Standard Rates For Billing of Civil Works

1. The document provides standard rates for billing of various civil works structures for MPPTCL substations at voltages of 33KV, 132KV, 220KV and 400KV. 2. The rates are as per the MPPWD SOR dated December 1st, 2020 and applicable NSOR items, for structures like foundations, buildings, trenches, fencing etc. listed in the document. 3. Excavation, filling, backfilling costs are to be paid separately as per actual work done based on the MPPWD SOR, and the listed rates exclude these costs.

Uploaded by

N. R. Bharti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
687 views7 pages

Standard Rates For Billing of Civil Works

1. The document provides standard rates for billing of various civil works structures for MPPTCL substations at voltages of 33KV, 132KV, 220KV and 400KV. 2. The rates are as per the MPPWD SOR dated December 1st, 2020 and applicable NSOR items, for structures like foundations, buildings, trenches, fencing etc. listed in the document. 3. Excavation, filling, backfilling costs are to be paid separately as per actual work done based on the MPPWD SOR, and the listed rates exclude these costs.

Uploaded by

N. R. Bharti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Modified as on 1st Sept 2022

STANDARD RATES FOR BILLING OF CIVIL WORKS

Base SOR:- MPPWD SOR, for Building work and Electrical work w.e.f. 01.12.2020 with its amendment up to amendment No.2 and applicable NSOR items.

Rates as per MPPWD SOR for various civil Structures i.e. Structure foundations, Control Room Buildings, Cable trenches, Fencing work etc. as listed below for 400 KV/220
KV/132 KV substations of MPPTCL against the name of structure in column No. 7 are as per Standard Measurement Book (volume-I & volume-II) and in accordance with
the drawings mentioned in the SMB's. The rates mentioned in column No. 7 are excluding cost of excavation, filling, back filling and as mentioned in remark column,
which shall be payble separately as per actual work done on the basis of MPPWD SOR w.e.f. 01.12.2020 and applicable NSOR items.

Reference of SMB Pg
Rate
No.
as per MP PWD SOR
w.e.f. 01.12.2020 for
[Link]. SOR No. Service Master No Particulars of Civil Structure Unit Reamrks
Buildings work &
Electrical works and
applicable NSOR items

1' 2' 3' 4' 5' 6' 7' 8'

Volume-I
1 33 KV Structure Foundations Vol-I/P-1 to 18
(i) 123 NSOR 4000225 33 KV Gantry (1 GO3) Vol-I / P-1 1 No. 36039.80
(ii) 124 NSOR 4000226 33 KV Main Bus (1 BO4) Vol-I / P-3 1 No. 73003.58
(iii) 125 NSOR 4000227 33 KV Auxilary Bus (1BO5) Vol-I/P-5 1 No. 49126.20
(iv) 126 NSOR 4000228 33 KV Isolator (1DO3) Vol-I/P-7 1 No. 10016.73
(v) 127 NSOR 4000229 33 KV CT/PT/LA/PI Vol-I/P-9 1 No. 3786.50
(vi) 128 NSOR 4000230 33 KV CB Vol-I/P-11 1 No. 12693.05
(vii) 129 NSOR 4000231 33 KV, 36 KV/12MVAR Capacitor Bank Vol-I/P-13 1 No. 58293.34
(viii) 130 NSOR 4000232 33 KV NCT Vol-I/P-15 1 No. 3771.79
(ix) 131 NSOR 4000233 33 KV Special PI Vol-I/P-17 1 No. 10173.92
2 132 KV Structure Foundations Vol-I/P-19 to 38
(i) 132 NSOR 4000234 132 KV Main Bus (3B04) Vol-I/P-19 1 No. 37474.44
(ii) 133 NSOR 4000235 132 KV Gantry (3GO2) Vol-I/P-21 1 No. 73659.53
(iii) 134 NSOR 4000236 132 KV Auxilary Bus (3BO3) Vol-I/P-23 1 No. 47746.56
(iv) 135 NSOR 4000237 132 KV PT (3VO4) Vol-I/P-25 1 No. 8363.69
(v) 136 NSOR 4000238 132 KV C.C (3KO2) Vol-I/P-27 1 No. 8063.20
(vi) 137 NSOR 4000239 132 KV Isolator (3DO2) & (3DO5) Vol-I/P-29 1 No. 15592.51
(vii) 138 NSOR 4000240 132 KV PI (3PO2) & 132 KV CT (3 CO5) (For non BC soil) Vol-I/P-31 1 No. 3140.53

--198--

SMB (Gist)
Modified as on 1st Sept 2022

Reference of SMB Pg
Rate
No.
as per MP PWD SOR
w.e.f. 01.12.2020 for
[Link]. SOR No. Service Master No Particulars of Civil Structure Unit Reamrks
Buildings work &
Electrical works and
applicable NSOR items

1' 2' 3' 4' 5' 6' 7' 8'


(viii) 139 NSOR 4000241 132 KV PI (3 PO2) & 132 KV CT (3 CO5) (for BC Soil) 1 No Vol-I/P-33 1 No. 3881.04
Foundation only
(ix) 140 NSOR 4000242 132 KV LA (3 LO4) 1 No Foundation only Vol-I/P-35 1 No. 3863.49
(x) 141 NSOR 4000243 132 KV CB (Circuit Breaqker) Vol-I/P-37 1 No. 23699.77
3 220 KV Structure Foundation Vol-I/P-39 to 58
(i) 142 NSOR 4000244 220 KV Auixlary Bus (ABA) Vol-I/P-39 1 No. 46213.66
(ii) 143 NSOR 4000245 220 KV Gantry (AGT) Vol-I/P-41 1 No. 58532.80
(iii) 144 NSOR 4000246 220 KV Main Bus (ABM) Vol-I/P-43 1 No. 38348.09
(iv) 145 NSOR 4000247 220 KV Gantry (AAGT) Vol-I/P-45 1 No. 62942.31
(v) 146 NSOR 4000248 220 KV Post Insulator (API) Vol-I/P-47 1 No. 11811.09
(vi) 147 NSOR 4000249 220 KV Isolator Vol-I/P-49 1 No. 36556.93
(vii) 148 NSOR 4000250 220 KV Lighting Arrestor (ALA) Vol-I/P-51 1 No. 4588.47
(viii) 149 NSOR 4000251 220 KV Coupling Capacitor (ACC) Vol-I/P-53 1 No. 10348.08
(ix) 150 NSOR 4000252 220 KV ACT/APT/CVT Vol-I/P-55 1 No. 9669.35
(x) 151 NSOR 4000253 220 KV Circuit Breaker (CB) Vol-I/P-57 1 No. 38144.30
4 400 KV Structure Foundation Vol-I/P-59 to 87 1 No.
(i) 152 NSOR 4000254 400 KV F.B.C -1 Vol-I/P-59 1 No. 261031.55
(ii) 153 NSOR 4000255 400 KV F.B.C -2 Vol-I/P-61 1 No. 160460.08
(iii) 154 NSOR 4000256 400 KV F.T.C Vol-I/P-63 1 No. 128472.86
(iv) 155 NSOR 4000257 400 KV F.G.C-1 Vol-I/P-65 1 No. 539943.41
(v) 156 NSOR 4000258 400 KV F.G.C.-2 Vol-I/P-67 1 No. 550367.78
(vi) 157 NSOR 4000259 400 KV CVT Vol-I/P-70 1 No. 26391.83
(vii) 158 NSOR 4000260 400 KV Centre Break Isolator Vol-I/P-72 1 No. 190109.37
(viii) 159 NSOR 4000261 400 KV CT Vol-I/P-74 1 No. 20166.23
(ix) 160 NSOR 4000262 400 KV CB CGL Make (For Black Cotton Soil) Vol-I/P-76 1 No. 124765.87
(x) 161 NSOR 4000263 400 KV CB CGL Make (For Other than Black Cotton Soil) Vol-I/P-78 1 No. 119871.06
(xi) 162 NSOR 4000264 400 KV LA (OBLUM and SHREEM make) Vol-I/P-80 1 No. 26657.70
(xi) 163 NSOR 4000265 400 KV PI (JAISHREE ) Vol-I/P-82 1 No. 14408.13
(xii) 164 NSOR 4000266 400 KV PI (JAISHREE and SHREEM make) Vol-I/P-84 1 No. 14372.42
(xiii) 165 NSOR 4000267 400 KV Pentograph Isolator Vol-I/P-86 1No. 48315.70
--199--

SMB (Gist)
Modified as on 1st Sept 2022

Reference of SMB Pg
Rate
No.
as per MP PWD SOR
w.e.f. 01.12.2020 for
[Link]. SOR No. Service Master No Particulars of Civil Structure Unit Reamrks
Buildings work &
Electrical works and
applicable NSOR items

1' 2' 3' 4' 5' 6' 7' 8'


5 132 KV Control Room Building, Type -V(A) Vol-I/P-88 to 147
(i) 166 NSOR 4000268 Stage-I- Complete structural work upto Plinth Beam Level Vol-I/P-88 to 93 1 job 756722.45

(ii) 167 NSOR 4000269 Stage-II-Complete structural work above Plinth Beam Level to Vol-I/P-101 to 110 1 job 1688248.79
slab cast level
(iii) 168 NSOR 4000270 Stage-III-Complete plaster (external and internal ), Sanitary Vol-I/P-118 to 134 1 job 1070295.31 Also excluding external and
fittings (excluding Sewage system), water supply fitting only, internal sanitary and water
Rain water pipe, Grills, Shutters, flooring, doors and windows supply pipe line work
work etc. all complete.
(iv) 169 NSOR 4000271 Stage-IV-Complete Electrification works i/c all Electrical Vol-I/P-135 to 139 1 job 128040.00
Fixtures.
(v) 170 NSOR 4000272 Stage-V-Complete Putty and Painting Vol-I/P-140 to 147 1 job 226895.80

Grand Total of 132 KV Control Room Building, Type -V(A) 3870202.35

6 220 KV Control Room Building, Type -II Vol-I/P-148 to 230


(i) 171 NSOR 4000273 Stage-I- Complete structural work upto Plinth Beam Level Vol-I/P-148 to 153 1 job 828409.25

(ii) 172 NSOR 4000274 Stage-II-Complete structural work above Plinth Beam Level to Vol-I/P-166 to 178 1 job 2334962.98
slab cast level
(iii) 173 NSOR 4000275 Stage-III-Complete plaster (external and internal ), Sanitary Vol-I/P-191 to 212 1 job 1575505.33
fittings (excluding Sewage system), water supply fitting only, Also excluding external and
Rain water pipe, Grills, Shutters, flooring, doors and windows internal sanitary and water
work etc. all complete. supply pipe line work

(iv) 174 NSOR 4000276 Stage-IV-Complete Electrification works i/c all Electrical Vol-I/P-213 to 217 1 job 178438.00
Fixtures.
(v) 175 NSOR 4000277 Stage-V-Complete Putty and Painting Vol-I/P-218 to 230 1 job 314911.45
--200--

SMB (Gist)
Modified as on 1st Sept 2022

Reference of SMB Pg
Rate
No.
as per MP PWD SOR
w.e.f. 01.12.2020 for
[Link]. SOR No. Service Master No Particulars of Civil Structure Unit Reamrks
Buildings work &
Electrical works and
applicable NSOR items

1' 2' 3' 4' 5' 6' 7' 8'


Grand Total of 220 KV Control Room Building, Type -II 5232227.01
7 400 KV Control Room Building, S-Type Vol-I/P-231 to 355
(i) 176 NSOR 4000278 Stage-I-Complete structural work upto Plinth Beam Level Vol-I/P-231 to 236 1 job 1173373.86

(ii) 177 NSOR 4000279 Stage -II (Part-A)- Complete structural and masonary work Vol-I/P-255 to 269 1 job 3313130.91
above Plinth Beam Level to slab cast level (Ground Floor).

(iii) 178 NSOR 4000280 Stage -II (Part-B) Complete structural and masonary work above Vol-I/P-287 to 294 1 job 3352504.49
ground floor slab to first floor slab level. Also excluding external and
internal sanitary and water
(iv) 179 NSOR 4000281 Stage-III-Complete plaster (external and internal ), Sanitary Vol-I/P-306 to 331 1 job 4058821.69 supply pipe line work
fittings (excluding Sewage system), water supply fitting only,
Rain water pipe, Grills, Shutters, flooring, doors and windows
work etc. all complete.

(iv) 180 NSOR 4000282 Stage-IV-Complete Electrification works i/c all Electrical Vol-I/P-333 to 337 1 job 491662.00
Fixtures.
(v) 181 NSOR 4000283 Stage-V-Complete Putty and Painting Vol-I/P-338 to 355 1 job 835932.84
Grand Total of 400 KV Control Room Building S-Type 13225425.79
8 Transformer Foundation Vol-I/P-356 to 374
(i) 182 NSOR 4000284 33 KV Station Transformer Vol-I/P-356 1No 12227.39
(ii) 183 NSOR 4000285 132/33 KV 40/50 MVA X-Mer Foundation excluding Anciliary Vol-I/P-358 1No 125127.87
Except ancillary
Foundation but incluiding Jacking Pad
foundations
(iii) 184 NSOR 4000286 132/33 KV 40/63MVA X-Mer foundation excluding Ancilary Vol-I/P-361 to 362 1No 104761.83
foundation but including Jacking Pad
--201--

SMB (Gist)
Modified as on 1st Sept 2022

Reference of SMB Pg
Rate
No.
as per MP PWD SOR
w.e.f. 01.12.2020 for
[Link]. SOR No. Service Master No Particulars of Civil Structure Unit Reamrks
Buildings work &
Electrical works and
applicable NSOR items

1' 2' 3' 4' 5' 6' 7' 8'


(iv) 185 NSOR 4000287 220/33 KV 40/50 MVA X-Mer foundation excluding ancilary Vol-I/P-364 1No 123846.00
foundatio but including Jacking Pad.
(iv) 186 NSOR 4000288 132/33 KV 50/63 MVA X-Mer foundation excluding ancilary Vol-I/P-367 to 368 1No 126895.54
foundatio but including Jacking Pad. Except ancillary
(v) 187 NSOR 4000289 220/132/33 KV, 128/168 MVA X-Mer foundation excluding Vol-I/P-370 to 371 1No 151107.73 foundations
ancilary foundatio but including Jacking Pad.
(vi) 188 NSOR 4000290 315 MVA , 400/220/33 KV Power Transformer (BHEL Make) . Vol-I/P-373 1No 384491.10

Volume -II
1 Cable Trench
(i) Brick Masnory Cable trench Vol-II/P-1 to 17
189 NSOR 4000291 A Type Vol-II/P-1 to 3 M 7497.87
190 NSOR 4000292 B Type Vol-II/P-4 to 6 M 5219.60
191 NSOR 4000293 C Type Vol-II/P-7 to 9 M 4239.73
Also excluding Top Slab
192 NSOR 4000294 D Type Vol-II/P-10 to 11 M 2493.21
and corners
193 NSOR 4000295 E Type Vol-II/P-12 to 13 M 1778.60
194 NSOR 4000296 F Type Vol-II/P-14 to 15 M 1357.19
195 NSOR 4000297 G Type Vol-II/P-16 to 17 M 2117.30
(ii) RCC Cable Trench Vol-II/P-18 to 40
196 NSOR 4000298 A Type Vol-II/P-18 to 21 M 7484.20
197 NSOR 4000299 B Type Vol-II/P-22 to 25 M 5674.43
198 NSOR 4000300 C Type Vol-II/P-26 to 28 M 4425.36
Also excluding Top Slab
199 NSOR 4000301 D Type Vol-II/P-29 to 31 M 3236.07
and corners
200 NSOR 4000302 E Type Vol-II/P-32 to 34 M 2329.10
201 NSOR 4000303 F Type Vol-II/P-35 to 37 M 1730.53
202 NSOR 4000304 G Type Vol-II/P-38 to 40 M 2775.17
--202--

SMB (Gist)
Modified as on 1st Sept 2022

Reference of SMB Pg
Rate
No.
as per MP PWD SOR
w.e.f. 01.12.2020 for
[Link]. SOR No. Service Master No Particulars of Civil Structure Unit Reamrks
Buildings work &
Electrical works and
applicable NSOR items

1' 2' 3' 4' 5' 6' 7' 8'


(iii) RCC Cable trench at Road Croosing Vol-II/P-41 to 59
203 NSOR 4000305 A Type Vol-II/P-41 to 44 per No. 115810.62
204 NSOR 4000306 B Type Vol-II/P-45 to 48 per No. 94245.97 For constructing Road
205 NSOR 4000307 C Type Vol-II/P-49 to 52 per No. 75567.75 Crossing of 6.5 M Width
206 NSOR 4000308 D Type Vol-II/P- 53to 56 per No. 51916.41 Road.
207 NSOR 4000309 G Type Vol-II/P- 57 to 59 per No. 48278.23
2 Road Vol-II/P-60 to 66
(i) 208 NSOR 4000310 WBM Road Vol-II/P-60 to 61 M 1461.60 Good Soil, 4.5 M Width
(ii) 209 NSOR 4000311 PCC Road Vol-II/P-62 to 63 M 4208.93 Good Soil, 4.5 M Width
(iii) 210 NSOR 4000312 RCC Road Vol-II/P-64 to 66 M 6756.31
3 Web Trap Vol-II/P-67 to 73
(i) 211 NSOR 4000313 GE Make Vol-II/P-67 to 69 per No. 38156.95
(ii) 212 NSOR 4000314 Quality Power Make Vol-II/P-70 to 71 per No. 37810.89
(iii) 213 NSOR 4000315 Techno Electric & Eng. Make Vol-II/P-72to 73 per No. 38156.95
4 Reactor Vol-II/P-74 to 84
(i) 214 NSOR 4000316 CGL Make Vol-II/P-74 to 76 per No. 209464.86
(ii) 215 NSOR 4000317 GE Make Vol-II/P-77 to 78 per No. 306438.06
(iii) 216 NSOR 4000318 CGPISL Make Vol-II/P-79 to 81 per No. 266216.94
(iv) 217 NSOR 4000319 BHEL Make Vol-II/P-82 to 84 per No. 302301.52
5 Capacitor Bank Vol-II/P-85 to 91
(i) 218 NSOR 4000320 TDK Make Vol-II/P-85 to 87 per No. 63434.17
(ii) 219 NSOR 4000321 ABB Make Vol-II/P-88 to 89 per No. 56463.96
6 220 NSOR 4000322 Earth Pit Vol-II/P-90 to 91 per No. 6439.21
7 FIRE Protection Wall Vol-II/P-92 to 109
(i) 221 NSOR 4000323 7 M High Vol-II/P-92 to 97 M 35047.86
(ii) 222 NSOR 4000324 8 M High Vol-II/P-98 to 103 M 40899.29
(iii) 223 NSOR 4000325 9 M High Vol-II/P-104 to 110 M 48139.77
(iv) 224 NSOR 4000326 10 M High Vol-II/P-110 to 117 M 57517.94
8 226 NSOR Yard Fencing Vol-II/P-118 to 120 M 2489.96 Except extra work at
4000327 turnings and steps due to
ground conditions.
9 Boundary Wall Vol-II/P-121 to 138
(i) 227 NSOR 4000328 2.4 M High Vol-II/P-121 to 129 M 7974.90 Except extra work at
(ii) 228 NSOR 4000329 1.5 M High Vol-II/P-130 to 138 M 5276.99 turnings and steps due to
ground conditions.
--203--

SMB (Gist)
Modified as on 1st Sept 2022

Reference of SMB Pg
Rate
No.
as per MP PWD SOR
w.e.f. 01.12.2020 for
[Link]. SOR No. Service Master No Particulars of Civil Structure Unit Reamrks
Buildings work &
Electrical works and
applicable NSOR items

1' 2' 3' 4' 5' 6' 7' 8'


10 Four Bay Sheds Vol-II/P-139 to 197
A 4 Bay Shed for EHT Vol-II/P-139 to 178 per No.
(i) 229 NSOR 4000330 Stage -I Complete structural work up to plinth beam level. Vol-II/P-139 to 146 per job 337758.75
(ii) 230 NSOR 4000331 Stage -II Complete Structural and Masnory work above plinth Vol-II/P-147 to 154 per job 423475.80
level
(iii) 231 NSOR 4000332 Stage -III Complete plaster (external and internal ), Sanitary Vol-II/P-155 to 173 per job 570946.32
fittings (excluding Sewage system), water supply fitting only, Also excluding external
Rain water pipe, Grills, Shutters, flooring, doors and windows Sanitary and water supply
work etc. all complete. pipe line works
(iv) 232 NSOR 4000333 Stage -IV Steel work in roof truss profile sheet etc. all complete Vol-II/P-174 to 175 per job 338917.26

(v) 233 NSOR 4000334 Stage -V Complete Electrification work i/c All Electrical Fixtures Vol-II/P-176 to 178 per job 72995.50

Grand Total 4 Bay Shed for EHT 1744093.63


B 4 Bay Shed for T&C Vol-II/P-179 to 197
(i) 234 NSOR 4000335 Stage -I Complete structural work up to plinth beam level. Vol-II/P-179 to 183 per job 265264.21
(ii) 235 NSOR 4000336 Stage -II Complete Structural and Masnory work above plinth Vol-II/P-184 to 186 per job 298997.60
level
(iii) 236 NSOR 4000337 Stage -III Complete plaster (external and internal ), Paint Vol-II/P-187 to 192 per job 281470.44
Also excluding external
(External & Internal) Grills, flooring, doors and window work
Sanitary and water supply
etc. all complete.
pipe line works
(iv) 237 NSOR 4000338 Stage -IV Steel work in roof truss profile sheet etc. all complete Vol-II/P-193 to 194 per job 344082.28

(v) 238 NSOR 3011144 Stage -V Complete Electrification work i/c All Electrical Fixtures Vol-II/P-195 to 197 per job 47403.50

Grand Total 4 Bay Shed for T&C 1237218.03


--204--