended) above the ground. Other requirements are described
as follows.
● Except for the cable outlet of the RRU, there must be no other objects in the
RRU installation space described in the following sections.
● The top RRU installation clearances stated in the following figures refer to the
amount of distance measured from the upper handle of the RRU upwards.

[Link] Installation Clearance for a Single RRU


This section describes the recommended and minimum clearance requirements for
installing a single RRU.

Clearance for Installing a Single RRU in Side-mounted Mode


The following figure shows the clearance for installing a single RRU in side-
mounted mode.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 24


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-25 Clearance for installing a single RRU in side-mounted mode

Clearance for Installing a Single RRU in Reverse Mode


The following figure shows the clearances for installing a single RRU in reverse
mode.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 25


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-26 Clearance for installing a single RRU in reverse mode

Clearance for Installing a Single RRU on a Tower


Figure 1-27 and Figure 1-28 show the minimum clearance for installing a single
RRU in side-mounted mode and reverse mode on a tower, respectively.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 26


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-27 Minimum clearance for installing a single RRU in side-mounted mode
on a tower

Figure 1-28 Minimum clearance for installing a single RRU in reverse mode on a
tower

[Link] Installation Clearance for Multiple RRUs


This section describes the recommended and minimum clearance requirements for
installing multiple RRUs.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 27


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Recommended Clearance for Combined Installation of Multiple RRUs on a


Pole
The following figure shows the recommended clearance for combined installation
of multiple RRUs on a pole.

Figure 1-29 Recommended clearance for combined installation of multiple RRUs


on a pole

Minimum Clearance for Combined Installation of Multiple RRUs on a Pole


The following figure shows the minimum clearances for combined installation of
multiple RRUs on a pole.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 28


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-30 Minimum clearance for combined installation of multiple RRUs on a


pole

Recommended Clearance for Multiple RRUs Installed in Reverse Mode on a


Wall
The following figure shows the recommended clearances for multiple RRUs
installed in reverse mode on a wall.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 29


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-31 Recommended clearance for multiple RRUs installed in reverse mode
on a wall

(1) RRU mounting kit

Minimum Clearance for Multiple RRUs Installed in Reverse Mode on a Wall


The following figure shows the minimum clearances for multiple RRUs installed in
reverse mode on a wall.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 30


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-32 Minimum clearance for multiple RRUs installed in reverse mode on a
wall

(1) RRU mounting kit

[Link] Installation Clearance Between RRUs


This section describes the clearance required between RRUs.
Vertical installation of multiple RRUs affects heat dissipation of the RRUs.
Therefore, this installation mode is not recommended.
The following figure shows the clearance required between RRUs in horizontal
installation.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 31


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-33 Horizontal clearance between RRUs

1.4 Unpacking Check


This section describes how to unpack the delivered equipment, components, or
parts and check whether all the materials are included and intact.

Context
When transporting, moving, or installing the equipment, components, or parts,
you must:
● Package them for delivery and transportation before the base station
deployment. Unpacked delivery or package replacement for transferring is not
allowed.
● Prevent them from colliding with doors, walls, shelves, or other objects.
● Wear clean gloves and do not touch them with bare hands, sweat-soaked
gloves, or dirty gloves.
● The transportation environment must meet requirements of ETSI 300 019-1-2
class 2.3. For the goods damage caused by non-standard and violent
transportation or non-human factors (such as natural disasters), the
transportation entity should take the responsibility.
● It is recommended that two persons unpack and move the RRU, as shown in
the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 32


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-34 Unpacking and moving the RRU

NOTICE

After unpacking an RRU, you must power on the RRU within 24 hours. Otherwise,
the RRU may be damaged.

Procedure
Step 1 Check the total number of packing cases according to the packing list.

If... Then...

The total number is consistent with Go to Step 2.


the packing list

The total number is not consistent Find out the cause and report it to the
with the packing list local Huawei office.

Step 2 Check the exterior of each packing case.

If... Then...

The outer package is intact Go to Step 3.

The outer package is severely Find out the cause and report it to the
damaged or soaked local Huawei office.

Step 3 Check the type and quantity of equipment in each packing case against the
packing list.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 33


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

If... Then...

The type and quantity are consistent Sign the Packing List with the customer.
with the packing list on each
packing case

There is any shortage, wrong Report the situation to the local Huawei
delivery, or damaged equipment office.

----End

1.5 Installation Procedure


This section describes the RRU installation procedure, which involves installing the
RRU and RRU cables, checking the RRU installation, and powering on the RRU.
Figure 1-35 shows the installation procedure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 34


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-35 RRU installation procedure

1.6 Installing an Optical Module


Before installing an RRU, you need to install its optical module.

NOTE

● The depicted optical modules in this section are for reference only.
● It is recommended that the optical module be installed on the ground, since there is no
anti-falling protection for installing the optical module on the tower.

The type of an optical module is important for reference. Before installing an


optical module, determine whether it is a single-mode optical module or a
multimode optical module.
● SM and MM labels on an optical module: SM indicates a single-mode optical
module, and MM indicates a multimode optical module.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 35


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● The puller of a single-mode optical module is blue and the puller of a


multimode optical module is black or gray.

Procedure
Step 1 Push the dustproof cap lever to loosen the dustproof cap on the CPRI port of the
RRU.

Figure 1-36 Pushing the lever to loosen the dustproof cap

Step 2 Remove the dustproof cap from the CPRI port of the RRU.

Figure 1-37 Removing the dustproof cap

Step 3 Insert an optical module into the CPRI port of the RRU. Ensure that the optical
module is inserted in the correct direction. Gently push it into the slot horizontally
until it is firmly in place. The connector is properly fastened when it is completely
inserted. See the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 36


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-38 Installing an optical module

(1) Dustproof plug of the optical module

NOTICE

● When the optical module is correctly installed and secured, you will hear a
click.
● Ensure that the optical module is installed in the correct direction to prevent
damage to the optical module or the CPRI port of the RRU.
● Long-time exposure to the air will deteriorate the performance of optical
modules. Therefore, do not remove the dustproof plug from an optical module
during the installation.

Step 4 Install a dustproof cap on the CPRI port of the RRU.

Figure 1-39 Installing a dustproof cap

Step 5 Pull the lever to tighten the dustproof cap on the CPRI port of the RRU.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 37


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-40 Pulling the lever to tighten the dustproof cap

----End

1.7 Preparing PGND and Power Cables


Before installing the RRU, you need to prepare PGND and power cables.

Context
The cross-sectional area of an RRU PGND cable is 16 mm2 (0.025 in.2). The OT
terminals at the two ends of the cable are M6 and M8 terminals, respectively.

Procedure
Step 1 Cut the cable to a length suitable for the cable route.
Step 2 Add corresponding connectors to both ends of each cable.
Cable Type Reference

PGND cable Assembling the OT Terminal and the Power Cable

Power cable Adding an Outdoor Quick-Lock Power Connector to


the RRU Power Cable on the RRU Side

----End

1.8 Hoisting the RRU and Related Cables


This section describes the procedure for hoisting an RRU and related cables onto a
tower.

1.8.1 Hoisting an RRU


This section describes the procedure and precautions for binding and hoisting the
RRU and its mounting kit separately onto a tower. Onsite operations are subject to

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 38


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

site conditions. In tower mounting scenarios, the RRU can be installed on a pole,
U-steel, or angle steel.

Prerequisites
● If the reverse mode is used, the attachment plate's position has been adapted
to fit installation before the RRU is hoisted onto a tower.
● If the mounting kit for combined installation is used, the attachment plate in
the position intended for the RRU to be installed has been removed from the
mounting kit for combined installation before the mounting kit is hoisted
onto a tower and the removed attachment plate is properly disposed of. That
is, before hoisting the mounting kit for combined installation onto a tower,
remove one, two, and three attachment plates from the mounting kit in
single-RRU installation, two-RRU combined installation, and three-RRU
combined installation, respectively. For details, see 1.9 Installing the RRU
(Combined Installation).

NOTICE

● Do not stand an RRU upright because the RF ports at the bottom cannot
support the weight of the RRU and the RRU may fall down.
● Place a foam pad or cardboard under an RRU to protect the RRU housing from
damage when the RRU is horizontally placed on the ground.
● The power cable must be routed and protected according to local laws and
regulations, industry standards, and operators' standards.

Procedure
Step 1 After climbing up the tower, installation engineer A secures the fixed pulley to the
support on the tower and leads the lifting rope through the fixed pulley.
Step 2 Installation engineer C on the ground binds the RRU mounting kit using the lifting
rope and guide rope. See Figure 1-41 and Figure 1-42. Installation engineer C
pulls the lifting rope downwards, and installation engineer B pulls the guide rope
outwards to protect the RRU mounting kit from colliding with the tower.

Figure 1-41 Binding the RRU mounting kit (mounting kit for separate installation)

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 39


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-42 Binding the RRU mounting kit (mounting kit for combined
installation)

(1) Lifting rope (2) Guide rope

Step 3 Installation engineer A catches the RRU mounting kit.


Step 4 Install the mounting kit. For details, see 1.9 Installing the RRU (Combined
Installation) and 1.10 Installing the RRU (Separate Installation).
Step 5 After the mounting kit is installed, untie the lifting rope and guide rope.
Step 6 Installation engineer C binds the RRU using the lifting rope and guide rope, as
shown in Figure 1-43 and Figure 1-44.

Figure 1-43 Binding the RRU (side-mounted mode)

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 40


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-44 Binding the RRU (reverse mode)

(1) Lifting rope (2) Handle (3) Traction eye (4) Guide rope

Do not hoist the module using the handle or traction eye only, as shown in the
following figure.

Figure 1-45 Prohibiting hoisting the module using the handle or traction eye only

Step 7 Hoist the RRU onto the tower.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 41


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

If... Then...

(Recommended) A mechanical Installation engineer C operates the


device, such as a winch, is used mechanical device and installation
engineer B controls the guide rope to
protect the RRU from colliding with the
tower, as shown in Figure 1-46.

The module is hoisted manually It is recommended that at least two


persons (installation engineers C and D)
pull the lifting rope downwards, and
installation engineer B controls the
guide rope to protect the RRU from
colliding with the tower, as shown in
Figure 1-47.

Figure 1-46 Hoisting the RRU using a mechanical device (the RRU is bound given
the assumption that the reverse mode is used)

(1) Lifting rope (2) Fixed pulley (3) Guide rope (4) Mechanical
device (such as a
winch)

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 42


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-47 Hosting the RRU manually (the RRU is bound given the assumption
that the reverse mode is used)

(1) Lifting rope (2) Fixed pulley (3) Guide rope

DANGER

● The load-bearing capacity of each rope must be greater than 200 kg (441 lb)
and the diameter of each rope must be less than 25 mm (0.98 in.).
● When hoisting each device onto a tower, protect them from colliding with the
tower.
● Separately hoist the RRU and its mounting kit onto the tower.
● Hoist the RRU onto the tower before it is installed on the pole, angle steel, or
U-steel.
● Do not hoist anything using the traction eye.

Step 8 Installation engineer A catches the RRU and installs it. For details, see 1.9
Installing the RRU (Combined Installation) and 1.10 Installing the RRU
(Separate Installation).

Step 9 Untie the lifting rope and guide rope.

----End

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 43


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

1.8.2 Hoisting Optical Fibers


This section describes the procedure and precautions for hoisting optical fibers
onto a tower.

Context
Cabling requirements for optical fibers must be met. For details, see "Cabling
Requirements".

Procedure
Step 1 Hoist the optical fibers onto the tower. See Figure 1-48.

Figure 1-48 Hoisting optical fibers onto the tower

(1) Lifting rope (2) Fixed pulley (3) Optical fibers (4) Guide rope

NOTICE

Before hoisting optical fibers onto the tower, check the labels on both ends
indicating which ends connect to the RRU or BBU, and hoist the end on the RRU
side onto the tower.

1. After climbing up the tower, installation engineer A secures the fixed pulley to
the support on the tower and leads the lifting rope through the fixed pulley.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 44


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

2. Installation engineer B places the optical fiber reels on the pay-off rack, and
installation engineer D leads the lifting rope through the stretch rope of the
optical fibers and uses another rope as a guide rope to secure the cables 4 m
(13.12 ft) away from the lifting rope knot. See Figure 1-49.

Figure 1-49 Binding optical fibers

(1) Lifting rope (2) Stretch rope (3) Guide rope

NOTICE

Do not remove the stretch rope and protection pipe or bind optical fibers
using one rope. See Figure 1-50.

Figure 1-50 Incorrect binding method

3. Installation engineer B rotates the optical fiber reels at a speed of 5 m to 15


m (16.40 ft to 49.21 ft) per minute to unwind the optical fibers.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 45


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

4. Installation engineer C pulls the lifting rope downwards, and installation


engineer D pulls the guide rope outwards to protect the optical fibers from
colliding with the tower.
Step 2 Vertically secure the optical fibers to the tower using cable clips.
Step 3 Untie the lifting rope and guide rope.

----End

1.8.3 Hoisting Power Cables


This section describes the procedure and precautions for hoisting power cables
onto a tower.

Context
Cabling requirements for power cables must be met. For details, see "Cabling
Requirements".
The power cable connectors on the RRU side are prepared before they are hoisted
onto the tower.

Procedure
Step 1 Hoist the power cables onto the tower. See Figure 1-51.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 46


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-51 Hoisting power cables onto the tower

(1) Lifting rope (2) Fixed pulley (3) Power cable

1. After climbing up the tower, installation engineer A secures the fixed pulley to
the support on the tower and leads the lifting rope through the fixed pulley.
2. Installation engineer B secures three cable ties below the power cable
connectors to secure the power cables onto the lifting rope. See Figure 1-52.
NOTE

The power cable connectors in the figure are examples only. The actual connectors may
vary.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 47


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-52 Binding cable ties

3. Installation engineer B wraps the power cable connectors with insulation tape.
See Figure 1-53.
NOTE

Wrap insulation tape from the middle of the connectors until the connectors are fixed
to the lifting rope.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 48


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-53 Wrapping the insulation tape

4. Installation engineer C pulls the lifting rope downwards, while installation


engineer B pulls the other end of the lifting rope outwards to protect the
cables from colliding with the tower.
Step 2 Vertically secure the power cables to the tower using cable clips.
Step 3 Remove the cable ties, insulation tape, and lifting rope.

----End

1.9 Installing the RRU (Combined Installation)


This section describes the procedure for installing the RRU using a mounting kit
for combined installation. It is recommended that two installation engineers
perform the operation.
RRUs can be combined only when they are installed on a pole, and a maximum of
three RRUs can be combined.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 49


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTICE

● Do not stand an RRU upright because the RF ports at the bottom cannot
support the weight of the RRU and the RRU may fall down.
● Place a foam pad or cardboard under an RRU to protect the RRU housing from
damage when the RRU is horizontally placed on the ground.

1.9.1 Installing a Single RRU on a Pole


This section describes the procedure and precautions for installing a single RRU on
a pole.

Prerequisites
In tower mounting scenarios, the following operations have been completed
before RRU installation: removing the attachment plate in the position intended
for the RRU to be installed from the mounting kit, and binding and hoisting the
RRU and its mounting kit separately onto a tower.

Procedure
Step 1 Remove the attachment plate from the mounting kit. Use an M12 torque wrench
(18 mm [0.71 in.]) to loosen the M12 screws on the top of an attachment plate in
the position intended for the RRU to be installed and the main bracket. Remove
the attachment plate from the mounting kit and dispose of it properly, as shown
in the following figure.

Figure 1-54 Removing one attachment plate from the mounting kit

(1) Delivered attachment plate (2) Main bracket

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 50


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Step 2 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.

Figure 1-55 Distance between the mounting kit and the ground

As shown in the figure above, it is recommended that the mounting kit be


installed at a position 1000 mm (39.37 in.) to 1400 mm (55.12 in.) high above
the ground. If the space is insufficient, only the minimum clearance
requirements in 1.3.6 Installation Clearance Requirements need to be met.
Step 3 Install the RRU mounting kit. See the following figure.
1. Adjust the positions of nuts based on the pole diameter and remove the bolt
at the open end from the slot on the auxiliary bracket.
2. Slide the RRU mounting kit onto the pole horizontally and fit the bolt into the
slot.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 51


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-56 Installing the RRU mounting kit

NOTICE

Ensure that the arrows on the mounting kit are pointing up.

Step 4 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the six nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the pole. See the
following figure.

NOTICE

● Tighten the three pairs of bolts in the sequence from a to b and c. For each
pair, tighten the nuts on the left and right bolts alternatively and ensure that
the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 52


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-57 Securing the RRU mounting kit

(1) M12 nut (six in total) (2) Plastic screw cap (six in total)

Step 5 Install the RRU on the mounting kit, as shown in the following figure.

Figure 1-58 Installing the RRU on the mounting kit

To install the RRU on the mounting kit, perform the following steps:

● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 53


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.

Figure 1-59 Installation above the ground

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 54


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.

Figure 1-60 Installation on a tower

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 55


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-61 Tightening M12 screws on the attachment plate

----End

1.9.2 Installing Two RRUs on a Pole


This section describes the procedure and precautions for installing two RRUs on a
pole.

Prerequisites
In tower mounting scenarios, the following operations have been completed
before RRU installation: removing the attachment plate in the position intended
for the RRU to be installed from the mounting kit, and binding and hoisting the
RRU and its mounting kit separately onto a tower.

Context
The mounting kit for combined installation (including attachment plates) for the
RRU5517t is compatible with 12 L, 18 L, 24 L, and 29 L RRUs, allowing such RRUs
to be assembled with the RRU5517t. This section describes combined installation
of two RRU5517t modules and combined installation of one RRU5517t and one
RRU of different volume.

Procedure
Step 1 Remove two attachment plates from the mounting kit. Use an M12 torque wrench
(18 mm [0.71 in.]) to loosen the M12 screws on the top of two attachment plates
in the positions intended for the RRUs to be installed and the main bracket.
Remove the attachment plates from the mounting kit, as shown in the following
figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 56


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● In combined installation of two RRU5517t modules, dispose of the two


removed attachment plates properly.
● In combined installation of one RRU5517t and one RRU of different volume,
properly dispose of one of the removed attachment plates and use the other
one to replace the attachment plate on the RRU of different volume.

Figure 1-62 Removing two attachment plates from the mounting kit

(1) Delivered attachment plate (2) Main bracket

Step 2 (For combined installation of one RRU5517t and one RRU of different volume)
Replace the attachment plate on the RRU of different volume.
1. Remove the attachment plate from the RRU of different volume (using a 12 L
blade RRU as an example). See the following figure.

Figure 1-63 Removing the attachment plate from the RRU of different
volume (using a 12 L blade RRU as an example)

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 57


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

2. Remove the four M6 spare screws from the retained RRU5517t attachment
plate and use them to install the RRU5517t attachment plate onto the RRU of
different volume. Use an M6 hex torque screwdriver to tighten the screws to 5
N·m (44.25 lbf·in.), as shown in the following figure.

Figure 1-64 Installing the RRU5517t attachment plate onto the RRU of
different volume (using a 12 L blade RRU as an example)

(1) M6 spare screw on the attachment plate

NOTE

When securing the RRU5517t attachment plate onto the RRU of different volume, select
proper screw holes based on the volume of the RRU. The following figure shows the screw
holes.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 58


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-65 Screw holes for securing the RRU5517t attachment plate onto the
RRU of different volume

RRU Volume Screw Hole

12 L, 24 L A

29 L B

18 L A or C

Step 3 Determine and mark the position for installing the mounting kit. For details, see
1.9.1 Installing a Single RRU on a Pole.
Step 4 Install the RRU mounting kit. For details, see 1.9.1 Installing a Single RRU on a
Pole.
Step 5 Install two RRUs onto the mounting kit in sequence, as shown in the following
figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 59


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-66 Installing two RRUs onto the mounting kit (using two RRU5517t
modules as an example)

To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 60


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-67 Installation above the ground

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 61


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-68 Installation on a tower

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 62


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-69 Tightening M12 screws on the attachment plate

----End

1.9.3 Installing Multiple RRUs on a Pole


This section describes the procedure and precautions for installing multiple RRUs
on a pole.

Prerequisites
In tower mounting scenarios, the following operations have been completed
before RRU installation: removing the attachment plate in the position intended
for the RRU to be installed from the mounting kit, and binding and hoisting the
RRU and its mounting kit separately onto a tower.

Context
● Before installing multiple RRUs on a pole, assess the strength and reliability of
the installation support to determine whether it can support the weight of the
equipment to be installed. This section provides an example of installing three
RRUs on a pole.
● The mounting kit for combined installation (including attachment plates) for
the RRU5517t is compatible with 12 L, 18 L, 24 L, and 29 L RRUs, allowing
such RRUs to be assembled with the RRU5517t. This section describes
combined installation of three RRU5517t modules and combined installation
of two RRU5517t modules and one RRU of different volume.

Procedure
Step 1 Remove three attachment plates from the mounting kit. Use an M12 torque
wrench (18 mm [0.71 in.]) to loosen the M12 screws on the top of three
attachment plates in the positions intended for the RRUs to be installed and the

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 63


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

main bracket. Remove the attachment plates from the mounting kit, as shown in
the following figure.
● In combined installation of three RRU5517t modules, dispose of the three
removed attachment plates properly.
● In combined installation of two RRU5517t modules and one RRU of different
volume, dispose of two removed attachment plates and use the remaining
one to replace the attachment plate on the RRU of different volume.

Figure 1-70 Removing three attachment plates from the mounting kit

(1) Delivered attachment plate (2) Main bracket

Step 2 (For combined installation of the RRU5517t and an RRU of different volume)
Replace the attachment plate on the RRU of different volume. For details, see
1.9.2 Installing Two RRUs on a Pole.
Step 3 Determine and mark the position for installing the mounting kit. For details, see
1.9.1 Installing a Single RRU on a Pole.
Step 4 Install the RRU mounting kit. For details, see 1.9.1 Installing a Single RRU on a
Pole.
Step 5 Install three RRUs onto the mounting kit in sequence, as shown in the following
figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 64


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-71 Installing three RRUs onto the mounting kit (using three RRU5517t
modules as an example)

To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 65


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-72 Installation above the ground

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 66


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-73 Installation on a tower

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 67


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-74 Tightening M12 screws on the attachment plate

----End

1.10 Installing the RRU (Separate Installation)


This section describes the procedure for installing the RRU using a mounting kit
for separate installation. It is recommended that two installation engineers
perform the operation.
The RRU supports the separate installation mode when installed on a pole, U-
steel, angle steel, or wall.

NOTICE

● Do not stand an RRU upright because the RF ports at the bottom cannot
support the weight of the RRU and the RRU may fall down.
● Place a foam pad or cardboard under an RRU to protect the RRU housing from
damage when the RRU is horizontally placed on the ground.

1.10.1 Installing the RRU on a Pole


This section describes the procedure and precautions for installing the RRU on a
pole.

[Link] Installing a Single RRU


Side-mounted mode is recommended for RRU installation on a pole. This section
describes the procedure and precautions for installing an RRU on a pole in side-

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 68


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

mounted mode. For details about how to install an RRU in reverse mode, see
"Installing an RRU on U-Steel."

Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.

Procedure
Step 1 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.

Figure 1-75 Distance between the mounting kit and the ground

As shown in the figure above, it is recommended that the mounting kit be


installed at a position 1000 mm (39.37 in.) to 1400 mm (55.12 in.) high above
the ground. If the space is insufficient, only the minimum clearance
requirements in 1.3.6 Installation Clearance Requirements need to be met.
Step 2 Install the RRU mounting kit. See the following figure.
1. Adjust the positions of nuts based on the pole diameter and remove the bolt
at the open end from the slot on the auxiliary bracket.
2. Slide the RRU mounting kit onto the pole horizontally and fit the bolt into the
slot.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 69


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-76 Installing the RRU mounting kit

NOTICE

Ensure that the arrows on the mounting kit are pointing up.

Step 3 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the four nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the pole. See the
following figure.

NOTICE

● For each pair of bolts, tighten the nuts on the left and right bolts alternatively
and ensure that the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 70


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-77 Securing the RRU mounting kit

(1) M12 nut (four in total) (2) Plastic screw cap (four in total)

Step 4 Install the RRU on the mounting kit, as shown in the following figure.

Figure 1-78 Installing the RRU on the mounting kit

To install the RRU on the mounting kit, perform the following steps:

● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 71


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.

Figure 1-79 Installation above the ground

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 72


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.

Figure 1-80 Installation on a tower

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Step 5 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 73


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-81 Tightening M12 screws on the attachment plate

----End

[Link] Installing Two RRUs


This section describes the procedure and precautions for installing two RRUs on a
pole.

Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.

Context
When two RRUs are installed on a pole, it is recommended that they be vertically
mounted in a staggered manner in reverse mode.

Procedure
Step 1 Determine and mark the position for installing the first mounting kit. For details
about installation, see [Link] Installing a Single RRU.

Step 2 Install and secure the first mounting kit. For details about installation, see [Link]
Installing a Single RRU.

Step 3 Adjust the installation position of the RRU attachment plate.

Use an M6 hex torque screwdriver to remove the attachment plate from one side
of the RRU, reinstall the attachment plate onto the front of the RRU, and use an
M6 hex torque screwdriver to tighten the screws to 5 N·m (44.25 lbf·in.).

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 74


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-82 Relocating the attachment plate to the front of the RRU

NOTICE

Ensure that the arrows on the attachment plate are pointing up during
reinstallation.

Step 4 Install the first RRU onto the mounting kit, as shown in the following figure.

Figure 1-83 Installing the first RRU onto the mounting kit

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 75


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.

Figure 1-84 Installation above the ground

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 76


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.

Figure 1-85 Installation on a tower

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 77


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Step 5 Secure the first RRU. Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the
M12 screws into the holes on the top of the RRU attachment plate and main
bracket to 50 N·m (442.54 lbf·in.) so that the attachment plate and main bracket
are firmly secured, as shown in the following figure.

Figure 1-86 Securing the first RRU mounting kit

Step 6 Install the second mounting kit. Ensure that the space left between the bottom of
two RRU mounting kits corresponds with the height of an RRU.
Step 7 Adjust the installation position of the second RRU attachment plate and install the
second RRU onto the mounting kit. Use an M12 torque wrench (18 mm [0.71 in.])
to tighten the M12 screws into the holes on the top of the RRU attachment plate
and main bracket to 50 N·m (442.54 lbf·in.) so that the attachment plate and
main bracket are firmly secured, as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 78


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-87 Installing the second RRU onto the mounting kit

----End

1.10.2 Installing an RRU on U-Steel


This section describes the procedure and precautions for installing an RRU on U-
steel. An RRU can be installed on U-steel in installation above the ground and
tower mounting. Only one RRU can be installed on a piece of U-steel and it is
installed in reverse mode.

Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.

Context
Figure 1-88 shows the top view of the installation mode.

NOTICE

When the width of the narrower edges of the U-steel is less than 40 mm (1.57
in.), only the installation modes a and b are supported.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 79


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-88 Top view of the installation mode

(1) U-steel

Procedure
Step 1 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 80


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-89 Distance between the mounting kit and the ground

As shown in the figure above, it is recommended that the mounting kit be


installed at a position 1000 mm (39.37 in.) to 1400 mm (55.12 in.) high above
the ground. If the space is insufficient, only the minimum clearance
requirements in 1.3.6 Installation Clearance Requirements need to be met.
Step 2 Install the RRU mounting kit. See the following figure.
1. Adjust the positions of nuts based on the pole diameter and remove the bolt
at the open end from the slot on the auxiliary bracket.
2. Slide the RRU mounting kit onto the U-steel horizontally and fit the bolt into
the slot.

Figure 1-90 Installing the RRU mounting kit

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 81


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTICE

Ensure that the arrows on the mounting kit are pointing up.

Step 3 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the four nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the U-steel. See the
following figure.

NOTICE

● For each pair of bolts, tighten the nuts on the left and right bolts alternatively
and ensure that the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.

Figure 1-91 Securing the RRU mounting kit

(1) M12 nut (four in total) (2) Plastic screw cap (four in total)

Step 4 Adjust the installation position of the RRU attachment plate.


Use an M6 hex torque screwdriver to remove the attachment plate from one side
of the RRU, reinstall the attachment plate onto the front of the RRU, and use an
M6 hex torque screwdriver to tighten the screws to 5 N·m (44.25 lbf·in.).

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 82


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-92 Relocating the attachment plate to the front of the RRU

NOTICE

Ensure that the arrows on the attachment plate are pointing up during
reinstallation.

Step 5 Install the RRU on the mounting kit, as shown in the following figure.

Figure 1-93 Installing the RRU on the mounting kit

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 83


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.

Figure 1-94 Installation above the ground

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 84


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.

Figure 1-95 Installation on a tower

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 85


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.

Figure 1-96 Tightening M12 screws on the attachment plate

----End

1.10.3 Installing an RRU on Angle Steel


This section describes the procedure and precautions for installing an RRU on
angle steel. An RRU can be installed on angle steel in installation above the
ground and tower mounting. Only one RRU can be installed on a piece of angle
steel and it is installed in reverse mode.

Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.

Context
Figure 1-97 shows the top view of the installation mode.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 86


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-97 Top view of the installation mode

(1) Angle steel

Procedure
Step 1 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.

Figure 1-98 Distance between the mounting kit and the ground

As shown in the figure above, it is recommended that the mounting kit be


installed at a position 1000 mm (39.37 in.) to 1400 mm (55.12 in.) high above
the ground. If the space is insufficient, only the minimum clearance
requirements in 1.3.6 Installation Clearance Requirements need to be met.

Step 2 Install the RRU mounting kit. See the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 87


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

1. Adjust the positions of nuts based on the pole diameter and remove the bolt
at the open end from the slot on the auxiliary bracket.
2. Slide the RRU mounting kit onto the angle steel horizontally and fit the bolt
into the slot.

Figure 1-99 Installing the RRU mounting kit

NOTICE

Ensure that the arrows on the mounting kit are pointing up.

Step 3 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the four nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the angle steel. See the
following figure.

NOTICE

● For each pair of bolts, tighten the nuts on the left and right bolts alternatively
and ensure that the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 88


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-100 Securing the RRU mounting kit

(1) M12 nut (four in total) (2) Plastic screw cap (four in total)

Step 4 Adjust the installation position of the RRU attachment plate.

Use an M6 hex torque screwdriver to remove the attachment plate from one side
of the RRU, reinstall the attachment plate onto the front of the RRU, and use an
M6 hex torque screwdriver to tighten the screws to 5 N·m (44.25 lbf·in.).

Figure 1-101 Relocating the attachment plate to the front of the RRU

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 89


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTICE

Ensure that the arrows on the attachment plate are pointing up during
reinstallation.

Step 5 Install the RRU on the mounting kit, as shown in the following figure.

Figure 1-102 Installing the RRU on the mounting kit

To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 90


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-103 Installation above the ground

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 91


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-104 Installation on a tower

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 92


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-105 Tightening M12 screws on the attachment plate

----End

1.10.4 Installing an RRU on a Wall


This section describes the procedure and precautions for installing an RRU on a
wall.

Context
● Use the connection plate and four M12x60 expansion bolts delivered with the
mounting kit for separate installation to install an RRU onto a wall, as shown
in the following figure.

Figure 1-106 Components for installation on a wall

(1) Connection plate (2) M12x60 bolt

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 93


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● The wall on which an RRU is installed must meet the following requirements:
– For each RRU, the wall must be able to support four times the weight of
one RRU and bear the bolt pulling force of 3.0 kN (675 lbf) vertical to the
wall.
– When expansion bolts are tightened to 45 N·m (398.28 lbf·in.), the bolts
work properly without causing cracks on the wall.
– If a wall (such as a hollow brick wall or thermal insulation wall) does not
meet the load bearing requirements, the bolts may fail to work, the wall
may be damaged, or the device may fall off. Select an appropriate
installation mode based on site conditions.

Procedure
Step 1 Remove the plastic screw cap, M12 nut, spring washer, flat washer, auxiliary
bracket, main bracket, and bolt from the mounting kit in sequence to retain only
the connection plate for RRU installation, as shown in the following figure.

Figure 1-107 Disassembling the mounting kit

(1) Bolt (2) Connection (3) Main bracket (4) Auxiliary


plate bracket

(5) Flat washer (6) Spring washer (7) M12 nut (8) Plastic screw
cap

Step 2 Place a marking-off template against the wall, use a level to ensure that the
marking-off template is placed horizontally, and then use a marker to mark
anchor points, as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 94


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-108 Marking anchor points

(1) Level (2) Marking-off template (3) RRU

As shown in the figure above, it is recommended that the mounting kit be


installed at a position 1000 mm (39.37 in.) to 1400 mm (55.12 in.) high above the
ground. If the space is insufficient, only the minimum clearance requirements in
1.3.6 Installation Clearance Requirements need to be met.
Step 3 Drill holes at the anchor points and then install expansion bolts in the holes, as
shown in the following figure.

CAUTION

Take proper safety measures to protect eyes and respiratory system against dust
when drilling holes.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 95


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-109 Drilling holes and installing expansion bolts

(1) M12x60 bolt (2) Spring (3) Flat (4) Expansion


washer washer sleeve

1. Use a hammer drill with a Φ16 bit to drill holes vertically at the anchor points
to a depth ranging from 55 mm to 60 mm (2.17 in. to 2.36 in.). Use a vacuum
cleaner to clean up the dust inside and around the holes, and measure the
distances between holes. If any of the holes is beyond the acceptable range,
mark a new anchor point and drill a new hole.
2. Partially tighten each expansion bolt and then vertically insert it into a hole.
3. Use a hammer to pound each expansion bolt until the corresponding
expansion sleeve completely enters the hole.
4. Partially tighten the expansion bolts clockwise.
5. Loosen the bolts counterclockwise, and remove the M12x60 bolt, spring
washer, and flat washer in sequence.
Step 4 Align the connection plate with the holes on the wall, insert four M12x60
expansion bolts into the holes, and use a torque socket to tighten the nuts of the
four expansion bolts to 45 N·m (398.28 lbf·in.), as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 96


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-110 Securing the connection plate to the wall

NOTE

Ensure that the arrows on the connection plate are pointing up.

(1) M12x60 expansion (2) Spring washer (3) Flat washer


bolt

Step 5 Adjust the installation position of the RRU attachment plate.


Use an M6 hex torque screwdriver to remove the attachment plate from one side
of the RRU, reinstall the attachment plate onto the front of the RRU, and use an
M6 hex torque screwdriver to tighten the screws to 5 N·m (44.25 lbf·in.).

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 97


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-111 Relocating the attachment plate to the front of the RRU

NOTICE

Ensure that the arrows on the attachment plate are pointing up during
reinstallation.

Step 6 Install the RRU on the connection plate, as shown in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 98


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-112 Installing the RRU on the connection plate

Horizontally move the RRU toward the connection plate and exercise caution
during movement. Then perform the following steps:
1. Place the lower tab of the attachment plate (illustration 3) into the lower slot
of the mounting kit (illustration 6), and slightly lift the RRU. See illustration a
in the following figure.
2. Place the upper hook of the attachment plate (illustration 1) into the upper
slot of the mounting kit (illustration 4), and ensure that the foolproof screw
of the mounting kit (illustration 5) is completely fitted into the foolproof hole
of the attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of the
mounting kit (illustration 6). See illustration b in the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 99


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-113 Installing the RRU on the connection plate

(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit

(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate

(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit

Step 7 Use a torque socket to tighten the M12 screws into the holes on the top of the
RRU attachment plate and connection plate to 50 N·m (442.54 lbf·in.) so that the
attachment plate and connection plate are firmly secured, as shown in the
following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 100


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-114 Tightening M12 screws on the attachment plate

----End

1.11 Installing RRU Cables


The RRU cables include PGND cables, RF jumpers, optical fibers, and power cables.

1.11.1 Cabling Requirements


Cables must be routed according to specified cabling requirements to prevent
signal interference.

NOTE

If a cable listed below is not required, skip the cabling requirements of the cable.

General Cabling Requirements


Bending radius requirements
● The bending radius of a 7/8'' feeder must be greater than 250 mm (9.84 in.),
and the bending radius of a 5/4'' feeder must be greater than 380 mm (14.96
in.).
● The bending radius of a 1/4'' jumper must be greater than 35 mm (1.38 in.).
The bending radius of a super-flexible 1/2'' jumper must be greater than 50
mm (1.97 in.), and the bending radius of an ordinary 1/2'' jumper must be
greater than 127 mm (5 in.).
● The bending radius of a power cable or PGND cable must be at least three
times the cable diameter.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 101


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● The bending radius of an optical fiber is at least 20 times its diameter, and the
bending radius of a breakout cable is at least 30 mm (1.18 in.).
● The bending radius of an E1/T1 cable must be at least three times its
diameter.
● The bending radius of a signal cable must be at least five times its diameter.
Cable binding requirements
● Cables must be bound before being routed out of the equipment.
● Cables of the same type must be bound together.
● Different types of cables must be separately routed and bound.
● The cables must be bound tightly and neatly. The sheaths of the cables must
not be damaged.
● The cable ties must face the same direction, and those at the same horizontal
line must be in a straight line.
● The excess of the indoor cable ties needs to be cut off. A 5 mm (0.20 in.)
excess needs to be reserved for each outdoor cable tie, without any sharp
edges.
● After cables are installed, labels or nameplates must be attached to the cables
at their ends, curves, and interconnection positions.
Security requirements
● When routing cables, avoid sharp objects or sharp edges on the wall. If
necessary, use tubes to protect the cables.
● When routing cables, keep the cables away from heat sources and use heat
insulation materials to insulate the cables from the heat sources.
● Reserve a proper distance (0.1 m or 0.33 ft is recommended) between
equipment and cables, especially at the cable curves to protect the cables and
equipment.
Indoor cabling requirements
● Cables are routed indoors through the feeder window.
● Reserve drip loops for all cables outside the feeder window before routing
them into the room. Ensure that the radiuses of the drip loops are greater
than or equal to the minimum bending radiuses of the cables.
● When routing a cable into the room, ensure that a person is assisting you in
the room.
● Apply waterproof treatment to the feeder window.

Outdoor Cabling Requirements


● After being connected to a ground clip on power cables, a ground cable must
be routed downwards to prevent water from entering the equipment to which
the power cables connect.
● Protect outdoor cables against potential damage. For example, put the cables
through tubes.
● The cables to be protected include AC power cables, transmission cables, and
cables routed underground.
● When routing cables through tubes on the ground below the cabinet, put a
30 mm to 50 mm (1.18 in. to 1.97 in.) length of the tubes into the base of the

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 102


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

cabinet but do not put the tubes into the cabinet. Use waterproof tape or
waterproof silicon gel to block both ends of the tubes and use sheet metal
tabs to secure the tubes to the cable outlets in the base.
● When routing cables through tubes along a metal cable trough below the
cabinet, do not put the tubes into the base of the cabinet but cover the cable
trough and connect the tubes to the cable outlets in the base.
● When routing RRU/AAU cables, ensure that the highest positions of the routes
of all cables (except RF cables and AISG cables) are lower than the bottom of
the module. This prevents water from entering the maintenance cavity of the
module along the cables.
● Use clips to secure cables outdoors. For the method of installing a clip, see the
installation guide delivered with the clip.
● Arrange cables neatly along the routing direction and use clips to secure the
cables.
● Determine the positions where the clips are installed according to the actual
situation during the onsite installation. For example, 7/8" feeders are secured
at an interval of 1.5 m to 2 m (4.92 ft to 6.56 ft). CPRI/Ir optical fibers and
power cables are secured at an interval of 1.2 m to 2 m (3.93 ft to 6.56 ft),
and the recommended value is 2 m (6.56 ft). Ensure that the clips are evenly
spaced and face the same direction.
● When fastening cables with a clip, ensure that the cables are aligned neatly
and are routed through the holes in the clip. Do not stretch the cables too
tightly.
● Cable ties are used to assist in binding cables. One cable tie can bind a
maximum of two cables.
There are two types of clips which are described as follows:
● A 3-hole clip is shown by illustration a in the following figure. It is often used
to fasten feeders.
● A 6-hole clip is shown by illustration b in the following figure. It is often used
to fasten power cables and CPRI/Ir optical fibers.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 12 AWG/4 mm2 (0.006 in.2)/10 AWG, or the power cable has
non-round core wires with the cross-sectional area of 12 AWG/4 mm2
(0.006 in.2)/10 AWG/6 mm2 (0.009 in.2)/8 AWG/7 AWG, the 6-hole clip
does not require the removal of the rubber tube in the cable outlet for a
power cable. The 6-hole clip matches 3.3–8.3 mm2 (0.005–0.013 in.2)
RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 6 mm2 (0.009 in.2)/8 AWG, or the power cable has non-round
core wires with the cross-sectional area of 10 mm2 (0.016 in.2), the 6-
hole clip requires the removal of the rubber tube in the cable outlet for a
power cable. The 6-hole clip matches 3.3–8.3 mm2 (0.005–0.013 in.2)
RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 12 AWG/4 mm2 (0.006 in.2)/10 AWG, or the power cable has
non-round core wires with the cross-sectional area of 12 AWG/4 mm2
(0.006 in.2)/10 AWG/6 mm2 (0.009 in.2)/8 AWG/7 AWG/5 AWG, the 6-
hole clip does not require the removal of the rubber tube in the cable

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 103


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

outlet for a power cable. The 6-hole clip matches 3.3–10 mm2 (0.005–
0.016 in.2) RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 6 mm2 (0.009 in.2)/8 AWG/10 mm2 (0.016 in.2), or the power
cable has non-round core wires with the cross-sectional area of 16 mm2
(0.025 in.2), the 6-hole clip requires the removal of the rubber tube in the
cable outlet for a power cable. The 6-hole clip matches 3.3–10 mm2
(0.005–0.016 in.2) RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 6 AWG/16 mm2 (0.025 in.2), the 6-hole clip does not require the
removal of the rubber tube in the cable outlet for a power cable. The 6-
hole clip matches 13.3–25 mm2 (0.021–0.039 in.2) RRU/AAU power
cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 4 AWG/25 mm2 (0.039 in.2), the 6-hole clip requires the removal
of the rubber tube in the cable outlet for a power cable. The 6-hole clip
matches 13.3–25 mm2 (0.021–0.039 in.2) RRU/AAU power cables.

Figure 1-115 Exterior of the clips

(1) Cable outlet for a (2) Cable outlet for a (3) Cable outlet for a (4) Rubber tube
feeder CPRI/Ir optical fiber power cable

The following figure shows the cables secured on a cable tray.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 104


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-116 Cables secured on a cable tray

(1) 3-hole clip (2) 6-hole clip

The following figure shows the cables secured on a tower.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 105


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-117 Cables secured on a tower

(1) 3-hole clip (2) 6-hole clip

Special Cabling Requirements


Cabling of power cables
● Power cables must be installed in the position specified in engineering design
documents.
● If the length of a cable cannot meet the requirement, replace the cable rather
than adding connectors or soldering joints to lengthen the cables.
● Cables can only be routed under well-planned instructions. The cabling
activities are allowed only when qualified personnel and communication
facilities are available.
● Do not circle or twist cables.
● After routing a DC power cable onto the platform on a tower, route it along
the shortest path to the rails surrounding the platform, and route it along the
inside of the rails.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 106


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● After routing a DC power cable close to the equipment on a tower, use clips
to secure the power cable onto a pole or the rails surrounding the platform.
Ensure the position where the power cable is secured is less than 1.5 m (4.92
ft) away from the equipment to which the power cable connects.

Cabling of PGND cables


● PGND cables for a base station must be connected to the same group of
ground bars.
● PGND cables cannot be routed overhead outdoors. All PGND cables must be
buried in the ground or laid out indoors.
● The external conductor of the coaxial wire and the shield layer of the shielded
cable must have proper electrical contact with the metal surface of the
equipment to which they are connected.
● PGND cables and signal cables must be installed with a certain distance
reserved between them to prevent interference from each other.
● Switches or fuses must not be installed on the PGND cables.
● Other devices must not be used for electrical connections of the PGND cables.
● All the metal parts in the housing of the equipment must be reliably
connected to the ground terminal.

Cabling of E1 cables
● E1 cables cannot be crossed with power cables, PGND cables, or RF cables
when being laid out. If transmission cables are routed with power cables,
PGND cables, or RF cables in parallel, the spacing between them must be
greater than 30 mm (1.18 in.).
● E1 cables are routed straightly and bound neatly with cable ties.
● Sufficient slack is provided in E1 cables at turns.
● E1 cables cannot be pressed by the cabinet door when routed through the
cabinet. The following figure shows both correct and incorrect ways of routing
the cables.

Figure 1-118 E1 cables routed in the cabinet

Cabling of optical fibers


● At least three persons are required for routing optical fibers. The cabling
activities of optical fibers are allowed only when qualified personnel and
communication facilities are available.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 107


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● The operating temperature of optical fibers ranges from -40°C to +60°C (-40°F
to +140°F). If the actual temperature is beyond this range, take protective
measures or select another route.
● Do not circle or twist cables.
● Do not bind optical fibers at the position where they bend.
● Do not stretch, step on, or place heavy objects on optical fibers. Keep the
optical fibers away from sharp objects.
● When optical fibers are routed, the excess of the optical fibers must be coiled
around special equipment, such as a fiber coiler.
● An optical jumper must be bound using binding straps. If an optical fiber
needs to be secured in a cabinet or a piece of equipment, use binding straps
to bind it and then use cable ties to secure the binding straps to the cabinet
or equipment. Ensure that the optical fibers can flexibly move in the cable
ties. Right angle bending is not allowed. The following figure shows the
correct and incorrect manners of binding optical fibers.

Figure 1-119 Binding optical fibers

● When coiling optical fibers, apply even strength. Do not bend the optical
fibers with force.
● Unused optical connectors must be covered with dustproof caps.
● The optical fibers must not be pressed by the door of the cabinet when
routed, as shown in the following figures.

Figure 1-120 CPRI/Ir optical fibers routed in the cabinet (1)

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 108


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-121 CPRI/Ir optical fibers routed in the cabinet (2)

Figure 1-122 FE/GE optical fibers routed in the cabinet

● After routing an optical fiber onto the platform on a tower, route it along the
shortest path to the rails surrounding the platform, and route it along the
inside of the rails.
● After routing an optical fiber near the equipment on a tower, use clips to
secure the optical fiber onto a pole or the rails surrounding the platform.
Ensure that the distance between the equipment and the position where the
optical fiber is secured is not too long.
● Coil the excess of the optical fibers near the equipment on the tower before
securing the cables onto the tower.

1.11.2 Cable Connections


This section describes how to install RRU cables.
When an RRU is used to perform monitoring:
● If the external power supply system needs to be monitored, and alarm signals
such as RS485 and dry contact signals can be modulated using power cables,
you do not need to install the monitoring extension box (MEB).

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 109


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● In other cases, an MEB is required. For details about the MEB and MEB cable
installation, see the MEB user guide.
Figure 1-123 and Figure 1-124 show the cable connections for a single RRU.

Figure 1-123 Cable connections of an RRU without an MEB

(1) PGND cable (2) RRU RF jumper (3) RRU AISG multi-wire
cable

(4) CPRI optical fiber (5) RRU power cable -

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 110


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-124 Cable connections of an RRU with an MEB

(1) PGND cable (2) RRU RF jumper (3) RRU AISG multi-wire
cable

(4) CPRI optical fiber (5) RRU power cable (6) MEB alarm cable

(7) MEB power cable - -

Figure 1-125 shows the cable connections for multiple RRUs.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 111


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-125 Cable connections for multiple RRUs

(1) PGND cable (2) RRU RF jumper (3) RRU power cable

(4) CPRI optical fiber - -

1.11.3 Cable List


RRU cables, including PGND cables, power cables, CPRI optical fibers, and RF
jumpers, are used to connect the external ports of an RRU to external devices.

The following table lists RRU cables.

Table 1-7 RRU cable list

Cable One End The Other End

Connector Installation Connector Installation


Position Position

PGND OT terminal Ground OT terminal (M8, Ground


cable (M6, 16 terminal at 16 mm2 [0.025 in. terminal on
mm2 [0.025 the bottom 2]) the ground bar
in.2]) of the RRU

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 112


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Cable One End The Other End

Connector Installation Connector Installation


Position Position

Power Outdoor PWR port at Depending on External power


cable quick-lock the bottom power equipment equipment
power of the RRU
connector

CPRI DLC CPRI port at DLC connector CPRI port on


optical connector the bottom the BBU or
fiber of the RRU CPRI port on
the RRU

RF jumper 4.3-10 male RF port on 4.3-10 male Antenna


connector the RRU connector or DIN system
male connectora

AISG DB9 RET port on AISG standard AISG standard


multi-wire waterproof the RRU female connector male connector
cable male on the RCU
connector

a: Determine the cable type based on the connector used at the other end of
the cable on the live network.

1.11.4 Installing an RRU PGND Cable


This section describes how to install an RRU PGND cable.

Context
The cross-sectional area of an RRU PGND cable is 16 mm2 (0.025 in.2). The OT
terminals at the two ends of the cable are M6 and M8 terminals, respectively.

DANGER

Install RRU PGND cables by strictly following the following operations. Otherwise,
you risk device damage or personal injury.

Procedure
Step 1 Install an RRU PGND cable. Connect the M6 OT terminal of the RRU PGND cable
to the ground terminal at the bottom of the RRU, and use an M6 Phillips torque
screwdriver to tighten the screw to 4.8 N·m (42.48 lbf·in.), as shown in the
following figure. Connect the M8 OT terminal to the external ground bar.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 113


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-126 Installing an RRU PGND Cable

When installing PGND cables, crimp the OT terminals in the correct direction. See
Figure 1-127.

Figure 1-127 Direction for installing an OT terminal

Step 2 Label the installed cables according to the instructions in section "Attaching a
Cable-Tying Label" in Installation Reference.

----End

1.11.5 Installing an RRU RF Jumper


This section describes how to install an RRU RF jumper.

Context
For details about the connections between RRU RF ports and antenna ports, see
descriptions of RRU RF cable connections in the corresponding RRU hardware
description document, which is available in 3900 & 5900 Series Base Station
Product Documentation at Description > Hardware Description > RRU
Hardware Description.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 114


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Procedure
Step 1 Connect the 4.3-10 straight male connector on the RRU RF jumper to the RF port
and use a torque wrench to tighten the connector to 5–15 N·m (44.25–132.76 lbf·
in.). See the following figure.

CAUTION

● On AC-powered electric railways, such as high-speed railways, when leaky


cables are connected to RRUs installed in tunnels, high-voltage-resistance DC
blocks must be installed between RRU RF jumpers and leaky cables to protect
the RRUs against damage.
● Do not rotate, remove, or insert connectors on RF jumpers when the RRU is
powered on. Otherwise, device damage or personal injury may occur.

Figure 1-128 Installing an RRU RF jumper

Step 2 Connect the other end of the RRU RF jumper to the external antenna system.
Before the installation, confirm the connector type at the other end of the cable.

Step 3 Take appropriate protective measures on the connectors of the RRU RF jumper.
Two protection methods are available. Figure 1-129 shows method 1
(recommended) and Figure 1-130 shows method 2.
NOTE

● Do not stretch the PVC insulation tape before wrapping. Before wrapping the waterproof
tape, stretch the tape evenly until the length of the tape is twice of its original length.
● Ensure that each layer of the tape overlaps more than 50% of the previous layer. Slightly
stretch the tape and press it firmly to avoid wrinkles or air pockets so that the tape is tightly
wrapped and stuck and will not fall off.
● Ensure that the adhesive side overlaps the preceding layer.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 115


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-129 Taking protective measures for a connector of the RF jumper


(method 1)

(1) PVC insulation tape

1. Wrap three layers of PVC insulation tape. Specifically, start wrapping 50 mm


(1.97 in.) below the connector of the RF jumper. First, move from bottom to
top, then from top to bottom, and then once again from bottom to top. Cut
off the redundant tape after three layers are wrapped. After wrapping each
layer of the tape, use your hands to firmly press the tape down to ensure
good protection.
2. Bind cable ties around the cable 3 to 5 mm (0.12 to 0.20 in.) away from each
end of the PVC insulation tape to prevent the tape from aging.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 116


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-130 Taking protective measures for a connector of the RF jumper


(method 2)

(1) Waterproof tape (2) PVC insulation tape

1. Wrap three layers of waterproof tape. Specifically, start wrapping 50 mm


(1.97 in.) below the connector of the RF jumper. First, move from bottom to
top, then from top to bottom, and then once again from bottom to top. Cut
off the redundant tape after three layers are wrapped. After wrapping each
layer of the tape, use your hands to firmly press the tape down to ensure
good protection.
2. Wrap three layers of PVC insulation tape. Start wrapping 30 mm (1.18 in.)
below the bottom of the waterproof tape. First, move from bottom to top,
then from top to bottom, and then once again from bottom to top. Cut off
the redundant tape after three layers are wrapped. After wrapping each layer
of the tape, use your hands to firmly press the tape down to ensure good
protection.
3. Bind cable ties around the cable 3 to 5 mm (0.12 to 0.20 in.) away from each
end of the PVC insulation tape to prevent the tape from aging.
Step 4 Check the dustproof cap on the antenna connector. The dustproof cap needs to be
protected. Two protection methods are available. Figure 1-131 shows method 1
(recommended) and Figure 1-132 shows method 2.

NOTICE

Do not remove dustproof caps from unused antenna ports.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 117


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTE

● Do not stretch the PVC insulation tape before wrapping. Before wrapping the waterproof
tape, stretch the tape evenly until the length of the tape is twice of its original length.
● Ensure that each layer of the tape overlaps more than 50% of the previous layer. Slightly
stretch the tape and press it firmly to avoid wrinkles or air pockets so that the tape is tightly
wrapped and stuck and will not fall off.
● Ensure that the adhesive side overlaps the preceding layer.

Figure 1-131 Taking protective measures for a dustproof cap (method 1)

(1) Dustproof cap (3) PVC insulation tape

1. Verify that dustproof caps are not removed.


2. Wrap three layers of PVC insulation tape layer upon layer in the following
sequence: from bottom to top, and then from top to bottom, and once again
from bottom to top. Cut off the redundant tape after three layers are
wrapped. After wrapping each layer of the tape, use your hands to firmly
press the tape down to ensure good protection.
3. Bind cable ties around the cable 3 to 5 mm (0.12 to 0.20 in.) away from each
end of the PVC insulation tape to prevent the tape from aging.

Figure 1-132 Taking protective measures for a dustproof cap (method 2)

(1) Dustproof cap (2) Waterproof tape (3) PVC insulation tape

1. Verify that dustproof caps are not removed.


2. Wrap three layers of waterproof tape layer upon layer in the following
sequence: from bottom to top, and then from top to bottom, and once again
from bottom to top. Cut off the redundant tape after three layers are

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 118


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

wrapped. After wrapping each layer of the tape, use your hands to firmly
press the tape down to ensure good protection.
3. Wrap three layers of PVC insulation tape layer upon layer in the following
sequence: from bottom to top, and then from top to bottom, and once again
from bottom to top. Cut off the redundant tape after three layers are
wrapped. After wrapping each layer of the tape, use your hands to firmly
press the tape down to ensure good protection.
4. Bind cable ties around the cable 3 to 5 mm (0.12 to 0.20 in.) away from each
end of the PVC insulation tape to prevent the tape from aging.
Step 5 Route the cables according to the instructions in section "Cabling Requirements".
Step 6 Label the installed cables according to the instructions in section "Attaching a Sign
Plate Label" in Installation Reference.
Step 7 Attach color-coding labels to the installed cables according to the instructions in
section "Attaching a Color-coding Label" in Installation Reference.

----End

1.11.6 (Optional) Installing an AISG Multi-Wire Cable for the


RRU
This section describes how to install an RRU AISG multi-wire cable.

Context
The exterior of an AISG multi-wire cable in this section is only for reference. The
actual AISG multi-wire cable may be different.

Procedure
Step 1 Use an M3 Phillips torque screwdriver to loosen the screws on the dustproof cap
of the RET port and remove the dustproof cap.
Step 2 Connect the DB9 waterproof connector at one end of the RRU AISG multi-wire
cable to the RET port at the bottom of the RRU and use an M3 Phillips torque
screwdriver to tighten the stud on each side of the DB9 waterproof connector to
0.4 N·m (3.54 lbf·in.). See the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 119


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-133 Installing an RRU AISG multi-wire cable

Step 3 Connect the other end of the cable to the AISG standard male connector of the
antenna system.
Step 4 Route the cables according to the instructions in section "Cabling Requirements".
Step 5 Attach color-coding labels to the installed cables according to the instructions in
section "Attaching a Color-coding Label" in Installation Reference.

----End

1.11.7 Installing a CPRI Optical Fiber


This section describes how to install a CPRI optical fiber.

Context
A CPRI optical fiber transmits CPRI signals between a BBU and an RRU.
The rate of the optical module to be installed must match the rate of the
corresponding CPRI port.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 120


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-134 Components of a connector

(1) Shell (2) Lever (3) Stop plane (4) Tongue

(5) Protective rubber (6) Rubber stopper (7) Nut -


plug

NOTICE

● Long-time exposure to the air will deteriorate the performance of optical


modules. Therefore, cover the optical module with a dustproof cap before you
connect an optical fiber.
● Ensure that CPRI optical fibers are correctly connected before powering on the
RRU. Otherwise, a fault may occur on the RRU, resulting in unavailable cells.
● CPRI optical fibers must be correctly connected at one go. Otherwise, a fault
may occur on the RRU, resulting in unavailable cells.

Procedure
Step 1 Unscrew the nut of the outdoor quick-lock optical fiber connector and remove the
rubber stopper from the rubber plug. Pull the cord at the end of the plug to
remove the plug out of the connector shell, and place the plug on the side of the
connector. See the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 121


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-135 Unscrewing the nut of the connector and removing a rubber stopper
from the rubber plug

NOTICE

● When installing one optical fiber, remove only one stopper and reserve the
other one.
● When installing two optical fibers, remove the two stoppers.

Step 2 Remove the protection pipe of the optical fiber. Then, bind an anti-falling cable tie
at the position about 500 mm (19.69 in.) away from the head of the optical fiber.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 122


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-136 Binding an anti-falling cable tie

NOTICE

The cable tie can prevent the outdoor quick-lock optical fiber connector from
sliding down along the optical fiber.

Step 3 Route the optical fiber through the nut and the shell of the outdoor quick-lock
optical fiber connector in sequence.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 123


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-137 Routing the optical fiber through the outdoor quick-lock optical fiber
connector

Step 4 Push the lever to loosen the dustproof cap on the CPRI port of the RRU.

Figure 1-138 Pushing the lever to loosen the dustproof cap

Step 5 Remove the dustproof cap from the CPRI port of the RRU and the dustproof plug
from the optical module.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 124


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-139 Removing the dustproof cap and dustproof plug

Step 6 Install a CPRI optical fiber.

NOTICE

● After removing the dustproof plug from the optical module and the dustproof
cap from the optical fiber connector, insert the optical fiber into the optical
module immediately (within one minute) to avoid pollution of the optical
module or optical fiber connector, which may cause an optical module alarm.
● To avoid any damage to the optical fibers, install the optical fiber by strictly
following the instructions in section "Cabling Requirements."

● When installing the CPRI optical fiber for a two-fiber bidirectional optical
module, remove the dustproof plugs from the ports on the optical module
and the dustproof caps from the optical fiber connectors, and connect the end
labeled 1A and 1B to the optical module on the RRU side. See the following
figure. Connect the DLC connector on the end labeled 2A and 2B to the CPRI
port on the main control board or baseband processing unit in the BBU.

Figure 1-140 Installing a CPRI optical fiber for a two-fiber bidirectional optical
module

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 125


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

● When installing the CPRI optical fiber for a single-fiber bidirectional optical
module, remove the dustproof plug from the port on the optical module and
the dustproof cap from the LC connector labeled 1A, split the DLC connector
into two LC connectors, and connect the end labeled 1A to the optical module
on the RRU side. See the following figure. Connect the LC connector on the
opposite end labeled 2A to the CPRI port on the main control board or
baseband processing unit in the BBU.

Figure 1-141 Installing a CPRI optical fiber for a single-fiber bidirectional


optical module

Step 7 Insert the outdoor quick-lock optical fiber connector into the CPRI port and close
the lever. See the following figure.

Figure 1-142 Inserting and fastening the outdoor quick-lock optical fiber
connector

Step 8 Put the optical fiber into the protective rubber plug through the opening of the
protective rubber plug.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 126


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-143 Putting the optical fiber into the hole of the protective rubber plug

Step 9 Push the protective rubber plug into the hole at the bottom of the outdoor quick-
lock optical fiber connector.

Figure 1-144 Pushing the protective rubber plug into the hole

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 127


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTICE

Ensure that the protective rubber plug is inserted completely and cannot move
further.

Step 10 Push the nut onto the protective rubber plug, and use a torque wrench with a
recommended torque of 4 N·m (35.40 lbf·in.) to tighten the nut until it is level
with the stop plane of the lever. See the following figure.

Figure 1-145 Tightening the nut by referring to the stop plane

(1) Handle (2) Stop plane (3) Tongue

NOTICE

Insert the tongue into the nut completely to make the nut attach to the stop
plane.

Step 11 Route the cables according to the instructions in section "Cabling Requirements".

Step 12 Label the installed cables according to the instructions in section "Attaching an L-
Shaped Label" in Installation Reference.

----End

1.11.8 Installing an RRU Power Cable


This section describes how to install an RRU power cable.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 128


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Prerequisites
● The power cable has been prepared. For details, see "Adding an Outdoor
Quick-Lock Power Connector to the RRU Power Cable on the RRU Side". The
exteriors of modules in this section are for reference only.
● A connector has been added to the RRU power cable on the power device
side. For details, see the corresponding descriptions in the base station
installation guide.
NOTE

● Colors and exteriors of cables may vary with countries and regions. Cables purchased at
local markets must comply with local rules and regulations.
● The power cables are black and blue in most countries and regions, whereas blue and
gray in the UK and red and blue in China.

CAUTION

● Before installing an RRU power cable, ensure that the upper-level circuit
breaker or power cable is disconnected and no voltage is detected on the
power cable. Do not remove or insert the power connector on the RRU side
when the RRU is in the power-on state.
● A drip loop needs to be created on a cable near the RRU port, preventing rain
from damaging the RRU.
● When installing the RRU power cable, connect the power cable to the RRU first
and then to the power equipment. An incorrect connection sequence or reverse
polarity may cause damage to the RRU or personal injury.

Procedure
Step 1 Push the dustproof cap lever of the power port to loosen the dustproof cap.

Figure 1-146 Pushing the lever to loosen the dustproof cap

Step 2 Remove the dustproof cap from the power port.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 129


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-147 Removing the dustproof cap

Step 3 Open the lever on the outdoor quick-lock power connector and connect the
connector to the power port on the RRU, as shown by step a in the following
figure. Close the lever completely until you hear a click, as shown by step b in the
following figure.

Figure 1-148 Installing the power cable with an outdoor quick-lock power
connector

Step 4 Connect the opposite end of the power cable to the port on the power supply
device.
NOTE

When a DC RRU is installed outdoors, the RRU power cable must be grounded through the
shield layer on the power supply device side. For details, see the corresponding descriptions
in DBS3900 & DBS5900 Installation Guide.

Step 5 Route the cable by following the instructions in section "Cabling Requirements".

Step 6 Attach labels to the cable by following the instructions in section "Attaching a
Cable-Tying Label" in Installation Reference.

----End

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 130


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

1.12 Checking the RRU Installation


After the RRU is installed, you need to check the device installation, protection,
and cables.
Table 1-8 provides the RRU hardware installation checklist.

Table 1-8 RRU hardware installation checklist


Check Item Description

Device The installation position of each device strictly complies with the
installation engineering design and meets clearance requirements. Sufficient
space is reserved for O&M.

The RRU is securely installed.

Protection Vacant RF ports are covered with dustproof caps and the caps
are protected.

Cables All cables are not damaged or broken. The power and PGND
cables are continuous throughout their length without joints.

The terminals at both ends of each power or PGND cable are


securely soldered or crimped.

All power and PGND cables are not short-circuited or reversely


connected. The connectors of optical fibers and power cables are
intact and securely connected.

Power and PGND cables are bound separately from other cables.
All cable labels are correct, legible, and complete.

The RRU PGND cable and the surge protection grounding of the
building share one group of grounding conductors. All ground
cables are properly grounded.

1.13 Powering On an RRU


This section describes the procedure and precautions for powering on an RRU.

NOTICE

After you unpack an RRU, you must power it on within 24 hours. If you power off
the RRU for maintenance, you must restore power to the RRU within 24 hours.

Figure 1-149 shows the process for powering on an RRU.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 131


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-149 Powering on an RRU

(a) The RRU is supplied with –48 V DC power and the input voltage ranges from –36 V DC to –
57 V DC.

(b) When the RRU is running properly, the RUN indicator is on for 1s and off for 1s, and the
ALM indicator is steady off.

Procedure
1. Check whether the input voltage of the RRU is within the normal range.
2. On the power equipment for the RRU, turn on the corresponding circuit
breaker or insert the corresponding power connector to power on the RRU.

DANGER

Do not look into the optical module without eye protection after the RRU is
powered on.

3. Wait for 3 minutes to 5 minutes and then check the RRU indicator status. For
details, see descriptions about RRU indicators in the corresponding RRU
hardware description.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 132


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTE

If RRUs are cascaded, check the indicator status of all RRUs.


4. Take corresponding actions based on the status of the indicators.

If... Then...

The RRU is working properly End the power-on procedure.

The RRU is faulty On the power equipment, turn off


the corresponding circuit breaker or
remove the corresponding power
connector. Rectify the fault, and then
go to 2.

1.14 Appendix

1.14.1 Adding an Outdoor Quick-Lock Power Connector to the


RRU Power Cable on the RRU Side
This section describes the procedure and precautions for adding an outdoor quick-
lock power connector to the RRU power cable on the RRU side.

Context

CAUTION

Add an outdoor quick-lock power connector to the RRU power cable by strictly
following the operations described in this section. Otherwise, you risk device
damage or personal injury.

The following figure shows a cable diagram for the RRU power cable.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 133


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-150 Cable diagram for the RRU power cable

(1) Cable diagram for the RRU power cable

Procedure
Step 1 Press the lever unlock button on the outdoor quick-lock power connector (see
illustration 1 in the following figure). Open the lever and press the unlock button
of the inner part (see illustration 2 in the following figure). Remove the inner part
of the connector (see illustration 3 in the following figure).

Figure 1-151 Unlocking and removing the inner part of the connector

(1) Lever unlock button (2) Unlock button of the (3) Inner part of the
inner part power connector

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 134


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Step 2 (Optional) The connector is configured with two layers of waterproof rings. When
the cross-sectional area of the power cable is greater than or equal to 6 mm2
(0.0093 in.2) or 7 AWG, properly remove and store the inner waterproof ring.

Figure 1-152 Waterproof ring

(1) Inner waterproof ring

Step 3 Loosen the nut on the connector shell (do not let the nut fall off), and route the
power cable into the shell of the outdoor quick-lock power connector.

Figure 1-153 Routing the power cable

(1) Inner waterproof ring (2) Shell nut

Step 4 Determine the length of the power cable for different operations based on the
cable diagram. See the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 135


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-154 Determining the cable length based on the cable diagram

1. Strip the specified length of the outer sheath off the cable, as shown in the
following figure.

Figure 1-155 Stripping off the sheath

2. Strip the specified length of the sheath off each core wire, as shown in the
following figure.

Figure 1-156 Stripping the sheath off each core wire

3. Strip the specified length of the sheath off the power cable to expose its
shield layer, as shown in the following figure.

Figure 1-157 Stripping the sheath off the power cable to expose the shield
layer

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 136


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

NOTICE

When stripping the sheath off the power cable, do not damage the shield
layer of the power cable.

Step 5 Open the cable lock lever (see step a in the following figure) of the inner part of
the outdoor quick-lock power connector. Loosen the screw (see the dashed red
line in the following figure) and open the shielding clip (see step b in the
following figure).

Figure 1-158 Opening the cable lock lever and shielding clip

(1) Cable lock lever (2) Shielding clip

Step 6 Connect the blue core wire labeled NEG(-) to the "-" port and the black/brown
core wire labeled RTN(+) to the "+" port on the connector. Observe the contact
between the spring and conductor through the windows. See the following figure.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 137


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-159 Observing the contact between the spring and conductor

(1) Spring (2) Conductor (3) Sheath

NOTICE

● Check the following items through the window: The conductor must be pressed
by the spring (see illustration a in the previous figure). The length of the wire
inserted into the connector is appropriate (see illustration b in the previous
figure). The spring must not press the sheath of the wire (see illustration c in
the previous figure). No copper wire is bent (see illustration d in the previous
figure).
● If cables are not properly locked, check the stripping length.

Step 7 Press the cable lock lever, lock the shielding clip, and use an M3 Phillips torque
screwdriver to tighten the bolt (see the dashed red line in the following figure) to
1.4 N·m (12.39 lbf·in.). Then, press the lever until it does not bounce back to
ensure that the core wires are locked.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 138


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-160 Pressing the cable lock lever and locking the shielding clip

Step 8 Push the inner part back into the shell until you hear a click. Then, the inner part
is correctly inserted.

Figure 1-161 Inserting the inner part into the connector shell

Step 9 Pull the power cable slightly until it is straight and cannot be moved. Use a torque
wrench to tighten the nut until it contacts the stop plane (as shown by step a in
the following figure). The recommended tightening torque is 9 N·m or 79.66 lbf·in.
(as shown by step b in the following figure).

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 139


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-162 Completing the installation

(1) Stop plane

----End

1.14.2 Assembling the OT Terminal and the Power Cable


There are two types of OT terminals: one-hole OT terminal and two-hole OT
terminal. This section describes the procedure for adding an OT terminal to a
power cable by using a one-hole OT terminal as an example.

Context
Figure 1-163 shows a one-hole OT terminal and materials related to a power
cable.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 140


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-163 One-hole OT terminal and materials related to a power cable

(A) Heat shrink tubing (B) One-hole OT (C) Insulation layer of (D) Conductor of a
terminal with a bare a power cable power cable
crimping terminal

Figure 1-164 shows a two-hole OT terminal and materials related to a power


cable.

Figure 1-164 Two-hole OT terminal and materials related to a power cable

(A) Heat shrink tubing (B) Two-hole OT (C) Insulation layer of (D) Conductor of a
terminal with a bare a power cable power cable
crimping terminal

Procedure
Step 1 Based on the cross-sectional area of the cable conductor, strip a part of the
insulation layer "C". The L1-long conductor "D" is exposed, as shown in Figure
1-165. The recommended values of L1 are listed in Table 1-9.

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 141


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-165 Stripping a power cable (OT terminal)

NOTICE

● When stripping a power cable, do not damage the conductor of the cable.
● If the bare crimping terminal is not provided by Huawei, the value of L1 is 1
mm to 2 mm (0.04 in. to 0.08 in.) greater than the value of L.
● After stripping the insulation layer off the power cable, adjust the shape of
bare wires based on actual situations to facilitate the installation of OT
terminals. Add OT terminals to the power cable immediately after the stripping.
Otherwise, bare wires may split, which hinders the installation.
● If the bare wires split and OT terminals cannot be installed, cut off the bare
wires, strip another length of insulation layer off the cable, and add OT
terminals to the cable.

Table 1-9 Mapping between the cross-sectional area of the conductor and the
value of L1

Cross-Sectional Area of the Value of L1


Conductor

1 mm2 (0.0015 in.2) 7 mm (0.28 in.)

1.5 mm2 (0.0023 in.2) 7 mm (0.28 in.)

2.5 mm2 (0.0039 in.2) 7 mm (0.28 in.)

4 mm2 (0.0062 in.2) 8 mm (0.31 in.)

6 mm2 (0.0093 in.2) 9 mm (0.35 in.)

10 mm2 (0.015 in.2) 11 mm (0.43 in.)

16 mm2 (0.025 in.2) 13 mm (0.51 in.)

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 142


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Cross-Sectional Area of the Value of L1


Conductor

25 mm2 (0.039 in.2) 14 mm (0.55 in.)

35 mm2 (0.054 in.2) 16 mm (0.63 in.)

50 mm2 (0.077 in.2) 16 mm (0.63 in.)

NOTE

If you are proficient in assembling OT terminals and power cables, you can obtain the value
of L1 by comparing the part to be crimped with a power cable.

Step 2 Feed the power cable into the heat shrink tubing (A), as shown in Figure 1-166.
Table 1-10 shows the recommended length of the heat shrink tubing.

Figure 1-166 Putting the heat shrink tubing onto the bare crimping terminal

Table 1-10 Mapping between the cross-sectional area of the conductor and the
length of the heat shrink tubing

Cross-Sectional Area of the Recommended Length of the Heat Shrink


Conductor Tubing

1 mm2 (0.0015 in.2) 25 mm (0.98 in.)

1.5 mm2 (0.0023 in.2) 25 mm (0.98 in.)

2.5 mm2 (0.0039 in.2) 25 mm (0.98 in.)

4 mm2 (0.0062 in.2) 25 mm (0.98 in.)

6 mm2 (0.0093 in.2) 25 mm (0.98 in.)

10 mm2 (0.015 in.2) 25 mm (0.98 in.)

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 143


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Cross-Sectional Area of the Recommended Length of the Heat Shrink


Conductor Tubing

16 mm2 (0.025 in.2) 30 mm (1.18 in.)

25 mm2 (0.039 in.2) 30 mm (1.18 in.)

35 mm2 (0.054 in.2) 35 mm (1.38 in.)

50 mm2 (0.077 in.2) 50 mm (1.97 in.)

Step 3 Put the OT terminal "B" onto the exposed conductor, and ensure that the OT
terminal is in good contact with the insulation layer "C" of the power cable, as
shown in Figure 1-166.

NOTICE

After the conductor is fed into the OT terminal, the exposed part of the conductor,
as indicated by L2 in Figure 1-166, must not exceed 2 mm (0.08 in.).

Step 4 Crimp the joint parts of the bare crimping terminal and the conductor, as shown in
Figure 1-168.
NOTE

The shapes of crimped parts may vary with the crimping tools.

NOTICE

Ensure that the OT terminal does not have burrs on its surface after the crimping.
Otherwise, it may damage the heat shrink tubing. The following figure shows an
OT terminal with burrs and an OT terminal without burrs.

Figure 1-167 Crimped end

Issue Draft A Copyright © Huawei Technologies Co., Ltd. 144


(2022-12-31)
RRU5517t
Installation Guide 1 RRU5517t Installation Guide

Figure 1-168 Crimping the joint parts of the bare crimping terminal and the
conductor (OT terminal)

Step 5 Push the heat shrink tubing "A" towards the connector until the tube covers the
crimped part, and then heat the tubing by using a heat gun, as shown in Figure
1-169.

Figure 1-169 Heating the heat shrink tubing (OT terminal)

NOTICE

Do not install the heat shrink tubing to the screw hole of the OT terminal "B".
Do not overheat the heat shrink tubing because the insulation layer may be
damaged.

----End