0% found this document useful (0 votes)
212 views1 page

Engineering Design Calculations

The document provides design parameters for a cantilever soldier pile system including pile size and spacing, soil properties, surcharge loads, and calculations for active and passive soil pressures, shear forces, bending moments, and the required pile section modulus. An iterative process is used to determine the depth of pile embedment below grade, points of zero shear and inflection, and equivalent soil pressures on the pile to achieve equilibrium of forces and zero moment at the bottom of the pile.

Uploaded by

SAEED Negar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
212 views1 page

Engineering Design Calculations

The document provides design parameters for a cantilever soldier pile system including pile size and spacing, soil properties, surcharge loads, and calculations for active and passive soil pressures, shear forces, bending moments, and the required pile section modulus. An iterative process is used to determine the depth of pile embedment below grade, points of zero shear and inflection, and equivalent soil pressures on the pile to achieve equilibrium of forces and zero moment at the bottom of the pile.

Uploaded by

SAEED Negar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Cantilever Soldier Pile Design

Pile Size 1.33 ft


Pile Spacing 7.00 ft
Exposed Height of Excavation H 11.20 ft
Pile Embedment Below Grade D 18.20 ft
Embedment Safety Factor D = 1.3*D 23.66 ft Load Factor
Active Pressure Coefficient Ka 0.54 0.40 1.35
Passive Pressure Coefficient Kp 4.52 3.01 1.50
Soil Weight γ 172.50 pcf 115.00 1.50
Soil Internal Friction Angle φ 30.00
Surcharge 337.50 psf 250.00 1.35
Arching Adjustment Factor 0.08
Arching Adjustment Factor for Design farch 2.400 MIN(3,0.08*φ)
Soldier Pile Spacing Factor f 0.457 MIN(1, farch*Pile size/Pile spacing)

Active Soil Pressure on Lagging Pa1 1043.28 psf H*Ka*γ


Active Soil Pressure on Pile at Bottom of Grade Pa'1 476.93 psf f*γ*H*Ka
Active Soil Pressure on Pile at Bottom of Pile Pa2 1251.94 psf f*γ*D*Ka+Pa'1
Net Soil Pressure at bottom of Pile due to Passive
Pressure below bottom of grade Pe 5227.99 psf f*γ*D*(Kp-Ka)-Pa'1
Net Soil Pressure at bottom of Pile due to Passive
Pressure below top of grade Pj 9692.57 psf f*γ*D*(Kp-Ka)+f*γ*H*Kp
Active Surcharge Pressure Pq 182.25 psf Ka*Surcharge

Distance from bottom of pile to point where


passive pressure below below bottom grade turns
to active pressure (inflection point in soil
pressure diagram); Z 4.88 ft ((Pe-Pa'1)*D-H*Pa1-H*Pq)/(Pe+Pj)

Sum of the horizontal forces F 1020.60 plf H*Pa1/2+Pq*H+(Pa'1+Pa2)*D/2+(Pe+Pj)*Z/2-(Pe+Pa2)*D/2

Sum of Moments about bottom of pile should be Adjust "D" 2+C5)+C17*C5*C5/2+(C18-


equal to Zero. “Increase embedment, D, by 20-40 to achieve C17)*(C5/2)*(C5/3)+(((C19+C20)*C2
percent unless a FS=1.5 or 1.75 has been used on "0" 3)/2)*(C23/3)-
passive pressure”. Use 30%. Moment -128.97 lbs moment. 173.43 (((C19+C18)*C5)/2)*(C5/3)

Locate Point of zero shear; Distance from bottom


grade to point where net pressure turns from
active to passive pressure (inflection point A in
pressure diagram) Y 1.52 ft Pa'1/(f*γ*(Kp-Ka)) 4.12
Surcharge pressure at A Pq' 83.31 psf f*Pq
Shear due to surchage at A due to surcharge
pressure above point A Fqa 2167.96 plf H*Pq+Y*Pq'
Total Shear at A Vtotal 8373.16 plf H*Pa1/2+Pa'1*Y/2+Fqa

Soil pressure on pile a1 156.73 pcf f*γ*(Kp-Ka)/2


Surcharge pressure on pile b1 -83.31 pcf -1*Pq'
Total shear must equal c1 c1 -8373.16 pcf -1*Vtotal

Determinate dt 5256192.8 b1^2-4*a1*c1


Add determinate xp 7.58 (-1*b1+dt^0.5)/(2*a1)
Subtract determinate xn -7.05 (-1*b1-dt^0.5)/(2*a1)
Distance to equivalent amount of shear X 7.58 MAX(xp,xn)
Check Vcheck 9636.17 a1*X^2-b1*X
This should equal Vtotal (+-) Vtotal 8373.16 Vtotal

Moment due to soil pressure above A Msoila 78103.09ft*lbs (H*Pa1/2*(H/3+X+Y)+Pa'1*Y/2*(2/3*Y+X))*1


Moment due to soil pressure between A and B Msoilb 22751.29ft*lbs (f*γ*(Kp-Ka)*X*(X/2)*(X/3))*1
Moment due to surcharge above excavation Mqh 30008.38ft*lbs (Pq*H*(H/2+Y+X))*1
Moment due to surcharge below excavation Mqd 7548.29ft*lbs (Pq*(X+Y)*(X+Y)/2)*1
Total Moment Mtotb 650359.3ft*lbs H*(Msoila-Msoilb+Mqh+Mqd)
3
Pile Section Modulus Required (Fb = 0.9*Fy) Sx 173.43 in Mtotb*12/(50*1000*0.9)

You might also like