0% found this document useful (0 votes)
31 views8 pages

Civil Works BOQ for Tejgoan Substation

Uploaded by

faruk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views8 pages

Civil Works BOQ for Tejgoan Substation

Uploaded by

faruk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

O

8
.
5
%
3.1 BOQ for Civil Works
o
BOQ for Civil Works of Building of 1-A-2 Tejgoan 132kV Substation n
Unit Price
No. Item Description Unit Qty.
(BDT) m
2.2 Pile cap - - ###
a
t
+

L
a
[Link] supply and casting , fc=4350psi
2.2.1 concrete m³ 2,160.00 b
15,697.52###
2. including shuttering , test and all additional works
o
u
r

Including supply and fitting and fixing, fyk=72500psi


2.2.2 rebar ton 216.00 96,575.00###
(500MPa)
2.3 Foundation beam - - ###
[Link] supply and casting , fc=4350psi
2.3.1 concrete m³ 40.00 15,697.52###
2. including shuttering and all additional works
Including supply , fitting and fixing, fyk=72500psi
2.3.2 rebar ton 8.00 96,575.00###
(500MPa)
2.4 Raft Working - - ###
[Link] supply and casting , fc=4350psi
2.4.1 concrete m³ 505.00 15,697.52###
2. including shuttering and all additional works
Including supply , fitting and fixing, fyk=72500psi
2.4.2 rebar ton 40.00 96,575.00###
(500MPa)
3 Cushion comcrete - - ###
[Link] supply and casting , fc=2000psi
3.1 Concrete cushion m³ 266.50 10,000.00###
2. including shuttering, test and all additional works
4 Super Structure - - ###
4.1 Concrete working - - ###
4.1.2 Basement 3 - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 207.36 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 155.18 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 106.00 15,457.38###
2. including shuttering, test and all additional works

[Link] supply and casting , fc=4350psi, waterproof


[Link] Share wall concrete P6 m³ 155.38 17,320.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 6.92 15,457.38###
2. including shuttering, test and all additional works
8
.
5
%

o
n
Unit Price
No. Item Description Unit Qty.
(BDT) m
[Link] supply and casting , fc=4350psi a
[Link] Car ramp m³ 16.98 15,457.38###
2. including shuttering, test and all additional works t
[Link] supply and casting , fc=3000psi +
[Link] Lintel m³ 3.20 15,457.38###
2. including shuttering, test and all additional works
L
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 3.20 17,011.24###
a
2. including shuttering, test and all additional works
b
[Link] supply and casting , fc=3000psi o
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works u
4.1.3 Basement 2 - r
- ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 159.51 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 202.33 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 155.38 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi, waterproof
[Link] Share wall concrete P6 m³ 135.74 17,320.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 6.92 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Car ramp m³ 16.98 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 3.20 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 3.20 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works
4.1.4 Basement 1 - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 159.51 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 202.33 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 155.38 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi, waterproof
[Link] Share wall concrete P6 m³ 135.74 17,320.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 6.92 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Car ramp m³ 16.98 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 3.20 15,457.38###
2. including shuttering, test and all additional works
8
.
5
%

o
n
Unit Price
No. Item Description Unit Qty.
(BDT) m
[Link] supply and casting , fc=3000psi a
[Link] Tie column m³ 3.20 17,011.24###
2. including shuttering, test and all additional works t
[Link] supply and casting , fc=3000psi +
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works
4.1.5 Ground Floor - L
- ###
a
[Link] supply and casting , fc=4350psi b
[Link] Column m³ 604.80 17,011.24###
2. including shuttering, test and all additional works o
[Link] supply and casting , fc=4350psi u
[Link] Beam m³ 526.06 16,040.07###
2. including shuttering, test and all additional works r
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 303.00 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Share wall m³ 73.50 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 27.00 15,457.38###
2. including shuttering, test and all additional works
fair-faced in-situ concrete [Link] supply and casting , fc=4350psi
[Link] m³ 58.28 18,548.85###
external walls. 2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 3.20 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 3.20 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works
4.1.6 1st Floor - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 241.92 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 341.94 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 202.00 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Share wall m³ 29.40 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 10.50 15,457.38###
2. including shuttering, test and all additional works
fair-faced in-situ concrete [Link] supply and casting , fc=4350psi
[Link] m³ 23.31 18,548.85###
external walls. 2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 3.20 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 3.20 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works
4.1.7 2nd Floor - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 288.00 17,011.24###
2. including shuttering, test and all additional works
8
.
5
%

o
n
Unit Price
No. Item Description Unit Qty.
(BDT) m
[Link] supply and casting , fc=4350psi a
[Link] Beam m³ 341.94 16,040.07###
2. including shuttering, test and all additional works t
[Link] supply and casting , fc=4350psi +
[Link] Slab m³ 202.00 15,457.38###
2. including shuttering, test and all additional works
L
[Link] supply and casting , fc=4350psi
[Link] Share wall m³ 35.00 17,011.24###
a
2. including shuttering, test and all additional works
b
[Link] supply and casting , fc=4350psi o
[Link] Stair m³ 12.50 15,457.38###
2. including shuttering, test and all additional works u
fair-faced in-situ concrete [Link] supply and casting , fc=4350psi r
[Link] m³ 18.75 18,548.85###
external walls. 2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 3.20 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 3.20 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works
4.1.8 3rd Floor - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 230.40 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 241.20 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 121.80 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Share wall m³ 35.00 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 12.50 15,457.38###
2. including shuttering, test and all additional works
fair-faced in-situ concrete [Link] supply and casting , fc=4350psi
[Link] m³ 18.75 18,548.85###
external walls. 2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 3.20 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 3.20 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works
4.1.9 4th Floor - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 193.54 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 241.20 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 121.80 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Share wall m³ 29.40 17,011.24###
2. including shuttering, test and all additional works
8
.
5
%

o
n
Unit Price
No. Item Description Unit Qty.
(BDT) m
[Link] supply and casting , fc=4350psi a
[Link] Stair m³ 10.50 15,457.38###
2. including shuttering, test and all additional works t
fair-faced in-situ concrete [Link] supply and casting , fc=4350psi +
[Link] m³ 18.75 18,548.85###
external walls. 2. including shuttering, test and all additional works
L
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 3.20 15,457.38###
a
2. including shuttering, test and all additional works
b
[Link] supply and casting , fc=3000psi o
[Link] Tie column m³ 3.20 17,011.24###
2. including shuttering, test and all additional works u
[Link] supply and casting , fc=3000psi r
[Link] Tie beam m³ 5.00 16,040.07###
2. including shuttering, test and all additional works
4.1.10 5th Floor to 9th Floor - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 576.00 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 554.40 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 456.75 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Share wall m³ 126.00 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 43.13 15,457.38###
2. including shuttering, test and all additional works
fair-faced in-situ concrete [Link] supply and casting , fc=4350psi
[Link] m³ 67.50 18,548.85###
external walls. 2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 12.80 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 12.80 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie beam m³ 20.00 16,040.07###
2. including shuttering, test and all additional works
4.1.11 10th Floor to 13th Floor - - ###
[Link] supply and casting , fc=4350psi
[Link] Column m³ 373.25 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Beam m³ 443.52 16,040.07###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Slab m³ 365.40 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Share wall m³ 100.80 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=4350psi
[Link] Stair m³ 34.50 15,457.38###
2. including shuttering, test and all additional works
fair-faced in-situ concrete [Link] supply and casting , fc=4350psi
[Link] m³ 54.00 18,548.85###
external walls. 2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 12.80 15,457.38###
2. including shuttering, test and all additional works
8
.
5
%

o
n
Unit Price
No. Item Description Unit Qty.
(BDT) m
[Link] supply and casting , fc=3000psi a
[Link] Tie column m³ 12.80 17,011.24###
2. including shuttering, test and all additional works t
[Link] supply and casting , fc=3000psi +
[Link] Tie beam m³ 20.00 16,040.07###
2. including shuttering, test and all additional works
4.1.13 Roof Top - L
- ###
a
[Link] supply and casting , fc=4350psi b
[Link] Beam m³ 65.50 16,040.07###
2. including shuttering, test and all additional works o
[Link] supply and casting , fc=4350psi u
[Link] Slab m³ 73.08 15,457.38###
2. including shuttering, test and all additional works r
[Link] supply and casting , fc=4350psi
[Link] Column m³ 73.73 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Lintel m³ 12.80 15,457.38###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie column m³ 12.80 17,011.24###
2. including shuttering, test and all additional works
[Link] supply and casting , fc=3000psi
[Link] Tie beam m³ 20.00 16,040.07###
2. including shuttering, test and all additional works
Total Price ###
DPDC Shutter Cost Analysis
As per Tender BOQ Qty Shutter rental Budget= 47,247,697.00

Items Unit Qty new required Rate Appr. Amount


Shutter New sft 20,500.00 700 14,350,000.00
Plain Sheet 10
sft 8,359.98 335 2,800,593.30
SWG
3''X3'' hollow
rft 19,876.80 356 7,076,140.80
Box
1.5''X1.5'' hollow
rft 37,287.04 172 6,413,370.88
Box
Red oxide gallan 30.00 917.28 27,518.40
Fresh Leaf gallan 30.00 1332.24 39,967.20
Thinner gallan 10.00 648.648 6,486.48
Shutter
remaking sft 85,000.00 50 4,250,000.00
/Resize
Total = 34,964,077.06
s

Remarks
Details qty cal attach mail
Details qty cal attach mail

Details qty cal attach mail

Details qty cal attach mail


Details qty cal attach mail
Details qty cal attach mail
Details qty cal attach mail

Assume Per Floor 5000 sft

You might also like