0% found this document useful (0 votes)
84 views4 pages

MRT Line 1 Construction WBS Overview

This document outlines a work breakdown structure (WBS) for the construction of CP01 soil improvement and land development of a depot. It includes 76 main work packages organized hierarchically, such as contractual milestones, document submittals, procurement, general work, sand filling by zone and depth, horizontal drainage by zone, embankment by zone and height, slope protection by zone, and soil improvement.

Uploaded by

Shohel Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views4 pages

MRT Line 1 Construction WBS Overview

This document outlines a work breakdown structure (WBS) for the construction of CP01 soil improvement and land development of a depot. It includes 76 main work packages organized hierarchically, such as contractual milestones, document submittals, procurement, general work, sand filling by zone and depth, horizontal drainage by zone, embankment by zone and height, slope protection by zone, and soil improvement.

Uploaded by

Shohel Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

WBS ID WBS Short Name Parent WBS

1 MRT-Line-1CP01
2A 1
3B 1
4 1 3
5 2 3
6 3 3
9C 1
10 1 9
11 1 10
12 2 10
13 1 9
14 D 1
15 1 14
16 2 14
17 E 1
18 1 17
19 1 18
20 2 18
21 3 18
22 4 18
23 5 18
24 6 18
25 1 17
26 1 25
27 2 25
28 3 25
29 4 25
30 5 25
31 6 25
32 1 17
33 1 32
34 2 32
35 3 32
36 4 32
37 5 32
38 6 32
39 1 17
40 1 39
41 2 39
42 3 39
43 4 39
44 5 39
45 6 39
46 1 17
47 1 46
48 2 46
49 3 46
50 4 46
51 5 46
52 6 46
53 1 17
54 1 53
55 2 53
56 3 53
57 4 53
58 1 17
59 1 58
60 2 58
61 3 58
62 4 58
63 1 17
64 1 63
65 2 63
66 3 63
67 4 63
68 1 17
69 1 68
70 2 68
71 3 68
72 4 68
73 5 68
74 6 68
75 F 1
76 75
77
78
79
80
81
WBS
Construction of CP01: Soil Improvement & Land Development of Depot
Contractual Milestones
Document Submittals and Approval
Permit and Approval
Shop Drawings Submittals and Approval
Method Statement Submission and Approval
Procurement and Equipment Mobilization Status
Procurement Status
Local Materials
Imported Materials
Equipment Mobilization Status
General Work
Temporay Work
Temporary Facilitics
Sand Filling Work
Sand Filling Work Upto 3.5 m
Zone-1
Zone-2
Zone-3
Zone-4
Zone-5
Zone-6
Sand Filling Work Upto 4.5 m
Zone-1
Zone-2
Zone-3
Zone-4
Zone-5
Zone-6
Sand Filling Work Upto 5.5 m
Zone-1
Zone-2
Zone-3
Zone-4
Zone-5
Zone-6
Sand Mat (+6m)
Zone-1
Zone-2
Zone-3
Zone-4
Zone-5
Zone-6
Horizontal Drainage
Zone-1
Zone-2
Zone-3
Zone-4
Zone-5
Zone-6
Embankment upto 7 m
Zone-1
Zone-2
Zone-3
Zone-4
Embankment upto 8 m
Zone-1
Zone-2
Zone-3
Zone-4
Embankment upto 8.5 m
Zone-1
Zone-2
Zone-3
Zone-4
Slope Protection
Zone-1
Zone-2
Zone-3
Zone-4
Zone-5
Zone-6
Soil Improvement
Static