0% found this document useful (0 votes)
69 views24 pages

Safety Performance Report May 2024

Gemba procedure.

Uploaded by

nadeemshaikh0333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views24 pages

Safety Performance Report May 2024

Gemba procedure.

Uploaded by

nadeemshaikh0333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

SOS MAY 2024

Value Stream- Total No. of


Safety members %ge
Department Hazards raised

SOS YEAR July 2024


TOTAL OPEN CLOSE

OPEN SOS STATUS


CAPA Responsible number
Admin
M.E
Maintenance
Dispatch
IT
EHS
Safety Performance – Safety Triangle

Fatal

Lost Time Injuries (LTI)


-
Medical Treatment Injury
Identified (MTI) Closed
- - Total Injury Ra
IdentifiedFirst Aid Incidents Closed
- -
Identified Near miss Incidents Closed

Identified Unsafe Act / Behaviour Closed

Identified Unsafe condition Closed


YTD- 2024

Total Injury Rate (TIR)– 0.0

Closed
Reactive
Closed

Proactive
Jul-20

Plan Act
Week 1 1,590,006
Week 2 9,478,152
Week 3 26,661,640
Week 4 48,880,438
Week 5 20,067,966
Total 106,678,201
Owner

Remarks

BV Pla
60000000

50000000

40000000

30000000

20000000
9478152.3158534
8
10000000 1590005.5858657
3 924605.91
0
Week 1 Week 2
Arvind/Mohan

BV Plan Vs Actual-Jul'20
48880438.096378
4

26661639.566285
5 20067965.726611
8
9478152.3158534
8
58657
24605.91
ek 1 Week 2 Week 3 Week 4 Week 5

Plan Act
Date Planned Qty Actual Qty Diff
1 22 19 3
2 20 14 6
3 24 20 4
4 20 13 7
5 15 11 4
6 18 17 1
8 30 27 3 35
Plan vs Ac
9 20 22 -2 30
10 23 22 1
25
11 20 25 -5
12 20 16 4 20
13 18 23 -5 15
15 18 23 -5
10
16 16 6 10
17 24 22 2 5
18 25 21 4 0
1 2 3 4 5 6 7 8 9 10 11 12 13 1
19 24 18 6
-5
20 10 14 -4
22 12 17 -5 -10
23 22 18 4 Plan Qty Ac
24 25 23 2
25 21 24 -3
26 21 17 4
27 17 17 0
28 18 14 4
29 20 23 -3
30 20 16 4
week 1 119 94 25
week 2 131 135 -4
week 3 117 104 13
week 4 176 169 7 Plan Adherence
Total 543 502 41
Plan vs Actual

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Plan Qty Actual Qty Diff

92.45%
Tray Report for May-2024
week 1 (01 to 10 July) week 2 (11 to 18) week 3(20 to 25)
Planned 190 263 329
Actual 190 223 79
Missed 0 -40 -250
Machining
Remarks. components & Pick Machining components & Pick
list list
24
week 4(27 to 31)
180
139
-41

Machining components & Pick list


Gate Entry Pending for GRN May 2024
Remarks Week 1 (01 to 10 July) Week 2 (upto 18 July)
Issues Opening Closing Opening Closing
32 6 6 8

Rate Diff/GST/P&F 4 5
NO PO 2
Wrong Gate Entry correcte
material Unboxing
Inventory Control
Material not received/With 1
Lot numbering Method 1
supplier issue 1

Aging Aging
Rate Diff/GST/P&F 02-15 Days, 02-03 Days 02-5days, 1-3days, 02-2days
NO PO 01-10days, 1-2days
Wrong Gate Entry correcte
material Unboxing
Inventory Control
Material not received/With 01-5days
Lot numbering Method 01-03 Days
supplier issue 01-03 Days
for GRN May 2024
Week 3 (upto 24 July) Week 4 (upto 31 July) Week 5
Opening Closing Opening Closing Opening Closing
8 9 9 4

8 1

2
1

Aging Aging
01-4days, 07-3days 01-4days

01-2days

02-3days
01-3days
Month - July 2024 WORK CENTER UTILIZATION Value Stream - BV

Week work center Name Run time Utilisation Capacity


week 1 ASMTS_BS Assembly & testing- BV- 15-100 FB MS 10 31% 32
week 2 ASMTS_BS Assembly & testing- BV- 15-100 FB MS 5 8% 53
week 3 ASMTS_BS Assembly & testing- BV- 15-100 FB MS 26 50% 53
week 4 ASMTS_BS Assembly & testing- BV- 15-100 FB MS 89 168% 53
week 5 ASMTS_BS Assembly & testing- BV- 15-100 FB MS 198 375% 53
week 1 ASMTS_BM Assembly & testing- BV-125RB-200FB 6 9% 64
week 2 ASMTS_BM Assembly & testing- BV-125RB-200FB 100 95% 106
week 3 ASMTS_BM Assembly & testing- BV-125RB-200FB 70 66% 106
week 4 ASMTS_BM Assembly & testing- BV-125RB-200FB 42 40% 106
week 5 ASMTS_BM Assembly & testing- BV-125RB-200FB 64 301% 106
week 1 ASMTS_BL Assembly & testing- BV-TMBV 250-600 34 53% 64
week 2 ASMTS_BL Assembly & testing- BV-TMBV 250-600 23 22% 106
week 3 ASMTS_BL Assembly & testing- BV-TMBV 250-600 42 40% 106
week 4 ASMTS_BL Assembly & testing- BV-TMBV 250-600 0 0% 106
week 5 ASMTS_BL Assembly & testing- BV-TMBV 250-600 39 37% 106
TOTAL 748 86% 1220

work center Name Run time Utilisation Capacity


ASMTS_BS Assembly & testing- BV- 15-100 FB MS 328 126% 222
ASMTS_BM Assembly & testing- BV-125RB-200FB 282 102% 444
ASMTS_BL Assembly & testing- BV-TMBV 250-600 138 30% 444
Total Assembly & testing 748 86% 1110
OTD July

Estimated OTD
Owner
REWORK Utilization
SL Transaction Date MO Number Manufactured Qty labor run time Actual Cost
1 30,000
Rewo
11-Jul-2020 321558 2 4 24,188
2 11-Jul-2020 321781 3 3 1,081
25,000
3 11-Jul-2020 321882 5 7 25,269
4 11-Jul-2020 321924 16 8 6,038 20,000
5 11-Jul-2020 321941 10 10 0
15,000
6 21-Jul-2020 322316 32 8 6,038
7 21-Jul-2020 322693 14 14 17,842 10,000
8 24-Jul-2020 322819 36 3.6 2,717
5,000
9 24-Jul-2020 322901 6 1.2 906
10 0
1 2 3 4

Manufactured Qty Used labor ruActual Cost


124 59 84,079
30,000
Rework Cost
25,000

20,000

15,000

10,000

5,000

0
1 2 3 4 5 6 7 8 9 10
INVENTORY LIQUIDATION-JUNE'20
Date: 1/6/20
Value Stream: BV Plan--May'20
Beginning inventory of 1st May'20 32.6
Purchase value for May'20 1.2
Sale Value X Material cost % 2.4
Liquidation of unallocated inventory 0.60
Beginning inventory of 1st Jun'20 (Forecast) value in Crore INR 30.75

Liquidation of unallocated inventory-July'20 Plan 16.0


Liquidation of unallocated inventory-july'20 Actual

Liquidation of unallocated inventory July'20 Actual Value-INR-Cr

Parts selling to Sonic & SRC 1000000

Unallocated valve 600000


Owner Venkatesh

UNE'20
Act--May'20 1/6/2020 1/7/2020
32.6 31.0 28.1
1.27 2.3 2.2
2.8 4.9 6.4
0.76 0.3 0.3
31.00 28.1 23.5

Target Responsible Remarks

July VV 5.5 -week2 -SRC done

July VV
Owner

Week From To Total Released Not releas


1st 1-Jul-20 4-Jul-20 900 200 700

2nd 6-Jul-20 11-Jul-20 700 140 560


Reason Ageing line more than 3 days
401- castings POP lines are reflecting against B7 MO 4
117- Subcon POP lines are reflecting against B7 MO 9
80-Captive POP lines are reflecting against without CO link Not required 2
102-Bought out lines are reflecting against not required to BV 1
16

401- castings POP lines are reflecting against B7 MO 1


117- Subcon POP lines are reflecting against B7 MO 9
80-Captive POP lines are reflecting against without CO link Not required 1
102-Bought out lines are reflecting against ------ 1
33 lines are not required to BV & 30 no’s BOM error & balance B7 MO demand
12
Resp
Maharaja
Siddarth
Anthon
Karunakar

Maharaja
Siddarth
Anthon
Karunakar
[Link] M/C CODES M/C DESCRIPTION Nil
1 3CM 5160 HYUNDAI M/C TURN MILL CENTER Nil
2 3CM 5164 HYUNDAI M/C TURN MILL CENTER Nil
3 3CM 5165 WIDMA VU 850 Nil
4 3CM 5166 WIDMA VU 850 Nil
5 3EM-5205 BFW VMC MACHINE (BV) Nil
6 3EM- 5113 H M T LATHE NH 26 (B.V M/C SHOP) Nil
7 3EM- 5129 KIRLOSKAR LATHE "BOMBAY" (B.V) Nil
8 3EM- 5135 WOTON BORING M/C ( B.V M/C SHOP) Nil
9 3EM- 5136 BALL TURNING LATHE (ACCURATE) Nil
10 3EM- 5137 BALL TURNING LATHE (ACCURATE) Nil
11 3EM-5147 CHINA LATHE CA 6261B (B.V) Nil
12 3EM-5151 BALL TURNING LATHE (ACCURATE) (B.V) Nil
13 3EM-5156 CHINA VTL C 5112 (1 MTR) (BV) Nil
14 3EA-6513 HYDRAULIC PRESS 20 TON FOR BALL Nil
15 3EM-5303 BATLIBOI DRILLING M/C BR - 618 (B.V) Nil
16 3EM-5306 CHINA DRILLING M/C Z3032 x 8/1 (BV) Nil
17 3EM-5420 DIE GRINDER (BALL VALVE) Nil
18 3EM- 5422 DOUBLE ENDED GRINDER (BV) Nil
19 3EL-5428 BALL LAPPING MACHINE (B.V) Nil
20 3EL-5429 BALL LAPPING MACHINE(BDK) (B.V) Nil
21 3EL-5430 BALL LAPPING MACHINE (BDK) (B.V) Nil
22 3EL-5431 BALL LAPPING MACHINE (BDK) (B.V) Nil
23 3W-5438 BALL LAPPING MACHINE (BDK) Nil
24 3W-5439 BALL LAPPING MACHINE (BDK) Nil
25 3W-5440 BALL LAPPING MACHINE (BDK) Nil
26 3CG-5505 ARC WELDING MACHINE (BV) Nil
27 3CA-5815 HYDRO TANK Nil
28 3EA-5913 TEST BED 15 TON (BALL VALVE ) Nil
29 3EA-5915 TEST BED 80 & 175 TON (BALL VALVE ) Nil
30 3EA-5917 TEST BED FOR SCREW END FOR BALL Nil
31 3EA-5918 NON COMPRESSION TEST BED FOR BALL Nil
32 3EA-5919 HYDRAULIC TEST BED 80 TON Nil
33 3EA-5909 HYDRO CLAMPING FOR BALL VALVE 3 TON *D* Nil
34 3W-5942 TEST BED 3 STAGE (BV) Nil
35 3T-5943 TEST BED 170 TON TRIDENT Nil
36 3T-5944 TEST BED 80 TON TRIDENT Nil
37 3EA-6232 EOT CRANE 5000 KGS (BV) Nil
38 3EA 6234 EOT CRANE 2 TON ( BV IMI) Nil
39 3EA-6236 5 TON EOT CRANE , SWIFT MAKE (BALL VALVE) Nil
40 3W-6240 5 TON EOT CRANE (SIGMA) Nil
41 3W-6241 2 TON MONO RAIL CRANE SIGMA Nil
42 3W-6242 3 TON EOT CRANE (BV) Nil
43 3W-6804 STRACKER Nil
44 3EA-5807 AIR COMPRESSOR IR SCREW TYPE UP5 11 C (BV) Nil
45 3CG-5812 AIR COMPRESSOR ELGI 50 HP TYPE E37- 9.5 (BV) Nil
Owner Mohan/Sid

MAY Opening 1011


End 1107

SFG/FG MO 96
Subcon/Inhouse 1011

Target date 20/07 /20

Note: Newly getting added