RRU5517t Installation Guide
RRU5517t Installation Guide
Installation Guide
Issue Draft A
Date 2022-12-31
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: [Link]
Email: support@[Link]
Contents
Overview
This document describes how to install a DC blade RRU5517t (referred to as RRU
in this document). RRU is short for remote radio unit. For details about auxiliary
devices of the RRU, such as power modules and distribution equipment, see "RRU
Auxiliary Devices" in the corresponding RRU hardware description document.
Product Versions
The following table lists the product versions related to this document.
Intended Audience
This document is intended for:
Organization
1.1 Changes in RRU5517t Installation Guide
This section describes changes between document versions, including the new,
modified, and deleted contents.
1.2 Installation Preparations
Before the installation, make sure that reference documents and required tools
and instruments are ready and installation personnel has passed related training
to ensure a smooth installation.
1.3 Information to Be Known Before the Installation
Before installing an RRU, you must be familiar with its exterior, ports, indicators,
mounting kit, installation scenarios, and installation clearance requirements.
1.4 Unpacking Check
Draft A (2022-12-31)
This is a draft.
1.3.1 Exterior
The RRU has a blade structure.
The following figure shows an RRU.
You can obtain the RRU name, frequency band and power supply information
from the nameplate on the cover plate of the cabling cavity. The following figure
shows the position of the nameplate on the RRU.
NOTE
(1) Nameplate (2) Module name (3) Frequency band (4) Power supply
1.3.2 Ports
The external ports are located at the bottom of the RRU, including the RF port,
optical fiber port, and power port.
The following figure shows the ports on the RRU panels.
1.3.3 Indicators
There are six indicators on an RRU. They indicate the running status of the RRU.
The following figure shows the indicators on the RRU.
NOTICE
In new deployment scenarios, the required RRU mounting kits (described in this
document) are used to install the RRU described in this document.
(1) (2) M12 screw (3) Main (4) Bolt (5) Auxiliary
Attachment on the bracket bracket
plate attachment
plate
As shown in the preceding figure, the mounting kit for combined installation is
delivered with three attachment plates by default. The attachment plates are
removed based on site requirements. The number of attachment plates to be
removed is determined by the number of RRUs to be installed. The removed
attachment plate is used to replace the attachment plate delivered with a 12 L, 18
L, 24 L, or 29 L RRU, if assembled with the RRU5517t.
NOTICE
During RRU installation, do not remove components from the RRU mounting kit
unless otherwise specified in this document.
The weight of the mounting kit for combined installation (including three
attachment plates) is 27.5 kg (60.64 lb).
(5) Flat washer (6) Spring washer (7) M12 nut (8) Plastic screw
cap
The weight of the mounting kit for separate installation is 7.3 kg (16.10 lb).
Installation Mode
The following table lists the installation modes supported by the two types of RRU
mounting kits.
The following figure shows an example of how to install an RRU on a pole using a
mounting kit for separate installation.
NOTE
The attachment plate on the RRU in the preceding figure is for reference only.
Restrictions
Application Scenarios
To ensure proper heat dissipation of the RRU, the following requirements must be
met:
● Do not install it in an enclosed indoor or outdoor cabinet without a cooling
system, as shown in Figure 1-10.
● Do not install it in an enclosed camouflage box.
● Do not install it in an enclosed equipment room without a cooling system
(including a weak-current well or a stuffy roof).
● An RRU is a professional communication device and cannot be installed in
areas that are easily accessible to the general public. Therefore, RRU
installation involves safety considerations. For details about the requirements
and precautions, see Safety Information.
If the module is installed in an unsuitable environment, the module will have poor
heat dissipation and may not work properly.
Installation Restrictions
● The specifications of installation supports described in this document are
based only on the exterior and dimensions of the mounting kits. Before
installing equipment, assess the strength and reliability of the installation
support to determine whether it can support the weight of the equipment.
● To ensure heat dissipation of the RRU and waterproofing of the ports at the
bottom of the RRU, the RRU must be installed at a vertical deviation angle
not exceeding 10°. See Figure 1-11.
Figure 1-13 Single RRU installed on a pole (mounting kit for combined
installation)
Figure 1-14 Two RRUs installed on a pole (mounting kit for combined
installation)
Figure 1-15 Three RRUs installed on a pole (mounting kit for combined
installation)
Figure 1-16 RRU5517t assembled with an RRU of different volume (mounting kit
for combined installation)
Figure 1-18 Single RRU installed on a pole (mounting kit for separate installation)
Figure 1-19 Two RRUs installed on a pole (mounting kit for separate installation)
NOTICE
Only one RRU can be installed on a piece of U-steel and the RRU is installed in
reverse mode.
Figure 1-21 RRU installed on U-steel (mounting kit for separate installation)
NOTICE
Only one RRU can be installed on a piece of angle steel and the RRU is installed in
reverse mode.
Figure 1-23 RRU installed on angle steel (mounting kit for separate installation)
Figure 1-24 RRU installed on a wall (mounting kit for separate installation)
Figure 1-27 Minimum clearance for installing a single RRU in side-mounted mode
on a tower
Figure 1-28 Minimum clearance for installing a single RRU in reverse mode on a
tower
Figure 1-31 Recommended clearance for multiple RRUs installed in reverse mode
on a wall
Figure 1-32 Minimum clearance for multiple RRUs installed in reverse mode on a
wall
Context
When transporting, moving, or installing the equipment, components, or parts,
you must:
● Package them for delivery and transportation before the base station
deployment. Unpacked delivery or package replacement for transferring is not
allowed.
● Prevent them from colliding with doors, walls, shelves, or other objects.
● Wear clean gloves and do not touch them with bare hands, sweat-soaked
gloves, or dirty gloves.
● The transportation environment must meet requirements of ETSI 300 019-1-2
class 2.3. For the goods damage caused by non-standard and violent
transportation or non-human factors (such as natural disasters), the
transportation entity should take the responsibility.
● It is recommended that two persons unpack and move the RRU, as shown in
the following figure.
NOTICE
After unpacking an RRU, you must power on the RRU within 24 hours. Otherwise,
the RRU may be damaged.
Procedure
Step 1 Check the total number of packing cases according to the packing list.
If... Then...
The total number is not consistent Find out the cause and report it to the
with the packing list local Huawei office.
If... Then...
The outer package is severely Find out the cause and report it to the
damaged or soaked local Huawei office.
Step 3 Check the type and quantity of equipment in each packing case against the
packing list.
If... Then...
The type and quantity are consistent Sign the Packing List with the customer.
with the packing list on each
packing case
There is any shortage, wrong Report the situation to the local Huawei
delivery, or damaged equipment office.
----End
NOTE
● The depicted optical modules in this section are for reference only.
● It is recommended that the optical module be installed on the ground, since there is no
anti-falling protection for installing the optical module on the tower.
Procedure
Step 1 Push the dustproof cap lever to loosen the dustproof cap on the CPRI port of the
RRU.
Step 2 Remove the dustproof cap from the CPRI port of the RRU.
Step 3 Insert an optical module into the CPRI port of the RRU. Ensure that the optical
module is inserted in the correct direction. Gently push it into the slot horizontally
until it is firmly in place. The connector is properly fastened when it is completely
inserted. See the following figure.
NOTICE
● When the optical module is correctly installed and secured, you will hear a
click.
● Ensure that the optical module is installed in the correct direction to prevent
damage to the optical module or the CPRI port of the RRU.
● Long-time exposure to the air will deteriorate the performance of optical
modules. Therefore, do not remove the dustproof plug from an optical module
during the installation.
Step 5 Pull the lever to tighten the dustproof cap on the CPRI port of the RRU.
----End
Context
The cross-sectional area of an RRU PGND cable is 16 mm2 (0.025 in.2). The OT
terminals at the two ends of the cable are M6 and M8 terminals, respectively.
Procedure
Step 1 Cut the cable to a length suitable for the cable route.
Step 2 Add corresponding connectors to both ends of each cable.
Cable Type Reference
----End
site conditions. In tower mounting scenarios, the RRU can be installed on a pole,
U-steel, or angle steel.
Prerequisites
● If the reverse mode is used, the attachment plate's position has been adapted
to fit installation before the RRU is hoisted onto a tower.
● If the mounting kit for combined installation is used, the attachment plate in
the position intended for the RRU to be installed has been removed from the
mounting kit for combined installation before the mounting kit is hoisted
onto a tower and the removed attachment plate is properly disposed of. That
is, before hoisting the mounting kit for combined installation onto a tower,
remove one, two, and three attachment plates from the mounting kit in
single-RRU installation, two-RRU combined installation, and three-RRU
combined installation, respectively. For details, see 1.9 Installing the RRU
(Combined Installation).
NOTICE
● Do not stand an RRU upright because the RF ports at the bottom cannot
support the weight of the RRU and the RRU may fall down.
● Place a foam pad or cardboard under an RRU to protect the RRU housing from
damage when the RRU is horizontally placed on the ground.
● The power cable must be routed and protected according to local laws and
regulations, industry standards, and operators' standards.
Procedure
Step 1 After climbing up the tower, installation engineer A secures the fixed pulley to the
support on the tower and leads the lifting rope through the fixed pulley.
Step 2 Installation engineer C on the ground binds the RRU mounting kit using the lifting
rope and guide rope. See Figure 1-41 and Figure 1-42. Installation engineer C
pulls the lifting rope downwards, and installation engineer B pulls the guide rope
outwards to protect the RRU mounting kit from colliding with the tower.
Figure 1-41 Binding the RRU mounting kit (mounting kit for separate installation)
Figure 1-42 Binding the RRU mounting kit (mounting kit for combined
installation)
(1) Lifting rope (2) Handle (3) Traction eye (4) Guide rope
Do not hoist the module using the handle or traction eye only, as shown in the
following figure.
Figure 1-45 Prohibiting hoisting the module using the handle or traction eye only
If... Then...
Figure 1-46 Hoisting the RRU using a mechanical device (the RRU is bound given
the assumption that the reverse mode is used)
(1) Lifting rope (2) Fixed pulley (3) Guide rope (4) Mechanical
device (such as a
winch)
Figure 1-47 Hosting the RRU manually (the RRU is bound given the assumption
that the reverse mode is used)
DANGER
● The load-bearing capacity of each rope must be greater than 200 kg (441 lb)
and the diameter of each rope must be less than 25 mm (0.98 in.).
● When hoisting each device onto a tower, protect them from colliding with the
tower.
● Separately hoist the RRU and its mounting kit onto the tower.
● Hoist the RRU onto the tower before it is installed on the pole, angle steel, or
U-steel.
● Do not hoist anything using the traction eye.
Step 8 Installation engineer A catches the RRU and installs it. For details, see 1.9
Installing the RRU (Combined Installation) and 1.10 Installing the RRU
(Separate Installation).
----End
Context
Cabling requirements for optical fibers must be met. For details, see "Cabling
Requirements".
Procedure
Step 1 Hoist the optical fibers onto the tower. See Figure 1-48.
(1) Lifting rope (2) Fixed pulley (3) Optical fibers (4) Guide rope
NOTICE
Before hoisting optical fibers onto the tower, check the labels on both ends
indicating which ends connect to the RRU or BBU, and hoist the end on the RRU
side onto the tower.
1. After climbing up the tower, installation engineer A secures the fixed pulley to
the support on the tower and leads the lifting rope through the fixed pulley.
2. Installation engineer B places the optical fiber reels on the pay-off rack, and
installation engineer D leads the lifting rope through the stretch rope of the
optical fibers and uses another rope as a guide rope to secure the cables 4 m
(13.12 ft) away from the lifting rope knot. See Figure 1-49.
NOTICE
Do not remove the stretch rope and protection pipe or bind optical fibers
using one rope. See Figure 1-50.
----End
Context
Cabling requirements for power cables must be met. For details, see "Cabling
Requirements".
The power cable connectors on the RRU side are prepared before they are hoisted
onto the tower.
Procedure
Step 1 Hoist the power cables onto the tower. See Figure 1-51.
1. After climbing up the tower, installation engineer A secures the fixed pulley to
the support on the tower and leads the lifting rope through the fixed pulley.
2. Installation engineer B secures three cable ties below the power cable
connectors to secure the power cables onto the lifting rope. See Figure 1-52.
NOTE
The power cable connectors in the figure are examples only. The actual connectors may
vary.
3. Installation engineer B wraps the power cable connectors with insulation tape.
See Figure 1-53.
NOTE
Wrap insulation tape from the middle of the connectors until the connectors are fixed
to the lifting rope.
----End
NOTICE
● Do not stand an RRU upright because the RF ports at the bottom cannot
support the weight of the RRU and the RRU may fall down.
● Place a foam pad or cardboard under an RRU to protect the RRU housing from
damage when the RRU is horizontally placed on the ground.
Prerequisites
In tower mounting scenarios, the following operations have been completed
before RRU installation: removing the attachment plate in the position intended
for the RRU to be installed from the mounting kit, and binding and hoisting the
RRU and its mounting kit separately onto a tower.
Procedure
Step 1 Remove the attachment plate from the mounting kit. Use an M12 torque wrench
(18 mm [0.71 in.]) to loosen the M12 screws on the top of an attachment plate in
the position intended for the RRU to be installed and the main bracket. Remove
the attachment plate from the mounting kit and dispose of it properly, as shown
in the following figure.
Figure 1-54 Removing one attachment plate from the mounting kit
Step 2 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.
Figure 1-55 Distance between the mounting kit and the ground
NOTICE
Ensure that the arrows on the mounting kit are pointing up.
Step 4 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the six nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the pole. See the
following figure.
NOTICE
● Tighten the three pairs of bolts in the sequence from a to b and c. For each
pair, tighten the nuts on the left and right bolts alternatively and ensure that
the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.
(1) M12 nut (six in total) (2) Plastic screw cap (six in total)
Step 5 Install the RRU on the mounting kit, as shown in the following figure.
To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.
----End
Prerequisites
In tower mounting scenarios, the following operations have been completed
before RRU installation: removing the attachment plate in the position intended
for the RRU to be installed from the mounting kit, and binding and hoisting the
RRU and its mounting kit separately onto a tower.
Context
The mounting kit for combined installation (including attachment plates) for the
RRU5517t is compatible with 12 L, 18 L, 24 L, and 29 L RRUs, allowing such RRUs
to be assembled with the RRU5517t. This section describes combined installation
of two RRU5517t modules and combined installation of one RRU5517t and one
RRU of different volume.
Procedure
Step 1 Remove two attachment plates from the mounting kit. Use an M12 torque wrench
(18 mm [0.71 in.]) to loosen the M12 screws on the top of two attachment plates
in the positions intended for the RRUs to be installed and the main bracket.
Remove the attachment plates from the mounting kit, as shown in the following
figure.
Figure 1-62 Removing two attachment plates from the mounting kit
Step 2 (For combined installation of one RRU5517t and one RRU of different volume)
Replace the attachment plate on the RRU of different volume.
1. Remove the attachment plate from the RRU of different volume (using a 12 L
blade RRU as an example). See the following figure.
Figure 1-63 Removing the attachment plate from the RRU of different
volume (using a 12 L blade RRU as an example)
2. Remove the four M6 spare screws from the retained RRU5517t attachment
plate and use them to install the RRU5517t attachment plate onto the RRU of
different volume. Use an M6 hex torque screwdriver to tighten the screws to 5
N·m (44.25 lbf·in.), as shown in the following figure.
Figure 1-64 Installing the RRU5517t attachment plate onto the RRU of
different volume (using a 12 L blade RRU as an example)
NOTE
When securing the RRU5517t attachment plate onto the RRU of different volume, select
proper screw holes based on the volume of the RRU. The following figure shows the screw
holes.
Figure 1-65 Screw holes for securing the RRU5517t attachment plate onto the
RRU of different volume
12 L, 24 L A
29 L B
18 L A or C
Step 3 Determine and mark the position for installing the mounting kit. For details, see
1.9.1 Installing a Single RRU on a Pole.
Step 4 Install the RRU mounting kit. For details, see 1.9.1 Installing a Single RRU on a
Pole.
Step 5 Install two RRUs onto the mounting kit in sequence, as shown in the following
figure.
Figure 1-66 Installing two RRUs onto the mounting kit (using two RRU5517t
modules as an example)
To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.
----End
Prerequisites
In tower mounting scenarios, the following operations have been completed
before RRU installation: removing the attachment plate in the position intended
for the RRU to be installed from the mounting kit, and binding and hoisting the
RRU and its mounting kit separately onto a tower.
Context
● Before installing multiple RRUs on a pole, assess the strength and reliability of
the installation support to determine whether it can support the weight of the
equipment to be installed. This section provides an example of installing three
RRUs on a pole.
● The mounting kit for combined installation (including attachment plates) for
the RRU5517t is compatible with 12 L, 18 L, 24 L, and 29 L RRUs, allowing
such RRUs to be assembled with the RRU5517t. This section describes
combined installation of three RRU5517t modules and combined installation
of two RRU5517t modules and one RRU of different volume.
Procedure
Step 1 Remove three attachment plates from the mounting kit. Use an M12 torque
wrench (18 mm [0.71 in.]) to loosen the M12 screws on the top of three
attachment plates in the positions intended for the RRUs to be installed and the
main bracket. Remove the attachment plates from the mounting kit, as shown in
the following figure.
● In combined installation of three RRU5517t modules, dispose of the three
removed attachment plates properly.
● In combined installation of two RRU5517t modules and one RRU of different
volume, dispose of two removed attachment plates and use the remaining
one to replace the attachment plate on the RRU of different volume.
Figure 1-70 Removing three attachment plates from the mounting kit
Step 2 (For combined installation of the RRU5517t and an RRU of different volume)
Replace the attachment plate on the RRU of different volume. For details, see
1.9.2 Installing Two RRUs on a Pole.
Step 3 Determine and mark the position for installing the mounting kit. For details, see
1.9.1 Installing a Single RRU on a Pole.
Step 4 Install the RRU mounting kit. For details, see 1.9.1 Installing a Single RRU on a
Pole.
Step 5 Install three RRUs onto the mounting kit in sequence, as shown in the following
figure.
Figure 1-71 Installing three RRUs onto the mounting kit (using three RRU5517t
modules as an example)
To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.
----End
NOTICE
● Do not stand an RRU upright because the RF ports at the bottom cannot
support the weight of the RRU and the RRU may fall down.
● Place a foam pad or cardboard under an RRU to protect the RRU housing from
damage when the RRU is horizontally placed on the ground.
mounted mode. For details about how to install an RRU in reverse mode, see
"Installing an RRU on U-Steel."
Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.
Procedure
Step 1 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.
Figure 1-75 Distance between the mounting kit and the ground
NOTICE
Ensure that the arrows on the mounting kit are pointing up.
Step 3 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the four nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the pole. See the
following figure.
NOTICE
● For each pair of bolts, tighten the nuts on the left and right bolts alternatively
and ensure that the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.
(1) M12 nut (four in total) (2) Plastic screw cap (four in total)
Step 4 Install the RRU on the mounting kit, as shown in the following figure.
To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 5 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.
----End
Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.
Context
When two RRUs are installed on a pole, it is recommended that they be vertically
mounted in a staggered manner in reverse mode.
Procedure
Step 1 Determine and mark the position for installing the first mounting kit. For details
about installation, see [Link] Installing a Single RRU.
Step 2 Install and secure the first mounting kit. For details about installation, see [Link]
Installing a Single RRU.
Use an M6 hex torque screwdriver to remove the attachment plate from one side
of the RRU, reinstall the attachment plate onto the front of the RRU, and use an
M6 hex torque screwdriver to tighten the screws to 5 N·m (44.25 lbf·in.).
Figure 1-82 Relocating the attachment plate to the front of the RRU
NOTICE
Ensure that the arrows on the attachment plate are pointing up during
reinstallation.
Step 4 Install the first RRU onto the mounting kit, as shown in the following figure.
Figure 1-83 Installing the first RRU onto the mounting kit
To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 5 Secure the first RRU. Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the
M12 screws into the holes on the top of the RRU attachment plate and main
bracket to 50 N·m (442.54 lbf·in.) so that the attachment plate and main bracket
are firmly secured, as shown in the following figure.
Step 6 Install the second mounting kit. Ensure that the space left between the bottom of
two RRU mounting kits corresponds with the height of an RRU.
Step 7 Adjust the installation position of the second RRU attachment plate and install the
second RRU onto the mounting kit. Use an M12 torque wrench (18 mm [0.71 in.])
to tighten the M12 screws into the holes on the top of the RRU attachment plate
and main bracket to 50 N·m (442.54 lbf·in.) so that the attachment plate and
main bracket are firmly secured, as shown in the following figure.
Figure 1-87 Installing the second RRU onto the mounting kit
----End
Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.
Context
Figure 1-88 shows the top view of the installation mode.
NOTICE
When the width of the narrower edges of the U-steel is less than 40 mm (1.57
in.), only the installation modes a and b are supported.
(1) U-steel
Procedure
Step 1 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.
Figure 1-89 Distance between the mounting kit and the ground
NOTICE
Ensure that the arrows on the mounting kit are pointing up.
Step 3 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the four nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the U-steel. See the
following figure.
NOTICE
● For each pair of bolts, tighten the nuts on the left and right bolts alternatively
and ensure that the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.
(1) M12 nut (four in total) (2) Plastic screw cap (four in total)
Figure 1-92 Relocating the attachment plate to the front of the RRU
NOTICE
Ensure that the arrows on the attachment plate are pointing up during
reinstallation.
Step 5 Install the RRU on the mounting kit, as shown in the following figure.
To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.
----End
Prerequisites
In tower mounting scenarios, the RRU and its mounting kit have been separately
bound and hoisted onto the tower before RRU installation.
Context
Figure 1-97 shows the top view of the installation mode.
Procedure
Step 1 Determine and mark the position for installing the mounting kit.
● For installation on a tower, determine a position for installing the mounting
kit according to 1.3.6 Installation Clearance Requirements.
● For installation above the ground, determine a position for installing the
mounting kit according to the following figure.
Figure 1-98 Distance between the mounting kit and the ground
Step 2 Install the RRU mounting kit. See the following figure.
1. Adjust the positions of nuts based on the pole diameter and remove the bolt
at the open end from the slot on the auxiliary bracket.
2. Slide the RRU mounting kit onto the angle steel horizontally and fit the bolt
into the slot.
NOTICE
Ensure that the arrows on the mounting kit are pointing up.
Step 3 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the four nuts to 50 N·m
(442.54 lbf·in.) so that the mounting kit is secured onto the angle steel. See the
following figure.
NOTICE
● For each pair of bolts, tighten the nuts on the left and right bolts alternatively
and ensure that the spacing between the brackets is the same on the two sides.
● Do not remove the plastic screw caps at the end of the bolt installed onto the
mounting kit.
(1) M12 nut (four in total) (2) Plastic screw cap (four in total)
Use an M6 hex torque screwdriver to remove the attachment plate from one side
of the RRU, reinstall the attachment plate onto the front of the RRU, and use an
M6 hex torque screwdriver to tighten the screws to 5 N·m (44.25 lbf·in.).
Figure 1-101 Relocating the attachment plate to the front of the RRU
NOTICE
Ensure that the arrows on the attachment plate are pointing up during
reinstallation.
Step 5 Install the RRU on the mounting kit, as shown in the following figure.
To install the RRU on the mounting kit, perform the following steps:
● For installation above the ground, horizontally move the RRU toward the
mounting kit. Exercise caution during movement.
a. Place the lower tab of the attachment plate (illustration 3) into the lower
slot of the mounting kit (illustration 6), and slightly lift the RRU. See
illustration a in the following figure.
b. Place the upper hook of the attachment plate (illustration 1) into the
upper slot of the mounting kit (illustration 4), and ensure that the
foolproof screw of the mounting kit (illustration 5) is completely fitted
into the foolproof hole of the attachment plate (illustration 2). In this
case, the lower tab of the attachment plate (illustration 3) is completely
fitted into the lower slot of the mounting kit (illustration 6). See
illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
● For installation on a tower, slowly lift the RRU downwards to the mounting
kit.
a. Place the foolproof screw of the mounting kit (illustration 5) into the
foolproof hole of the attachment plate (illustration 2). See illustration a
in the following figure.
b. Gently place the RRU downwards. Place the upper hook of the
attachment plate (illustration 1) into the upper slot of the mounting kit
(illustration 4), and ensure that the foolproof screw of the mounting kit
(illustration 5) is completely fitted into the foolproof hole of the
attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of
the mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 6 Use an M12 torque wrench (18 mm [0.71 in.]) to tighten the M12 screws into the
holes on the top of the RRU attachment plate and main bracket to 50 N·m
(442.54 lbf·in.) so that the attachment plate and main bracket are firmly secured,
as shown in the following figure.
----End
Context
● Use the connection plate and four M12x60 expansion bolts delivered with the
mounting kit for separate installation to install an RRU onto a wall, as shown
in the following figure.
● The wall on which an RRU is installed must meet the following requirements:
– For each RRU, the wall must be able to support four times the weight of
one RRU and bear the bolt pulling force of 3.0 kN (675 lbf) vertical to the
wall.
– When expansion bolts are tightened to 45 N·m (398.28 lbf·in.), the bolts
work properly without causing cracks on the wall.
– If a wall (such as a hollow brick wall or thermal insulation wall) does not
meet the load bearing requirements, the bolts may fail to work, the wall
may be damaged, or the device may fall off. Select an appropriate
installation mode based on site conditions.
Procedure
Step 1 Remove the plastic screw cap, M12 nut, spring washer, flat washer, auxiliary
bracket, main bracket, and bolt from the mounting kit in sequence to retain only
the connection plate for RRU installation, as shown in the following figure.
(5) Flat washer (6) Spring washer (7) M12 nut (8) Plastic screw
cap
Step 2 Place a marking-off template against the wall, use a level to ensure that the
marking-off template is placed horizontally, and then use a marker to mark
anchor points, as shown in the following figure.
CAUTION
Take proper safety measures to protect eyes and respiratory system against dust
when drilling holes.
1. Use a hammer drill with a Φ16 bit to drill holes vertically at the anchor points
to a depth ranging from 55 mm to 60 mm (2.17 in. to 2.36 in.). Use a vacuum
cleaner to clean up the dust inside and around the holes, and measure the
distances between holes. If any of the holes is beyond the acceptable range,
mark a new anchor point and drill a new hole.
2. Partially tighten each expansion bolt and then vertically insert it into a hole.
3. Use a hammer to pound each expansion bolt until the corresponding
expansion sleeve completely enters the hole.
4. Partially tighten the expansion bolts clockwise.
5. Loosen the bolts counterclockwise, and remove the M12x60 bolt, spring
washer, and flat washer in sequence.
Step 4 Align the connection plate with the holes on the wall, insert four M12x60
expansion bolts into the holes, and use a torque socket to tighten the nuts of the
four expansion bolts to 45 N·m (398.28 lbf·in.), as shown in the following figure.
NOTE
Ensure that the arrows on the connection plate are pointing up.
Figure 1-111 Relocating the attachment plate to the front of the RRU
NOTICE
Ensure that the arrows on the attachment plate are pointing up during
reinstallation.
Step 6 Install the RRU on the connection plate, as shown in the following figure.
Horizontally move the RRU toward the connection plate and exercise caution
during movement. Then perform the following steps:
1. Place the lower tab of the attachment plate (illustration 3) into the lower slot
of the mounting kit (illustration 6), and slightly lift the RRU. See illustration a
in the following figure.
2. Place the upper hook of the attachment plate (illustration 1) into the upper
slot of the mounting kit (illustration 4), and ensure that the foolproof screw
of the mounting kit (illustration 5) is completely fitted into the foolproof hole
of the attachment plate (illustration 2). In this case, the lower tab of the
attachment plate (illustration 3) is completely fitted into the lower slot of the
mounting kit (illustration 6). See illustration b in the following figure.
(1) Upper hook of the attachment plate (4) Upper slot of the mounting kit
(2) Foolproof hole of the attachment (5) Foolproof screw of the mounting kit
plate
(3) Lower tab of the attachment plate (6) Lower slot of the mounting kit
Step 7 Use a torque socket to tighten the M12 screws into the holes on the top of the
RRU attachment plate and connection plate to 50 N·m (442.54 lbf·in.) so that the
attachment plate and connection plate are firmly secured, as shown in the
following figure.
----End
NOTE
If a cable listed below is not required, skip the cabling requirements of the cable.
● The bending radius of an optical fiber is at least 20 times its diameter, and the
bending radius of a breakout cable is at least 30 mm (1.18 in.).
● The bending radius of an E1/T1 cable must be at least three times its
diameter.
● The bending radius of a signal cable must be at least five times its diameter.
Cable binding requirements
● Cables must be bound before being routed out of the equipment.
● Cables of the same type must be bound together.
● Different types of cables must be separately routed and bound.
● The cables must be bound tightly and neatly. The sheaths of the cables must
not be damaged.
● The cable ties must face the same direction, and those at the same horizontal
line must be in a straight line.
● The excess of the indoor cable ties needs to be cut off. A 5 mm (0.20 in.)
excess needs to be reserved for each outdoor cable tie, without any sharp
edges.
● After cables are installed, labels or nameplates must be attached to the cables
at their ends, curves, and interconnection positions.
Security requirements
● When routing cables, avoid sharp objects or sharp edges on the wall. If
necessary, use tubes to protect the cables.
● When routing cables, keep the cables away from heat sources and use heat
insulation materials to insulate the cables from the heat sources.
● Reserve a proper distance (0.1 m or 0.33 ft is recommended) between
equipment and cables, especially at the cable curves to protect the cables and
equipment.
Indoor cabling requirements
● Cables are routed indoors through the feeder window.
● Reserve drip loops for all cables outside the feeder window before routing
them into the room. Ensure that the radiuses of the drip loops are greater
than or equal to the minimum bending radiuses of the cables.
● When routing a cable into the room, ensure that a person is assisting you in
the room.
● Apply waterproof treatment to the feeder window.
cabinet but do not put the tubes into the cabinet. Use waterproof tape or
waterproof silicon gel to block both ends of the tubes and use sheet metal
tabs to secure the tubes to the cable outlets in the base.
● When routing cables through tubes along a metal cable trough below the
cabinet, do not put the tubes into the base of the cabinet but cover the cable
trough and connect the tubes to the cable outlets in the base.
● When routing RRU/AAU cables, ensure that the highest positions of the routes
of all cables (except RF cables and AISG cables) are lower than the bottom of
the module. This prevents water from entering the maintenance cavity of the
module along the cables.
● Use clips to secure cables outdoors. For the method of installing a clip, see the
installation guide delivered with the clip.
● Arrange cables neatly along the routing direction and use clips to secure the
cables.
● Determine the positions where the clips are installed according to the actual
situation during the onsite installation. For example, 7/8" feeders are secured
at an interval of 1.5 m to 2 m (4.92 ft to 6.56 ft). CPRI/Ir optical fibers and
power cables are secured at an interval of 1.2 m to 2 m (3.93 ft to 6.56 ft),
and the recommended value is 2 m (6.56 ft). Ensure that the clips are evenly
spaced and face the same direction.
● When fastening cables with a clip, ensure that the cables are aligned neatly
and are routed through the holes in the clip. Do not stretch the cables too
tightly.
● Cable ties are used to assist in binding cables. One cable tie can bind a
maximum of two cables.
There are two types of clips which are described as follows:
● A 3-hole clip is shown by illustration a in the following figure. It is often used
to fasten feeders.
● A 6-hole clip is shown by illustration b in the following figure. It is often used
to fasten power cables and CPRI/Ir optical fibers.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 12 AWG/4 mm2 (0.006 in.2)/10 AWG, or the power cable has
non-round core wires with the cross-sectional area of 12 AWG/4 mm2
(0.006 in.2)/10 AWG/6 mm2 (0.009 in.2)/8 AWG/7 AWG, the 6-hole clip
does not require the removal of the rubber tube in the cable outlet for a
power cable. The 6-hole clip matches 3.3–8.3 mm2 (0.005–0.013 in.2)
RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 6 mm2 (0.009 in.2)/8 AWG, or the power cable has non-round
core wires with the cross-sectional area of 10 mm2 (0.016 in.2), the 6-
hole clip requires the removal of the rubber tube in the cable outlet for a
power cable. The 6-hole clip matches 3.3–8.3 mm2 (0.005–0.013 in.2)
RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 12 AWG/4 mm2 (0.006 in.2)/10 AWG, or the power cable has
non-round core wires with the cross-sectional area of 12 AWG/4 mm2
(0.006 in.2)/10 AWG/6 mm2 (0.009 in.2)/8 AWG/7 AWG/5 AWG, the 6-
hole clip does not require the removal of the rubber tube in the cable
outlet for a power cable. The 6-hole clip matches 3.3–10 mm2 (0.005–
0.016 in.2) RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 6 mm2 (0.009 in.2)/8 AWG/10 mm2 (0.016 in.2), or the power
cable has non-round core wires with the cross-sectional area of 16 mm2
(0.025 in.2), the 6-hole clip requires the removal of the rubber tube in the
cable outlet for a power cable. The 6-hole clip matches 3.3–10 mm2
(0.005–0.016 in.2) RRU/AAU power cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 6 AWG/16 mm2 (0.025 in.2), the 6-hole clip does not require the
removal of the rubber tube in the cable outlet for a power cable. The 6-
hole clip matches 13.3–25 mm2 (0.021–0.039 in.2) RRU/AAU power
cables.
– If the RRU/AAU power cable has round core wires with the cross-sectional
area of 4 AWG/25 mm2 (0.039 in.2), the 6-hole clip requires the removal
of the rubber tube in the cable outlet for a power cable. The 6-hole clip
matches 13.3–25 mm2 (0.021–0.039 in.2) RRU/AAU power cables.
(1) Cable outlet for a (2) Cable outlet for a (3) Cable outlet for a (4) Rubber tube
feeder CPRI/Ir optical fiber power cable
● After routing a DC power cable close to the equipment on a tower, use clips
to secure the power cable onto a pole or the rails surrounding the platform.
Ensure the position where the power cable is secured is less than 1.5 m (4.92
ft) away from the equipment to which the power cable connects.
Cabling of E1 cables
● E1 cables cannot be crossed with power cables, PGND cables, or RF cables
when being laid out. If transmission cables are routed with power cables,
PGND cables, or RF cables in parallel, the spacing between them must be
greater than 30 mm (1.18 in.).
● E1 cables are routed straightly and bound neatly with cable ties.
● Sufficient slack is provided in E1 cables at turns.
● E1 cables cannot be pressed by the cabinet door when routed through the
cabinet. The following figure shows both correct and incorrect ways of routing
the cables.
● The operating temperature of optical fibers ranges from -40°C to +60°C (-40°F
to +140°F). If the actual temperature is beyond this range, take protective
measures or select another route.
● Do not circle or twist cables.
● Do not bind optical fibers at the position where they bend.
● Do not stretch, step on, or place heavy objects on optical fibers. Keep the
optical fibers away from sharp objects.
● When optical fibers are routed, the excess of the optical fibers must be coiled
around special equipment, such as a fiber coiler.
● An optical jumper must be bound using binding straps. If an optical fiber
needs to be secured in a cabinet or a piece of equipment, use binding straps
to bind it and then use cable ties to secure the binding straps to the cabinet
or equipment. Ensure that the optical fibers can flexibly move in the cable
ties. Right angle bending is not allowed. The following figure shows the
correct and incorrect manners of binding optical fibers.
● When coiling optical fibers, apply even strength. Do not bend the optical
fibers with force.
● Unused optical connectors must be covered with dustproof caps.
● The optical fibers must not be pressed by the door of the cabinet when
routed, as shown in the following figures.
● After routing an optical fiber onto the platform on a tower, route it along the
shortest path to the rails surrounding the platform, and route it along the
inside of the rails.
● After routing an optical fiber near the equipment on a tower, use clips to
secure the optical fiber onto a pole or the rails surrounding the platform.
Ensure that the distance between the equipment and the position where the
optical fiber is secured is not too long.
● Coil the excess of the optical fibers near the equipment on the tower before
securing the cables onto the tower.
● In other cases, an MEB is required. For details about the MEB and MEB cable
installation, see the MEB user guide.
Figure 1-123 and Figure 1-124 show the cable connections for a single RRU.
(1) PGND cable (2) RRU RF jumper (3) RRU AISG multi-wire
cable
(1) PGND cable (2) RRU RF jumper (3) RRU AISG multi-wire
cable
(4) CPRI optical fiber (5) RRU power cable (6) MEB alarm cable
(1) PGND cable (2) RRU RF jumper (3) RRU power cable
a: Determine the cable type based on the connector used at the other end of
the cable on the live network.
Context
The cross-sectional area of an RRU PGND cable is 16 mm2 (0.025 in.2). The OT
terminals at the two ends of the cable are M6 and M8 terminals, respectively.
DANGER
Install RRU PGND cables by strictly following the following operations. Otherwise,
you risk device damage or personal injury.
Procedure
Step 1 Install an RRU PGND cable. Connect the M6 OT terminal of the RRU PGND cable
to the ground terminal at the bottom of the RRU, and use an M6 Phillips torque
screwdriver to tighten the screw to 4.8 N·m (42.48 lbf·in.), as shown in the
following figure. Connect the M8 OT terminal to the external ground bar.
When installing PGND cables, crimp the OT terminals in the correct direction. See
Figure 1-127.
Step 2 Label the installed cables according to the instructions in section "Attaching a
Cable-Tying Label" in Installation Reference.
----End
Context
For details about the connections between RRU RF ports and antenna ports, see
descriptions of RRU RF cable connections in the corresponding RRU hardware
description document, which is available in 3900 & 5900 Series Base Station
Product Documentation at Description > Hardware Description > RRU
Hardware Description.
Procedure
Step 1 Connect the 4.3-10 straight male connector on the RRU RF jumper to the RF port
and use a torque wrench to tighten the connector to 5–15 N·m (44.25–132.76 lbf·
in.). See the following figure.
CAUTION
Step 2 Connect the other end of the RRU RF jumper to the external antenna system.
Before the installation, confirm the connector type at the other end of the cable.
Step 3 Take appropriate protective measures on the connectors of the RRU RF jumper.
Two protection methods are available. Figure 1-129 shows method 1
(recommended) and Figure 1-130 shows method 2.
NOTE
● Do not stretch the PVC insulation tape before wrapping. Before wrapping the waterproof
tape, stretch the tape evenly until the length of the tape is twice of its original length.
● Ensure that each layer of the tape overlaps more than 50% of the previous layer. Slightly
stretch the tape and press it firmly to avoid wrinkles or air pockets so that the tape is tightly
wrapped and stuck and will not fall off.
● Ensure that the adhesive side overlaps the preceding layer.
NOTICE
NOTE
● Do not stretch the PVC insulation tape before wrapping. Before wrapping the waterproof
tape, stretch the tape evenly until the length of the tape is twice of its original length.
● Ensure that each layer of the tape overlaps more than 50% of the previous layer. Slightly
stretch the tape and press it firmly to avoid wrinkles or air pockets so that the tape is tightly
wrapped and stuck and will not fall off.
● Ensure that the adhesive side overlaps the preceding layer.
(1) Dustproof cap (2) Waterproof tape (3) PVC insulation tape
wrapped. After wrapping each layer of the tape, use your hands to firmly
press the tape down to ensure good protection.
3. Wrap three layers of PVC insulation tape layer upon layer in the following
sequence: from bottom to top, and then from top to bottom, and once again
from bottom to top. Cut off the redundant tape after three layers are
wrapped. After wrapping each layer of the tape, use your hands to firmly
press the tape down to ensure good protection.
4. Bind cable ties around the cable 3 to 5 mm (0.12 to 0.20 in.) away from each
end of the PVC insulation tape to prevent the tape from aging.
Step 5 Route the cables according to the instructions in section "Cabling Requirements".
Step 6 Label the installed cables according to the instructions in section "Attaching a Sign
Plate Label" in Installation Reference.
Step 7 Attach color-coding labels to the installed cables according to the instructions in
section "Attaching a Color-coding Label" in Installation Reference.
----End
Context
The exterior of an AISG multi-wire cable in this section is only for reference. The
actual AISG multi-wire cable may be different.
Procedure
Step 1 Use an M3 Phillips torque screwdriver to loosen the screws on the dustproof cap
of the RET port and remove the dustproof cap.
Step 2 Connect the DB9 waterproof connector at one end of the RRU AISG multi-wire
cable to the RET port at the bottom of the RRU and use an M3 Phillips torque
screwdriver to tighten the stud on each side of the DB9 waterproof connector to
0.4 N·m (3.54 lbf·in.). See the following figure.
Step 3 Connect the other end of the cable to the AISG standard male connector of the
antenna system.
Step 4 Route the cables according to the instructions in section "Cabling Requirements".
Step 5 Attach color-coding labels to the installed cables according to the instructions in
section "Attaching a Color-coding Label" in Installation Reference.
----End
Context
A CPRI optical fiber transmits CPRI signals between a BBU and an RRU.
The rate of the optical module to be installed must match the rate of the
corresponding CPRI port.
NOTICE
Procedure
Step 1 Unscrew the nut of the outdoor quick-lock optical fiber connector and remove the
rubber stopper from the rubber plug. Pull the cord at the end of the plug to
remove the plug out of the connector shell, and place the plug on the side of the
connector. See the following figure.
Figure 1-135 Unscrewing the nut of the connector and removing a rubber stopper
from the rubber plug
NOTICE
● When installing one optical fiber, remove only one stopper and reserve the
other one.
● When installing two optical fibers, remove the two stoppers.
Step 2 Remove the protection pipe of the optical fiber. Then, bind an anti-falling cable tie
at the position about 500 mm (19.69 in.) away from the head of the optical fiber.
NOTICE
The cable tie can prevent the outdoor quick-lock optical fiber connector from
sliding down along the optical fiber.
Step 3 Route the optical fiber through the nut and the shell of the outdoor quick-lock
optical fiber connector in sequence.
Figure 1-137 Routing the optical fiber through the outdoor quick-lock optical fiber
connector
Step 4 Push the lever to loosen the dustproof cap on the CPRI port of the RRU.
Step 5 Remove the dustproof cap from the CPRI port of the RRU and the dustproof plug
from the optical module.
NOTICE
● After removing the dustproof plug from the optical module and the dustproof
cap from the optical fiber connector, insert the optical fiber into the optical
module immediately (within one minute) to avoid pollution of the optical
module or optical fiber connector, which may cause an optical module alarm.
● To avoid any damage to the optical fibers, install the optical fiber by strictly
following the instructions in section "Cabling Requirements."
● When installing the CPRI optical fiber for a two-fiber bidirectional optical
module, remove the dustproof plugs from the ports on the optical module
and the dustproof caps from the optical fiber connectors, and connect the end
labeled 1A and 1B to the optical module on the RRU side. See the following
figure. Connect the DLC connector on the end labeled 2A and 2B to the CPRI
port on the main control board or baseband processing unit in the BBU.
Figure 1-140 Installing a CPRI optical fiber for a two-fiber bidirectional optical
module
● When installing the CPRI optical fiber for a single-fiber bidirectional optical
module, remove the dustproof plug from the port on the optical module and
the dustproof cap from the LC connector labeled 1A, split the DLC connector
into two LC connectors, and connect the end labeled 1A to the optical module
on the RRU side. See the following figure. Connect the LC connector on the
opposite end labeled 2A to the CPRI port on the main control board or
baseband processing unit in the BBU.
Step 7 Insert the outdoor quick-lock optical fiber connector into the CPRI port and close
the lever. See the following figure.
Figure 1-142 Inserting and fastening the outdoor quick-lock optical fiber
connector
Step 8 Put the optical fiber into the protective rubber plug through the opening of the
protective rubber plug.
Figure 1-143 Putting the optical fiber into the hole of the protective rubber plug
Step 9 Push the protective rubber plug into the hole at the bottom of the outdoor quick-
lock optical fiber connector.
Figure 1-144 Pushing the protective rubber plug into the hole
NOTICE
Ensure that the protective rubber plug is inserted completely and cannot move
further.
Step 10 Push the nut onto the protective rubber plug, and use a torque wrench with a
recommended torque of 4 N·m (35.40 lbf·in.) to tighten the nut until it is level
with the stop plane of the lever. See the following figure.
NOTICE
Insert the tongue into the nut completely to make the nut attach to the stop
plane.
Step 11 Route the cables according to the instructions in section "Cabling Requirements".
Step 12 Label the installed cables according to the instructions in section "Attaching an L-
Shaped Label" in Installation Reference.
----End
Prerequisites
● The power cable has been prepared. For details, see "Adding an Outdoor
Quick-Lock Power Connector to the RRU Power Cable on the RRU Side". The
exteriors of modules in this section are for reference only.
● A connector has been added to the RRU power cable on the power device
side. For details, see the corresponding descriptions in the base station
installation guide.
NOTE
● Colors and exteriors of cables may vary with countries and regions. Cables purchased at
local markets must comply with local rules and regulations.
● The power cables are black and blue in most countries and regions, whereas blue and
gray in the UK and red and blue in China.
CAUTION
● Before installing an RRU power cable, ensure that the upper-level circuit
breaker or power cable is disconnected and no voltage is detected on the
power cable. Do not remove or insert the power connector on the RRU side
when the RRU is in the power-on state.
● A drip loop needs to be created on a cable near the RRU port, preventing rain
from damaging the RRU.
● When installing the RRU power cable, connect the power cable to the RRU first
and then to the power equipment. An incorrect connection sequence or reverse
polarity may cause damage to the RRU or personal injury.
Procedure
Step 1 Push the dustproof cap lever of the power port to loosen the dustproof cap.
Step 3 Open the lever on the outdoor quick-lock power connector and connect the
connector to the power port on the RRU, as shown by step a in the following
figure. Close the lever completely until you hear a click, as shown by step b in the
following figure.
Figure 1-148 Installing the power cable with an outdoor quick-lock power
connector
Step 4 Connect the opposite end of the power cable to the port on the power supply
device.
NOTE
When a DC RRU is installed outdoors, the RRU power cable must be grounded through the
shield layer on the power supply device side. For details, see the corresponding descriptions
in DBS3900 & DBS5900 Installation Guide.
Step 5 Route the cable by following the instructions in section "Cabling Requirements".
Step 6 Attach labels to the cable by following the instructions in section "Attaching a
Cable-Tying Label" in Installation Reference.
----End
Device The installation position of each device strictly complies with the
installation engineering design and meets clearance requirements. Sufficient
space is reserved for O&M.
Protection Vacant RF ports are covered with dustproof caps and the caps
are protected.
Cables All cables are not damaged or broken. The power and PGND
cables are continuous throughout their length without joints.
Power and PGND cables are bound separately from other cables.
All cable labels are correct, legible, and complete.
The RRU PGND cable and the surge protection grounding of the
building share one group of grounding conductors. All ground
cables are properly grounded.
NOTICE
After you unpack an RRU, you must power it on within 24 hours. If you power off
the RRU for maintenance, you must restore power to the RRU within 24 hours.
(a) The RRU is supplied with –48 V DC power and the input voltage ranges from –36 V DC to –
57 V DC.
(b) When the RRU is running properly, the RUN indicator is on for 1s and off for 1s, and the
ALM indicator is steady off.
Procedure
1. Check whether the input voltage of the RRU is within the normal range.
2. On the power equipment for the RRU, turn on the corresponding circuit
breaker or insert the corresponding power connector to power on the RRU.
DANGER
Do not look into the optical module without eye protection after the RRU is
powered on.
3. Wait for 3 minutes to 5 minutes and then check the RRU indicator status. For
details, see descriptions about RRU indicators in the corresponding RRU
hardware description.
NOTE
If... Then...
1.14 Appendix
Context
CAUTION
Add an outdoor quick-lock power connector to the RRU power cable by strictly
following the operations described in this section. Otherwise, you risk device
damage or personal injury.
The following figure shows a cable diagram for the RRU power cable.
Procedure
Step 1 Press the lever unlock button on the outdoor quick-lock power connector (see
illustration 1 in the following figure). Open the lever and press the unlock button
of the inner part (see illustration 2 in the following figure). Remove the inner part
of the connector (see illustration 3 in the following figure).
Figure 1-151 Unlocking and removing the inner part of the connector
(1) Lever unlock button (2) Unlock button of the (3) Inner part of the
inner part power connector
Step 2 (Optional) The connector is configured with two layers of waterproof rings. When
the cross-sectional area of the power cable is greater than or equal to 6 mm2
(0.0093 in.2) or 7 AWG, properly remove and store the inner waterproof ring.
Step 3 Loosen the nut on the connector shell (do not let the nut fall off), and route the
power cable into the shell of the outdoor quick-lock power connector.
Step 4 Determine the length of the power cable for different operations based on the
cable diagram. See the following figure.
Figure 1-154 Determining the cable length based on the cable diagram
1. Strip the specified length of the outer sheath off the cable, as shown in the
following figure.
2. Strip the specified length of the sheath off each core wire, as shown in the
following figure.
3. Strip the specified length of the sheath off the power cable to expose its
shield layer, as shown in the following figure.
Figure 1-157 Stripping the sheath off the power cable to expose the shield
layer
NOTICE
When stripping the sheath off the power cable, do not damage the shield
layer of the power cable.
Step 5 Open the cable lock lever (see step a in the following figure) of the inner part of
the outdoor quick-lock power connector. Loosen the screw (see the dashed red
line in the following figure) and open the shielding clip (see step b in the
following figure).
Figure 1-158 Opening the cable lock lever and shielding clip
Step 6 Connect the blue core wire labeled NEG(-) to the "-" port and the black/brown
core wire labeled RTN(+) to the "+" port on the connector. Observe the contact
between the spring and conductor through the windows. See the following figure.
Figure 1-159 Observing the contact between the spring and conductor
NOTICE
● Check the following items through the window: The conductor must be pressed
by the spring (see illustration a in the previous figure). The length of the wire
inserted into the connector is appropriate (see illustration b in the previous
figure). The spring must not press the sheath of the wire (see illustration c in
the previous figure). No copper wire is bent (see illustration d in the previous
figure).
● If cables are not properly locked, check the stripping length.
Step 7 Press the cable lock lever, lock the shielding clip, and use an M3 Phillips torque
screwdriver to tighten the bolt (see the dashed red line in the following figure) to
1.4 N·m (12.39 lbf·in.). Then, press the lever until it does not bounce back to
ensure that the core wires are locked.
Figure 1-160 Pressing the cable lock lever and locking the shielding clip
Step 8 Push the inner part back into the shell until you hear a click. Then, the inner part
is correctly inserted.
Figure 1-161 Inserting the inner part into the connector shell
Step 9 Pull the power cable slightly until it is straight and cannot be moved. Use a torque
wrench to tighten the nut until it contacts the stop plane (as shown by step a in
the following figure). The recommended tightening torque is 9 N·m or 79.66 lbf·in.
(as shown by step b in the following figure).
----End
Context
Figure 1-163 shows a one-hole OT terminal and materials related to a power
cable.
(A) Heat shrink tubing (B) One-hole OT (C) Insulation layer of (D) Conductor of a
terminal with a bare a power cable power cable
crimping terminal
(A) Heat shrink tubing (B) Two-hole OT (C) Insulation layer of (D) Conductor of a
terminal with a bare a power cable power cable
crimping terminal
Procedure
Step 1 Based on the cross-sectional area of the cable conductor, strip a part of the
insulation layer "C". The L1-long conductor "D" is exposed, as shown in Figure
1-165. The recommended values of L1 are listed in Table 1-9.
NOTICE
● When stripping a power cable, do not damage the conductor of the cable.
● If the bare crimping terminal is not provided by Huawei, the value of L1 is 1
mm to 2 mm (0.04 in. to 0.08 in.) greater than the value of L.
● After stripping the insulation layer off the power cable, adjust the shape of
bare wires based on actual situations to facilitate the installation of OT
terminals. Add OT terminals to the power cable immediately after the stripping.
Otherwise, bare wires may split, which hinders the installation.
● If the bare wires split and OT terminals cannot be installed, cut off the bare
wires, strip another length of insulation layer off the cable, and add OT
terminals to the cable.
Table 1-9 Mapping between the cross-sectional area of the conductor and the
value of L1
NOTE
If you are proficient in assembling OT terminals and power cables, you can obtain the value
of L1 by comparing the part to be crimped with a power cable.
Step 2 Feed the power cable into the heat shrink tubing (A), as shown in Figure 1-166.
Table 1-10 shows the recommended length of the heat shrink tubing.
Figure 1-166 Putting the heat shrink tubing onto the bare crimping terminal
Table 1-10 Mapping between the cross-sectional area of the conductor and the
length of the heat shrink tubing
Step 3 Put the OT terminal "B" onto the exposed conductor, and ensure that the OT
terminal is in good contact with the insulation layer "C" of the power cable, as
shown in Figure 1-166.
NOTICE
After the conductor is fed into the OT terminal, the exposed part of the conductor,
as indicated by L2 in Figure 1-166, must not exceed 2 mm (0.08 in.).
Step 4 Crimp the joint parts of the bare crimping terminal and the conductor, as shown in
Figure 1-168.
NOTE
The shapes of crimped parts may vary with the crimping tools.
NOTICE
Ensure that the OT terminal does not have burrs on its surface after the crimping.
Otherwise, it may damage the heat shrink tubing. The following figure shows an
OT terminal with burrs and an OT terminal without burrs.
Figure 1-168 Crimping the joint parts of the bare crimping terminal and the
conductor (OT terminal)
Step 5 Push the heat shrink tubing "A" towards the connector until the tube covers the
crimped part, and then heat the tubing by using a heat gun, as shown in Figure
1-169.
NOTICE
Do not install the heat shrink tubing to the screw hole of the OT terminal "B".
Do not overheat the heat shrink tubing because the insulation layer may be
damaged.
----End