Cargo Operations Records MAR002
Cargo Operations Records MAR002
/ NISM
11 Forms
M O L MAR002 - Cargo Operations Records
Start up
Vessel information
Date
Vessel Name LNG MEGREZ Port Zeebrugge, Belgium
(dd/mm/yyyy)
Fluxys Zeebrugge
Voy No. 2204182 Berth Name Berth Side
LNG Terminal
CAPT. RAJITHRAJ LAMBA
Cargo No. Y-L-2022-182 Master Chief Officer
N SARANJEET
ARTIC INDIGO
Flag HONG KONG Vessel Type LNG Vessel Owner
LNG SHIPPING
Gross
IMO Number 9834325 Call Sign VRSQ9 114790
Tonnage
Arrival Date
Agent Name
(dd/mm/yyyy)
Last Port SABETTA Last country RF
Cargo information
Cargo onboard- Cargo Qty at
Opening CTMS Rate Down
Ballast onboard
(m3)- (Start of Ballast Qty at
operations) Rate Down
Mooring information
Mooring pattern Mooring Allowable
Fwd. 2+3+2+2 pattern Aft 2+3+2+2 tension range
(E.g. 2+2+2+2) (E.g. 2+2+2+2) (E.g. 5-40 T)
Alarm setting
(Tension Monitor)
(E.g 12-35 T)
- 0 0
Float Gauge Alarm
Category . Eg. High-High, - Tank 3 Tank 3
(in m)
(in m)
High, Low
- 0 0
EH Tank 4 Tank 4
Independent Spot Sensor
(write the nomenclature) . H 0 0
Eg. High, High-High, Very
Eg. High, High-High, Very
High or High, Very High, Tank 5 Tank 5
Extreme High -
0 0
P/S Tank
S FORE
P FORE
S 1
P 1
S 2
P 2
S 3
P 3
S 4
P 4
S AFT
Name all the Ballast Tanks
P AFT
C APK
File
Rev
Date
Rel By
LAMBA
SARANJEET
RTIC INDIGO
NG SHIPPING
MOL LNG Transport Co. Ltd. / NISM File 7.0
11 Forms
M O L MAR002 - Cargo Operations Records
Rev
Date
06
17.01.22
Instructions Rel By Akihiro Yamauchi
Instructions
1 For Further information on completing this form see SMS 05-02-00
2 This colour shows a field for data entry in the form Calculated / linked field.
3 Date shall be in this format- Date (dd/mm/yyyy) - TIME shall be in format hh:mm
4 All specific data must be filled in the 1st sheet (start up) before using any forms in MAR002.
5 Please use the appropriate Operations / Tank type where applicable and the relevant data. Mark N/A if required.
6 Some of the information may not be specific to the tank type and shall be left blank or mark N/A.
7 During the Port Stay, all applicable hourly record must be made and compared.
8 A complete record during the voyage must be made into the respective form.
9 Where applicable, snapshots / log printouts shall be taken (soft or hard copy).
10 All Cargo / Ballast quantity shall be entered in the m3.
11 Mention the unit of the pressure as applicable.
12 Use Tank Cooldown at Sea Form for extended cooldown in Port also.
Users are encouraged to use the Electronic copy as much as possible. Where applicable, print layout is set for 24
13
hours of the monitoring sheet only.
14 Subsequent Hourly Time will be auto filled once the minimum data is entered.
15 Frequency / report / retention – refer to SMS 03-03-03.
General information
Vessel Fluxys Zeebrugge LNG
LNG MEGREZ Port Zeebrugge, Belgium Berth
Name Terminal
LAMBA SARANJEET
Cargo No. Y-L-2022-182 Master CAPT. RAJITHRAJ N Chief Officer
SINGH
1. Arrival (as applicable) Date (dd/mm/yyyy)
From To From To
ATR / Equator
NOR Tendered /
SBE / EOSP Temperature at
Received NOR
Anchor - Let go ~
Vessel's Line Cooldown Tank 1
Aweigh
Passed Breakwater /
Bay pilotage Tank 2
Buoy
Harbour pilotage Escort Boat Tank 3
Pratique Granted Tugs Alongside Tank 4
Mooring - First Line / All
Finished With Engines Tank 5
Fast
Steam Off / Turning Gear
Gangway Connected
Engaged
Remarks
Signature (Ship's representative) Signature (Shore representative) Signature (Buyer's representative)
MOL LNG Transport Co. Ltd. / NISM File 7.0
11 Forms Rev 06
M O L MAR002 - Cargo Operations Records Date 17.01.22
Line Cooldown Rel By A kihiro Yamauchi
General information
Vessel Name LNG MEGREZ Voy No. 2204182 Date (dd/mm/yyyy)
Port Zeebrugge, Belgium Berth Fluxys Zeebrugge LNG Berth Side
Manifold in Use Master CAPT. RAJITHRAJ N Chief Officer LAMBA SARANJEET SINGH
Units of Pressures Tank KPA Pump KPA Line KPA Manifold BAR
Ship's Line cooldown (Before arriving in port).
Time Tank 1 Tank 2 Tank 3 Tank 4 Tank 5 Cargo Vol.
Level Volume Level Volume Level Volume Level Volume Level Volume (m3)
Start
Level Volume Level Volume Level Volume Level Volume Level Volume
Finish
HOURS 1 2 3 4 5 6 7 8 9 10 11
Time of Readings (Every 15 minutes)
Current (Amps)
Mention
Spray Dis. Press.
P/P No.
P/P Pump Load
Disch V/V opening %
No. 3 Tank Pressure
Gas Flow to E/R (Kg/Hr)
RPM
Forward
Press
Liquid X-Over Aft
Condition Forward
Temp
Aft
Press.
Liquid Header
Forward
Condition Temp
Aft
Current (Amps)
Mention
Spray Dis. Press.
P/P No.
P/P Pump Load
Disch V/V opening %
Current (Amps)
Mention
Spray Dis. Press.
P/P No.
P/P Pump Load
Disch V/V opening %
Vessel's Tank Pressure
Forward
Press
Liquid X-Over Aft
Condition Forward
Temp
Aft
Press.
Liquid Header
Forward
Condition Temp
Aft
Manifold No.
Cooldown v/v No.
Opening Ration No.
(Turns) No.
No.
Frosting
No.
Condition of
No.
Shore Arm (%)
No.
MOL LNG Transport Co. Ltd. / NISM File 7.0
11 Forms Rev 06
M O L MAR002 - Cargo Operations Records Date 17.01.22
Hourly Cargo Monitoring Rel By A kihiro Y amauchi
General information
Zeebrugge, Date
Vessel Name LNG MEGREZ Port
Belgium (dd/mm/yyyy)
Fluxys
Voy No. 2204182 Berth Name Berth Side
Zeebrugge LNG
CAPT. LAMBA SARANJEET
Cargo No. Y-L-2022-182 Master Chief Officer
RAJITHRAJ N SINGH
Units of
Manifold BAR Tank KPA Shore Tank / Vapour KPA Pump KPA Hyd. Unit KPA
Pressures
Hours 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Times at reading
(hh:mm)
Cargo onboard- Opening CTMS (m3) Qty at Rate Down (m3)
Tank 1
Tank 2
Cargo Volume
Tank 3
(m3)
Tank 4
Tank 5
Quantity Onboard
Cargo Transfer Rate N/A
Pressure
Cargo Port
Amps
P/P
Pressure
(Tank 1) Stbd
Amps
Pressure
Cargo Port
Amps
P/P
Pressure
(Tank 2) Stbd
Amps
Pressure
Cargo Port
Amps
P/P
Pressure
(Tank 3) Stbd
Amps
Pressure
Cargo Port
Amps
P/P
Pressure
(Tank 4) Stbd
Amps
Pressure
Cargo Port
Amps
P/P
Pressure
(Tank 5) Stbd
Amps
Tank Pressure
Tank /
Vapor Temperature
Hold /
Hold Pressure
Spray Line
Spray Line Pressure
1
2
Manifold Vapour
Pressure 3
4
Shore
Hours 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Times at reading
Forward
Press
Aft
X-Over Condition
Forward
Temp
Aft
Level
Hydraulic Pump
Pressure
Unit
Temperature (*C)
Amps
P/P No.2 Start
Pressure
applicable / running
Delivery
Amps
P/P No.3 Start
Pressure
Delivery
Amps
P/P No.4 Start
Pressure
Delivery
Amps
P/P No.5 Start
Pressure
Delivery
Amps
General information
Vessel Name LNG MEGREZ Voy No. 2204182 Date (dd/mm/yyyy)
Port Zeebrugge, Berth Fluxys Zeebrugge LGHSE
Mooring pattern Fwd. 2+3+2+2 Mooring pattern Aft 2+3+2+2 Allowable tension range:
CAPT. LAMBA SARANJEET
Alarm setting (Upp/Lower) Master Chief Officer
RAJITHRAJ N SINGH
(hh:mm)
Hours 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time
Mooring
Dolphin No
1
2
3
4
5
Mooring L i n e T e n s i o n (in Tonnes)
6
FWD
7
8
9
10
11
12
12
11
10
9
8
7
AFT
6
5
4
3
2
1
MOL LNG Transport Co. Ltd. / NISM File 7.0
11 Forms Rev 06
M O L MAR002 - Cargo Operations Records Date 17.01.22
Periodical Physical Checks Rel By Akihiro Yamauchi
General information
Date
Vessel Name LNG MEGREZ Port Zeebrugge, Belgium
(dd/mm/yyyy)
Fluxys Zeebrugge LNG
Voy No. 2204182 Berth Name Berth Side
Terminal
LAMBA SARANJEET
Cargo No. Y-L-2022-182 Master CAPT. RAJITHRAJ N Chief Officer
SINGH
HOURS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time of Readings
(hh:mm)
Vapor Arm
Angle
Manifold
Both side
Manifold
Offshore N2
pressure (if
applicable)
Hourly Condition / Status
Gangway /
Shore ladder
Dome Top /
Trunk Deck
Deck
Fwd Mooring
Station
Aft Mooring
Station
Sea
condition
Wind Dir.
CCR
Wind Speed
(Kts.)
Periodical Checks
25% 50% 75% About 75% Cargo About50% Cargo About 25% Cargo
Full Rate
Gauge Comparison
1
Manifold 1S
Differential 2P
2
Pressure 2S
(During 3P
3
Ramp-Up) 3S
4P
4
4S
5P
5S
MOL LNG Transport Co. Ltd. / NISM File 7.0
11 Forms Rev 06
M O L MAR002 - Cargo Operations Records Date 17.01.22
Hourly Ballast Monitoring Rel By Akihiro Y amauchi
General information
Vessel Name LNG MEGREZ Port Zeebrugge, Belgium Date (dd/mm/yyyy)
Voy No. 2204182 Berth Name Fluxys Zeebrugge LNG Berth Side
LAMBA SARANJEET
Cargo No. Y-L-2022-182 Master CAPT. RAJITHRAJ N Chief Officer
SINGH
Start Stop Remarks (If any)
Date Time Date Time
1
Ballast
2
P/P
3
Ballast Ops
(hh:mm)
HOURS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time of Readings
(hh:mm)
Pressure
Amps
Ballast Disch v/v opening
P/P 1 (%)
Suc. v/v press
(KPa)
Pressure
Amps
Ballast Disch v/v opening
P/P 2 (%)
Suc. v/v press
(KPa)
Pressure
Amps
Ballast Disch v/v opening
P/P 3 (%)
Suc. v/v press
(KPa)
Time of Readings
(hh:mm)
P/S Tank
S FORE
P FORE
S 1
P 1
S 2
P 2
S 3
P 3
S 4
P 4
S AFT
P AFT
C APK
Volume (m3)
0
Ballast Volume (m3) 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Ballast onboard
Draft (F)
Draft (A)
GoM (m)
Stability SF Actual
(%) Planned
BM Actual
(%) Planned
Ballast Tank Gauge Comparison (at least once during the ballast/deballast operation)
Time of Readings
Diff. Diff. Diff. Diff. Diff.
Gauge Reading (as applicable) Local CCR Local CCR Local CCR Local CCR Local CCR
P/S Tank
S FORE
P FORE
S 1
P 1
S 2
P 2
S 3
P 3
S 4
Ballast Tank Level Gauge Comparison
P 4
S AFT
P AFT
C APK
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
MOL LNG Transport Co. Ltd. / NISM File 7.0
11 Forms Rev 06
M O L MAR002 - Cargo Operations Records Date 17.01.22
Float Gauge Comparision Rel By Akihiro Yamauchi
General information
Vessel Date
LNG MEGREZ Port
Name (dd/mm/yyyy)
Berth
Voy No. 2204182 Berth Side
Name
Cargo
Y-L-2022-182 Master Chief Officer LAMBA SARANJEET SINGH
No.
Level comparison shall be taken not more than 4 hours of the interval during the full rate.
Before After Rate
Time of Readings Full Rate Secured
Lowering Lowering Down
General information
Vessel Date
LNG MEGREZ Port Zeebrugge, Belgium
Name (dd/mm/yyyy)
Voy No. 2204182 Berth Name Fluxys Zeebrugge LNG Terminal Berth Side
Cargo
Y-L-2022-182 Master CAPT. RAJITHRAJ N Chief Officer LAMBA SARANJEET SINGH
No.
General information
Vessel Date
LNG MEGREZ Port Zeebrugge, Belgium
Name (dd/mm/yyyy)
Voy No. 2204182 Master CAPT. RAJITHRAJ N Chief Officer LAMBA SARANJEET SINGH
CTMS Alarm Record (in port write the level at which alarm occurs)
Alarm Category No.1 Tank No.2 Tank No.3 Tank No.4 Tank No.5 Tank
LL
System 1 LL
-
System 2 LL
(as LL
applicable) -
Float Level Gauge Alarm Test (in port write the level at which alarm occurs)
Alarm Category No.1 Tank No.2 Tank No.3 Tank No.4 Tank No.5 Tank
-
-
-
General information
Vessel Date
LNG MEGREZ Voy No. 2204182
Name (dd/mm/yyyy)
Cargo No. Y-L-2022-182 Master CAPT. RAJITHRAJ N Chief Officer LAMBA SARANJEET SINGH
Level Volume Level Volume Level Volume Level Volume Level Volume
Finish
Press. Press.
Total /
Difference
Rate (℃/H)
Tank Tank Tank Tank Tank Tank Tank Tank Tank Tank Tank Tank Tank Tank Tank
Finish
Total /
Difference
Rate (℃/H)
Hourly recording during the Tank Cooldown at Sea / Extended Cooldown in Port
HOURS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time of Readings
(hh:mm)
Current
Spray P/P
Dis. Press.
Vap. T3 temp.
Membrane
Tank ONLY
Av. Vap. Temp
1 Carry out valve checks at least one day before arrival to allow sufficient time to rectify any defects found.
Design time should be confirmed as per maker guidance. The acceptable range of valve operation time
2
will be set ±10% of design of operation time or 2 seconds whichever is greater
3 If valve operation time is out of acceptable range, the valve shall be adjusted.
General information
Vessel Date
LNG MEGREZ Port Zeebrugge, Belgium
Name (dd/mm/yyyy)
LAMBA SARANJEET
Voy No. 2204182 Master CAPT. RAJITHRAJ N Chief Officer
SINGH
(Good / Not good / Not
Pneumatic
Pneumatic (Port)
(Starboard)
Electrical (Port) Electrical (Starboard)
Fusible Plug (actual or
Low Hydraulic Press.
Switchboard Signal)
ESD valves in liquid piping should fully close under all service
Manifold Side (Port or Stbd)
conditions within 30 seconds
Manifold Valve Time in Sec. Manifold Valve Time in Sec.
Valve Closing
Activating Point (Pass / Fail / No test) Activating Point (Pass / Fail / No test)
Manifold (Port) Manifold (Stbd)
Not good / Not tested)
EH H -
No 1 Cargo Tank
No 2 Cargo Tank
System 1
No 3 Cargo Tank
Independent Spot Sensor
(Pass / Fail / No test)
No 4 Cargo Tank
No 5 Cargo Tank
Independent Spot Sensor
(Pass / Fail / No test) EH H -
No 1 Cargo Tank
No 2 Cargo Tank
System 2
No 3 Cargo Tank
No 4 Cargo Tank
No 5 Cargo Tank
Additional Instructions
1 Carry out valve checks at least one day before arrival to allow sufficient time to rectify any defects found.
Design time should be confirmed as per maker guidance. The acceptable range of valve operation time will be set
2
±10% of design of operation time or 2 seconds whichever is greater
3 If valve operation time is out of acceptable range, the valve shall be adjusted.
General information
Vessel Date
LNG MEGREZ Port Zeebrugge, Belgium
Name (dd/mm/yyyy)
LAMBA SARANJEET
Voy No. 2204182 Master CAPT. RAJITHRAJ N Chief Officer
SINGH
No 2 P/P Disch - - - - - - 1
Spray Master - - - - - - 1
Spray Return - - - - - - 1
Spray Line Spray Nozzle 1 - - - - - - 1
Spray Nozzle 2 - - - - - - 1
Spray Nozzle 3 - - - - - - 1
1
Fuel Gas
Additional Instructions
1 Carry out valve checks at least one day before arrival to allow sufficient time to rectify any defects found.
2 Check ballast tank and pipeline condition to avoid water hammering and related damage.
Design time should be confirmed as per maker guidance. The acceptable range of valve operation time will be set
3
±10% of design of operation time or 2 seconds whichever is greater
4 If valve operation time is out of acceptable range, the valve shall be adjusted.
General information
Vessel Date
LNG MEGREZ Port Zeebrugge, Belgium
Name (dd/mm/yyyy)
Voy No. 2204182 Master CAPT. RAJITHRAJ N Chief Officer LAMBA SARANJEET SINGH
* Entries code in the Ballast Water Record Book as per IMO Ballast Water Management Convention
3.1 When Ballast water is taken on board
3.2 Whenever Ballast Water is circulated or treated for Ballast Water Management purposes
3.3 When Ballast Water is discharged into the sea
3.4 When Ballast Water is discharged to a reception facility
3.5 Accidental or other exceptional uptake or discharge of ballast
1) Ballasting with BWTS : Apply 3.1 + 3.2 (Ballasting without BWTS : Apply 3.1 only)
2) De-ballasting with BWTS : Apply 3.3 + 3.2 (De-ballasting into the sea without BWTS : Apply 3.3 only)
Mention Ballast Water Management OperationTreatment system used. E.g. Ozone treatment operation
(Ballasting) / Neutralization operation (De-ballasting)
Tanks / Holds BW Source (Before operation) After Ballast Water Management Operation
(List Multiple
Sources Entry Code Remarks
/ Tanks Date Port Or Volume Date Port Or Volume
(from the
Separately) dd/mm/yyyy Lat. Long (Units) dd/mm/yyyy Lat. Long (Units)
above list)
Ballast Water Tank Codes: - Forepeak = FP, Aft Peak = AA, Double Bottom = DB, Wing Tank = WT, Centre Tank = CT, Topside Tank = TS, Cargo Hold = CH, O=Other
Title
Responsible officer‘s name Signature
(printed)