0% found this document useful (0 votes)
1K views21 pages

Flywheel Assembly Control Plan Document

This control plan outlines the key processes, characteristics, and quality checks for a flywheel assembly. It lists four major processes: sand preparation, mould making, core making, and casting. For each process, critical characteristics such as moisture content, permeability, and hardness are identified along with acceptable tolerances. The control plan specifies testing frequency, sample size, responsibilities, and reaction plans to address any issues found.

Uploaded by

Suraj Rawat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views21 pages

Flywheel Assembly Control Plan Document

This control plan outlines the key processes, characteristics, and quality checks for a flywheel assembly. It lists four major processes: sand preparation, mould making, core making, and casting. For each process, critical characteristics such as moisture content, permeability, and hardness are identified along with acceptable tolerances. The control plan specifies testing frequency, sample size, responsibilities, and reaction plans to address any issues found.

Uploaded by

Suraj Rawat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Control Plan Overview
  • Turning 1st Setup
  • Turning 2nd Setup
  • Drilling Tapping & Timing Mark
  • Side Drilling
  • Industrial Furnaces
  • Dynamic Balancing
  • Outsourcing & Packaging

Doc. No.

: PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
L
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A Revision No. (Date): 01(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410A CP-CAS 01-09 Organization / Plant Approval Date : N/A Date (Originated) : 03/10/2015 Mr. RS Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N/A Customer Engineering Approval /Date (if Reqd.) : N/A Mr. Samdar Singh Manager - Casting

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N/A Mr. Sandeep Das Lab Technician

Grade : FG 260 As Per IS 210 : 2009

Special Char. Class


Characteristics Methods
Machine,
Part /
Process Name/ Device, Jig,
Process Evaluation/ Sample Reaction Plan Record
Operation Description Tools for BLN Product/ Process/
Number No. Product Process Measurement Control Method
Mfg. No. Specification/ Tolerance
Technique Size Freq. & Responsibility

WI - Sand
1.01 Moisture 2.0% - 4.0% Moisture Tester Remix
Preparation

Permeability- Facing Permeability WI - Sand


1.02 Minimum 50 Remix
Sand Meter Preparation
Sand Each Batch- Lab
1 Sand Preparation 1
Mixer Technician
Permeability - Backing Permeability WI - Sand Sand Testing
1.03 Minimum 60 Remix
Sand Meter Preparation
Report

Minimum 0.40 kg/ WI - Sand


1.04 GCS GCS machine Remix
Cm2 Preparation

Each Batch- 100 % Checking


Moulding Mould Hardness - Mould Hardness
2 Mould Making Machine 2.01
Machine Moulding
70-95 tester
5 Foundry Shift WI - Moulding & Break Mould
Supervisor if not OK

Each Batch- 100 % Checking


Core Hardness
3 Core Making Manual 3.01 Core Hardness Min. 40 tester
5 Foundry Shift WI - Core Making & Break Core if
Supervisor not OK

FG 260
Chemical Readjust
4.01 ▼ Refer Grade Chart Spectro Analysis 1 Every Heat Lab Technician Composition
Composition QC-CAS-F01

Tapping Operator Charging


Temperature
Induction Furnace

4.02 Temperature ▼ 1350 ˚ C - 1450˚ C 1 Each Heat Monitoring & Lab Reheat Report
Indicator
Technician

4
Melting and Operator
Pouring Pouring 1300 ˚ C -1400° C Temperature
4.03 ▼ 1 Each Heat Monitoring & Lab Reheat
Temperature Indicator
Engg.

Review Gating
Foundry Shift System in case No need to
4.04 Pouring Time ▼ 15-25 mins Stop Watch 2 2 / day
Supervisor of any adverse record
observations

1 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
L
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A Revision No. (Date): 01(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410A CP-CAS 01-09 Organization / Plant Approval Date : N/A Date (Originated) : 03/10/2015 Mr. RS Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N/A Customer Engineering Approval /Date (if Reqd.) : N/A Mr. Samdar Singh Manager - Casting

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N/A Mr. Sandeep Das Lab Technician

Grade : FG 260 As Per IS 210 : 2009

Special Char. Class


Characteristics Methods
Machine,
Part /
Process Name/ Device, Jig,
Process Evaluation/ Sample Reaction Plan Record
Operation Description Tools for BLN Product/ Process/
Number No. Product Process Measurement Control Method
Mfg. No. Specification/ Tolerance
Technique Size Freq. & Responsibility

60-75 Mins.
KO Knock Out Refer Knock out Time Information Foundry Shift Segregate &
5 Knock Out 5.01 2 2 / day Charging Report
Machine Time sheet Table Supervisor Check
( PRD-CAS-F03 )

Blow Holes, Cold Shut,


Shrinkage, Broken
Blasting Edges, Crushes, Pin
6 Blasting 6.01 No Visual Defects Visual 100% Each Lot Visual Inspection Rework / Reject
Machine Holes, Penetration,
Poor Finish, Gas Holes, Casting Analysis
Burrs, Porosity, Finns. Report

Grinding Visual Inspection


7 Grinding Machine 7.01 Gating & Parting Line No extra material Visual 100% Each Lot Blasting Shop Incharge Rework / Reject

Micro Test the Cut


Microstructure 1 No Heat- Lab
Testing 8.01 Microstructure Test 1 Lab Testing Section Reject Micro Report
M/C Test Technician
heat if NOT OK

Hardness
FG260 Brinell Hardness
8 Testing Refer Grade Chart Testing Machine 3000 As Per Internal Check &
Testing 8.02 Hardness Test 1 Lab Testing Hardness Report
M/C ( QC-CAS-F01 ) Kg Load Ǿ 10.00 mm Plan Segregate
Ball

In Case Of Failure
check counter UTM Testing
UTM 8.03 Tensile Strength UTM 1 Shift sample. If this also
Check Properties
Report
fails, reject lot.

Paint Each Batch-


Coating Thicker
Spray 9.01 DFT 150-250 microns 1 Blasting Shop Re Coat
Tester
Gun Incharge
WI Painting
9 Painting N/A
(PRD-CAS-WI10)
Each Batch-
9.02 Drying Time 6-8 Hours Watch 100% Blasting Shop Adjust Time
Incharge

2 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-01-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410A CP-10 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

[Link] up Approval
Check & Segregate Set up Approval
(QC-MCN-F01)/CMM
10.01 Runout 0.1 w.r.t.'A' CMM 1st PC
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER

Set up QC Incharge Check tooling & (QC-MCN-F01) / CMM


Report
ascertain root cause Report
2. Process Controlled

29 ▼
[Link] up Approval
Check & Segregate Set up Approval
(QC-MCN-F01)/CMM
10.02 Concentricity 0.1 w.r.t.'A' CMM 1st PC Set up QC Incharge
Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
2. Process Controlled

[Link] up Approval Check & Segregate


Set up Approval
10.03 Surface Finish 44 3.2 μRa Surface Comparator 1st PC Set up QC Incharge (QC-MCN-F01) Check tooling &
(QC-MCN-F01)
2. Process Controlled ascertain root cause
TURNING Ist SETUP

[Link] up Approval [Link] up Approval


Check & Segregate
Set up QC Incharge (QC-MCN-F01) (QC-MCN-F01)
10.04 Depth 46 15.5 / 15.9 mm Depth Vernier 1st PC 35th PC Inspector [Link] Process Inspection Report
Check tooling &
[Link] Process Inspection Report
CHUCK

ascertain root cause


(QC-MCN-F02) (QC-MCN-F02)

10
[Link] up Approval
Check & Segregate Set up Approval
(QC-MCN-F01)/CMM
10.05 Perpendicularity 0.05 w.r.t.'A' CMM 1st PC Set up QC Incharge
Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
2. Process Controlled

46A ▼
[Link] up Approval
Check & Segregate Set up Approval
(QC-MCN-F01)/CMM
10.06 Flatness 0.5 CMM 1st PC Set up QC Incharge
Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
2. Process Controlled

Set up Approval Check tooling & Set up Approval


10.07 Depth 47 24.5 / 24.9 mm Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

[Link] up Approval [Link] up Approval


Check & Segregate
Set up QC Incharge (QC-MCN-F01) (QC-MCN-F01)
10.08 Depth 48 ▼ 9.00 / 9.15 mm Depth Micrometer 1st PC 35th PC Inspector [Link] Process Inspection
Check tooling &
[Link] Process Inspection
ascertain root cause
Report (QC-MCN-F02) Report (QC-MCN-F02)

3 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-01-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410A CP-10 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK

Set up Approval Check tooling & as Set up Approval


10.09 Chamfer 54 1.0 X 45 ̊ Visual 1st PC Set up QC Incharge (QC-MCN-F01) certain root cause (QC-MCN-F01)

[Link] up Approval
Tool Profile / Check tooling & Set up Approval
10.1 Radius 55 R0.6-0.8 mm 1st PC Set up QC Incharge (QC-MCN-F01)
Visual [Link] Controlled
ascertain root cause (QC-MCN-F01)

[Link] up Approval Check & Segregate


Set up Approval
10.11 Surface Finish 55A 3.2 μRa Surface Comparator 1st PC Set up QC Incharge (QC-MCN-F01) Check tooling &
(QC-MCN-F01)
2. Process Controlled ascertain root cause
TURNING Ist SETUP

ɸ 335.5 / 340.5 Set up Approval Check tooling & as Set up Approval


10.12 Outer Diameter 56 Vernier Caliper 1st PC Set up QC Incharge (QC-MCN-F01) certain root cause (QC-MCN-F01)
mm

10 [Link] up Approval
[Link] up Approval
(QC-MCN-F01)
1st PC (QC-MCN-F01)
Set up QC Incharge Check & Segregate [Link] log book
Ø 313.45 / SG-27-1,2 with 2.100% Operator Monitoring
10.13 Outer Diameter 57 ▼ 100% Operator Check tooling & (QC-MCN-F10)
313.55 mm MSP-25 20th PC Inspector
[Link] Process Inspection
ascertain root cause [Link] Process Inspection
1 report (QC-MCN-F02)
report (QC-MCN-F02)
[Link] Analysis
[Link] Chart

[Link] up Approval
[Link] up Approval
Flat bottom Bore (QC-MCN-F01)
1st PC (QC-MCN-F01)
Set up QC Incharge Check & Segregate [Link] log book
Ø 100.00 / gauge with Dial LC 2.100% Operator Monitoring
10.14 Inner Diameter 60 ▼ 100% Operator Check tooling & (QC-MCN-F10)
100.054 mm 0.001 With MSR 31- 10th PC Inspector
[Link] Process Inspection
ascertain root cause [Link] Process Inspection
1 report (QC-MCN-F02)
1 report (QC-MCN-F02)
[Link] Analysis
[Link] Chart

[Link] up Approval
[Link] up Approval
(QC-MCN-F01)
1st PC (QC-MCN-F01)
Set up QC Incharge Check & Segregate [Link] log book
Ø 39.965 / APR -10 -1&2 with 2.100% Operator Monitoring
10.15 Inner Diameter 61 ▼ 100% Operator Check tooling & (QC-MCN-F10)
39.990 mm APG 10th PC Inspector
[Link] Process Inspection
ascertain root cause [Link] Process Inspection
1 report (QC-MCN-F02)
report (QC-MCN-F02)
[Link] Analysis
[Link] Chart

4 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-01-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410A CP-10 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

[Link] up Approval
[Link] up Approval
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK

(QC-MCN-F01) Check & Segregate


1st PC Set up QC Incharge (QC-MCN-F01)
10.16 Surface Finish 62 ▼ 1.6 μRa Surface Comparator [Link] Process Inspection Check tooling &
1 4 Hours Inspector
Report (QC-MCN-F02) ascertain root cause
[Link] Process Inspection
Report (QC-MCN-F02)
[Link] Controlled

[Link] up Approval
Check & Segregate Set up Approval
Set up (QC-MCN-F01) / CMM
10.17 Concentricity 63 ▼ 0.5 w.r.t.'A' CMM 1st PC 1 / Shift Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
2. Process Controlled

[Link] up Approval Check & Segregate


Set up Approval
10.18 Angle 65 45 ̊ Bevel Protractor 1st PC Set up QC Incharge (QC-MCN-F01) Check tooling &
(QC-MCN-F01)
[Link] Controlled ascertain root cause

Vendor
TURNING Ist SETUP

Identification Code:13434 Set Up Approval (QC-MCN- Set Up Approval (QC-MCN-


10.19 A1 Visual 1st PC Set up QC Incharge Check & Segregate.
Marked Heat Code: F01) F01)
YYMMDD

10 10.2 Depth A2 10.0 mm Ref. Depth Vernier 1st PC Set up QC Incharge


Set up Approval
(QC-MCN-F01)
Check tooling &
ascertain root cause
Set up Approval
(QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


10.21 Depth A3 21.3 mm Ref. Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


10.22 Depth A4 32.0 mm Ref. Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


10.23 Depth A5 108.6 mm Ref. Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

5 of 21
TURNING Ist

CNC TURNING CENTER WITH 3 JA


10
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-01-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410A CP-10 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

Hardness Testing
10.24 Hardness A6 180-230 HB 100% Set up QC Incharge Check & Segregate. On Part
Machine

Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.

1 E/DWLNL 25M08 WNMG080416GH UC5115 1 N/A Rough Turning


Tool Control

2 A 25EWLNL M08 WNMG080416GH UC5115 2 N/A Rough Boring

3 E/DWLNL 25M08 WNMG G080408 GHUC5115 3 N/A Finish Turning

4 A32/A25 EWNL M08 WNMG G080408 GHUC5115 4 N/A Finish Boring

Remarks: The ballooned dimensions 57, 60 & 61 to be checked by the operator 100% and has to be recorded in the log book.

6 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-02-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-11 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK

[Link] up Approval
Vernier Caliper + Check tooling & Set up Approval
11.01 Chamfer 23 3.0 X 45 ̊ 1st PC Set up QC Incharge (QC-MCN-F01)
Bevel protractor [Link] Controlled
ascertain root cause (QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


11.02 Chamfer 24 1.0 X 45 ̊ Visual 1st PC Set up QC Incharge (QC-MCN-F01) ascertain root cause (QC-MCN-F01)

[Link] up Approval
Check & Segregate Set up Approval
Set up (QC-MCN-F01) / CMM
11.03 Concentricity 25 ▼ ɸ 0.1 w.r.t. 'A' CMM 1st PC 1 / Shift Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
2. Process Controlled
TURNING 2nd SETUP

[Link] up Approval
Tool Profile / Check tooling & Set up Approval
11.04 Radius 26 R01.0mm MAX. 1st PC Set up QC Incharge (QC-MCN-F01)
Visual [Link] Controlled
ascertain root cause (QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


11 11.05 Chamfer 28 1.0 X 45 ̊ Visual 1st PC Set up QC Incharge (QC-MCN-F01) ascertain root cause (QC-MCN-F01)

[Link] up Approval
Tool Profile / Check tooling & Set up Approval
11.06 Radius 30 R1.0 mm 1st PC Set up QC Incharge (QC-MCN-F01)
Visual [Link] Controlled
ascertain root cause (QC-MCN-F01)

[Link] up Approval Check & Segregate


Surface Finish Set up Approval
11.07 Surface Finish 31 3.2 μRa 1st PC Set up QC Incharge (QC-MCN-F01) Check tooling &
Comparator 2. Process Controlled ascertain root cause
(QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


11.08 Depth 32 28.8 / 29.2 mm Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

7 of 21
TURNING 2nd

CNC TURNING CENTER WITH 3 JA


11
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-02-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-11 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

Set up Approval Check tooling & Set up Approval


11.09 Depth 33 33.0 mm Ref. Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


11.10 Chamfer 34 1.0 X 45 ̊ Visual 1st PC Set up QC Incharge
CNC TURNING CENTER WITH 3 JAW HYDRAULIC POWER

(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

ɸ 149.5 / 150.5 Set up Approval Check tooling & Set up Approval


11.11 Inner Diameter 35 Inside Caliper 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)
mm

ɸ 165.5 / 164.5 Set up Approval Check tooling & Set up Approval


11.12 Inner Diameter 36 Vernier Caliper 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)
mm
TURNING 2nd SETUP

[Link] up Approval
[Link] up Approval
(QC-MCN-F01)
1st PC (QC-MCN-F01)
ɸ 328.2 / 328.3 Set up QC Incharge Check & Segregate [Link] log book
2.100% Operator Monitoring
11.13 Inner Diameter 37 ▼ SPG-80-1 100% Operator
[Link] Process Inspection
Check tooling & (QC-MCN-F10)
mm
CHUCK

1 20th PC Inspector ascertain root cause [Link] Process Inspection


report (QC-MCN-F02)
report (QC-MCN-F02)
[Link] Analysis
11 [Link] Chart

ɸ 344.5 / 349.5 Set up Approval Check tooling & Set up Approval


11.14 Inner Diameter 38 Vernier Caliper 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)
mm

ɸ 387.5 / 392.5 Set up Approval Check tooling & Set up Approval


11.15 Inner Diameter 39 Vernier Caliper 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)
mm

[Link] up Approval
Check & Segregate Set up Approval
Set up (QC-MCN-F01) / CMM
11.16 Perpendicularity 40A ▼ 0.05 w.r.t.'A' CMM 1st PC 1 / Shift Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
2. Process Controlled

8 of 21
CNC TURNING CENTER WITH 3 JA
TURNING 2nd S

CHUCK
11 Control Plan
Doc. No. : PDC-EPD-F02
Rev. No. : 01 (03/04/2015)
Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-02-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-11 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

[Link] up Approval
Tool Profile / Check tooling & Set up Approval
11.17 Radius 41 R5.0 mm 1st PC Set up QC Incharge (QC-MCN-F01)
Visual [Link] Controlled
ascertain root cause (QC-MCN-F01)
TURNING CENTER WITH 3 JAW HYDRAULIC POWER CHUCK

[Link] up Approval Check & Segregate


Set up Approval
11.18 Surface Finish 42 6.3 μRa Visual 1st PC Set up QC Incharge (QC-MCN-F01) Check tooling &
(QC-MCN-F01)
2. Process Controlled ascertain root cause

[Link] up Approval Check & Segregate


Set up Approval
11.19 Surface Finish 43 3.2 μRa Surface Finish Tester 1st PC Set up QC Incharge (QC-MCN-F01) Check tooling &
(QC-MCN-F01)
2. Process Controlled ascertain root cause

Set up Approval Check tooling & Set up Approval


11.20 Depth 50 49.5 / 50.0 mm Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)
TURNING 2nd SETUP

Set up Approval Check tooling & Set up Approval


11.21 Depth 51 56.0 mm Ref. Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

11 11.22 Depth 52 98.0 mm Ref. Depth Vernier 1st PC Set up QC Incharge


Set up Approval
(QC-MCN-F01)
Check tooling &
ascertain root cause
Set up Approval
(QC-MCN-F01)

CMM / Height [Link] up Approval [Link] up Approval


Check & Segregate
1st PC Set up QC Incharge (QC-MCN-F01) / CMM (QC-MCN-F01) / CMM
11.23 Flatness 53 ▼ 0.1 mm Gauge with Dial LC Check tooling &
100% Inspector Report
ascertain root cause
Report
0.010 2. Process Controlled 2. On Part

[Link] up Approval [Link] up Approval


1st PC Set up QC Incharge (QC-MCN-F01) Check tooling & (QC-MCN-F01)
11.24 Depth A7 ▼ 19.8 / 20.2 mm SPG-75
1 35th PC Inspector [Link] Process Inspection ascertain root cause [Link] Process Inspection
Report (QC-MCN-F02) Report (QC-MCN-F02)

9 of 21
TURNING 2nd SETUP

CNC TURNING CENTER WITH 3 JAW HYDR


Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details
11
Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-02-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-11 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

Set up Approval Check tooling & Set up Approval


11.25 Depth A8 ▼ 29.75 mm Ref. Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

Set up Approval Check tooling & Set up Approval


11.26 Depth A9 107.08 mm Ref. Depth Vernier 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
Tool Control

1 EWLNL 2525M08 WNMG 080416GH UC5115 1 N/A Outer Diameter Finish

2 A40TEWLNLM08 WNMG 080416GH UC5115 2 N/A Bore Finish

3 A40TEWLNLM08 WNMG 080408GH UC5115 3 N/A Bore Finish

Remarks: The ballooned dimensions 37 to be checked by the operator 100% and has to be recorded in the log book.

10 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD--03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-12 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.01 Angle 1 90 ̊ ± 15 '
Gauge-05
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause
(QC-MCN-F02)
(QC-MCN-F02)
DRILLING, TAPPING & TIMING MARK

[Link] up Approval(QC-MCN-
Set up / Check tooling & Set up Approval(QC-MCN-
12.02 Dimension 2 67.0 mm CMM 1st PC
1 / Shift
F01) / CMM Report
ascertain root cause F01) / CMM Report
[Link] Controlled

[Link] up Approval(QC-MCN-
Set up / Check tooling & Set up Approval(QC-MCN-
12.03 Dimension 3 84.9 mm CMM 1st PC
1 / Shift
F01) / CMM Report
ascertain root cause F01) / CMM Report
[Link] Controlled
VMC Machine

[Link] up Approval(QC-MCN-
Set up / Check tooling & Set up Approval(QC-MCN-
12.04 Angle 4 ▼ 35 ° ± 30' CMM 1st PC
1 / Shift
F01) / CMM Report
ascertain root cause F01) / CMM Report
[Link] Controlled

12
[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.05 Angle 5 55 ̊ ± 0 ̊30 '
Gauge-12
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause
(QC-MCN-F02)
(QC-MCN-F02)

[Link] up Approval(QC-MCN-
R135.2 / 135.5 Set up / Check tooling & Set up Approval(QC-MCN-
12.06 Radius 6 ▼
mm
CMM 1st PC
1 / Shift
F01) / CMM Report
ascertain root cause F01) / CMM Report
[Link] Controlled

[Link] up Approval(QC-MCN-
Set up / Check tooling & Set up Approval(QC-MCN-
12.07 Radius 7 ▼ R148 ± 0.2 mm CMM 1st PC
1 / Shift
F01) / CMM Report
ascertain root cause F01) / CMM Report
[Link] Controlled

11 of 21
VMC Ma
DRILLING, TAPPING
12
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD--03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-12 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

[Link] up Approval(QC-MCN-
Set up / Check tooling & Set up Approval(QC-MCN-
12.08 Dimension 8 121.2 mm CMM 1st PC
1 / Shift
F01) / CMM Report
ascertain root cause F01) / CMM Report
[Link] Controlled

[Link] up Approval(QC-MCN-
Set up / Check tooling & Set up Approval(QC-MCN-
12.09 Dimension 9 131.9 mm CMM 1st PC
1 / Shift
F01) / CMM Report
ascertain root cause F01) / CMM Report
[Link] Controlled
DRILLING, TAPPING & TIMING MARK

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.10 Angle 10 65 ̊± 20'
Gauge-12
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause
(QC-MCN-F02)
(QC-MCN-F02)

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.11 Angle 11 60 ̊ ± 0 ̊30 '
Gauge-12
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
VMC Machine

1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause


(QC-MCN-F02)
(QC-MCN-F02)

12 [Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.12 Angle 12 60 ̊ ± 0 ̊30 '
Gauge-12
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause
(QC-MCN-F02)
(QC-MCN-F02)

Punch Position Check Tooling &


12.13 Radius
12A R140.0 mm Visual 100% Program Controlled
ascertain root cause
N/A

Check Tooling &


12.14 Punch Position 12B Equal Distance Visual 100% Program Controlled
ascertain root cause
N/A

12 of 21
VMC Machi
DRILLING, TAPPING &
Doc. No. : PDC-EPD-F02
12 Control Plan Rev. No. : 01 (03/04/2015)
Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD--03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-12 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

Punch Height 8.0 mm Check Tooling &


12.15 DEG_8 PS DC
12C
Deep 0.2 mm
Visual 100% Operator Monitoring
ascertain root cause
On part

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.16 Angle 13 60 ̊ ± 0 ̊30 '
Gauge-12
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause
(QC-MCN-F02)
(QC-MCN-F02)
DRILLING, TAPPING & TIMING MARK

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.17 Center Distance 14 ▼ 36.0 ± 0.3 mm
Gauge-12
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection
1 35th PC Inspector [Link]-Process Inspection ascertain root cause
Report (QC-MCN-F02)
Report (QC-MCN-F02)

[Link] up Approval(QC-MCN-
F01)/CMM Report [Link] up Approval(QC-MCN-
1st PC Set up QC Incharge Check & Segregate
CMM / Receiver 2.100% Operator Monitoring F01)/CMM Report
12.18 Angle 15 60 ̊ ± 0 ̊30 '
Gauge-05
100% Operator
[Link]-Process Inspection Report
Check tooling &
[Link]-Process Inspection Report
VMC Machine

1 35th PC Inspector ascertain root cause


(QC-MCN-F02) (QC-MCN-F02)
[Link] Controlled

12 [Link] Up Approval (QC-


Check Tooling & Set up Approval
12.19 Radius 16 R179.0 mm Visual 1st PC Set up QC Incharge MCN-F01)
ascertain root cause (QC-MCN-F01)
2. Process Controlled

Timing Mark 8̊
12.20 Angle to be 17 10 mm High Visual 100% N/A On Part
Punched 0.3 mm Deep

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)
Check tooling & F01)
12.21 12 Tapped Holes M8 X 1.25 TPG - 09 100% Operator 2.100% Operator Monitoring
ascertain root cause [Link]-Process Inspection
1 35th PC Inspector [Link]-Process Inspection
Report (QC-MCN-F02)
Report (QC-MCN-F02)

13 of 21
VMC Machi
DRILLING, TAPPING &
Doc. No. : PDC-EPD-F02
12 Control Plan Rev. No. : 01 (03/04/2015)
Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD--03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-12 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
18 Ø 312.0 ± 0.1 CMM / Receiver F01)/CMM Report
12.22 PCD ▼
mm Gauge-05
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection
1 35th PC Inspector [Link]-Process Inspection ascertain root cause
Report (QC-MCN-F02)
Report (QC-MCN-F02)

[Link] up Approval
Check & Segregate Set up Approval
Set up (QC-MCN-F01) / CMM
12.23 True Position Ø 0.2 CMM 1st PC
1 / Shift Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
[Link] Controlled
DRILLING, TAPPING & TIMING MARK

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
Ø 12.8 / 13.02 F01)/CMM Report
12.24 6 Holes
mm
CMM / SPG - 69 100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause
(QC-MCN-F02)
(QC-MCN-F02)

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
19 1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
CMM / Receiver F01)/CMM Report
12.25 PCD ▼ Ø 72 ± 0.2
Gauge-12
100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection
VMC Machine

1 35th PC Inspector [Link]-Process Inspection ascertain root cause


Report (QC-MCN-F02)
Report (QC-MCN-F02)

12 [Link] up Approval
Check & Segregate Set up Approval
Set up (QC-MCN-F01) / CMM
12.26 True Position Ø 0.4 CMM 1st PC
1 / Shift Report
Check tooling & (QC-MCN-F01) / CMM
ascertain root cause Report
[Link] Controlled

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01) Check & Segregate
F01)
12.27 2 Holes Ø 6.00 mm SPG - 66 100% Operator 2.100% Operator Monitoring Check tooling &
[Link]-Process Inspection Report
1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause
(QC-MCN-F02)
(QC-MCN-F02)

20

14 of 21
DRILLING, TAPPING & TIMIN
Doc. No. : PDC-EPD-F02

Control Plan

VMC Machine
Rev. No. : 01 (03/04/2015)
Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

12
Production Drawing No. : D10414420A-MCD--03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-12 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

[Link] up Approval(QC-MCN- [Link] up Approval(QC-MCN-


20 1st PC Set up QC Incharge F01) Check tooling & F01)
12.28 Drill Depth 25.0 mm Vernier Caliper 1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause [Link]-Process Inspection Report
(QC-MCN-F02) (QC-MCN-F02)

1. Set up Approval(QC-MCN-
Check tooling & Set up Approval(QC-MCN-
12.29 Chamfer 1.0 X 45 ̊ Visual 1st PC Set up QC Incharge F01)
ascertain root cause F01)
2. Program Controlled

1. Set up Approval(QC-MCN-
Check tooling & Set up Approval(QC-MCN-
12.30 Chamfer 40 1.0 X 45 ̊ Visual 1st PC Set up QC Incharge F01)
ascertain root cause F01)
2. Program Controlled
DRILLING, TAPPING & TIMING MARK

[Link] up Approval(QC-MCN-
STD Bolt with 1st PC Set up QC-Incharge F01) Check Tooling & Set up Approval(QC-MCN-
12.31 Tap Depth 66 25.0 mm
Vernier Caliper 1 35th PC Inspector [Link]-Process Inspection Report ascertain root cause F01)
(QC-MCN-F02)

1. Set up Approval(QC-MCN- [Link] up Approval(QC-MCN-


1st PC Setup QC Incharge 35th PC F01) Check Tooling & F01)
12.32 Drill Depth 67 28.0 mm Vernier caliper 1 Inspector [Link]-Process Inspection Report ascertain root cause 2. In-Process Inspection Report
(QC-MCN-F02) (QC-MCN-F02)
VMC Machine

[Link] up Approval(QC-MCN-
[Link] up Approval(QC-MCN-
1st PC Set up QC Incharge F01)/CMM Report Check & Segregate
Ø 13.032 /
12 12.33 Dowel Diameter 68 ▼
13.059 mm
CMM / SPG - 70 100%
1
Operator
35th PC Inspector
2.100% Operator Monitoring
[Link]-Process Inspection Report
Check tooling &
ascertain root cause
F01)/CMM Report
[Link]-Process Inspection Report
(QC-MCN-F02)
(QC-MCN-F02)

Ø 0.013 Set up Set up Approval(QC-MCN- Check tooling & Set up Approval(QC-MCN-


12.34 True Position 69 ▼
w.r.t.'A'
CMM 1st PC
1 / Shift F01) / CMM Report ascertain root cause F01) / CMM Report

[Link] up Approval(QC-MCN-
Check tooling & Set up Approval(QC-MCN-
12.35 Surface Finish 70 ▼ 1.6 μRa Surface Comparator 1st PC Set up QC Incharge F01)
ascertain root cause F01)
[Link] Controlled

15 of 21
VMC Machine
DRILLING, TAPPING & TI
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)

12
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept.
Issue No. : 04 (03/04/2015)
Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD--03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414410 CP-12 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

1. Set up Approval(QC-MCN-
Check tooling & Set up Approval(QC-MCN-
12.36 Chamfer 71 1.0 X 45 ̊ Visual 1st PC Set up QC Incharge F01)
ascertain root cause F01)
2. Program Controlled

Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.

1 Solid Carbide Drill Ø 13.2 mm 1 N/A

2 Solid Carbide Drill Ø 12.8 mm 2 N/A

3 SCLHM Ø 13.01 mm 3 N/A


Tool Control

Crank Drilling & Timing


4 Solid Carbide Lunge Reamer Ø 13.04 mm 4 N/A

5 High Speed Steel Drill Ø 10.0 mm 5 N/A

6 Solid Carbide Drill Ø 6.00 mm 6 N/A

8 Solid Carbide Drill Ø 6.6 mm 8 N/A


Clutch Drilling & Tapping
9 High Speed Steel machine tap M8 X 1.25 9 N/A
Remarks:

16 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-04-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414420 CP-13 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility
Column / Pillar Drill Machine 1"

164.5 / 165.5
13.01 Dimension 58 Fixture Controlled
mm
Side Drilling

Set up Approval Check Tooling & Set up Approval


13.02 2 Holes 69 Ø 8.00 mm Vernier Caliper 1st PC Set up QC Incharge
(QC-MCN-F01) ascertain root cause (QC-MCN-F01)

13

Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.

1 Drill Ø 8.0 mm 1 N/A Side Drilling


Tool Control

Remarks:

17 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414410A Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414420 CP-14 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility
Industrial Heating oven & Hydraulic Press

Chamfered Side of To be on Top 100% Operator Check &


14.01 Ring Gear Teethe Visual 100% Operator N/A
(not Ballooned) Side Monitoring Segregate
Ring Gear Heating & Fitment

Gap Between
0.254 mm Filler Gauge of 100% Operator Check &
14.02 Shoulder & Face 2 100% Operator N/A
of Gear Max 0.25 mm Monitoring Segregate

Ring Gear 100% Operator Readjust the


14 14.03 14 Heating Temp
Max. 350°C Digital Thermostat 100% Operator
Monitoring temperature
N/A

Ring Gear 100% Operator


14.04 30-40 mins Stop Watch 100% Operator Reheat N/A
Heating Time Monitoring

Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
Tool Control

Remarks:

18 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414420A CP-15 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

Ø 10.00 mm Tool Controlled


Check tooling & Set Up Approval- DB
15.01 Drill Diameter Vernier Caliper 1st PC Set Up- DB Supervisor & WI
ascertain root cause (QC-MCN-F07)
MAX. (PRD-MCN-WI06)

15.00 mm Stopper Controlled & WI Measure & Readjust Set Up Approval- DB


15.02 Drill Depth Vernier Caliper 1st PC Set Up- DB Supervisor
Dynamic Balancing Machine

Max. (PRD-MCN-WI06) the size of stopper (QC-MCN-F07)


Dynamic Balancing

13

WI Measure & Readjust


15.03 Dimension 46.0 / 46.5 Vernier Caliper 1st PC Set Up- DB Supervisor
(PRD-MCN-WI06) the Dimension
-
15

Seek Clarification
30.0 mm WI Set Up Approval- DB
15.04 Center Distance Vernier Caliper 1st PC Set Up- DB Supervisor from Next higher
Apart (PRD-MCN-WI06)
authority
(QC-MCN-F07)
14 {Ref. Drg No.

[Link] Up Approval cum In


D10414410A}

[Link] Up Approval cum In


Process Inspection Report -
1st PC Set Up-DB Supervisor Process Inspection Report -
Dynamic Dynamic Balancing
Dynamic Balancing
15.05 Balancing Value 20 g-cm 100% Operator Check & Segregate (QC-MCN-F07)
Balancing Machine 1 20th PC Inspector
(QC-MCN-F07)
[Link] Log Book (QC-
2.100%Operator Monitoring
MCN-F11)
3. Process Controlled
3. On Part

Sr. No. Tool Name Tool / Insert Specifications Tool No. Ref. Ballooned No. Operation Program No.
Tool Control

1 Drill 14.00-18.00 mm 1 N/A Drill

19 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414420A-MCD-03-04 Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414420A CP-15 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Dharam Singh Engineer -CMM

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

Remarks: The ballooned dimension 14 to be checked by the operator 100% and has to be recorded in the log book.

20 of 21
Doc. No. : PDC-EPD-F02

Control Plan Rev. No. : 01 (03/04/2015)


Issue No. : 04 (03/04/2015)
Prototype Key Contact Person : Mr. Vibhor V. Jain Core Team Member Dept. Contact Details

Pre-launch Works / Dept / Contact Details :9829246666 CEO Mr. Vibhor V. Jain CEO

Production Drawing No. : D10414410A Revision No. (Date): 00(03/10/2015) Mr. Himanshu Duniwal PC

Control Plan Number : D10414420A CP-16, 17 & 18 Organization / Plant Approval Date : N / A Date (Originated) : 03/10/2015 Mr. R.S. Shekhawat Engg. Drawing mail@[Link]
Part Number / Model No : EURO 4550 DC Other Approval / Date (if Reqd.) : N /A Customer Engineering Approval /Date (if Reqd.) : N / A Mr. Arjun Yadav Manager - M/C Shop

Part Name / Description : Flywheel Assembly Organization / Supplier Code : 13434 Customer Quality Approval / Date (if Reqd.) : N / A Mr. Babulal Jangid Supervisor-Packing

Special Char. Class


Characteristics Methods
Process Name/
Process Machine, Device,
Operation Product/ Process - Sample Reaction Plan Record
Numbe Jig, Tools for Mfg. Evaluation/ Measurement
Description No. Product BLN No. Process Specification/ Control Method
r Technique
Tolerance Size Freq. & Responsibility

100 % Sorting for


Pre-dispatch AS PER PDI PDI Report
16 16.01 AS PER PDI Report AS PER PDI Report AS PER PDI Report In - Process Control Deviated
Inspection Report (QC-PDS-F01)
Parameters

Surface of the part


should be dry and
17.01 Cleaning of parts
free from the Rust
Visual 100% Each Batch Re-cleaning
& Chips

Light Film of oil to Surface shall only


17.02 be applied with a coated with RPO Visual 100% Each Batch Re-Oiling
soaked cloth but no Excess Oil
Oiling Area & Packaging Area
Oiling & Packaging

17.03 Part Identification No Mixing Visual 100% Each Batch 100 % Sorting -
PKG-PDS-WI01, PKG-
PDS-WI02, Drg No.
D10414410A
16
PKG-01-01
17.04 Box Type
As per Packaging
Visual 100% Each Batch & Monitoring by -
Specification Sheet Supervisor

Quantity Per As per Packaging


17.05
Box Specification Sheet Visual 100% Each Batch Daily Packing Report
Repacking

As per Packaging
17.06 Labeling
Specification Sheet Visual 100% Each Batch -

Other Packaging As per Packaging


17.07
Material Specification Sheet
Visual 100% Each Batch -

Customer Name, As per Dispatch DES-PDS-WI01 and TAG


18 Dispatch 18.01 Visual Examination 100% Each Dispatch Re-Checking Dispatch Documents
Quantity, Date….. Schedule & Label on Box