A PROPOSED COMMUNITY HALL TO
BE CONSTRUCTED AT SANYANG
contact +2203504847
08/01/2024 [Link] pm
CODE SUITABILITY DESCRIPTION
STATUS PURPOSE OF ISSUE
PROJECT
Community Hall
TITLE
3D VIEW
MR MENDY
CLIENT
DRAWN BY CHECKED BY DATE
WURRY Checker 01/23/07
SCALE (@ A3) PROJECT NUMBER
Project Number
DRAWING NUMBER REV
A100
A104
1 NORTH
ELEVATION
contact +2203504847
ELEVATION
ELEVATION
EAST
08/01/2024 [Link] pm
WEST
1 A103
A103 2
CODE SUITABILITY DESCRIPTION
STATUS PURPOSE OF ISSUE
PROJECT
Community Hall
TITLE
SITE PLAN
SOUTH
2 ELEVATION
MR MENDY
CLIENT
A104
DRAWN BY CHECKED BY DATE
WURRY Checker 01/07/24
SCALE (@ A3) PROJECT NUMBER
1 : 200 Project Number
SITE PLAN
DRAWING NUMBER REV
1 1 : 200
A101
20000
A B C D E F G H
1
DN
CHANGING ROOM CHANGING ROOM
4501
MALE FEMALE
STAGE
2 DN
contact +2203504847
3060
3
08/01/2024 [Link] pm
3060
4 CODE SUITABILITY DESCRIPTION
3060
25000
HALL
STATUS PURPOSE OF ISSUE
6 DN DN
3060
PROJECT
7 DN DN Community Hall
3060
TITLE
8 FLOOR PLAN
3699
MR MENDY
STORE CLIENT
1500
DRAWN BY CHECKED BY DATE
10 WURRY Checker 01/07/24
SCALE (@ A3) PROJECT NUMBER
1500 4000 7000 2000 4000 1500
1 : 150 Project Number
DRAWING NUMBER REV
FLOOR PLAN A102
1 1 : 150
contact +2203504847
EAST ELEVATION
1 1 : 150
08/01/2024 [Link] pm
CODE SUITABILITY DESCRIPTION
STATUS PURPOSE OF ISSUE
PROJECT
Community Hall
TITLE
ELEVATIONS 1
MR MENDY
CLIENT
DRAWN BY CHECKED BY DATE
WURRY Checker 01/07/24
WEST ELEVATION
2 1 : 150
SCALE (@ A3)
1 : 150
PROJECT NUMBER
Project Number
DRAWING NUMBER REV
A103
contact +2203504847
08/01/2024 [Link] pm
NORTH ELEVATION CODE SUITABILITY DESCRIPTION
1 1 : 150
STATUS PURPOSE OF ISSUE
PROJECT
Community Hall
TITLE
ELEVATIONS 2
MR MENDY
CLIENT
DRAWN BY CHECKED BY DATE
WURRY Checker 01/07/24
SCALE (@ A3) PROJECT NUMBER
1 : 150 Project Number
SOUTH ELEVATION DRAWING NUMBER REV
2 1 : 150 A104
A B C D E F G H
1
A106
Level 1 contact +2203504847
4000
Beam
3000 08/01/2024 [Link] pm
3960
STAGE
CODE SUITABILITY DESCRIPTION
1500
FLOOR PLAN
Ground level 0
600
STATUS PURPOSE OF ISSUE
0
FOUNDATION PLAN
-750
PROJECT
Community Hall
TITLE
SECTION 1 SECTION 1
1 1 : 100
MR MENDY
CLIENT
DRAWN BY CHECKED BY DATE
WURRY Checker 01/08/24
SCALE (@ A3) PROJECT NUMBER
1 : 100 Project Number
DRAWING NUMBER REV
A105
1
A105
1 2 3 4 6 7 8 9 10
Level 1
contact +2203504847
4000
Beam
3000
08/01/2024 [Link] pm
STAGE
1500
FLOOR PLAN CODE SUITABILITY DESCRIPTION
Ground level 0
600
0
FOUNDATION PLAN STATUS PURPOSE OF ISSUE
-750
PROJECT
Community Hall
TITLE
SECTION 2
1 1 : 100 SECTION 2
MR MENDY
CLIENT
DRAWN BY CHECKED BY DATE
WURRY Checker 01/08/24
SCALE (@ A3) PROJECT NUMBER
1 : 100 Project Number
DRAWING NUMBER REV
A106
A104
1 NORTH
ELEVATION
20000
A B C D E F G H
4501
2
contact +2203504847
3060
3
08/01/2024 [Link] pm
3060
ELEVATION
ELEVATION
4 CODE SUITABILITY DESCRIPTION
EAST
WEST
3060
25000
1 A103
A103 2 STATUS PURPOSE OF ISSUE
6
3060
PROJECT
7 Community Hall
3060
TITLE
8 FOUNDATION PLAN
3699
MR MENDY
CLIENT
1500
DRAWN BY CHECKED BY DATE
10 WURRY Checker 01/08/24
SCALE (@ A3) PROJECT NUMBER
1500 4000 4500 2500 2000 4000 1500
1 : 150 Project Number
SOUTH DRAWING NUMBER REV
2 ELEVATION
A107
FOUNDATION PLAN
1 1 : 150
A104